  <row>
    <id>64550/CVOWC</id>
    <plant_name>Coastal Virginia Offshore Wind (CVOW) Commercial Project</plant_name>
    <generator_id>CVOWC</generator_id>
    <plant_id>64550</plant_id>
    <state>VA</state>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Offshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WS</prime_mover>
    <nameplate_mw>2640</nameplate_mw>
    <summer_mw>2640</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.907956</lat>
    <lon>-75.34907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58987/II-A</id>
    <plant_name>Chokecherry and Sierra Madre Wind</plant_name>
    <generator_id>II-A</generator_id>
    <plant_id>58987</plant_id>
    <state>WY</state>
    <county>Carbon</county>
    <developer>Power Company of Wyoming LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>1303.2</nameplate_mw>
    <summer_mw>1303.2</summer_mw>
    <planned_start>2032-12</planned_start>
    <planned_year>2032</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>41.683056</lat>
    <lon>-107.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68396/PGB45</id>
    <plant_name>Sunstone Solar</plant_name>
    <generator_id>PGB45</generator_id>
    <plant_id>68396</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Sunstone Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1200</nameplate_mw>
    <summer_mw>1200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.605916</lat>
    <lon>-119.563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68396/PGR45</id>
    <plant_name>Sunstone Solar</plant_name>
    <generator_id>PGR45</generator_id>
    <plant_id>68396</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Sunstone Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1200</nameplate_mw>
    <summer_mw>1200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.605916</lat>
    <lon>-119.563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68367/PEHA1</id>
    <plant_name>Pepper Hammock Solar and Storage</plant_name>
    <generator_id>PEHA1</generator_id>
    <plant_id>68367</plant_id>
    <state>GA</state>
    <county>Wayne</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1200</nameplate_mw>
    <summer_mw>1200</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.331</lat>
    <lon>-81.759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65301/SC1</id>
    <plant_name>Steward Creek Solar Phase 1</plant_name>
    <generator_id>SC1</generator_id>
    <plant_id>65301</plant_id>
    <state>IL</state>
    <county>Lee</county>
    <developer>TerraForm Power Operating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1200</nameplate_mw>
    <summer_mw>1200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.814343</lat>
    <lon>-88.98988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67551/VISTA</id>
    <plant_name>Vista Sands Solar</plant_name>
    <generator_id>VISTA</generator_id>
    <plant_id>67551</plant_id>
    <state>WI</state>
    <county>Portage</county>
    <developer>Vista Sands Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1182</nameplate_mw>
    <summer_mw>1182</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.446256</lat>
    <lon>-89.57631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69798/PMN1</id>
    <plant_name>Project Matador Nuclear</plant_name>
    <generator_id>PMN1</generator_id>
    <plant_id>69798</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi Nuclear</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Nuclear</technology>
    <energy_source>NUC</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>1117</nameplate_mw>
    <summer_mw>1117</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69798/PMN3</id>
    <plant_name>Project Matador Nuclear</plant_name>
    <generator_id>PMN3</generator_id>
    <plant_id>69798</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi Nuclear</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Nuclear</technology>
    <energy_source>NUC</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>1117</nameplate_mw>
    <summer_mw>1117</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69798/PMN2</id>
    <plant_name>Project Matador Nuclear</plant_name>
    <generator_id>PMN2</generator_id>
    <plant_id>69798</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi Nuclear</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Nuclear</technology>
    <energy_source>NUC</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>1117</nameplate_mw>
    <summer_mw>1117</summer_mw>
    <planned_start>2032-12</planned_start>
    <planned_year>2032</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69798/PMN4</id>
    <plant_name>Project Matador Nuclear</plant_name>
    <generator_id>PMN4</generator_id>
    <plant_id>69798</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi Nuclear</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Nuclear</technology>
    <energy_source>NUC</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>1117</nameplate_mw>
    <summer_mw>1117</summer_mw>
    <planned_start>2032-12</planned_start>
    <planned_year>2032</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68763/DECH1</id>
    <plant_name>Deschutes Solar and BESS</plant_name>
    <generator_id>DECH1</generator_id>
    <plant_id>68763</plant_id>
    <state>OR</state>
    <county>Wasco</county>
    <developer>DECH bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.157</lat>
    <lon>-121.136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68763/DECH2</id>
    <plant_name>Deschutes Solar and BESS</plant_name>
    <generator_id>DECH2</generator_id>
    <plant_id>68763</plant_id>
    <state>OR</state>
    <county>Wasco</county>
    <developer>DECH bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.157</lat>
    <lon>-121.136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70359/SYRVS</id>
    <plant_name>Sycamore Riverside Energy, LLC</plant_name>
    <generator_id>SYRVS</generator_id>
    <plant_id>70359</plant_id>
    <state>IN</state>
    <county>Sullivan</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>964</nameplate_mw>
    <summer_mw>964</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.213906</lat>
    <lon>-87.54727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67435/SRWND</id>
    <plant_name>Sunrise Wind</plant_name>
    <generator_id>SRWND</generator_id>
    <plant_id>67435</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Orsted Wind Power North America LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Offshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WS</prime_mover>
    <nameplate_mw>924</nameplate_mw>
    <summer_mw>924</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.977859</lat>
    <lon>-71.04454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68367/PEHA</id>
    <plant_name>Pepper Hammock Solar and Storage</plant_name>
    <generator_id>PEHA</generator_id>
    <plant_id>68367</plant_id>
    <state>GA</state>
    <county>Wayne</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>900</nameplate_mw>
    <summer_mw>900</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.331</lat>
    <lon>-81.759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58987/I-B</id>
    <plant_name>Chokecherry and Sierra Madre Wind</plant_name>
    <generator_id>I-B</generator_id>
    <plant_id>58987</plant_id>
    <state>WY</state>
    <county>Carbon</county>
    <developer>Power Company of Wyoming LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>849.6</nameplate_mw>
    <summer_mw>849.6</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>41.683056</lat>
    <lon>-107.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58987/I-A</id>
    <plant_name>Chokecherry and Sierra Madre Wind</plant_name>
    <generator_id>I-A</generator_id>
    <plant_id>58987</plant_id>
    <state>WY</state>
    <county>Carbon</county>
    <developer>Power Company of Wyoming LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>844.2</nameplate_mw>
    <summer_mw>844.2</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>41.683056</lat>
    <lon>-107.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68443/EMP01</id>
    <plant_name>Empire Wind 1</plant_name>
    <generator_id>EMP01</generator_id>
    <plant_id>68443</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>Empire Offshore Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Offshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WS</prime_mover>
    <nameplate_mw>810</nameplate_mw>
    <summer_mw>810</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.32</lat>
    <lon>-73.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66011/PV1</id>
    <plant_name>Cedar Island Solar LLC</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>66011</plant_id>
    <state>OR</state>
    <county>Sherman</county>
    <developer>Cedar Island Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>800</nameplate_mw>
    <summer_mw>800</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.233717</lat>
    <lon>-120.8985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68294/VIO1</id>
    <plant_name>Viola Generating Station</plant_name>
    <generator_id>VIO1</generator_id>
    <plant_id>68294</plant_id>
    <state>KS</state>
    <county>Sumner</county>
    <developer>Evergy Kansas Central, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>765</nameplate_mw>
    <summer_mw>693.2</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.331481</lat>
    <lon>-97.67</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68295/MCN1</id>
    <plant_name>McNew Generating Station</plant_name>
    <generator_id>MCN1</generator_id>
    <plant_id>68295</plant_id>
    <state>KS</state>
    <county>Reno</county>
    <developer>Evergy Kansas Central, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>765</nameplate_mw>
    <summer_mw>690.4</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>38.00595</lat>
    <lon>-97.92166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68053/LEG</id>
    <plant_name>Legend Power Station</plant_name>
    <generator_id>LEG</generator_id>
    <plant_id>68053</plant_id>
    <state>TX</state>
    <county>Jefferson</county>
    <developer>Entergy Texas Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CC</prime_mover>
    <nameplate_mw>754</nameplate_mw>
    <summer_mw>723</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.880219</lat>
    <lon>-93.99573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1364/5</id>
    <plant_name>Mill Creek (KY)</plant_name>
    <generator_id>5</generator_id>
    <plant_id>1364</plant_id>
    <state>KY</state>
    <county>Jefferson</county>
    <developer>Louisville Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>740</nameplate_mw>
    <summer_mw>645</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>38.0525</lat>
    <lon>-85.9103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69566/GEN1</id>
    <plant_name>CPV Basin Ranch Energy Center</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>69566</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>CPV Basin Ranch</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>722.5</nameplate_mw>
    <summer_mw>672.4</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.506094</lat>
    <lon>-103.4875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69566/GEN2</id>
    <plant_name>CPV Basin Ranch Energy Center</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>69566</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>CPV Basin Ranch</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>722.5</nameplate_mw>
    <summer_mw>672.4</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.506094</lat>
    <lon>-103.4875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68606/5</id>
    <plant_name>Cedar Bayou 5</plant_name>
    <generator_id>5</generator_id>
    <plant_id>68606</plant_id>
    <state>TX</state>
    <county>Chambers</county>
    <developer>Cedar Bayou 5 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>721</nameplate_mw>
    <summer_mw>674</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.751132</lat>
    <lon>-94.92114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65500/REVWD</id>
    <plant_name>Revolution Wind</plant_name>
    <generator_id>REVWD</generator_id>
    <plant_id>65500</plant_id>
    <state>RI</state>
    <county>Washington</county>
    <developer>Orsted Wind Power North America LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Offshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WS</prime_mover>
    <nameplate_mw>715</nameplate_mw>
    <summer_mw>715</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.15217</lat>
    <lon>-71.07783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69857/LBRBS</id>
    <plant_name>Libra Solar</plant_name>
    <generator_id>LBRBS</generator_id>
    <plant_id>69857</plant_id>
    <state>NV</state>
    <county>Lyon</county>
    <developer>Libra Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>700</nameplate_mw>
    <summer_mw>700</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>38.902103</lat>
    <lon>-118.9614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69857/LBRPV</id>
    <plant_name>Libra Solar</plant_name>
    <generator_id>LBRPV</generator_id>
    <plant_id>69857</plant_id>
    <state>NV</state>
    <county>Lyon</county>
    <developer>Libra Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>700</nameplate_mw>
    <summer_mw>700</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>38.902103</lat>
    <lon>-118.9614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68202/ROMW</id>
    <plant_name>IP Roman Wind</plant_name>
    <generator_id>ROMW</generator_id>
    <plant_id>68202</plant_id>
    <state>TX</state>
    <county>Deaf Smith</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>670.5</nameplate_mw>
    <summer_mw>670.5</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.990891</lat>
    <lon>-102.6076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70541/SPV</id>
    <plant_name>Swan Solar</plant_name>
    <generator_id>SPV</generator_id>
    <plant_id>70541</plant_id>
    <state>MO</state>
    <county>Bates</county>
    <developer>Swan Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>650</nameplate_mw>
    <summer_mw>650</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>38.322152</lat>
    <lon>-94.59622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68504/SLES1</id>
    <plant_name>Sandow Lakes Energy Station</plant_name>
    <generator_id>SLES1</generator_id>
    <plant_id>68504</plant_id>
    <state>TX</state>
    <county>Lee</county>
    <developer>SL Energy Power Plant I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>645</nameplate_mw>
    <summer_mw>590</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.419441</lat>
    <lon>-97.19124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68504/SLES2</id>
    <plant_name>Sandow Lakes Energy Station</plant_name>
    <generator_id>SLES2</generator_id>
    <plant_id>68504</plant_id>
    <state>TX</state>
    <county>Lee</county>
    <developer>SL Energy Power Plant I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>645</nameplate_mw>
    <summer_mw>590</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.419441</lat>
    <lon>-97.19124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65855/TE1PV</id>
    <plant_name>Tehuacana Creek Solar</plant_name>
    <generator_id>TE1PV</generator_id>
    <plant_id>65855</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>644.8</nameplate_mw>
    <summer_mw>644.8</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.914062</lat>
    <lon>-96.41347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62022/GEN1</id>
    <plant_name>Lincoln Land Energy Center</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>62022</plant_id>
    <state>IL</state>
    <county>Sangamon</county>
    <developer>Lincoln Land Energy Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>638.4</nameplate_mw>
    <summer_mw>520</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.5788</lat>
    <lon>-89.57984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62022/GEN2</id>
    <plant_name>Lincoln Land Energy Center</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>62022</plant_id>
    <state>IL</state>
    <county>Sangamon</county>
    <developer>Lincoln Land Energy Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>638.4</nameplate_mw>
    <summer_mw>520</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.5788</lat>
    <lon>-89.57984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63878/HAY</id>
    <plant_name>Haymaker Hybrid</plant_name>
    <generator_id>HAY</generator_id>
    <plant_id>63878</plant_id>
    <state>MT</state>
    <county>Wheatland</county>
    <developer>Haymaker Energy Project LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>630</nameplate_mw>
    <summer_mw>630</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>46.357442</lat>
    <lon>-110.3958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69764/HPW</id>
    <plant_name>Illinois Generation LLC</plant_name>
    <generator_id>HPW</generator_id>
    <plant_id>69764</plant_id>
    <state>IL</state>
    <county>Livingston</county>
    <developer>Pattern Operators LP</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>616.5</nameplate_mw>
    <summer_mw>616.5</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.06713</lat>
    <lon>-88.2497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63802/G001</id>
    <plant_name>Shady Hills Combined Cycle Facility</plant_name>
    <generator_id>G001</generator_id>
    <plant_id>63802</plant_id>
    <state>FL</state>
    <county>Pasco</county>
    <developer>Shady Hills Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>612</nameplate_mw>
    <summer_mw>538.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>28.366667</lat>
    <lon>-82.55833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68479/SHRT</id>
    <plant_name>Short Creek Solar</plant_name>
    <generator_id>SHRT</generator_id>
    <plant_id>68479</plant_id>
    <state>TX</state>
    <county>Wichita</county>
    <developer>Wichita Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>606.4</nameplate_mw>
    <summer_mw>605</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.017622</lat>
    <lon>-98.8013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68982/SGG01</id>
    <plant_name>Singing Grass Wind</plant_name>
    <generator_id>SGG01</generator_id>
    <plant_id>68982</plant_id>
    <state>CO</state>
    <county>Kit Carson</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>603</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.201143</lat>
    <lon>-102.8576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66914/DAN</id>
    <plant_name>Danish Fields Solar, LLC</plant_name>
    <generator_id>DAN</generator_id>
    <plant_id>66914</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Danish Fields Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.013637</lat>
    <lon>-96.22054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70135/SWNSN</id>
    <plant_name>Swenson Solar</plant_name>
    <generator_id>SWNSN</generator_id>
    <plant_id>70135</plant_id>
    <state>TX</state>
    <county>Stonewall</county>
    <developer>Swenson Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.985403</lat>
    <lon>-100.0292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65842/CFCBS</id>
    <plant_name>Clear Fork Creek Solar and BESS SLF</plant_name>
    <generator_id>CFCBS</generator_id>
    <plant_id>65842</plant_id>
    <state>TX</state>
    <county>Wilson</county>
    <developer>Clear Fork</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.263568</lat>
    <lon>-97.78055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65842/CFCPV</id>
    <plant_name>Clear Fork Creek Solar and BESS SLF</plant_name>
    <generator_id>CFCPV</generator_id>
    <plant_id>65842</plant_id>
    <state>TX</state>
    <county>Wilson</county>
    <developer>Clear Fork</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.263568</lat>
    <lon>-97.78055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69989/PB1</id>
    <plant_name>Arkansas Cypress Solar Station</plant_name>
    <generator_id>PB1</generator_id>
    <plant_id>69989</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Entergy Arkansas LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.42</lat>
    <lon>-92.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68071/BELLF</id>
    <plant_name>Bellflower Solar (VA)</plant_name>
    <generator_id>BELLF</generator_id>
    <plant_id>68071</plant_id>
    <state>VA</state>
    <county>Brunswick</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37</lat>
    <lon>-78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64163/11111</id>
    <plant_name>Hecate Energy Cider Solar LLC</plant_name>
    <generator_id>11111</generator_id>
    <plant_id>64163</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>Greenbacker Renewable Energy Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>557</nameplate_mw>
    <summer_mw>557</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.097336</lat>
    <lon>-78.23041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58987/II-B</id>
    <plant_name>Chokecherry and Sierra Madre Wind</plant_name>
    <generator_id>II-B</generator_id>
    <plant_id>58987</plant_id>
    <state>WY</state>
    <county>Carbon</county>
    <developer>Power Company of Wyoming LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>553.5</nameplate_mw>
    <summer_mw>553.5</summer_mw>
    <planned_start>2033-12</planned_start>
    <planned_year>2033</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>41.683056</lat>
    <lon>-107.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69684/70125</id>
    <plant_name>Maricopa Solar</plant_name>
    <generator_id>70125</generator_id>
    <plant_id>69684</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Maricopa Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>550</nameplate_mw>
    <summer_mw>550</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.46303</lat>
    <lon>-113.1101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65310/DAWN1</id>
    <plant_name>Renegade Solar Project (Dawn)</plant_name>
    <generator_id>DAWN1</generator_id>
    <plant_id>65310</plant_id>
    <state>TX</state>
    <county>Deaf Smith</county>
    <developer>Renegade Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>515</nameplate_mw>
    <summer_mw>515</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.913</lat>
    <lon>-102.2706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64234/19936</id>
    <plant_name>Hecate Energy Harley Hand Solar LLC</plant_name>
    <generator_id>19936</generator_id>
    <plant_id>64234</plant_id>
    <state>TX</state>
    <county>Nolan</county>
    <developer>Hecate Energy Harley Hand Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>514</nameplate_mw>
    <summer_mw>514</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.468537</lat>
    <lon>-100.2164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64847/CRTW1</id>
    <plant_name>Rail Tie Wind</plant_name>
    <generator_id>CRTW1</generator_id>
    <plant_id>64847</plant_id>
    <state>WY</state>
    <county>Albany</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>504</nameplate_mw>
    <summer_mw>504</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.055833</lat>
    <lon>-105.4942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65028/ROSES</id>
    <plant_name>Roseland Solar Project, LLC</plant_name>
    <generator_id>ROSES</generator_id>
    <plant_id>65028</plant_id>
    <state>TX</state>
    <county>Falls</county>
    <developer>Enel Green Power Roseland Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.461242</lat>
    <lon>-96.82493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64209/26SBA</id>
    <plant_name>Bellefield 2 Solar &amp; Energy Storage Farm</plant_name>
    <generator_id>26SBA</generator_id>
    <plant_id>64209</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>26SB 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.017779</lat>
    <lon>-118.0687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64209/26SBB</id>
    <plant_name>Bellefield 2 Solar &amp; Energy Storage Farm</plant_name>
    <generator_id>26SBB</generator_id>
    <plant_id>64209</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>26SB 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.017779</lat>
    <lon>-118.0687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69820/GRA1</id>
    <plant_name>Grace Energy Center</plant_name>
    <generator_id>GRA1</generator_id>
    <plant_id>69820</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>Grace Orchard Interconnection, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.653564</lat>
    <lon>-114.696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69820/GRA2</id>
    <plant_name>Grace Energy Center</plant_name>
    <generator_id>GRA2</generator_id>
    <plant_id>69820</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>Grace Orchard Interconnection, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.653564</lat>
    <lon>-114.696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66414/RMSY</id>
    <plant_name>Hecate Energy Ramsey Storage</plant_name>
    <generator_id>RMSY</generator_id>
    <plant_id>66414</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Hecate Energy Ramsey Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.02939</lat>
    <lon>-96.2362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68204/MEITW</id>
    <plant_name>IP Meitner Wind</plant_name>
    <generator_id>MEITW</generator_id>
    <plant_id>68204</plant_id>
    <state>TX</state>
    <county>Roberts</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>258</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.696972</lat>
    <lon>-100.8213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68203/MEITS</id>
    <plant_name>IP Meitner Solar</plant_name>
    <generator_id>MEITS</generator_id>
    <plant_id>68203</plant_id>
    <state>TX</state>
    <county>Gray</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>214</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.562222</lat>
    <lon>-100.6941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68201/ROMS</id>
    <plant_name>IP Roman Solar</plant_name>
    <generator_id>ROMS</generator_id>
    <plant_id>68201</plant_id>
    <state>TX</state>
    <county>Deaf Smith</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.990891</lat>
    <lon>-102.6076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70397/SRSP1</id>
    <plant_name>Steel River Solar Phase 1</plant_name>
    <generator_id>SRSP1</generator_id>
    <plant_id>70397</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68354/LSPV1</id>
    <plant_name>La Salle Solar</plant_name>
    <generator_id>LSPV1</generator_id>
    <plant_id>68354</plant_id>
    <state>TX</state>
    <county>LaSalle</county>
    <developer>La Salle Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.092519</lat>
    <lon>-99.05701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68034/SNSCB</id>
    <plant_name>Sunscape Renewable Energy</plant_name>
    <generator_id>SNSCB</generator_id>
    <plant_id>68034</plant_id>
    <state>TX</state>
    <county>Nueces</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.819197</lat>
    <lon>-97.79994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68034/SNSCP</id>
    <plant_name>Sunscape Renewable Energy</plant_name>
    <generator_id>SNSCP</generator_id>
    <plant_id>68034</plant_id>
    <state>TX</state>
    <county>Nueces</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.819197</lat>
    <lon>-97.79994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69584/3572</id>
    <plant_name>Rising Star Solar</plant_name>
    <generator_id>3572</generator_id>
    <plant_id>69584</plant_id>
    <state>TX</state>
    <county>Starr</county>
    <developer>Rising Star Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.382105</lat>
    <lon>-98.61544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68353/LSBS1</id>
    <plant_name>La Salle ESS</plant_name>
    <generator_id>LSBS1</generator_id>
    <plant_id>68353</plant_id>
    <state>TX</state>
    <county>LaSalle</county>
    <developer>La Salle ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.094701</lat>
    <lon>-99.05554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70398/SRSP2</id>
    <plant_name>Steel River Solar Phase 2</plant_name>
    <generator_id>SRSP2</generator_id>
    <plant_id>70398</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70399/SRSP3</id>
    <plant_name>Steel River Solar Phase 3</plant_name>
    <generator_id>SRSP3</generator_id>
    <plant_id>70399</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68635/KU1</id>
    <plant_name>Kemmerer Unit 1</plant_name>
    <generator_id>KU1</generator_id>
    <plant_id>68635</plant_id>
    <state>WY</state>
    <county>Lincoln</county>
    <developer>US SFR Owner LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Nuclear</technology>
    <energy_source>NUC</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>342.1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>41.705993</lat>
    <lon>-110.5603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68342/HOHI1</id>
    <plant_name>Hop Hill Solar Generation and BESS</plant_name>
    <generator_id>HOHI1</generator_id>
    <plant_id>68342</plant_id>
    <state>WA</state>
    <county>Benton</county>
    <developer>HOHI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2031-09</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.324</lat>
    <lon>-119.822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68342/HOHI2</id>
    <plant_name>Hop Hill Solar Generation and BESS</plant_name>
    <generator_id>HOHI2</generator_id>
    <plant_id>68342</plant_id>
    <state>WA</state>
    <county>Benton</county>
    <developer>HOHI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2031-09</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.324</lat>
    <lon>-119.822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63911/MECN</id>
    <plant_name>MEC North</plant_name>
    <generator_id>MECN</generator_id>
    <plant_id>63911</plant_id>
    <state>MI</state>
    <county>Calhoun</county>
    <developer>MEC North</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2034-06</planned_start>
    <planned_year>2034</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.233559</lat>
    <lon>-84.96234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63912/MECS</id>
    <plant_name>MEC South</plant_name>
    <generator_id>MECS</generator_id>
    <plant_id>63912</plant_id>
    <state>MI</state>
    <county>Calhoun</county>
    <developer>MEC South</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <planned_start>2034-06</planned_start>
    <planned_year>2034</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.237103</lat>
    <lon>-84.95915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70522/SSLR</id>
    <plant_name>Hecate Energy Sunfish Solar LLC</plant_name>
    <generator_id>SSLR</generator_id>
    <plant_id>70522</plant_id>
    <state>MI</state>
    <county>Calhoun</county>
    <developer>Hecate Energy Sunfish Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>499</nameplate_mw>
    <summer_mw>499</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.376961</lat>
    <lon>-84.87973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68317/DUTC1</id>
    <plant_name>Dutchman Solar generation and BESS</plant_name>
    <generator_id>DUTC1</generator_id>
    <plant_id>68317</plant_id>
    <state>WY</state>
    <county>Converse</county>
    <developer>DUTC bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>499</nameplate_mw>
    <summer_mw>499</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>42.871644</lat>
    <lon>-105.8176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68317/DUTC2</id>
    <plant_name>Dutchman Solar generation and BESS</plant_name>
    <generator_id>DUTC2</generator_id>
    <plant_id>68317</plant_id>
    <state>WY</state>
    <county>Converse</county>
    <developer>DUTC bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>499</nameplate_mw>
    <summer_mw>499</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>42.871644</lat>
    <lon>-105.8176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69071/CT1</id>
    <plant_name>Bison Generation Station</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>69071</plant_id>
    <state>ND</state>
    <county>Williams</county>
    <developer>Basin Electric Power Coop</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>496</nameplate_mw>
    <summer_mw>409</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>48.327932</lat>
    <lon>-103.3127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69071/CT2</id>
    <plant_name>Bison Generation Station</plant_name>
    <generator_id>CT2</generator_id>
    <plant_id>69071</plant_id>
    <state>ND</state>
    <county>Williams</county>
    <developer>Basin Electric Power Coop</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>496</nameplate_mw>
    <summer_mw>409</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>48.327932</lat>
    <lon>-103.3127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68296/MC1</id>
    <plant_name>Mullin Creek #1 Generating Station</plant_name>
    <generator_id>MC1</generator_id>
    <plant_id>68296</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>Evergy Missouri West</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>489.7</nameplate_mw>
    <summer_mw>425.1</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>38.00595</lat>
    <lon>-97.92166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>728/8</id>
    <plant_name>Yates</plant_name>
    <generator_id>8</generator_id>
    <plant_id>728</plant_id>
    <state>GA</state>
    <county>Coweta</county>
    <developer>Georgia Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>482.8</nameplate_mw>
    <summer_mw>418.4</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.4622</lat>
    <lon>-84.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>728/10</id>
    <plant_name>Yates</plant_name>
    <generator_id>10</generator_id>
    <plant_id>728</plant_id>
    <state>GA</state>
    <county>Coweta</county>
    <developer>Georgia Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>482.8</nameplate_mw>
    <summer_mw>418.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.4622</lat>
    <lon>-84.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>728/9</id>
    <plant_name>Yates</plant_name>
    <generator_id>9</generator_id>
    <plant_id>728</plant_id>
    <state>GA</state>
    <county>Coweta</county>
    <developer>Georgia Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>482.8</nameplate_mw>
    <summer_mw>418.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.4622</lat>
    <lon>-84.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69184/WF5CT</id>
    <plant_name>Waterford 5</plant_name>
    <generator_id>WF5CT</generator_id>
    <plant_id>69184</plant_id>
    <state>LA</state>
    <county>St Charles</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>478</nameplate_mw>
    <summer_mw>420</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>29.988583</lat>
    <lon>-90.48565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69185/JPSCT</id>
    <plant_name>Jefferson Power Station</plant_name>
    <generator_id>JPSCT</generator_id>
    <plant_id>69185</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Entergy Arkansas LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>478</nameplate_mw>
    <summer_mw>420</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.427527</lat>
    <lon>-92.13996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69445/CT1</id>
    <plant_name>Waterford 6</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>69445</plant_id>
    <state>LA</state>
    <county>St Charles</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>478</nameplate_mw>
    <summer_mw>420</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>29.988583</lat>
    <lon>-90.48565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69223/GT1</id>
    <plant_name>Vicksburg Advanced Power Station</plant_name>
    <generator_id>GT1</generator_id>
    <plant_id>69223</plant_id>
    <state>MS</state>
    <county>Warren</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>477.7</nameplate_mw>
    <summer_mw>422.8</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.28526</lat>
    <lon>-90.92568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70187/CT1</id>
    <plant_name>Traceview Advanced Power Station</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>70187</plant_id>
    <state>MS</state>
    <county>Madison</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>477.7</nameplate_mw>
    <summer_mw>422.8</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.405646</lat>
    <lon>-90.22114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69426/CT1</id>
    <plant_name>Westlake Power Station</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>69426</plant_id>
    <state>LA</state>
    <county>Calcasieu</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>477.7</nameplate_mw>
    <summer_mw>390</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.281105</lat>
    <lon>-93.30189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67914/1A</id>
    <plant_name>Delta Blues Advanced Power Station</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>67914</plant_id>
    <state>MS</state>
    <county>Washington</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>477</nameplate_mw>
    <summer_mw>422.2</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.330476</lat>
    <lon>-91.13058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69060/SNFA</id>
    <plant_name>Snowflake A Solar and BESS</plant_name>
    <generator_id>SNFA</generator_id>
    <plant_id>69060</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>475</nameplate_mw>
    <summer_mw>475</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.998055</lat>
    <lon>-110.1255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69060/SNFBA</id>
    <plant_name>Snowflake A Solar and BESS</plant_name>
    <generator_id>SNFBA</generator_id>
    <plant_id>69060</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>475</nameplate_mw>
    <summer_mw>475</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.998055</lat>
    <lon>-110.1255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69690/PG2</id>
    <plant_name>Panther Grove 2</plant_name>
    <generator_id>PG2</generator_id>
    <plant_id>69690</plant_id>
    <state>IL</state>
    <county>Livingston</county>
    <developer>Panther Grove 2 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>472.5</nameplate_mw>
    <summer_mw>472.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.815283</lat>
    <lon>-88.86191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68214/1A</id>
    <plant_name>Franklin Farms 1&amp;2</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>68214</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.53246</lat>
    <lon>-91.62767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68214/2A</id>
    <plant_name>Franklin Farms 1&amp;2</plant_name>
    <generator_id>2A</generator_id>
    <plant_id>68214</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.53246</lat>
    <lon>-91.62767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69449/1A</id>
    <plant_name>Richland Parish Power Station 1&amp;2</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>69449</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.468339</lat>
    <lon>-91.68038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69449/2A</id>
    <plant_name>Richland Parish Power Station 1&amp;2</plant_name>
    <generator_id>2A</generator_id>
    <plant_id>69449</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.468339</lat>
    <lon>-91.68038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69649/3A</id>
    <plant_name>Richland Parish Power Station 3</plant_name>
    <generator_id>3A</generator_id>
    <plant_id>69649</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.496716</lat>
    <lon>-91.69867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69650/4A</id>
    <plant_name>Richland Parish Power Station 4</plant_name>
    <generator_id>4A</generator_id>
    <plant_id>69650</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.497782</lat>
    <lon>-91.6997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC1A</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC1A</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC2A</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC2A</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2031-11</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC3A</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC3A</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>469.3</nameplate_mw>
    <summer_mw>435.4</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69077/1A</id>
    <plant_name>Lone Star Power Station</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>69077</plant_id>
    <state>TX</state>
    <county>San Jacinto</county>
    <developer>Entergy Texas Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>467.3</nameplate_mw>
    <summer_mw>432</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.414158</lat>
    <lon>-95.01671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69750/1A</id>
    <plant_name>Ironwood Power Station</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>69750</plant_id>
    <state>AR</state>
    <county>Hot Spring</county>
    <developer>Entergy Arkansas LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>467.3</nameplate_mw>
    <summer_mw>432</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.433826</lat>
    <lon>-92.9042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65851/HB2PV</id>
    <plant_name>Hollow Branch Creek</plant_name>
    <generator_id>HB2PV</generator_id>
    <plant_id>65851</plant_id>
    <state>TX</state>
    <county>Madison</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>460</nameplate_mw>
    <summer_mw>460</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.061726</lat>
    <lon>-96.05606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68546/1</id>
    <plant_name>Smarr Combined Cycle Energy Facility</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68546</plant_id>
    <state>GA</state>
    <county>Monroe</county>
    <developer>Oglethorpe Power Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CC</prime_mover>
    <nameplate_mw>459</nameplate_mw>
    <summer_mw>407</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.975936</lat>
    <lon>-83.84369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65854/RDYPV</id>
    <plant_name>Rowdy Creek Solar and BESS</plant_name>
    <generator_id>RDYPV</generator_id>
    <plant_id>65854</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>455</nameplate_mw>
    <summer_mw>455</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.75694</lat>
    <lon>-95.6458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/CTG1</id>
    <plant_name>Kingston</plant_name>
    <generator_id>CTG1</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>454.8</nameplate_mw>
    <summer_mw>372.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3399/CTG2</id>
    <plant_name>Cumberland (TN)</plant_name>
    <generator_id>CTG2</generator_id>
    <plant_id>3399</plant_id>
    <state>TN</state>
    <county>Stewart</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>454.8</nameplate_mw>
    <summer_mw>372.9</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.3903</lat>
    <lon>-87.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3399/CTG1</id>
    <plant_name>Cumberland (TN)</plant_name>
    <generator_id>CTG1</generator_id>
    <plant_id>3399</plant_id>
    <state>TN</state>
    <county>Stewart</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>454.8</nameplate_mw>
    <summer_mw>372.9</summer_mw>
    <planned_start>2034-12</planned_start>
    <planned_year>2034</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.3903</lat>
    <lon>-87.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66621/1A</id>
    <plant_name>Orange County Advanced Power Station</plant_name>
    <generator_id>1A</generator_id>
    <plant_id>66621</plant_id>
    <state>TX</state>
    <county>Orange</county>
    <developer>Entergy Texas Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>453</nameplate_mw>
    <summer_mw>396.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.025251</lat>
    <lon>-93.87134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66621/1B</id>
    <plant_name>Orange County Advanced Power Station</plant_name>
    <generator_id>1B</generator_id>
    <plant_id>66621</plant_id>
    <state>TX</state>
    <county>Orange</county>
    <developer>Entergy Texas Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>453</nameplate_mw>
    <summer_mw>396.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.025251</lat>
    <lon>-93.87134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66871/SOLAR</id>
    <plant_name>GulfStar Power, LLC</plant_name>
    <generator_id>SOLAR</generator_id>
    <plant_id>66871</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>GulfStar Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>451.6</nameplate_mw>
    <summer_mw>451.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.191296</lat>
    <lon>-95.96752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68772/CHALK</id>
    <plant_name>Chalk Bluff Solar</plant_name>
    <generator_id>CHALK</generator_id>
    <plant_id>68772</plant_id>
    <state>AR</state>
    <county>St Francis</county>
    <developer>Chalk Bluff Solar Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.051606</lat>
    <lon>-90.43254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70175/ZSPV</id>
    <plant_name>ZSS Solar</plant_name>
    <generator_id>ZSPV</generator_id>
    <plant_id>70175</plant_id>
    <state>TX</state>
    <county>Knox</county>
    <developer>NextEra Energy Resources - ERCOT</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.479935</lat>
    <lon>-99.67475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67664/SOLEI</id>
    <plant_name>Soleil</plant_name>
    <generator_id>SOLEI</generator_id>
    <plant_id>67664</plant_id>
    <state>TX</state>
    <county>Clay</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.799253</lat>
    <lon>-98.04552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68273/1</id>
    <plant_name>Naples Power Plant</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68273</plant_id>
    <state>TX</state>
    <county>Morris</county>
    <developer>Arkansas Electric Coop Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>33.21964</lat>
    <lon>-94.70564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68273/2</id>
    <plant_name>Naples Power Plant</plant_name>
    <generator_id>2</generator_id>
    <plant_id>68273</plant_id>
    <state>TX</state>
    <county>Morris</county>
    <developer>Arkansas Electric Coop Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>33.21964</lat>
    <lon>-94.70564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69691/06</id>
    <plant_name>Greens Bayou 6</plant_name>
    <generator_id>06</generator_id>
    <plant_id>69691</plant_id>
    <state>TX</state>
    <county>Harris</county>
    <developer>NRG Greens Bayou 6 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>447</nameplate_mw>
    <summer_mw>411</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.821222</lat>
    <lon>-95.21786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68607/PLJW1</id>
    <plant_name>Pelicans Jaw Hybrid Solar</plant_name>
    <generator_id>PLJW1</generator_id>
    <plant_id>68607</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Pelicans Jaw Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>440</nameplate_mw>
    <summer_mw>440</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.765183</lat>
    <lon>-119.7436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69689/CT11</id>
    <plant_name>Vast Sands Power</plant_name>
    <generator_id>CT11</generator_id>
    <plant_id>69689</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>Permian Power I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>440</nameplate_mw>
    <summer_mw>440</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.584096</lat>
    <lon>-102.958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69689/CT12</id>
    <plant_name>Vast Sands Power</plant_name>
    <generator_id>CT12</generator_id>
    <plant_id>69689</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>Permian Power I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>440</nameplate_mw>
    <summer_mw>440</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.584096</lat>
    <lon>-102.958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69873/CRW02</id>
    <plant_name>Cheyenne Ridge II</plant_name>
    <generator_id>CRW02</generator_id>
    <plant_id>69873</plant_id>
    <state>CO</state>
    <county>Cheyenne</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>438</nameplate_mw>
    <summer_mw>438</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.997719</lat>
    <lon>-102.3593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56/LEC3</id>
    <plant_name>Lowman Energy Center</plant_name>
    <generator_id>LEC3</generator_id>
    <plant_id>56</plant_id>
    <state>AL</state>
    <county>Washington</county>
    <developer>PowerSouth Energy Cooperative</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>438</nameplate_mw>
    <summer_mw>409</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.488019</lat>
    <lon>-87.91075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68305/GWT1</id>
    <plant_name>Gigawatt Solar</plant_name>
    <generator_id>GWT1</generator_id>
    <plant_id>68305</plant_id>
    <state>TX</state>
    <county>Parker</county>
    <developer>Gigawatt Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>429</nameplate_mw>
    <summer_mw>429</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.547389</lat>
    <lon>-97.59792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63818/78787</id>
    <plant_name>Panther Grove Wind, LLC</plant_name>
    <generator_id>78787</generator_id>
    <plant_id>63818</plant_id>
    <state>IL</state>
    <county>Woodford</county>
    <developer>Panther Grove Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>423</nameplate_mw>
    <summer_mw>423</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.7129</lat>
    <lon>-89.1706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68759/IPQ1B</id>
    <plant_name>Quantum BESS</plant_name>
    <generator_id>IPQ1B</generator_id>
    <plant_id>68759</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>422.4</nameplate_mw>
    <summer_mw>323.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.0121</lat>
    <lon>-99.5604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68761/IPQ2B</id>
    <plant_name>Quantum II BESS</plant_name>
    <generator_id>IPQ2B</generator_id>
    <plant_id>68761</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>422.4</nameplate_mw>
    <summer_mw>323.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.135</lat>
    <lon>-99.5719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67262/RP1</id>
    <plant_name>Ripley Energy Center</plant_name>
    <generator_id>RP1</generator_id>
    <plant_id>67262</plant_id>
    <state>OK</state>
    <county>Payne</county>
    <developer>Associated Electric Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>419</nameplate_mw>
    <summer_mw>411.4</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AECI</balancing_authority>
    <lat>36.116</lat>
    <lon>-96.902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67263/TN1</id>
    <plant_name>Turney Energy Center</plant_name>
    <generator_id>TN1</generator_id>
    <plant_id>67263</plant_id>
    <state>MO</state>
    <county>Clinton</county>
    <developer>Associated Electric Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>419</nameplate_mw>
    <summer_mw>411.4</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AECI</balancing_authority>
    <lat>39.615</lat>
    <lon>-94.351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65855/TE1BS</id>
    <plant_name>Tehuacana Creek Solar</plant_name>
    <generator_id>TE1BS</generator_id>
    <plant_id>65855</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>418</nameplate_mw>
    <summer_mw>418</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.914062</lat>
    <lon>-96.41347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69272/SEQII</id>
    <plant_name>Enbridge Solar (Sequoia II)</plant_name>
    <generator_id>SEQII</generator_id>
    <plant_id>69272</plant_id>
    <state>TX</state>
    <county>Callahan</county>
    <developer>Enbridge Solar (Sequoia II), LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>415</nameplate_mw>
    <summer_mw>415</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.341078</lat>
    <lon>-99.17308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68369/STMO</id>
    <plant_name>Starfire Mountain Solar</plant_name>
    <generator_id>STMO</generator_id>
    <plant_id>68369</plant_id>
    <state>KY</state>
    <county>Perry</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>410</nameplate_mw>
    <summer_mw>410</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.4119</lat>
    <lon>-83.1206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8059/2G1</id>
    <plant_name>Comanche (OK)</plant_name>
    <generator_id>2G1</generator_id>
    <plant_id>8059</plant_id>
    <state>OK</state>
    <county>Comanche</county>
    <developer>Public Service Co of Oklahoma</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>408.8</nameplate_mw>
    <summer_mw>368.1</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.5431</lat>
    <lon>-98.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8059/3G1</id>
    <plant_name>Comanche (OK)</plant_name>
    <generator_id>3G1</generator_id>
    <plant_id>8059</plant_id>
    <state>OK</state>
    <county>Comanche</county>
    <developer>Public Service Co of Oklahoma</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>408.8</nameplate_mw>
    <summer_mw>368.1</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.5431</lat>
    <lon>-98.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66912/HS1</id>
    <plant_name>Hill Solar 1</plant_name>
    <generator_id>HS1</generator_id>
    <plant_id>66912</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Hill Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>405</nameplate_mw>
    <summer_mw>405</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.139</lat>
    <lon>-97.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67984/FFLPA</id>
    <plant_name>Firefly Solar PA</plant_name>
    <generator_id>FFLPA</generator_id>
    <plant_id>67984</plant_id>
    <state>PA</state>
    <county>Lawrence</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>401.6</nameplate_mw>
    <summer_mw>401.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.930281</lat>
    <lon>-80.43244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67378/MB</id>
    <plant_name>Mineral Basin Solar Power</plant_name>
    <generator_id>MB</generator_id>
    <plant_id>67378</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>Mineral Basin Solar Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>401.6</nameplate_mw>
    <summer_mw>401.6</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.106469</lat>
    <lon>-78.29426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66621/1C</id>
    <plant_name>Orange County Advanced Power Station</plant_name>
    <generator_id>1C</generator_id>
    <plant_id>66621</plant_id>
    <state>TX</state>
    <county>Orange</county>
    <developer>Entergy Texas Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>365</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.025251</lat>
    <lon>-93.87134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68422/CALII</id>
    <plant_name>Callisto II Energy Center</plant_name>
    <generator_id>CALII</generator_id>
    <plant_id>68422</plant_id>
    <state>TX</state>
    <county>Harris</county>
    <developer>Callisto II Energy Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.645345</lat>
    <lon>-95.45025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67978/SSPV1</id>
    <plant_name>Sierra Solar Hybrid</plant_name>
    <generator_id>SSPV1</generator_id>
    <plant_id>67978</plant_id>
    <state>NV</state>
    <county>Churchill</county>
    <developer>Sierra Pacific Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>39.8536</lat>
    <lon>-119.0394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68917/BS</id>
    <plant_name>Beavertail Solar</plant_name>
    <generator_id>BS</generator_id>
    <plant_id>68917</plant_id>
    <state>MO</state>
    <county>Henry</county>
    <developer>Beavertail Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SPA</balancing_authority>
    <lat>38.311814</lat>
    <lon>-93.93546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69509/1</id>
    <plant_name>Gabriel</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69509</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>San Gabriel Project LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.11</lat>
    <lon>-117.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67059/1</id>
    <plant_name>Iron Belt</plant_name>
    <generator_id>1</generator_id>
    <plant_id>67059</plant_id>
    <state>TX</state>
    <county>Borden</county>
    <developer>Iron Belt Energy Storage Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.5557</lat>
    <lon>-101.6601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69508/1</id>
    <plant_name>Marici</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69508</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Marici Project LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.007751</lat>
    <lon>-117.9462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69553/BCS</id>
    <plant_name>Blacks Creek Solar</plant_name>
    <generator_id>BCS</generator_id>
    <plant_id>69553</plant_id>
    <state>ID</state>
    <county>Ada</county>
    <developer>Blacks Creek Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>IPCO</balancing_authority>
    <lat>43.499</lat>
    <lon>-116.1918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64670/KOV4A</id>
    <plant_name>Big Creek Solar LLC</plant_name>
    <generator_id>KOV4A</generator_id>
    <plant_id>64670</plant_id>
    <state>AR</state>
    <county>Lee</county>
    <developer>Big Creek Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.870404</lat>
    <lon>-117.9656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63782/RH1</id>
    <plant_name>Rough Hat</plant_name>
    <generator_id>RH1</generator_id>
    <plant_id>63782</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Candela Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.09907</lat>
    <lon>-115.8337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66805/LYCAN</id>
    <plant_name>Lycan Solar Project</plant_name>
    <generator_id>LYCAN</generator_id>
    <plant_id>66805</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.621326</lat>
    <lon>-115.0959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69056/CBBA</id>
    <plant_name>CO Bar Solar and BESS</plant_name>
    <generator_id>CBBA</generator_id>
    <plant_id>69056</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69056/CBPV</id>
    <plant_name>CO Bar Solar and BESS</plant_name>
    <generator_id>CBPV</generator_id>
    <plant_id>69056</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69239/HSS</id>
    <plant_name>High Spring Solar Energy</plant_name>
    <generator_id>HSS</generator_id>
    <plant_id>69239</plant_id>
    <state>OK</state>
    <county>Muskogee</county>
    <developer>High Spring Solar Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>250.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.576674</lat>
    <lon>-95.65816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70219/VALLE</id>
    <plant_name>Valley Farms Energy Center</plant_name>
    <generator_id>VALLE</generator_id>
    <plant_id>70219</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Valley Farms Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.94793</lat>
    <lon>-111.4576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68022/CLP20</id>
    <plant_name>Cowboy Solar I</plant_name>
    <generator_id>CLP20</generator_id>
    <plant_id>68022</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Cowboy Solar I</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.032968</lat>
    <lon>-104.3816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64208/30PNA</id>
    <plant_name>Red Antelope Solar &amp; Energy Storage Farm</plant_name>
    <generator_id>30PNA</generator_id>
    <plant_id>64208</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>302PN 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>36.7</lat>
    <lon>-111.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68287/EAGL1</id>
    <plant_name>Eagle Eye Solar and Storage</plant_name>
    <generator_id>EAGL1</generator_id>
    <plant_id>68287</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>EAGL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>33.727</lat>
    <lon>-112.881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68287/EAGL2</id>
    <plant_name>Eagle Eye Solar and Storage</plant_name>
    <generator_id>EAGL2</generator_id>
    <plant_id>68287</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>EAGL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>33.727</lat>
    <lon>-112.881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68209/PSGBS</id>
    <plant_name>Purple Sage Energy Center</plant_name>
    <generator_id>PSGBS</generator_id>
    <plant_id>68209</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Noble Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.029139</lat>
    <lon>-115.8062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68209/PSGPV</id>
    <plant_name>Purple Sage Energy Center</plant_name>
    <generator_id>PSGPV</generator_id>
    <plant_id>68209</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Noble Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.029139</lat>
    <lon>-115.8062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63488/OBSLR</id>
    <plant_name>Obsidian Solar Center</plant_name>
    <generator_id>OBSLR</generator_id>
    <plant_id>63488</plant_id>
    <state>OR</state>
    <county>Lake</county>
    <developer>Obsidian Solar Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>43.312167</lat>
    <lon>-120.8218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68022/CLPBS</id>
    <plant_name>Cowboy Solar I</plant_name>
    <generator_id>CLPBS</generator_id>
    <plant_id>68022</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Cowboy Solar I</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.032968</lat>
    <lon>-104.3816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70331/MRASL</id>
    <plant_name>Mirasol Energy Center, LLC.</plant_name>
    <generator_id>MRASL</generator_id>
    <plant_id>70331</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Mirasol Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.11439</lat>
    <lon>-104.2017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68367/PEHA2</id>
    <plant_name>Pepper Hammock Solar and Storage</plant_name>
    <generator_id>PEHA2</generator_id>
    <plant_id>68367</plant_id>
    <state>GA</state>
    <county>Wayne</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.331</lat>
    <lon>-81.759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66805/LYCN2</id>
    <plant_name>Lycan Solar Project</plant_name>
    <generator_id>LYCN2</generator_id>
    <plant_id>66805</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <planned_start>2030-04</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.621326</lat>
    <lon>-115.0959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67657/HANSO</id>
    <plant_name>Hanson</plant_name>
    <generator_id>HANSO</generator_id>
    <plant_id>67657</plant_id>
    <state>TX</state>
    <county>Coleman</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>396</nameplate_mw>
    <summer_mw>396</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.690367</lat>
    <lon>-99.51389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69877/CHPV1</id>
    <plant_name>Charger Solar</plant_name>
    <generator_id>CHPV1</generator_id>
    <plant_id>69877</plant_id>
    <state>TX</state>
    <county>Refugio</county>
    <developer>AP Solar 4 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>394.4</nameplate_mw>
    <summer_mw>394.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.416661</lat>
    <lon>-97.03519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69057/CBDBA</id>
    <plant_name>CO Bar D Solar and BESS</plant_name>
    <generator_id>CBDBA</generator_id>
    <plant_id>69057</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>394</nameplate_mw>
    <summer_mw>394</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69057/CBDPV</id>
    <plant_name>CO Bar D Solar and BESS</plant_name>
    <generator_id>CBDPV</generator_id>
    <plant_id>69057</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>394</nameplate_mw>
    <summer_mw>394</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69595/GTGEN</id>
    <plant_name>Saddleback Generation Station</plant_name>
    <generator_id>GTGEN</generator_id>
    <plant_id>69595</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Copia Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>375</nameplate_mw>
    <summer_mw>345</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.410034</lat>
    <lon>-113.1694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69595/GTGN2</id>
    <plant_name>Saddleback Generation Station</plant_name>
    <generator_id>GTGN2</generator_id>
    <plant_id>69595</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Copia Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>375</nameplate_mw>
    <summer_mw>345</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.410034</lat>
    <lon>-113.1694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60206/HCCT1</id>
    <plant_name>Wolf Summit Energy</plant_name>
    <generator_id>HCCT1</generator_id>
    <plant_id>60206</plant_id>
    <state>WV</state>
    <county>Harrison</county>
    <developer>Wolf Summit Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>371.5</nameplate_mw>
    <summer_mw>319.1</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.287039</lat>
    <lon>-80.32287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65853/MIDPV</id>
    <plant_name>Banita Creek- Spindlepop Solar</plant_name>
    <generator_id>MIDPV</generator_id>
    <plant_id>65853</plant_id>
    <state>TX</state>
    <county>Nacogdoches</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>371</nameplate_mw>
    <summer_mw>371</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.5552</lat>
    <lon>-94.7919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63841/ARIDA</id>
    <plant_name>Arida Solar (Hybrid)</plant_name>
    <generator_id>ARIDA</generator_id>
    <plant_id>63841</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>326FW 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>370</nameplate_mw>
    <summer_mw>370</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.092036</lat>
    <lon>-114.6888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63841/BESS</id>
    <plant_name>Arida Solar (Hybrid)</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>63841</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>326FW 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>370</nameplate_mw>
    <summer_mw>370</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.092036</lat>
    <lon>-114.6888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69189/C2PV</id>
    <plant_name>Cowboy Solar II</plant_name>
    <generator_id>C2PV</generator_id>
    <plant_id>69189</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Cowboy Solar II</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>365</nameplate_mw>
    <summer_mw>365</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.032968</lat>
    <lon>-104.3816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68760/IPQ1S</id>
    <plant_name>Quantum Solar</plant_name>
    <generator_id>IPQ1S</generator_id>
    <plant_id>68760</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>362.8</nameplate_mw>
    <summer_mw>320.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.0129</lat>
    <lon>-99.5604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68762/IPQ2S</id>
    <plant_name>Quantum II Solar</plant_name>
    <generator_id>IPQ2S</generator_id>
    <plant_id>68762</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>362.8</nameplate_mw>
    <summer_mw>320.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.1377</lat>
    <lon>-99.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68745/SS2</id>
    <plant_name>Sunfish Solar 2</plant_name>
    <generator_id>SS2</generator_id>
    <plant_id>68745</plant_id>
    <state>MI</state>
    <county>Calhoun</county>
    <developer>Consumers Energy Co - (MI)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.24653</lat>
    <lon>-85.00559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT5</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT5</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT6</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT6</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT2</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT2</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT3</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT3</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT7</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT7</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT4</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT4</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CT1</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70200/64205</id>
    <plant_name>Lucy Solar</plant_name>
    <generator_id>64205</generator_id>
    <plant_id>70200</plant_id>
    <state>TX</state>
    <county>Concho</county>
    <developer>Concho County Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>351.3</nameplate_mw>
    <summer_mw>351.3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.472348</lat>
    <lon>-99.99328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66915/CTW</id>
    <plant_name>Cottonwood Bayou Solar</plant_name>
    <generator_id>CTW</generator_id>
    <plant_id>66915</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Cottonwood Bayou Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.263123</lat>
    <lon>-95.258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67359/4666</id>
    <plant_name>Funston Solar</plant_name>
    <generator_id>4666</generator_id>
    <plant_id>67359</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Funston Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.783669</lat>
    <lon>-99.72019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68065/CHILS</id>
    <plant_name>Chillingham Solar</plant_name>
    <generator_id>CHILS</generator_id>
    <plant_id>68065</plant_id>
    <state>TX</state>
    <county>Bell</county>
    <developer>Chillingham Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.006</lat>
    <lon>-97.262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65854/RDYBS</id>
    <plant_name>Rowdy Creek Solar and BESS</plant_name>
    <generator_id>RDYBS</generator_id>
    <plant_id>65854</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.75694</lat>
    <lon>-95.6458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69796/HARVS</id>
    <plant_name>Harvey Solar</plant_name>
    <generator_id>HARVS</generator_id>
    <plant_id>69796</plant_id>
    <state>OH</state>
    <county>Licking</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.273115</lat>
    <lon>-82.71962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68039/ELISA</id>
    <plant_name>Elisabeth Solar</plant_name>
    <generator_id>ELISA</generator_id>
    <plant_id>68039</plant_id>
    <state>AZ</state>
    <county>Yuma</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.95453</lat>
    <lon>-113.4954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69989/PB2</id>
    <plant_name>Arkansas Cypress Solar Station</plant_name>
    <generator_id>PB2</generator_id>
    <plant_id>69989</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Entergy Arkansas LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.42</lat>
    <lon>-92.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68546/2</id>
    <plant_name>Smarr Combined Cycle Energy Facility</plant_name>
    <generator_id>2</generator_id>
    <plant_id>68546</plant_id>
    <state>GA</state>
    <county>Monroe</county>
    <developer>Oglethorpe Power Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CC</prime_mover>
    <nameplate_mw>345</nameplate_mw>
    <summer_mw>304</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.975936</lat>
    <lon>-83.84369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68940/CAPV</id>
    <plant_name>Country Acres Clean Power LLC</plant_name>
    <generator_id>CAPV</generator_id>
    <plant_id>68940</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>344</nameplate_mw>
    <summer_mw>344</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>38.751744</lat>
    <lon>-121.4221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68305/GWT2</id>
    <plant_name>Gigawatt Solar</plant_name>
    <generator_id>GWT2</generator_id>
    <plant_id>68305</plant_id>
    <state>TX</state>
    <county>Parker</county>
    <developer>Gigawatt Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>344</nameplate_mw>
    <summer_mw>344</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.547389</lat>
    <lon>-97.59792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69661/IPD1S</id>
    <plant_name>Darden I Solar</plant_name>
    <generator_id>IPD1S</generator_id>
    <plant_id>69661</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>342.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.504106</lat>
    <lon>-120.2167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69662/IPD2S</id>
    <plant_name>Darden II Solar</plant_name>
    <generator_id>IPD2S</generator_id>
    <plant_id>69662</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>342.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.457086</lat>
    <lon>-120.2248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69663/IPD3S</id>
    <plant_name>Darden III Solar</plant_name>
    <generator_id>IPD3S</generator_id>
    <plant_id>69663</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>342.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.499703</lat>
    <lon>-120.1912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69664/IPD4S</id>
    <plant_name>Darden IV Solar</plant_name>
    <generator_id>IPD4S</generator_id>
    <plant_id>69664</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>342.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.464339</lat>
    <lon>-120.1862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69184/WF5ST</id>
    <plant_name>Waterford 5</plant_name>
    <generator_id>WF5ST</generator_id>
    <plant_id>69184</plant_id>
    <state>LA</state>
    <county>St Charles</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>342</nameplate_mw>
    <summer_mw>310</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>29.988583</lat>
    <lon>-90.48565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69185/JPS1</id>
    <plant_name>Jefferson Power Station</plant_name>
    <generator_id>JPS1</generator_id>
    <plant_id>69185</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Entergy Arkansas LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>342</nameplate_mw>
    <summer_mw>310</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.427527</lat>
    <lon>-92.13996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69445/ST1</id>
    <plant_name>Waterford 6</plant_name>
    <generator_id>ST1</generator_id>
    <plant_id>69445</plant_id>
    <state>LA</state>
    <county>St Charles</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>342</nameplate_mw>
    <summer_mw>310</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>29.988583</lat>
    <lon>-90.48565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67914/1C</id>
    <plant_name>Delta Blues Advanced Power Station</plant_name>
    <generator_id>1C</generator_id>
    <plant_id>67914</plant_id>
    <state>MS</state>
    <county>Washington</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>341.7</nameplate_mw>
    <summer_mw>291.5</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.330476</lat>
    <lon>-91.13058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69223/ST1</id>
    <plant_name>Vicksburg Advanced Power Station</plant_name>
    <generator_id>ST1</generator_id>
    <plant_id>69223</plant_id>
    <state>MS</state>
    <county>Warren</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>341.7</nameplate_mw>
    <summer_mw>291.9</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.28526</lat>
    <lon>-90.92568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70187/ST1</id>
    <plant_name>Traceview Advanced Power Station</plant_name>
    <generator_id>ST1</generator_id>
    <plant_id>70187</plant_id>
    <state>MS</state>
    <county>Madison</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>341.7</nameplate_mw>
    <summer_mw>291.9</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.405646</lat>
    <lon>-90.22114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69426/CA1</id>
    <plant_name>Westlake Power Station</plant_name>
    <generator_id>CA1</generator_id>
    <plant_id>69426</plant_id>
    <state>LA</state>
    <county>Calcasieu</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>341.7</nameplate_mw>
    <summer_mw>341.7</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.281105</lat>
    <lon>-93.30189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62954/GEN1</id>
    <plant_name>Alle-Catt Wind Energy LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>62954</plant_id>
    <state>NY</state>
    <county>Allegany</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>340</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.262038</lat>
    <lon>-78.20154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69040/ARY1</id>
    <plant_name>Arroyo Solar</plant_name>
    <generator_id>ARY1</generator_id>
    <plant_id>69040</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>335</nameplate_mw>
    <summer_mw>335</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.161657</lat>
    <lon>-104.5488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64999/CPNS1</id>
    <plant_name>Pecan Prairie North Solar</plant_name>
    <generator_id>CPNS1</generator_id>
    <plant_id>64999</plant_id>
    <state>TX</state>
    <county>Leon</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>324.1</nameplate_mw>
    <summer_mw>324.1</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.13718</lat>
    <lon>-96.26925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64669/KOV4A</id>
    <plant_name>Notch Peak Solar LLC</plant_name>
    <generator_id>KOV4A</generator_id>
    <plant_id>64669</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>Notch Peak Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>324</nameplate_mw>
    <summer_mw>324</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.520131</lat>
    <lon>-112.6602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/STG1</id>
    <plant_name>Kingston</plant_name>
    <generator_id>STG1</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>323</nameplate_mw>
    <summer_mw>296.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3399/STG2</id>
    <plant_name>Cumberland (TN)</plant_name>
    <generator_id>STG2</generator_id>
    <plant_id>3399</plant_id>
    <state>TN</state>
    <county>Stewart</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>323</nameplate_mw>
    <summer_mw>296.6</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.3903</lat>
    <lon>-87.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3399/STG1</id>
    <plant_name>Cumberland (TN)</plant_name>
    <generator_id>STG1</generator_id>
    <plant_id>3399</plant_id>
    <state>TN</state>
    <county>Stewart</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>323</nameplate_mw>
    <summer_mw>296.6</summer_mw>
    <planned_start>2034-12</planned_start>
    <planned_year>2034</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.3903</lat>
    <lon>-87.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66910/MYR</id>
    <plant_name>Myrtle Solar, LLC</plant_name>
    <generator_id>MYR</generator_id>
    <plant_id>66910</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Myrtle Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>313</nameplate_mw>
    <summer_mw>313</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.228486</lat>
    <lon>-95.42744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68214/1B</id>
    <plant_name>Franklin Farms 1&amp;2</plant_name>
    <generator_id>1B</generator_id>
    <plant_id>68214</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.53246</lat>
    <lon>-91.62767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68214/2B</id>
    <plant_name>Franklin Farms 1&amp;2</plant_name>
    <generator_id>2B</generator_id>
    <plant_id>68214</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.53246</lat>
    <lon>-91.62767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69449/1B</id>
    <plant_name>Richland Parish Power Station 1&amp;2</plant_name>
    <generator_id>1B</generator_id>
    <plant_id>69449</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.468339</lat>
    <lon>-91.68038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69449/2B</id>
    <plant_name>Richland Parish Power Station 1&amp;2</plant_name>
    <generator_id>2B</generator_id>
    <plant_id>69449</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.468339</lat>
    <lon>-91.68038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69649/3B</id>
    <plant_name>Richland Parish Power Station 3</plant_name>
    <generator_id>3B</generator_id>
    <plant_id>69649</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.496716</lat>
    <lon>-91.69867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69650/4B</id>
    <plant_name>Richland Parish Power Station 4</plant_name>
    <generator_id>4B</generator_id>
    <plant_id>69650</plant_id>
    <state>LA</state>
    <county>Richland</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.497782</lat>
    <lon>-91.6997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC1B</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC1B</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC2B</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC2B</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2031-11</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69944/PC3B</id>
    <plant_name>Pointe Coupee Power Station</plant_name>
    <generator_id>PC3B</generator_id>
    <plant_id>69944</plant_id>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>311</nameplate_mw>
    <summer_mw>302.8</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.739</lat>
    <lon>-91.377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69930/MS2</id>
    <plant_name>Milford Solar Phase II</plant_name>
    <generator_id>MS2</generator_id>
    <plant_id>69930</plant_id>
    <state>UT</state>
    <county>Beaver</county>
    <developer>Milford Solar Phase II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>310</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>38.522442</lat>
    <lon>-113.0148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67776/GRS2B</id>
    <plant_name>Cuchillas PV and BESS</plant_name>
    <generator_id>GRS2B</generator_id>
    <plant_id>67776</plant_id>
    <state>TX</state>
    <county>Webb</county>
    <developer>Gransolar Texas Two LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>306.9</nameplate_mw>
    <summer_mw>306.9</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.644178</lat>
    <lon>-99.18445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66391/BESS</id>
    <plant_name>Ash Creek BESS</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>66391</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>ACTX BESS Project LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>306</nameplate_mw>
    <summer_mw>306</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.900218</lat>
    <lon>-97.01642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67776/GRS2P</id>
    <plant_name>Cuchillas PV and BESS</plant_name>
    <generator_id>GRS2P</generator_id>
    <plant_id>67776</plant_id>
    <state>TX</state>
    <county>Webb</county>
    <developer>Gransolar Texas Two LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>305.6</nameplate_mw>
    <summer_mw>305.6</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.644178</lat>
    <lon>-99.18445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66691/BRIGG</id>
    <plant_name>Briggs Solar, LLC</plant_name>
    <generator_id>BRIGG</generator_id>
    <plant_id>66691</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>305</nameplate_mw>
    <summer_mw>305</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.144326</lat>
    <lon>-99.55977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69661/IPD1B</id>
    <plant_name>Darden I Solar</plant_name>
    <generator_id>IPD1B</generator_id>
    <plant_id>69661</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>303.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.504106</lat>
    <lon>-120.2167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69662/IPD2B</id>
    <plant_name>Darden II Solar</plant_name>
    <generator_id>IPD2B</generator_id>
    <plant_id>69662</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>303.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.457086</lat>
    <lon>-120.2248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69663/IPD3B</id>
    <plant_name>Darden III Solar</plant_name>
    <generator_id>IPD3B</generator_id>
    <plant_id>69663</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>303.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.499703</lat>
    <lon>-120.1912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69664/IPD4B</id>
    <plant_name>Darden IV Solar</plant_name>
    <generator_id>IPD4B</generator_id>
    <plant_id>69664</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>303.7</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.464339</lat>
    <lon>-120.1862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65853/MIDBS</id>
    <plant_name>Banita Creek- Spindlepop Solar</plant_name>
    <generator_id>MIDBS</generator_id>
    <plant_id>65853</plant_id>
    <state>TX</state>
    <county>Nacogdoches</county>
    <developer>Parliament Energy Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>302.9</nameplate_mw>
    <summer_mw>302.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.5552</lat>
    <lon>-94.7919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68739/UVAPV</id>
    <plant_name>Uva Creek Solar</plant_name>
    <generator_id>UVAPV</generator_id>
    <plant_id>68739</plant_id>
    <state>TX</state>
    <county>Borden</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>301</nameplate_mw>
    <summer_mw>301</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.679762</lat>
    <lon>-101.5044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63798/ATL01</id>
    <plant_name>Atlas</plant_name>
    <generator_id>ATL01</generator_id>
    <plant_id>63798</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>174 Power Global Corp.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.94345</lat>
    <lon>-113.7917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66545/MMTHS</id>
    <plant_name>Mammoth South Solar Project</plant_name>
    <generator_id>MMTHS</generator_id>
    <plant_id>66545</plant_id>
    <state>IN</state>
    <county>Pulaski</county>
    <developer>Mammoth South LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.095334</lat>
    <lon>-86.69157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69055/ALTS4</id>
    <plant_name>ATLAS SOLAR IV</plant_name>
    <generator_id>ALTS4</generator_id>
    <plant_id>69055</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>ATLAS SOLAR IV, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66546/MMTHC</id>
    <plant_name>Mammoth Central Solar Project</plant_name>
    <generator_id>MMTHC</generator_id>
    <plant_id>66546</plant_id>
    <state>IN</state>
    <county>Pulaski</county>
    <developer>Mammoth Central LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.090899</lat>
    <lon>-86.71283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68514/MC201</id>
    <plant_name>Mammoth Central II Solar Facility</plant_name>
    <generator_id>MC201</generator_id>
    <plant_id>68514</plant_id>
    <state>IN</state>
    <county>Pulaski</county>
    <developer>Mammoth Central II LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.090053</lat>
    <lon>-86.69398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69479/KSHKS</id>
    <plant_name>Koshkonong Solar Energy Center LLC</plant_name>
    <generator_id>KSHKS</generator_id>
    <plant_id>69479</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.976875</lat>
    <lon>-89.07209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69299/4519</id>
    <plant_name>Singer Solar</plant_name>
    <generator_id>4519</generator_id>
    <plant_id>69299</plant_id>
    <state>LA</state>
    <county>Beauregard</county>
    <developer>Singer Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.694644</lat>
    <lon>-93.33381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68328/ORCH1</id>
    <plant_name>Pioneer Clean Energy Center</plant_name>
    <generator_id>ORCH1</generator_id>
    <plant_id>68328</plant_id>
    <state>AZ</state>
    <county>Yuma</county>
    <developer>Yuma bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.549081</lat>
    <lon>-114.5974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68328/ORCH2</id>
    <plant_name>Pioneer Clean Energy Center</plant_name>
    <generator_id>ORCH2</generator_id>
    <plant_id>68328</plant_id>
    <state>AZ</state>
    <county>Yuma</county>
    <developer>Yuma bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.549081</lat>
    <lon>-114.5974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68184/COLES</id>
    <plant_name>Coles Wind</plant_name>
    <generator_id>COLES</generator_id>
    <plant_id>68184</plant_id>
    <state>IL</state>
    <county>Coles</county>
    <developer>Coles Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.605953</lat>
    <lon>-88.18026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69480/HGHNN</id>
    <plant_name>High Noon Solar Energy LLC</plant_name>
    <generator_id>HGHNN</generator_id>
    <plant_id>69480</plant_id>
    <state>WI</state>
    <county>Columbia</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.35326</lat>
    <lon>-89.34738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70020/1</id>
    <plant_name>Pinopolis BESS</plant_name>
    <generator_id>1</generator_id>
    <plant_id>70020</plant_id>
    <state>SC</state>
    <county>Berkeley</county>
    <developer>Pinopolis BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SC</balancing_authority>
    <lat>33.246764</lat>
    <lon>-79.98517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68030/RDHLW</id>
    <plant_name>Red Hollow Renewable Energy</plant_name>
    <generator_id>RDHLW</generator_id>
    <plant_id>68030</plant_id>
    <state>TX</state>
    <county>Archer</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.564936</lat>
    <lon>-98.612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68030/RHLWB</id>
    <plant_name>Red Hollow Renewable Energy</plant_name>
    <generator_id>RHLWB</generator_id>
    <plant_id>68030</plant_id>
    <state>TX</state>
    <county>Archer</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.564936</lat>
    <lon>-98.612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69364/REDEG</id>
    <plant_name>Red Egret</plant_name>
    <generator_id>REDEG</generator_id>
    <plant_id>69364</plant_id>
    <state>TX</state>
    <county>Galveston</county>
    <developer>Red Egret, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.4229</lat>
    <lon>-95.0049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70097/SWB</id>
    <plant_name>Sherco BESS</plant_name>
    <generator_id>SWB</generator_id>
    <plant_id>70097</plant_id>
    <state>MN</state>
    <county>Sherburne</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.372125</lat>
    <lon>-93.89978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60070/GEN</id>
    <plant_name>Nolin Hills</plant_name>
    <generator_id>GEN</generator_id>
    <plant_id>60070</plant_id>
    <state>OR</state>
    <county>Umatilla</county>
    <developer>Nolin Hills Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.55455</lat>
    <lon>-119.1143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60070/GEN2</id>
    <plant_name>Nolin Hills</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>60070</plant_id>
    <state>OR</state>
    <county>Umatilla</county>
    <developer>Nolin Hills Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.55455</lat>
    <lon>-119.1143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65850/ELIBS</id>
    <plant_name>Elio Energy LLC</plant_name>
    <generator_id>ELIBS</generator_id>
    <plant_id>65850</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Elio Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.247678</lat>
    <lon>-95.68546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66309/UVPV2</id>
    <plant_name>Uvalde Solar 2</plant_name>
    <generator_id>UVPV2</generator_id>
    <plant_id>66309</plant_id>
    <state>TX</state>
    <county>Uvalde</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.225768</lat>
    <lon>-99.69913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66426/1EUS</id>
    <plant_name>Utah Solar 1</plant_name>
    <generator_id>1EUS</generator_id>
    <plant_id>66426</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>ECG Utah Solar1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.504761</lat>
    <lon>-112.5077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66908/BZPV</id>
    <plant_name>Bonanza Solar and Storage Project</plant_name>
    <generator_id>BZPV</generator_id>
    <plant_id>66908</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.558</lat>
    <lon>-115.799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68033/SNRSE</id>
    <plant_name>Sunrose Renewable Energy</plant_name>
    <generator_id>SNRSE</generator_id>
    <plant_id>68033</plant_id>
    <state>TX</state>
    <county>Austin</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.674226</lat>
    <lon>-96.12137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68033/SRSEB</id>
    <plant_name>Sunrose Renewable Energy</plant_name>
    <generator_id>SRSEB</generator_id>
    <plant_id>68033</plant_id>
    <state>TX</state>
    <county>Austin</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.674226</lat>
    <lon>-96.12137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69963/YLWWD</id>
    <plant_name>Yellow Wood Solar Energy LLC</plant_name>
    <generator_id>YLWWD</generator_id>
    <plant_id>69963</plant_id>
    <state>OH</state>
    <county>Clinton</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.271465</lat>
    <lon>-83.7904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70097/SSB</id>
    <plant_name>Sherco BESS</plant_name>
    <generator_id>SSB</generator_id>
    <plant_id>70097</plant_id>
    <state>MN</state>
    <county>Sherburne</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.372125</lat>
    <lon>-93.89978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70204/CANPV</id>
    <plant_name>Cantaloupe Solar</plant_name>
    <generator_id>CANPV</generator_id>
    <plant_id>70204</plant_id>
    <state>TX</state>
    <county>Reeves</county>
    <developer>Cantaloupe Solar - ERCOT</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.05668</lat>
    <lon>-103.6634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70238/RDHS</id>
    <plant_name>Roadhouse Energy Center</plant_name>
    <generator_id>RDHS</generator_id>
    <plant_id>70238</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Roadhouse Energy Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.0065</lat>
    <lon>-117.5696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70330/BRSPV</id>
    <plant_name>Bighorn Ridge Solar</plant_name>
    <generator_id>BRSPV</generator_id>
    <plant_id>70330</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>NextEra Energy Resources - ERCOT</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.956251</lat>
    <lon>-103.028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70583/HLS01</id>
    <plant_name>Highland Solar I, LLC - (CO)</plant_name>
    <generator_id>HLS01</generator_id>
    <plant_id>70583</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Highland Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.41955</lat>
    <lon>-104.2277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68076/ROCKY</id>
    <plant_name>Rocky Run Solar</plant_name>
    <generator_id>ROCKY</generator_id>
    <plant_id>68076</plant_id>
    <state>VA</state>
    <county>Brunswick</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37</lat>
    <lon>-78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68758/IPEA3</id>
    <plant_name>Easley Solar</plant_name>
    <generator_id>IPEA3</generator_id>
    <plant_id>68758</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.722655</lat>
    <lon>-115.326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64208/30PNB</id>
    <plant_name>Red Antelope Solar &amp; Energy Storage Farm</plant_name>
    <generator_id>30PNB</generator_id>
    <plant_id>64208</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>302PN 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>36.7</lat>
    <lon>-111.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68813/VITEX</id>
    <plant_name>Vitex Storage</plant_name>
    <generator_id>VITEX</generator_id>
    <plant_id>68813</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.382286</lat>
    <lon>-114.9102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63113/BESS</id>
    <plant_name>Southern Bighorn Solar Hybrid</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>63113</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>300MS 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.304793</lat>
    <lon>-114.4728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63113/SBS</id>
    <plant_name>Southern Bighorn Solar Hybrid</plant_name>
    <generator_id>SBS</generator_id>
    <plant_id>63113</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>300MS 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.304793</lat>
    <lon>-114.4728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69763/HPS</id>
    <plant_name>Heritage Prairie Solar LLC</plant_name>
    <generator_id>HPS</generator_id>
    <plant_id>69763</plant_id>
    <state>IL</state>
    <county>Kankakee</county>
    <developer>Pattern Operators LP</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.06713</lat>
    <lon>-88.2497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68283/DESA</id>
    <plant_name>Desert Sand BESS</plant_name>
    <generator_id>DESA</generator_id>
    <plant_id>68283</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>DESA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.497049</lat>
    <lon>-113.0514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68283/DESA1</id>
    <plant_name>Desert Sand BESS</plant_name>
    <generator_id>DESA1</generator_id>
    <plant_id>68283</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>DESA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.497049</lat>
    <lon>-113.0514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70367/OBAES</id>
    <plant_name>O'Bannion Energy Storage</plant_name>
    <generator_id>OBAES</generator_id>
    <plant_id>70367</plant_id>
    <state>TX</state>
    <county>Jack</county>
    <developer>O'Bannion Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.041</lat>
    <lon>-98.339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68298/THSI1</id>
    <plant_name>THREE SISTERS Solar Generation and BESS</plant_name>
    <generator_id>THSI1</generator_id>
    <plant_id>68298</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>THSI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.053732</lat>
    <lon>-109.823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68298/THSI2</id>
    <plant_name>THREE SISTERS Solar Generation and BESS</plant_name>
    <generator_id>THSI2</generator_id>
    <plant_id>68298</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>THSI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.053732</lat>
    <lon>-109.823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68371/REBU</id>
    <plant_name>Red Butte Solar and Storage</plant_name>
    <generator_id>REBU</generator_id>
    <plant_id>68371</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.6134</lat>
    <lon>-113.644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68371/REBU2</id>
    <plant_name>Red Butte Solar and Storage</plant_name>
    <generator_id>REBU2</generator_id>
    <plant_id>68371</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.6134</lat>
    <lon>-113.644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67649/AMERA</id>
    <plant_name>Amerada</plant_name>
    <generator_id>AMERA</generator_id>
    <plant_id>67649</plant_id>
    <state>TX</state>
    <county>Freestone</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.861926</lat>
    <lon>-96.11463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65703/HEHUM</id>
    <plant_name>Humidor Storage I</plant_name>
    <generator_id>HEHUM</generator_id>
    <plant_id>65703</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Hecate Grid Humidor Storage 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.29116</lat>
    <lon>-118.7518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68344/LOSN1</id>
    <plant_name>Lower Snake Solar Generation BESS</plant_name>
    <generator_id>LOSN1</generator_id>
    <plant_id>68344</plant_id>
    <state>WA</state>
    <county>Garfield</county>
    <developer>LOSN, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.502392</lat>
    <lon>-117.8263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68344/LOSN2</id>
    <plant_name>Lower Snake Solar Generation BESS</plant_name>
    <generator_id>LOSN2</generator_id>
    <plant_id>68344</plant_id>
    <state>WA</state>
    <county>Garfield</county>
    <developer>LOSN, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.502392</lat>
    <lon>-117.8263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67819/CRSB1</id>
    <plant_name>Robinson Solar</plant_name>
    <generator_id>CRSB1</generator_id>
    <plant_id>67819</plant_id>
    <state>NV</state>
    <county>White Pine</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>39.298603</lat>
    <lon>-115.2192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67819/CRSS1</id>
    <plant_name>Robinson Solar</plant_name>
    <generator_id>CRSS1</generator_id>
    <plant_id>67819</plant_id>
    <state>NV</state>
    <county>White Pine</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>39.298603</lat>
    <lon>-115.2192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69640/73509</id>
    <plant_name>Cazadores Solar</plant_name>
    <generator_id>73509</generator_id>
    <plant_id>69640</plant_id>
    <state>TX</state>
    <county>Duval</county>
    <developer>Cazadores Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.392246</lat>
    <lon>-98.50107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61170/33UI8</id>
    <plant_name>Gale 1 Solar</plant_name>
    <generator_id>33UI8</generator_id>
    <plant_id>61170</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>33UI 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.523</lat>
    <lon>-112.546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69643/60215</id>
    <plant_name>Deep Space Solar</plant_name>
    <generator_id>60215</generator_id>
    <plant_id>69643</plant_id>
    <state>CO</state>
    <county>Kiowa</county>
    <developer>Deep Space Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.402141</lat>
    <lon>-103.286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69644/58441</id>
    <plant_name>Pease River Solar</plant_name>
    <generator_id>58441</generator_id>
    <plant_id>69644</plant_id>
    <state>TX</state>
    <county>Foard</county>
    <developer>Pease River Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.991957</lat>
    <lon>-99.69277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68186/FIRE</id>
    <plant_name>Firelands Wind</plant_name>
    <generator_id>FIRE</generator_id>
    <plant_id>68186</plant_id>
    <state>OH</state>
    <county>Huron</county>
    <developer>Firelands Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>297</nameplate_mw>
    <summer_mw>297</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.210325</lat>
    <lon>-82.77908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68339/1</id>
    <plant_name>Abercrombie Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68339</plant_id>
    <state>ND</state>
    <county>Richland</county>
    <developer>Otter Tail Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>295.1</nameplate_mw>
    <summer_mw>295.1</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.4277</lat>
    <lon>-96.8259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69150/SYPRT</id>
    <plant_name>Sypert Branch Solar</plant_name>
    <generator_id>SYPRT</generator_id>
    <plant_id>69150</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Sypert Branch Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>293.9</nameplate_mw>
    <summer_mw>260</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.877895</lat>
    <lon>-97.1944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68758/IPEA1</id>
    <plant_name>Easley Solar</plant_name>
    <generator_id>IPEA1</generator_id>
    <plant_id>68758</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>IPX Power USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>290</nameplate_mw>
    <summer_mw>290</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.722655</lat>
    <lon>-115.326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59243/CHAN1</id>
    <plant_name>Changing Winds</plant_name>
    <generator_id>CHAN1</generator_id>
    <plant_id>59243</plant_id>
    <state>TX</state>
    <county>Castro</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>288</nameplate_mw>
    <summer_mw>288</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.511944</lat>
    <lon>-102.0519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69606/7496</id>
    <plant_name>Monarch Creek Wind, LLC</plant_name>
    <generator_id>7496</generator_id>
    <plant_id>69606</plant_id>
    <state>TX</state>
    <county>Throckmorton</county>
    <developer>Monarch Creek Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>287.6</nameplate_mw>
    <summer_mw>287.6</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.183899</lat>
    <lon>-99.42239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68507/EEC</id>
    <plant_name>Excelsior Energy Center</plant_name>
    <generator_id>EEC</generator_id>
    <plant_id>68507</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>Excelsior Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>280</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.064852</lat>
    <lon>-78.07681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69496/PDRA</id>
    <plant_name>Piedra Solar</plant_name>
    <generator_id>PDRA</generator_id>
    <plant_id>69496</plant_id>
    <state>TX</state>
    <county>Freestone</county>
    <developer>Piedra Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>280</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.648989</lat>
    <lon>-96.34517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8059/2S1</id>
    <plant_name>Comanche (OK)</plant_name>
    <generator_id>2S1</generator_id>
    <plant_id>8059</plant_id>
    <state>OK</state>
    <county>Comanche</county>
    <developer>Public Service Co of Oklahoma</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>277.6</nameplate_mw>
    <summer_mw>267</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.5431</lat>
    <lon>-98.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8059/3S1</id>
    <plant_name>Comanche (OK)</plant_name>
    <generator_id>3S1</generator_id>
    <plant_id>8059</plant_id>
    <state>OK</state>
    <county>Comanche</county>
    <developer>Public Service Co of Oklahoma</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>277.6</nameplate_mw>
    <summer_mw>267</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.5431</lat>
    <lon>-98.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67542/BHWP</id>
    <plant_name>Blue Hills Wind Project</plant_name>
    <generator_id>BHWP</generator_id>
    <plant_id>67542</plant_id>
    <state>TX</state>
    <county>Val Verde</county>
    <developer>Greenalia Wind Power Blue Hills, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>276</nameplate_mw>
    <summer_mw>276</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.233597</lat>
    <lon>-101.3636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69778/HK1SO</id>
    <plant_name>Hashknife Energy Center LLC</plant_name>
    <generator_id>HK1SO</generator_id>
    <plant_id>69778</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>275</nameplate_mw>
    <summer_mw>275</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.574259</lat>
    <lon>-110.4946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69778/HK1ST</id>
    <plant_name>Hashknife Energy Center LLC</plant_name>
    <generator_id>HK1ST</generator_id>
    <plant_id>69778</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>275</nameplate_mw>
    <summer_mw>275</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.574259</lat>
    <lon>-110.4946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66786/ELVMT</id>
    <plant_name>Elevate Middletown</plant_name>
    <generator_id>ELVMT</generator_id>
    <plant_id>66786</plant_id>
    <state>CT</state>
    <county>Middlesex</county>
    <developer>Lighthouse Middletown, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>275</nameplate_mw>
    <summer_mw>275</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.554321</lat>
    <lon>-72.57832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69588/YCWT</id>
    <plant_name>Yellow Cat Wind, LLC</plant_name>
    <generator_id>YCWT</generator_id>
    <plant_id>69588</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>270</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.07</lat>
    <lon>-96.83</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64911/CSRS1</id>
    <plant_name>South Ripley Solar</plant_name>
    <generator_id>CSRS1</generator_id>
    <plant_id>64911</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>270</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.198116</lat>
    <lon>-79.75789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA5</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA5</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA6</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA6</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA2</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA2</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA3</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA3</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA7</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA7</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA4</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA4</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3122/CA1</id>
    <plant_name>Homer City Generating Station</plant_name>
    <generator_id>CA1</generator_id>
    <plant_id>3122</plant_id>
    <state>PA</state>
    <county>Indiana</county>
    <developer>Homer City Generation, L.P.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>268</nameplate_mw>
    <summer_mw>268</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.512825</lat>
    <lon>-79.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69403/GOOD2</id>
    <plant_name>Goodnight Wind II</plant_name>
    <generator_id>GOOD2</generator_id>
    <plant_id>69403</plant_id>
    <state>TX</state>
    <county>Armstrong</county>
    <developer>FGE Goodnight II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>265.5</nameplate_mw>
    <summer_mw>265.5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.937162</lat>
    <lon>-101.4339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/CT1</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>265.4</nameplate_mw>
    <summer_mw>239.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/CT2</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>CT2</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>265.4</nameplate_mw>
    <summer_mw>239.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68873/BIGS</id>
    <plant_name>Big Sampson Wind</plant_name>
    <generator_id>BIGS</generator_id>
    <plant_id>68873</plant_id>
    <state>TX</state>
    <county>Crockett</county>
    <developer>Big Sampson Wind Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>265</nameplate_mw>
    <summer_mw>265</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.981883</lat>
    <lon>-101.8505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64547/3</id>
    <plant_name>Turtle Creek</plant_name>
    <generator_id>3</generator_id>
    <plant_id>64547</plant_id>
    <state>NE</state>
    <county>Sarpy</county>
    <developer>Omaha Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>264</nameplate_mw>
    <summer_mw>221</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.092238</lat>
    <lon>-96.16831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55972/CT-3</id>
    <plant_name>Cass County</plant_name>
    <generator_id>CT-3</generator_id>
    <plant_id>55972</plant_id>
    <state>NE</state>
    <county>Cass</county>
    <developer>Omaha Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>264</nameplate_mw>
    <summer_mw>221</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.947913</lat>
    <lon>-95.96403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55972/CT-4</id>
    <plant_name>Cass County</plant_name>
    <generator_id>CT-4</generator_id>
    <plant_id>55972</plant_id>
    <state>NE</state>
    <county>Cass</county>
    <developer>Omaha Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>264</nameplate_mw>
    <summer_mw>221</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.947913</lat>
    <lon>-95.96403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55972/CT-5</id>
    <plant_name>Cass County</plant_name>
    <generator_id>CT-5</generator_id>
    <plant_id>55972</plant_id>
    <state>NE</state>
    <county>Cass</county>
    <developer>Omaha Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>264</nameplate_mw>
    <summer_mw>221</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.947913</lat>
    <lon>-95.96403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69071/CA1</id>
    <plant_name>Bison Generation Station</plant_name>
    <generator_id>CA1</generator_id>
    <plant_id>69071</plant_id>
    <state>ND</state>
    <county>Williams</county>
    <developer>Basin Electric Power Coop</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>263</nameplate_mw>
    <summer_mw>320</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>48.327932</lat>
    <lon>-103.3127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69071/CA2</id>
    <plant_name>Bison Generation Station</plant_name>
    <generator_id>CA2</generator_id>
    <plant_id>69071</plant_id>
    <state>ND</state>
    <county>Williams</county>
    <developer>Basin Electric Power Coop</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>263</nameplate_mw>
    <summer_mw>320</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>48.327932</lat>
    <lon>-103.3127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7916/7</id>
    <plant_name>Talbot County Energy</plant_name>
    <generator_id>7</generator_id>
    <plant_id>7916</plant_id>
    <state>GA</state>
    <county>Talbot</county>
    <developer>Oglethorpe Power Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>262</nameplate_mw>
    <summer_mw>241</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.5892</lat>
    <lon>-84.6917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69635/74964</id>
    <plant_name>Peach Wood Solar</plant_name>
    <generator_id>74964</generator_id>
    <plant_id>69635</plant_id>
    <state>GA</state>
    <county>Mitchell</county>
    <developer>Peach WoodSolar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>261</nameplate_mw>
    <summer_mw>261</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.343419</lat>
    <lon>-84.21269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70419/RSBA</id>
    <plant_name>Royal Slope</plant_name>
    <generator_id>RSBA</generator_id>
    <plant_id>70419</plant_id>
    <state>WA</state>
    <county>Grant</county>
    <developer>Royal Slope Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>260</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.883147</lat>
    <lon>-119.9207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70419/RSPV</id>
    <plant_name>Royal Slope</plant_name>
    <generator_id>RSPV</generator_id>
    <plant_id>70419</plant_id>
    <state>WA</state>
    <county>Grant</county>
    <developer>Royal Slope Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>260</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.883147</lat>
    <lon>-119.9207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65893/OCIRO</id>
    <plant_name>OCI SunRoper</plant_name>
    <generator_id>OCIRO</generator_id>
    <plant_id>65893</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>OCI Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>260</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.240399</lat>
    <lon>-96.01154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1G01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1G01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1G02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1G02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1G03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1G03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2G01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2G01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2G02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2G02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2G03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2G03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>242.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70407/RSS</id>
    <plant_name>Roy Solar</plant_name>
    <generator_id>RSS</generator_id>
    <plant_id>70407</plant_id>
    <state>OK</state>
    <county>Stephens</county>
    <developer>Roy Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>258</nameplate_mw>
    <summer_mw>258</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SPA</balancing_authority>
    <lat>34.309919</lat>
    <lon>-96.77935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67837/RAYRS</id>
    <plant_name>Ray Ranch Solar</plant_name>
    <generator_id>RAYRS</generator_id>
    <plant_id>67837</plant_id>
    <state>TX</state>
    <county>Goliad</county>
    <developer>Ray Ranch Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>255.2</nameplate_mw>
    <summer_mw>255.2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.628</lat>
    <lon>-97.724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66411/RMSY</id>
    <plant_name>Hecate Grid East Valley Storage</plant_name>
    <generator_id>RMSY</generator_id>
    <plant_id>66411</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Hecate Grid East Valley Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>255</nameplate_mw>
    <summer_mw>255</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>25.94113</lat>
    <lon>-97.53276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70299/814</id>
    <plant_name>Pioneer Creek Wind, LLC</plant_name>
    <generator_id>814</generator_id>
    <plant_id>70299</plant_id>
    <state>KS</state>
    <county>Ford</county>
    <developer>NextEra Energy Resources, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>252</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.735053</lat>
    <lon>-99.80556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64835/NA</id>
    <plant_name>Silver Queen Wind Farm</plant_name>
    <generator_id>NA</generator_id>
    <plant_id>64835</plant_id>
    <state>IA</state>
    <county>Crawford</county>
    <developer>Silver Queen Wind Farm, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>252</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>42.002397</lat>
    <lon>-95.1316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69892/OAK</id>
    <plant_name>Oak Valley Solar</plant_name>
    <generator_id>OAK</generator_id>
    <plant_id>69892</plant_id>
    <state>TX</state>
    <county>Ellis</county>
    <developer>Oak Valley Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>251.3</nameplate_mw>
    <summer_mw>251.3</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.012951</lat>
    <lon>-96.49974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69681/DRAKE</id>
    <plant_name>Mallard Energy Storage</plant_name>
    <generator_id>DRAKE</generator_id>
    <plant_id>69681</plant_id>
    <state>TX</state>
    <county>Collin</county>
    <developer>Mallard Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.064274</lat>
    <lon>-96.45051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69968/RUS</id>
    <plant_name>Rumble Solar</plant_name>
    <generator_id>RUS</generator_id>
    <plant_id>69968</plant_id>
    <state>OK</state>
    <county>Grady</county>
    <developer>Rumble Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.338721</lat>
    <lon>-97.98901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68325/SMS</id>
    <plant_name>Show Me State Solar</plant_name>
    <generator_id>SMS</generator_id>
    <plant_id>68325</plant_id>
    <state>MO</state>
    <county>Callaway</county>
    <developer>Show Me State Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.958702</lat>
    <lon>-91.94479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65880/ZEYA</id>
    <plant_name>Zeya</plant_name>
    <generator_id>ZEYA</generator_id>
    <plant_id>65880</plant_id>
    <state>TX</state>
    <county>Galveston</county>
    <developer>Engie North America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.388758</lat>
    <lon>-94.94793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67357/4666</id>
    <plant_name>Tiger Solar</plant_name>
    <generator_id>4666</generator_id>
    <plant_id>67357</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Vaca Del Sol, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.796921</lat>
    <lon>-99.88089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70137/DL250</id>
    <plant_name>Dry Land Prairie Energy Storage</plant_name>
    <generator_id>DL250</generator_id>
    <plant_id>70137</plant_id>
    <state>CO</state>
    <county>Cheyenne</county>
    <developer>Dry Land Prairie Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.99974</lat>
    <lon>-102.4943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70053/SP250</id>
    <plant_name>South Platte Storage</plant_name>
    <generator_id>SP250</generator_id>
    <plant_id>70053</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>South Platte Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.12</lat>
    <lon>-103.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70300/USADC</id>
    <plant_name>Adams Creek Solar Project</plant_name>
    <generator_id>USADC</generator_id>
    <plant_id>70300</plant_id>
    <state>TX</state>
    <county>Wilbarger</county>
    <developer>Adams Creek Solar Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.15382</lat>
    <lon>-98.96333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69887/PRTGS</id>
    <plant_name>Portage Solar, LLC</plant_name>
    <generator_id>PRTGS</generator_id>
    <plant_id>69887</plant_id>
    <state>WI</state>
    <county>Portage</county>
    <developer>Geronimo Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.456358</lat>
    <lon>-89.54401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70178/CBLT</id>
    <plant_name>Cobalt</plant_name>
    <generator_id>CBLT</generator_id>
    <plant_id>70178</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>RE Cobalt LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.571</lat>
    <lon>-118.1789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66706/11101</id>
    <plant_name>Patoka Solar</plant_name>
    <generator_id>11101</generator_id>
    <plant_id>66706</plant_id>
    <state>IN</state>
    <county>Posey</county>
    <developer>Strata Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.14033</lat>
    <lon>-87.77567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66707/11102</id>
    <plant_name>Prairie Oak Solar</plant_name>
    <generator_id>11102</generator_id>
    <plant_id>66707</plant_id>
    <state>IL</state>
    <county>Shelby</county>
    <developer>Strata Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.542799</lat>
    <lon>-89.03153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67552/ELMBA</id>
    <plant_name>Elm Flats Solar</plant_name>
    <generator_id>ELMBA</generator_id>
    <plant_id>67552</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.113579</lat>
    <lon>-96.30476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68583/RRB</id>
    <plant_name>Rock N' Roll</plant_name>
    <generator_id>RRB</generator_id>
    <plant_id>68583</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.299371</lat>
    <lon>-95.42218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67226/ROCKH</id>
    <plant_name>Rock House Solar</plant_name>
    <generator_id>ROCKH</generator_id>
    <plant_id>67226</plant_id>
    <state>GA</state>
    <county>McDuffie</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.4481</lat>
    <lon>-82.4039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63202/701</id>
    <plant_name>TREX US Red Holly</plant_name>
    <generator_id>701</generator_id>
    <plant_id>63202</plant_id>
    <state>TX</state>
    <county>Lynn</county>
    <developer>TREX US Red Holly LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.952</lat>
    <lon>-101.737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69721/BESS1</id>
    <plant_name>Energizar BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>69721</plant_id>
    <state>MA</state>
    <county>Suffolk</county>
    <developer>Energizar Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.39556</lat>
    <lon>-71.02218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70047/SSPV</id>
    <plant_name>Selenite Springs Solar</plant_name>
    <generator_id>SSPV</generator_id>
    <plant_id>70047</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>NextEra Energy Resources - ERCOT</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.992503</lat>
    <lon>-103.0571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70462/PAWS</id>
    <plant_name>Pawnee Solar &amp; BESS</plant_name>
    <generator_id>PAWS</generator_id>
    <plant_id>70462</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.127571</lat>
    <lon>-103.7249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70034/ES</id>
    <plant_name>Evlou Solar, LLC</plant_name>
    <generator_id>ES</generator_id>
    <plant_id>70034</plant_id>
    <state>TX</state>
    <county>El Paso</county>
    <developer>Evlou Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>31.507744</lat>
    <lon>-106.0534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70034/ESS</id>
    <plant_name>Evlou Solar, LLC</plant_name>
    <generator_id>ESS</generator_id>
    <plant_id>70034</plant_id>
    <state>TX</state>
    <county>El Paso</county>
    <developer>Evlou Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>31.507744</lat>
    <lon>-106.0534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67987/MYSPB</id>
    <plant_name>Mystic Springs Renewable Energy (Hybrid)</plant_name>
    <generator_id>MYSPB</generator_id>
    <plant_id>67987</plant_id>
    <state>TX</state>
    <county>Kaufman</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.821255</lat>
    <lon>-96.19042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67987/MYSPS</id>
    <plant_name>Mystic Springs Renewable Energy (Hybrid)</plant_name>
    <generator_id>MYSPS</generator_id>
    <plant_id>67987</plant_id>
    <state>TX</state>
    <county>Kaufman</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.821255</lat>
    <lon>-96.19042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70258/H2SLR</id>
    <plant_name>Hawkeye Solar II, LLC</plant_name>
    <generator_id>H2SLR</generator_id>
    <plant_id>70258</plant_id>
    <state>IA</state>
    <county>Clinton</county>
    <developer>Hawkeye Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.835204</lat>
    <lon>-90.69966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67982/ATHS1</id>
    <plant_name>Athens Solar I (Hybrid)</plant_name>
    <generator_id>ATHS1</generator_id>
    <plant_id>67982</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.754889</lat>
    <lon>-121.4071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67982/ATHSB</id>
    <plant_name>Athens Solar I (Hybrid)</plant_name>
    <generator_id>ATHSB</generator_id>
    <plant_id>67982</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.754889</lat>
    <lon>-121.4071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68883/STBA</id>
    <plant_name>Sawtooth Solar</plant_name>
    <generator_id>STBA</generator_id>
    <plant_id>68883</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.728</lat>
    <lon>-111.629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68883/STPV</id>
    <plant_name>Sawtooth Solar</plant_name>
    <generator_id>STPV</generator_id>
    <plant_id>68883</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.728</lat>
    <lon>-111.629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66684/HL001</id>
    <plant_name>Intermountain Pumped Storage Project</plant_name>
    <generator_id>HL001</generator_id>
    <plant_id>66684</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.414705</lat>
    <lon>-112.4404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66684/HL002</id>
    <plant_name>Intermountain Pumped Storage Project</plant_name>
    <generator_id>HL002</generator_id>
    <plant_id>66684</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.414705</lat>
    <lon>-112.4404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66684/HL003</id>
    <plant_name>Intermountain Pumped Storage Project</plant_name>
    <generator_id>HL003</generator_id>
    <plant_id>66684</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.414705</lat>
    <lon>-112.4404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66684/HL004</id>
    <plant_name>Intermountain Pumped Storage Project</plant_name>
    <generator_id>HL004</generator_id>
    <plant_id>66684</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.414705</lat>
    <lon>-112.4404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66686/HL001</id>
    <plant_name>Haiwee Pumped Storage Project</plant_name>
    <generator_id>HL001</generator_id>
    <plant_id>66686</plant_id>
    <state>CA</state>
    <county>Inyo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>36.233105</lat>
    <lon>-117.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66686/HL002</id>
    <plant_name>Haiwee Pumped Storage Project</plant_name>
    <generator_id>HL002</generator_id>
    <plant_id>66686</plant_id>
    <state>CA</state>
    <county>Inyo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>36.233105</lat>
    <lon>-117.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66686/HL003</id>
    <plant_name>Haiwee Pumped Storage Project</plant_name>
    <generator_id>HL003</generator_id>
    <plant_id>66686</plant_id>
    <state>CA</state>
    <county>Inyo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>36.233105</lat>
    <lon>-117.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66686/HL004</id>
    <plant_name>Haiwee Pumped Storage Project</plant_name>
    <generator_id>HL004</generator_id>
    <plant_id>66686</plant_id>
    <state>CA</state>
    <county>Inyo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>36.233105</lat>
    <lon>-117.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70397/SRSB1</id>
    <plant_name>Steel River Solar Phase 1</plant_name>
    <generator_id>SRSB1</generator_id>
    <plant_id>70397</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70515/PV1</id>
    <plant_name>Burt County Solar (Sandhills Energy)</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70515</plant_id>
    <state>NE</state>
    <county>Burt</county>
    <developer>Burt County Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.712811</lat>
    <lon>-96.15962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64912/CMPS1</id>
    <plant_name>Mill Point Solar</plant_name>
    <generator_id>CMPS1</generator_id>
    <plant_id>64912</plant_id>
    <state>NY</state>
    <county>Montgomery</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.919098</lat>
    <lon>-74.34116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68491/FPS</id>
    <plant_name>Freedom Pine Solar</plant_name>
    <generator_id>FPS</generator_id>
    <plant_id>68491</plant_id>
    <state>ME</state>
    <county>York</county>
    <developer>Freedom Pine Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.34779</lat>
    <lon>-70.8974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3797/CERC1</id>
    <plant_name>Chesterfield</plant_name>
    <generator_id>CERC1</generator_id>
    <plant_id>3797</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>Virginia Electric &amp; Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>233.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.3822</lat>
    <lon>-77.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3797/CERC2</id>
    <plant_name>Chesterfield</plant_name>
    <generator_id>CERC2</generator_id>
    <plant_id>3797</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>Virginia Electric &amp; Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>233.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.3822</lat>
    <lon>-77.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3797/CERC3</id>
    <plant_name>Chesterfield</plant_name>
    <generator_id>CERC3</generator_id>
    <plant_id>3797</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>Virginia Electric &amp; Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>233.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.3822</lat>
    <lon>-77.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3797/CERC4</id>
    <plant_name>Chesterfield</plant_name>
    <generator_id>CERC4</generator_id>
    <plant_id>3797</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>Virginia Electric &amp; Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>233.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.3822</lat>
    <lon>-77.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68351/CLAPV</id>
    <plant_name>Clairemont Solar</plant_name>
    <generator_id>CLAPV</generator_id>
    <plant_id>68351</plant_id>
    <state>TX</state>
    <county>Kent</county>
    <developer>Clairemont Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.371565</lat>
    <lon>-100.9758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68356/LUBA2</id>
    <plant_name>Lazy U ESS 2</plant_name>
    <generator_id>LUBA2</generator_id>
    <plant_id>68356</plant_id>
    <state>TX</state>
    <county>Hardeman</county>
    <developer>Lazy U ESS 2 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.265496</lat>
    <lon>-99.87214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68357/LUPV1</id>
    <plant_name>Lazy U Solar 1</plant_name>
    <generator_id>LUPV1</generator_id>
    <plant_id>68357</plant_id>
    <state>TX</state>
    <county>Hardeman</county>
    <developer>Lazy U Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.265496</lat>
    <lon>-99.87214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68358/LUPV2</id>
    <plant_name>Lazy U Solar 2</plant_name>
    <generator_id>LUPV2</generator_id>
    <plant_id>68358</plant_id>
    <state>TX</state>
    <county>Hardeman</county>
    <developer>Lazy U Solar 2 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.265496</lat>
    <lon>-99.87214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70398/SRSB2</id>
    <plant_name>Steel River Solar Phase 2</plant_name>
    <generator_id>SRSB2</generator_id>
    <plant_id>70398</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68355/LUBA1</id>
    <plant_name>Lazy U ESS 1</plant_name>
    <generator_id>LUBA1</generator_id>
    <plant_id>68355</plant_id>
    <state>TX</state>
    <county>Hardeman</county>
    <developer>Lazy U ESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.265496</lat>
    <lon>-99.87214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70399/SRSB3</id>
    <plant_name>Steel River Solar Phase 3</plant_name>
    <generator_id>SRSB3</generator_id>
    <plant_id>70399</plant_id>
    <state>AR</state>
    <county>Mississippi</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>35.578637</lat>
    <lon>-90.09763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67950/MFS1</id>
    <plant_name>Moonlight Flats Solar Power 1</plant_name>
    <generator_id>MFS1</generator_id>
    <plant_id>67950</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>Moonlight Flats Solar Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.092288</lat>
    <lon>-78.17989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69595/STGEN</id>
    <plant_name>Saddleback Generation Station</plant_name>
    <generator_id>STGEN</generator_id>
    <plant_id>69595</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Copia Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>230</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.410034</lat>
    <lon>-113.1694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69595/STGN2</id>
    <plant_name>Saddleback Generation Station</plant_name>
    <generator_id>STGN2</generator_id>
    <plant_id>69595</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Copia Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>230</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.410034</lat>
    <lon>-113.1694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63850/CHERY</id>
    <plant_name>Cherry</plant_name>
    <generator_id>CHERY</generator_id>
    <plant_id>63850</plant_id>
    <state>CA</state>
    <county>Kings</county>
    <developer>Westlands Cherry, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>249.7</nameplate_mw>
    <summer_mw>249.7</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.122457</lat>
    <lon>-119.9232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67862/SOLAR</id>
    <plant_name>Kingstree East 230 Solar Project</plant_name>
    <generator_id>SOLAR</generator_id>
    <plant_id>67862</plant_id>
    <state>SC</state>
    <county>Georgetown</county>
    <developer>Kingstree East 230 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>249</nameplate_mw>
    <summer_mw>249</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SC</balancing_authority>
    <lat>33.563633</lat>
    <lon>-79.46326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68370/SALM</id>
    <plant_name>Salmonfly Solar and Storage</plant_name>
    <generator_id>SALM</generator_id>
    <plant_id>68370</plant_id>
    <state>OR</state>
    <county>Jefferson</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>247</nameplate_mw>
    <summer_mw>247</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PGE</balancing_authority>
    <lat>44.6157</lat>
    <lon>-121.3436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68370/SALM2</id>
    <plant_name>Salmonfly Solar and Storage</plant_name>
    <generator_id>SALM2</generator_id>
    <plant_id>68370</plant_id>
    <state>OR</state>
    <county>Jefferson</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>247</nameplate_mw>
    <summer_mw>247</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PGE</balancing_authority>
    <lat>44.6157</lat>
    <lon>-121.3436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66701/BB1</id>
    <plant_name>Buffalo Branch Wind and Solar LLC</plant_name>
    <generator_id>BB1</generator_id>
    <plant_id>66701</plant_id>
    <state>MO</state>
    <county>Dade</county>
    <developer>Buffalo Branch Wind and Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>247</nameplate_mw>
    <summer_mw>247</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AECI</balancing_authority>
    <lat>37.38332</lat>
    <lon>-93.92999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63851/GRAPE</id>
    <plant_name>Grape</plant_name>
    <generator_id>GRAPE</generator_id>
    <plant_id>63851</plant_id>
    <state>CA</state>
    <county>Kings</county>
    <developer>Westlands Grape, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>246.4</nameplate_mw>
    <summer_mw>246.4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.145687</lat>
    <lon>-119.9051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68302/LAKET</id>
    <plant_name>Lake Trout Solar</plant_name>
    <generator_id>LAKET</generator_id>
    <plant_id>68302</plant_id>
    <state>IN</state>
    <county>Blackford</county>
    <developer>Lake Trout Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>245</nameplate_mw>
    <summer_mw>245</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.524925</lat>
    <lon>-85.30333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69506/GAIPV</id>
    <plant_name>Gail Mountain Solar</plant_name>
    <generator_id>GAIPV</generator_id>
    <plant_id>69506</plant_id>
    <state>TX</state>
    <county>Borden</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>244.4</nameplate_mw>
    <summer_mw>244.4</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.714612</lat>
    <lon>-101.5274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66896/LP2PV</id>
    <plant_name>Lupinus Solar 2, LLC</plant_name>
    <generator_id>LP2PV</generator_id>
    <plant_id>66896</plant_id>
    <state>TX</state>
    <county>Franklin</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>244</nameplate_mw>
    <summer_mw>244</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.303385</lat>
    <lon>-95.25692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70453/CT4</id>
    <plant_name>Red Oak Ridge Energy Center LLC</plant_name>
    <generator_id>CT4</generator_id>
    <plant_id>70453</plant_id>
    <state>WI</state>
    <county>Kenosha</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.631839</lat>
    <lon>-87.96625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70453/CT5</id>
    <plant_name>Red Oak Ridge Energy Center LLC</plant_name>
    <generator_id>CT5</generator_id>
    <plant_id>70453</plant_id>
    <state>WI</state>
    <county>Kenosha</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.631839</lat>
    <lon>-87.96625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70453/RDOR1</id>
    <plant_name>Red Oak Ridge Energy Center LLC</plant_name>
    <generator_id>RDOR1</generator_id>
    <plant_id>70453</plant_id>
    <state>WI</state>
    <county>Kenosha</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.631839</lat>
    <lon>-87.96625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70453/RDOR2</id>
    <plant_name>Red Oak Ridge Energy Center LLC</plant_name>
    <generator_id>RDOR2</generator_id>
    <plant_id>70453</plant_id>
    <state>WI</state>
    <county>Kenosha</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.631839</lat>
    <lon>-87.96625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70453/RDOR3</id>
    <plant_name>Red Oak Ridge Energy Center LLC</plant_name>
    <generator_id>RDOR3</generator_id>
    <plant_id>70453</plant_id>
    <state>WI</state>
    <county>Kenosha</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.631839</lat>
    <lon>-87.96625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66168/GEN01</id>
    <plant_name>Cattlemen Solar Park</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>66168</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Cattlemen Solar Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.045676</lat>
    <lon>-96.85863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68785/DHS1</id>
    <plant_name>Dolet Hills Solar</plant_name>
    <generator_id>DHS1</generator_id>
    <plant_id>68785</plant_id>
    <state>LA</state>
    <county>DeSoto</county>
    <developer>Dolet Hills Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.95595</lat>
    <lon>-93.62641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68264/12345</id>
    <plant_name>Rich Road Solar Energy Center</plant_name>
    <generator_id>12345</generator_id>
    <plant_id>68264</plant_id>
    <state>NY</state>
    <county>St Lawrence</county>
    <developer>Rich Road Solar Energy Center</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.567518</lat>
    <lon>-75.19654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6112/7</id>
    <plant_name>Fort St Vrain</plant_name>
    <generator_id>7</generator_id>
    <plant_id>6112</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>239</nameplate_mw>
    <summer_mw>177.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.2461</lat>
    <lon>-104.8742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6112/8</id>
    <plant_name>Fort St Vrain</plant_name>
    <generator_id>8</generator_id>
    <plant_id>6112</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>239</nameplate_mw>
    <summer_mw>177.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.2461</lat>
    <lon>-104.8742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68607/PJBS1</id>
    <plant_name>Pelicans Jaw Hybrid Solar</plant_name>
    <generator_id>PJBS1</generator_id>
    <plant_id>68607</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Pelicans Jaw Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>238.5</nameplate_mw>
    <summer_mw>238.5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.765183</lat>
    <lon>-119.7436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4041/11</id>
    <plant_name>South Oak Creek</plant_name>
    <generator_id>11</generator_id>
    <plant_id>4041</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>227.6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4041/12</id>
    <plant_name>South Oak Creek</plant_name>
    <generator_id>12</generator_id>
    <plant_id>4041</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>227.6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4041/13</id>
    <plant_name>South Oak Creek</plant_name>
    <generator_id>13</generator_id>
    <plant_id>4041</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>227.6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4041/14</id>
    <plant_name>South Oak Creek</plant_name>
    <generator_id>14</generator_id>
    <plant_id>4041</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>227.6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4041/15</id>
    <plant_name>South Oak Creek</plant_name>
    <generator_id>15</generator_id>
    <plant_id>4041</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>227.6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66421/GRS13</id>
    <plant_name>Despain Solar</plant_name>
    <generator_id>GRS13</generator_id>
    <plant_id>66421</plant_id>
    <state>TX</state>
    <county>Kinney</county>
    <developer>Gransolar Texas Thirteen, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>236.2</nameplate_mw>
    <summer_mw>236</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.282259</lat>
    <lon>-100.2098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69295/DFBSS</id>
    <plant_name>Duffy BESS</plant_name>
    <generator_id>DFBSS</generator_id>
    <plant_id>69295</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>Duffy Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>235.9</nameplate_mw>
    <summer_mw>235.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.854592</lat>
    <lon>-96.08606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6085/20</id>
    <plant_name>R M Schahfer</plant_name>
    <generator_id>20</generator_id>
    <plant_id>6085</plant_id>
    <state>IN</state>
    <county>Jasper</county>
    <developer>Northern Indiana Pub Serv Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>233.8</nameplate_mw>
    <summer_mw>234.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.2164</lat>
    <lon>-87.0261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69004/ADELI</id>
    <plant_name>Adelite Storage Project LLC</plant_name>
    <generator_id>ADELI</generator_id>
    <plant_id>69004</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Acciona Energy USA Global, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.622383</lat>
    <lon>-97.2105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68579/AC2S</id>
    <plant_name>AC Ranch II</plant_name>
    <generator_id>AC2S</generator_id>
    <plant_id>68579</plant_id>
    <state>NM</state>
    <county>Lea</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.732263</lat>
    <lon>-103.2748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68079/STAS1</id>
    <plant_name>Stagecoach LRE</plant_name>
    <generator_id>STAS1</generator_id>
    <plant_id>68079</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.17739</lat>
    <lon>-104.5012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62437/WT</id>
    <plant_name>Dodge County Wind</plant_name>
    <generator_id>WT</generator_id>
    <plant_id>62437</plant_id>
    <state>MN</state>
    <county>Dodge</county>
    <developer>Dodge County Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>228</nameplate_mw>
    <summer_mw>228</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.005633</lat>
    <lon>-92.95039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67783/GRS12</id>
    <plant_name>Ventures BESS</plant_name>
    <generator_id>GRS12</generator_id>
    <plant_id>67783</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>Gransolar Texas Twelve LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>226.8</nameplate_mw>
    <summer_mw>226.8</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.974482</lat>
    <lon>-95.99381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69658/NS2</id>
    <plant_name>New Salem Wind II</plant_name>
    <generator_id>NS2</generator_id>
    <plant_id>69658</plant_id>
    <state>ND</state>
    <county>Morton</county>
    <developer>New Salem Wind II</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>226</nameplate_mw>
    <summer_mw>95.3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.797929</lat>
    <lon>-101.4344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67356/6794</id>
    <plant_name>Throckmorton Wind</plant_name>
    <generator_id>6794</generator_id>
    <plant_id>67356</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Throckmorton Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>225.6</nameplate_mw>
    <summer_mw>225.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.213466</lat>
    <lon>-99.47612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67767/BECBA</id>
    <plant_name>Bramble Energy Center</plant_name>
    <generator_id>BECBA</generator_id>
    <plant_id>67767</plant_id>
    <state>TX</state>
    <county>Zavala</county>
    <developer>Mission Clean Energy Devco LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>225.1</nameplate_mw>
    <summer_mw>225.1</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.955627</lat>
    <lon>-99.72318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70193/REC01</id>
    <plant_name>Romero Energy Center</plant_name>
    <generator_id>REC01</generator_id>
    <plant_id>70193</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Romero Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.509114</lat>
    <lon>-113.008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68417/1</id>
    <plant_name>Hallsville</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68417</plant_id>
    <state>TX</state>
    <county>Harrison</county>
    <developer>Southwestern Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.4607</lat>
    <lon>-94.4852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68417/2</id>
    <plant_name>Hallsville</plant_name>
    <generator_id>2</generator_id>
    <plant_id>68417</plant_id>
    <state>TX</state>
    <county>Harrison</county>
    <developer>Southwestern Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.4607</lat>
    <lon>-94.4852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69198/ATL10</id>
    <plant_name>ATLAS Solar X, LLC</plant_name>
    <generator_id>ATL10</generator_id>
    <plant_id>69198</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>ATLAS Solar Manager, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.546706</lat>
    <lon>-113.5562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70194/REC02</id>
    <plant_name>Romero Energy Center II, LLC</plant_name>
    <generator_id>REC02</generator_id>
    <plant_id>70194</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Romero Energy Center II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.509114</lat>
    <lon>-113.008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64634/90FI8</id>
    <plant_name>Kingsley Solar Farm</plant_name>
    <generator_id>90FI8</generator_id>
    <plant_id>64634</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>90FI 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.742036</lat>
    <lon>-115.7354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69450/GEN01</id>
    <plant_name>Emerald Bluffs Solar Park</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>69450</plant_id>
    <state>WI</state>
    <county>Juneau</county>
    <developer>Emerald Bluffs Solar Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.764276</lat>
    <lon>-90.01398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2951/11</id>
    <plant_name>Horseshoe Lake</plant_name>
    <generator_id>11</generator_id>
    <plant_id>2951</plant_id>
    <state>OK</state>
    <county>Oklahoma</county>
    <developer>Oklahoma Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>224</nameplate_mw>
    <summer_mw>224</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.50866</lat>
    <lon>-97.17969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2951/12</id>
    <plant_name>Horseshoe Lake</plant_name>
    <generator_id>12</generator_id>
    <plant_id>2951</plant_id>
    <state>OK</state>
    <county>Oklahoma</county>
    <developer>Oklahoma Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>224</nameplate_mw>
    <summer_mw>224</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.50866</lat>
    <lon>-97.17969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2951/13</id>
    <plant_name>Horseshoe Lake</plant_name>
    <generator_id>13</generator_id>
    <plant_id>2951</plant_id>
    <state>OK</state>
    <county>Oklahoma</county>
    <developer>Oklahoma Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>224</nameplate_mw>
    <summer_mw>224</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.50866</lat>
    <lon>-97.17969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2951/14</id>
    <plant_name>Horseshoe Lake</plant_name>
    <generator_id>14</generator_id>
    <plant_id>2951</plant_id>
    <state>OK</state>
    <county>Oklahoma</county>
    <developer>Oklahoma Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>224</nameplate_mw>
    <summer_mw>224</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.50866</lat>
    <lon>-97.17969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66138/INMA1</id>
    <plant_name>Mayapple Solar 1</plant_name>
    <generator_id>INMA1</generator_id>
    <plant_id>66138</plant_id>
    <state>IN</state>
    <county>Pulaski</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>224</nameplate_mw>
    <summer_mw>224</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.055223</lat>
    <lon>-86.71323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63193/UNIT1</id>
    <plant_name>Alira</plant_name>
    <generator_id>UNIT1</generator_id>
    <plant_id>63193</plant_id>
    <state>TX</state>
    <county>Andrews</county>
    <developer>Luminant Generation Company LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>222.8</nameplate_mw>
    <summer_mw>222.8</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.347392</lat>
    <lon>-102.9677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61331/BA2</id>
    <plant_name>NISA Electric Generation Project</plant_name>
    <generator_id>BA2</generator_id>
    <plant_id>61331</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NYC Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>220.1</nameplate_mw>
    <summer_mw>220.1</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.7065</lat>
    <lon>-73.9702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63028/GEN1</id>
    <plant_name>Tip Top Solar Energy Center LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>63028</plant_id>
    <state>NM</state>
    <county>Lea</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.133136</lat>
    <lon>-103.3235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67759/TCHEC</id>
    <plant_name>Trenton Channel Energy Center</plant_name>
    <generator_id>TCHEC</generator_id>
    <plant_id>67759</plant_id>
    <state>MI</state>
    <county>Wayne</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.124423</lat>
    <lon>-83.18571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69520/AMDRB</id>
    <plant_name>Amador BESS</plant_name>
    <generator_id>AMDRB</generator_id>
    <plant_id>69520</plant_id>
    <state>TX</state>
    <county>Van Zandt</county>
    <developer>BT Amador Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.479347</lat>
    <lon>-96.0321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69590/HC1</id>
    <plant_name>Hollis Creek Solar</plant_name>
    <generator_id>HC1</generator_id>
    <plant_id>69590</plant_id>
    <state>LA</state>
    <county>Sabine</county>
    <developer>Hollis Creek PV I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.661627</lat>
    <lon>-93.47361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68744/LSEC</id>
    <plant_name>Liberty Solar Energy Center</plant_name>
    <generator_id>LSEC</generator_id>
    <plant_id>68744</plant_id>
    <state>MI</state>
    <county>Kalamazoo</county>
    <developer>Consumers Energy Co - (MI)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.3631</lat>
    <lon>-85.474</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68668/RIC90</id>
    <plant_name>Coke BESS</plant_name>
    <generator_id>RIC90</generator_id>
    <plant_id>68668</plant_id>
    <state>TX</state>
    <county>Coke</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.862499</lat>
    <lon>-100.7638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69108/COT01</id>
    <plant_name>Eastern Cottontail Solar</plant_name>
    <generator_id>COT01</generator_id>
    <plant_id>69108</plant_id>
    <state>OH</state>
    <county>Fairfield</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>254.5</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.844172</lat>
    <lon>-82.49453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69149/ANSN2</id>
    <plant_name>Anson 2 Solar</plant_name>
    <generator_id>ANSN2</generator_id>
    <plant_id>69149</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Anson Solar Center 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>218.5</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.805609</lat>
    <lon>-99.91901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67996/SEPAS</id>
    <plant_name>Leuven Solar LLC</plant_name>
    <generator_id>SEPAS</generator_id>
    <plant_id>67996</plant_id>
    <state>TX</state>
    <county>Nolan</county>
    <developer>Belgian Renewable Energy Group (BREG)</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>217</nameplate_mw>
    <summer_mw>217</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.49301</lat>
    <lon>-100.2463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67576/1</id>
    <plant_name>Castle Bluff Energy Center</plant_name>
    <generator_id>1</generator_id>
    <plant_id>67576</plant_id>
    <state>MO</state>
    <county>St Louis</county>
    <developer>Union Electric Co - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>216</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.4017</lat>
    <lon>-90.3358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67576/2</id>
    <plant_name>Castle Bluff Energy Center</plant_name>
    <generator_id>2</generator_id>
    <plant_id>67576</plant_id>
    <state>MO</state>
    <county>St Louis</county>
    <developer>Union Electric Co - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>216</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.4017</lat>
    <lon>-90.3358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67576/3</id>
    <plant_name>Castle Bluff Energy Center</plant_name>
    <generator_id>3</generator_id>
    <plant_id>67576</plant_id>
    <state>MO</state>
    <county>St Louis</county>
    <developer>Union Electric Co - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>216</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.4017</lat>
    <lon>-90.3358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66559/TXJC1</id>
    <plant_name>Jones City 1 Solar</plant_name>
    <generator_id>TXJC1</generator_id>
    <plant_id>66559</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>215</nameplate_mw>
    <summer_mw>215</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.781168</lat>
    <lon>-100.0065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69654/ZEUB</id>
    <plant_name>Zeus BESS</plant_name>
    <generator_id>ZEUB</generator_id>
    <plant_id>69654</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Zeus BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>213.6</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2031-09</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.711754</lat>
    <lon>-121.4884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64672/BLUJS</id>
    <plant_name>Blue Jay Solar I, LLC</plant_name>
    <generator_id>BLUJS</generator_id>
    <plant_id>64672</plant_id>
    <state>TX</state>
    <county>Grimes</county>
    <developer>Blue Jay Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.705329</lat>
    <lon>-96.06983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68323/ALT8A</id>
    <plant_name>Atlas VIII</plant_name>
    <generator_id>ALT8A</generator_id>
    <plant_id>68323</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>Atlas VIII LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69956/S10BS</id>
    <plant_name>Sanborn Hybrid 3</plant_name>
    <generator_id>S10BS</generator_id>
    <plant_id>69956</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Terra-Gen Operating Co-Hybrid</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.996</lat>
    <lon>-118.114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69956/S10PV</id>
    <plant_name>Sanborn Hybrid 3</plant_name>
    <generator_id>S10PV</generator_id>
    <plant_id>69956</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Terra-Gen Operating Co-Hybrid</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.996</lat>
    <lon>-118.114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69537/1</id>
    <plant_name>Lyon County Generating Station</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69537</plant_id>
    <state>MN</state>
    <county>Lyon</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>193.3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.226167</lat>
    <lon>-95.75362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69537/2</id>
    <plant_name>Lyon County Generating Station</plant_name>
    <generator_id>2</generator_id>
    <plant_id>69537</plant_id>
    <state>MN</state>
    <county>Lyon</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>193.3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.226167</lat>
    <lon>-95.75362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68040/SYCAM</id>
    <plant_name>Sycamore Cross Solar</plant_name>
    <generator_id>SYCAM</generator_id>
    <plant_id>68040</plant_id>
    <state>VA</state>
    <county>Isle of Wight</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>208.2</nameplate_mw>
    <summer_mw>208.2</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.017425</lat>
    <lon>-76.74399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8224/CT3</id>
    <plant_name>North Valmy</plant_name>
    <generator_id>CT3</generator_id>
    <plant_id>8224</plant_id>
    <state>NV</state>
    <county>Humboldt</county>
    <developer>Sierra Pacific Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>208</nameplate_mw>
    <summer_mw>208</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>40.881317</lat>
    <lon>-117.1516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>8224/CT4</id>
    <plant_name>North Valmy</plant_name>
    <generator_id>CT4</generator_id>
    <plant_id>8224</plant_id>
    <state>NV</state>
    <county>Humboldt</county>
    <developer>Sierra Pacific Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>208</nameplate_mw>
    <summer_mw>208</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>40.881317</lat>
    <lon>-117.1516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60206/HCCA1</id>
    <plant_name>Wolf Summit Energy</plant_name>
    <generator_id>HCCA1</generator_id>
    <plant_id>60206</plant_id>
    <state>WV</state>
    <county>Harrison</county>
    <developer>Wolf Summit Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>207.4</nameplate_mw>
    <summer_mw>205.4</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.287039</lat>
    <lon>-80.32287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70237/MULE1</id>
    <plant_name>Mule Shoe Energy Storage</plant_name>
    <generator_id>MULE1</generator_id>
    <plant_id>70237</plant_id>
    <state>TX</state>
    <county>Yoakum</county>
    <developer>Mule Shoe Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>207</nameplate_mw>
    <summer_mw>207</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>33.125909</lat>
    <lon>-102.76</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69589/BEEK1</id>
    <plant_name>Beekman Solar</plant_name>
    <generator_id>BEEK1</generator_id>
    <plant_id>69589</plant_id>
    <state>LA</state>
    <county>Morehouse</county>
    <developer>Beekman PV I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206.8</nameplate_mw>
    <summer_mw>185</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.989386</lat>
    <lon>-91.94288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70514/GEN1</id>
    <plant_name>Hoyte Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70514</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Milano Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206.8</nameplate_mw>
    <summer_mw>206.8</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.722496</lat>
    <lon>-96.77352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69468/PSVSP</id>
    <plant_name>Poseyville Solar Park</plant_name>
    <generator_id>PSVSP</generator_id>
    <plant_id>69468</plant_id>
    <state>MI</state>
    <county>Midland</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206.4</nameplate_mw>
    <summer_mw>117</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.5178</lat>
    <lon>-84.2254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69507/NHKRY</id>
    <plant_name>New Hickory Solar</plant_name>
    <generator_id>NHKRY</generator_id>
    <plant_id>69507</plant_id>
    <state>TX</state>
    <county>Jackson</county>
    <developer>New Hickory Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>206</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.069747</lat>
    <lon>-96.8782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69058/CBCBA</id>
    <plant_name>CO Bar C Solar and BESS</plant_name>
    <generator_id>CBCBA</generator_id>
    <plant_id>69058</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>206</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69058/CBCPV</id>
    <plant_name>CO Bar C Solar and BESS</plant_name>
    <generator_id>CBCPV</generator_id>
    <plant_id>69058</plant_id>
    <state>AZ</state>
    <county>Coconino</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>206</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>35.636594</lat>
    <lon>-111.8835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66651/C2-92</id>
    <plant_name>Arco Wind and Solar Project</plant_name>
    <generator_id>C2-92</generator_id>
    <plant_id>66651</plant_id>
    <state>ID</state>
    <county>Bonneville</county>
    <developer>PacifiCorp</developer>
    <sector>Electric Utility</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>206</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>43.557</lat>
    <lon>-112.4415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68511/CHC1</id>
    <plant_name>Henry Solar</plant_name>
    <generator_id>CHC1</generator_id>
    <plant_id>68511</plant_id>
    <state>OH</state>
    <county>Henry</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>206</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.474421</lat>
    <lon>-84.11271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67543/DOGSP</id>
    <plant_name>Donegal Solar Project</plant_name>
    <generator_id>DOGSP</generator_id>
    <plant_id>67543</plant_id>
    <state>TX</state>
    <county>Dickens</county>
    <developer>HE-Cottonwood Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>204.2</nameplate_mw>
    <summer_mw>204.2</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.796247</lat>
    <lon>-100.8728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67341/NOSPV</id>
    <plant_name>SGT Hoskins Solar Project Hybrid</plant_name>
    <generator_id>NOSPV</generator_id>
    <plant_id>67341</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>SGT Hoskins Solar Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>204.1</nameplate_mw>
    <summer_mw>204.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.63124</lat>
    <lon>-95.33785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68853/LMWOD</id>
    <plant_name>Limewood Bell Renewables Solar</plant_name>
    <generator_id>LMWOD</generator_id>
    <plant_id>68853</plant_id>
    <state>TX</state>
    <county>Bell</county>
    <developer>Modal Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.129365</lat>
    <lon>-97.26139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67353/4666</id>
    <plant_name>Erath County Solar</plant_name>
    <generator_id>4666</generator_id>
    <plant_id>67353</plant_id>
    <state>TX</state>
    <county>Erath</county>
    <developer>Erath County Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.089488</lat>
    <lon>-98.17853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67917/CHMPN</id>
    <plant_name>Champaign BESS, LLC</plant_name>
    <generator_id>CHMPN</generator_id>
    <plant_id>67917</plant_id>
    <state>TX</state>
    <county>Glasscock</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>202.7</nameplate_mw>
    <summer_mw>202.7</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.871567</lat>
    <lon>-101.7384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65049/CPCW1</id>
    <plant_name>Pike Creek Wind</plant_name>
    <generator_id>CPCW1</generator_id>
    <plant_id>65049</plant_id>
    <state>IL</state>
    <county>Logan</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>202.5</nameplate_mw>
    <summer_mw>202.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.059</lat>
    <lon>-89.537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69659/RBW</id>
    <plant_name>Red Butte Wind</plant_name>
    <generator_id>RBW</generator_id>
    <plant_id>69659</plant_id>
    <state>ND</state>
    <county>Morton</county>
    <developer>Red Butte Wind</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>202</nameplate_mw>
    <summer_mw>84</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>47.063928</lat>
    <lon>-101.4753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68275/1</id>
    <plant_name>Erin</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68275</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Erin Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>202</nameplate_mw>
    <summer_mw>202</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.163</lat>
    <lon>-96.013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69879/N3884</id>
    <plant_name>Ninnescah Flats Solar</plant_name>
    <generator_id>N3884</generator_id>
    <plant_id>69879</plant_id>
    <state>KS</state>
    <county>Pratt</county>
    <developer>Nextera Energy Resources</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.628817</lat>
    <lon>-98.59311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67918/DIOS</id>
    <plant_name>Dios BESS, LLC</plant_name>
    <generator_id>DIOS</generator_id>
    <plant_id>67918</plant_id>
    <state>TX</state>
    <county>Jackson</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.012998</lat>
    <lon>-96.5051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65948/PNW01</id>
    <plant_name>Plum Nellie Wind Farm LLC</plant_name>
    <generator_id>PNW01</generator_id>
    <plant_id>65948</plant_id>
    <state>KS</state>
    <county>Cloud</county>
    <developer>Plum Nellie Wind Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.376786</lat>
    <lon>-97.55649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65462/AXTON</id>
    <plant_name>Axton Solar</plant_name>
    <generator_id>AXTON</generator_id>
    <plant_id>65462</plant_id>
    <state>VA</state>
    <county>Henry</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>201.1</nameplate_mw>
    <summer_mw>201.1</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.671684</lat>
    <lon>-79.68606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62892/SONRI</id>
    <plant_name>EDPR CA Solar Park VI LLC (CA) Hybrid</plant_name>
    <generator_id>SONRI</generator_id>
    <plant_id>62892</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>EDPR CA Solar Park VI LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.62543</lat>
    <lon>-120.3789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67575/NZRTH</id>
    <plant_name>TX Nazareth Solar</plant_name>
    <generator_id>NZRTH</generator_id>
    <plant_id>67575</plant_id>
    <state>TX</state>
    <county>Swisher</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.49</lat>
    <lon>-101.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68902/ECHPV</id>
    <plant_name>Echols Grove Solar</plant_name>
    <generator_id>ECHPV</generator_id>
    <plant_id>68902</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Echols Grove LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.616471</lat>
    <lon>-95.45837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67535/ASHU1</id>
    <plant_name>Bell Creek BESS LLC</plant_name>
    <generator_id>ASHU1</generator_id>
    <plant_id>67535</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Nexus Renewables U.S. Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200.9</nameplate_mw>
    <summer_mw>200.9</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.137519</lat>
    <lon>-95.66797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68168/KAHBA</id>
    <plant_name>Kahla Storage</plant_name>
    <generator_id>KAHBA</generator_id>
    <plant_id>68168</plant_id>
    <state>TX</state>
    <county>Leon</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200.9</nameplate_mw>
    <summer_mw>200.9</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.325705</lat>
    <lon>-96.26071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69120/RESBS</id>
    <plant_name>Resaca Oasis Storage</plant_name>
    <generator_id>RESBS</generator_id>
    <plant_id>69120</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200.7</nameplate_mw>
    <summer_mw>200.7</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>25.978783</lat>
    <lon>-97.37263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67558/RIC96</id>
    <plant_name>Blackcat BESS</plant_name>
    <generator_id>RIC96</generator_id>
    <plant_id>67558</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200.6</nameplate_mw>
    <summer_mw>200.6</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.974879</lat>
    <lon>-95.99499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70021/STACB</id>
    <plant_name>Staccato BESS</plant_name>
    <generator_id>STACB</generator_id>
    <plant_id>70021</plant_id>
    <state>TX</state>
    <county>Fayette</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200.5</nameplate_mw>
    <summer_mw>200.5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.053062</lat>
    <lon>-96.92122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68179/TEMPW</id>
    <plant_name>Templeton Wind</plant_name>
    <generator_id>TEMPW</generator_id>
    <plant_id>68179</plant_id>
    <state>IN</state>
    <county>Benton</county>
    <developer>Templeton Wind Energy Center, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200.2</nameplate_mw>
    <summer_mw>200.2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.519676</lat>
    <lon>-87.15039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67976/GEN01</id>
    <plant_name>Cattlemen Solar II</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>67976</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Cattlemen Solar Park II LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.083559</lat>
    <lon>-96.85732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68481/HS2</id>
    <plant_name>Hill Solar II</plant_name>
    <generator_id>HS2</generator_id>
    <plant_id>68481</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Hill Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.115203</lat>
    <lon>-97.06783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68914/12343</id>
    <plant_name>Padua 3</plant_name>
    <generator_id>12343</generator_id>
    <plant_id>68914</plant_id>
    <state>TX</state>
    <county>Bexar</county>
    <developer>Padua 3</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.325064</lat>
    <lon>-98.32562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70344/RSPV</id>
    <plant_name>Rush Springs Solar</plant_name>
    <generator_id>RSPV</generator_id>
    <plant_id>70344</plant_id>
    <state>OK</state>
    <county>Stephens</county>
    <developer>Rush Springs Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.469189</lat>
    <lon>-97.89441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68425/TWPII</id>
    <plant_name>Tidwell Prairie II</plant_name>
    <generator_id>TWPII</generator_id>
    <plant_id>68425</plant_id>
    <state>TX</state>
    <county>Robertson</county>
    <developer>Tidwell Prairie IIA LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.103064</lat>
    <lon>-96.66494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69155/AHBA1</id>
    <plant_name>Apache Hill Energy Center</plant_name>
    <generator_id>AHBA1</generator_id>
    <plant_id>69155</plant_id>
    <state>TX</state>
    <county>Hood</county>
    <developer>Apache Hill Energy Center</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.380005</lat>
    <lon>-97.72782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65870/CASTR</id>
    <plant_name>Castor</plant_name>
    <generator_id>CASTR</generator_id>
    <plant_id>65870</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Engie North America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.150279</lat>
    <lon>-95.65118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66968/BFW00</id>
    <plant_name>Blackford Wind</plant_name>
    <generator_id>BFW00</generator_id>
    <plant_id>66968</plant_id>
    <state>IN</state>
    <county>Blackford</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.402078</lat>
    <lon>-85.30058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68089/TS03</id>
    <plant_name>Twelvemile Solar 3</plant_name>
    <generator_id>TS03</generator_id>
    <plant_id>68089</plant_id>
    <state>OK</state>
    <county>Mayes</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.331569</lat>
    <lon>-95.22931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68341/GREE</id>
    <plant_name>Greenwater BESS</plant_name>
    <generator_id>GREE</generator_id>
    <plant_id>68341</plant_id>
    <state>WA</state>
    <county>Pierce</county>
    <developer>GREE bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSEI</balancing_authority>
    <lat>47.236485</lat>
    <lon>-122.2271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68515/GREER</id>
    <plant_name>Greer Solar Plant</plant_name>
    <generator_id>GREER</generator_id>
    <plant_id>68515</plant_id>
    <state>MS</state>
    <county>Washington</county>
    <developer>Greer Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.115544</lat>
    <lon>-90.83077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69477/PLSNT</id>
    <plant_name>Pleasant Prairie Solar Energy LLC</plant_name>
    <generator_id>PLSNT</generator_id>
    <plant_id>69477</plant_id>
    <state>OH</state>
    <county>Franklin</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.944801</lat>
    <lon>-83.20397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69549/DLE1</id>
    <plant_name>Dry Lake East Energy Center</plant_name>
    <generator_id>DLE1</generator_id>
    <plant_id>69549</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Dry Lake East Energy Center</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.401094</lat>
    <lon>-114.8652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70408/WCB</id>
    <plant_name>Willow Creek Energy Storage</plant_name>
    <generator_id>WCB</generator_id>
    <plant_id>70408</plant_id>
    <state>OK</state>
    <county>Pawnee</county>
    <developer>Willow Creek Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SPA</balancing_authority>
    <lat>36.389624</lat>
    <lon>-97.02781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70513/3988</id>
    <plant_name>Delta Bobcat Solar</plant_name>
    <generator_id>3988</generator_id>
    <plant_id>70513</plant_id>
    <state>MO</state>
    <county>Cape Girardeau</county>
    <developer>Delta Bobcat Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.222603</lat>
    <lon>-89.7176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64290/ATHB2</id>
    <plant_name>SE Athos II, LLC</plant_name>
    <generator_id>ATHB2</generator_id>
    <plant_id>64290</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>SE Athos II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.751283</lat>
    <lon>-115.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69392/BBIA</id>
    <plant_name>Barton Branch IA</plant_name>
    <generator_id>BBIA</generator_id>
    <plant_id>69392</plant_id>
    <state>TX</state>
    <county>Robertson</county>
    <developer>Barton Branch IA LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.103064</lat>
    <lon>-96.66494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64744/TC001</id>
    <plant_name>Turkey Creek Solar Project</plant_name>
    <generator_id>TC001</generator_id>
    <plant_id>64744</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>174 Power Global Corp.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.382137</lat>
    <lon>-104.9141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66893/TXJS2</id>
    <plant_name>Jones City 2 Solar</plant_name>
    <generator_id>TXJS2</generator_id>
    <plant_id>66893</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.794928</lat>
    <lon>-99.99293</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67249/RRES</id>
    <plant_name>Rock Rose Energy Storage</plant_name>
    <generator_id>RRES</generator_id>
    <plant_id>67249</plant_id>
    <state>TX</state>
    <county>Fort Bend</county>
    <developer>Rock Rose Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.395241</lat>
    <lon>-95.73535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69779/HK2SO</id>
    <plant_name>Hashknife Energy Center II LLC</plant_name>
    <generator_id>HK2SO</generator_id>
    <plant_id>69779</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.574259</lat>
    <lon>-110.4946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69779/HK2ST</id>
    <plant_name>Hashknife Energy Center II LLC</plant_name>
    <generator_id>HK2ST</generator_id>
    <plant_id>69779</plant_id>
    <state>AZ</state>
    <county>Navajo</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>34.574259</lat>
    <lon>-110.4946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68568/TULLA</id>
    <plant_name>SR Tullahoma</plant_name>
    <generator_id>TULLA</generator_id>
    <plant_id>68568</plant_id>
    <state>TN</state>
    <county>Moore</county>
    <developer>SR Tullahoma, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.360002</lat>
    <lon>-86.27532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69723/BESS1</id>
    <plant_name>Taft BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>69723</plant_id>
    <state>MA</state>
    <county>Worcester</county>
    <developer>FE Taft LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.03383</lat>
    <lon>-71.60374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66852/HILL3</id>
    <plant_name>Hillsboro Solar 3</plant_name>
    <generator_id>HILL3</generator_id>
    <plant_id>66852</plant_id>
    <state>AL</state>
    <county>Lawrence</county>
    <developer>Urban Grid Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.669883</lat>
    <lon>-87.2332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65964/URSA</id>
    <plant_name>Ursa Solar, LLC</plant_name>
    <generator_id>URSA</generator_id>
    <plant_id>65964</plant_id>
    <state>WI</state>
    <county>Columbia</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.504285</lat>
    <lon>-89.11314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69169/FWS</id>
    <plant_name>Freshwater Solar, LLC</plant_name>
    <generator_id>FWS</generator_id>
    <plant_id>69169</plant_id>
    <state>MI</state>
    <county>Montcalm</county>
    <developer>Freshwater Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.338197</lat>
    <lon>-85.04013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70400/BEE1A</id>
    <plant_name>Bee Branch IA</plant_name>
    <generator_id>BEE1A</generator_id>
    <plant_id>70400</plant_id>
    <state>TX</state>
    <county>Robertson</county>
    <developer>Bee Branch IA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.104838</lat>
    <lon>-96.66477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63784/PLMNO</id>
    <plant_name>Palomino Solar</plant_name>
    <generator_id>PLMNO</generator_id>
    <plant_id>63784</plant_id>
    <state>OH</state>
    <county>Highland</county>
    <developer>Palomino Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.2158</lat>
    <lon>-83.7771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66685/WH001</id>
    <plant_name>Whale Rock Pumped Storage Hydro Project</plant_name>
    <generator_id>WH001</generator_id>
    <plant_id>66685</plant_id>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.454196</lat>
    <lon>-120.8671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66685/WH002</id>
    <plant_name>Whale Rock Pumped Storage Hydro Project</plant_name>
    <generator_id>WH002</generator_id>
    <plant_id>66685</plant_id>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.454196</lat>
    <lon>-120.8671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66685/WH003</id>
    <plant_name>Whale Rock Pumped Storage Hydro Project</plant_name>
    <generator_id>WH003</generator_id>
    <plant_id>66685</plant_id>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <developer>Premium Energy Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Hydroelectric Pumped Storage</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>PS</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.454196</lat>
    <lon>-120.8671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68348/ACESS</id>
    <plant_name>Alamo City ESS</plant_name>
    <generator_id>ACESS</generator_id>
    <plant_id>68348</plant_id>
    <state>TX</state>
    <county>Bexar</county>
    <developer>Alamo City ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.345305</lat>
    <lon>-98.31948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68911/27288</id>
    <plant_name>Flint</plant_name>
    <generator_id>27288</generator_id>
    <plant_id>68911</plant_id>
    <state>OH</state>
    <county>Franklin</county>
    <developer>Flint</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.09639</lat>
    <lon>-82.73361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68906/PFBA2</id>
    <plant_name>Pine Forest Solar I</plant_name>
    <generator_id>PFBA2</generator_id>
    <plant_id>68906</plant_id>
    <state>TX</state>
    <county>Hopkins</county>
    <developer>Pine Forest Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DOPD</balancing_authority>
    <lat>33.100779</lat>
    <lon>-95.39229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67768/CECBA</id>
    <plant_name>Cumbia Energy Center</plant_name>
    <generator_id>CECBA</generator_id>
    <plant_id>67768</plant_id>
    <state>TX</state>
    <county>Nueces</county>
    <developer>Mission Clean Energy Devco LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.739083</lat>
    <lon>-97.44955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66401/OHLPV</id>
    <plant_name>OCI Hillsboro</plant_name>
    <generator_id>OHLPV</generator_id>
    <plant_id>66401</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>HEC Renewable Energy America LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.941</lat>
    <lon>-97.021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65821/HNYSR</id>
    <plant_name>Honey Creek Solar</plant_name>
    <generator_id>HNYSR</generator_id>
    <plant_id>65821</plant_id>
    <state>IN</state>
    <county>White</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.7971</lat>
    <lon>-86.8572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66401/OHLBS</id>
    <plant_name>OCI Hillsboro</plant_name>
    <generator_id>OHLBS</generator_id>
    <plant_id>66401</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>HEC Renewable Energy America LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.941</lat>
    <lon>-97.021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66904/LBTN</id>
    <plant_name>Lumberton PV I, LLC</plant_name>
    <generator_id>LBTN</generator_id>
    <plant_id>66904</plant_id>
    <state>TX</state>
    <county>Hardin</county>
    <developer>Lumberton PV I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.298323</lat>
    <lon>-94.27631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67354/5698</id>
    <plant_name>Waco Solar II</plant_name>
    <generator_id>5698</generator_id>
    <plant_id>67354</plant_id>
    <state>TX</state>
    <county>Limestone</county>
    <developer>Waco Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.71062</lat>
    <lon>-96.7914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67652/BHALU</id>
    <plant_name>Bhalu</plant_name>
    <generator_id>BHALU</generator_id>
    <plant_id>67652</plant_id>
    <state>TX</state>
    <county>Howard</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.31219</lat>
    <lon>-101.3378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68031/SCPSB</id>
    <plant_name>Scopus Solar</plant_name>
    <generator_id>SCPSB</generator_id>
    <plant_id>68031</plant_id>
    <state>MO</state>
    <county>Bollinger</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.392178</lat>
    <lon>-89.89929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68031/SCPSR</id>
    <plant_name>Scopus Solar</plant_name>
    <generator_id>SCPSR</generator_id>
    <plant_id>68031</plant_id>
    <state>MO</state>
    <county>Bollinger</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.392178</lat>
    <lon>-89.89929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68036/VCHSB</id>
    <plant_name>Vichy Solar</plant_name>
    <generator_id>VCHSB</generator_id>
    <plant_id>68036</plant_id>
    <state>MO</state>
    <county>Maries</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.167934</lat>
    <lon>-91.82552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68036/VCHSR</id>
    <plant_name>Vichy Solar</plant_name>
    <generator_id>VCHSR</generator_id>
    <plant_id>68036</plant_id>
    <state>MO</state>
    <county>Maries</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.167934</lat>
    <lon>-91.82552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68299/TUAL</id>
    <plant_name>Tualatin Battery Energy Storage System</plant_name>
    <generator_id>TUAL</generator_id>
    <plant_id>68299</plant_id>
    <state>OR</state>
    <county>Washington</county>
    <developer>TUAL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PGE</balancing_authority>
    <lat>45</lat>
    <lon>-122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68315/ARFL1</id>
    <plant_name>Anthelope Hills Solar Generation BESS</plant_name>
    <generator_id>ARFL1</generator_id>
    <plant_id>68315</plant_id>
    <state>MT</state>
    <county>Beaverhead</county>
    <developer>ARFL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>45.05029</lat>
    <lon>-113.0588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68315/ARFL2</id>
    <plant_name>Anthelope Hills Solar Generation BESS</plant_name>
    <generator_id>ARFL2</generator_id>
    <plant_id>68315</plant_id>
    <state>MT</state>
    <county>Beaverhead</county>
    <developer>ARFL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>45.05029</lat>
    <lon>-113.0588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69189/C2BS</id>
    <plant_name>Cowboy Solar II</plant_name>
    <generator_id>C2BS</generator_id>
    <plant_id>69189</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Cowboy Solar II</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.032968</lat>
    <lon>-104.3816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69199/ATL11</id>
    <plant_name>ATLAS Solar XI, LLC</plant_name>
    <generator_id>ATL11</generator_id>
    <plant_id>69199</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>ATLAS Solar Manager, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.553361</lat>
    <lon>-113.5803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69982/3569</id>
    <plant_name>Diamondback Solar</plant_name>
    <generator_id>3569</generator_id>
    <plant_id>69982</plant_id>
    <state>TX</state>
    <county>Starr</county>
    <developer>Diamondback Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.426684</lat>
    <lon>-98.70102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70297/BWTS</id>
    <plant_name>Blackwater Solar Center - NM</plant_name>
    <generator_id>BWTS</generator_id>
    <plant_id>70297</plant_id>
    <state>NM</state>
    <county>Roosevelt</county>
    <developer>Blackwater Solar Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>34.292324</lat>
    <lon>-103.1657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70341/TW200</id>
    <plant_name>Thunder Wolf II, LLC</plant_name>
    <generator_id>TW200</generator_id>
    <plant_id>70341</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Thunder Wolf II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.94808</lat>
    <lon>-104.2357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70462/PAWB</id>
    <plant_name>Pawnee Solar &amp; BESS</plant_name>
    <generator_id>PAWB</generator_id>
    <plant_id>70462</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.127571</lat>
    <lon>-103.7249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66858/SPRV2</id>
    <plant_name>Spring Valley Solar 2</plant_name>
    <generator_id>SPRV2</generator_id>
    <plant_id>66858</plant_id>
    <state>AL</state>
    <county>Colbert</county>
    <developer>Urban Grid Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.674983</lat>
    <lon>-87.66373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67945/JCSIB</id>
    <plant_name>Juniper Creek Storage</plant_name>
    <generator_id>JCSIB</generator_id>
    <plant_id>67945</plant_id>
    <state>CA</state>
    <county>Sacramento</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.554073</lat>
    <lon>-121.2066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67985/HRNT2</id>
    <plant_name>Hornet Solar II (TX) (Hybrid)</plant_name>
    <generator_id>HRNT2</generator_id>
    <plant_id>67985</plant_id>
    <state>TX</state>
    <county>Swisher</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.483406</lat>
    <lon>-101.9699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67985/HRT2B</id>
    <plant_name>Hornet Solar II (TX) (Hybrid)</plant_name>
    <generator_id>HRT2B</generator_id>
    <plant_id>67985</plant_id>
    <state>TX</state>
    <county>Swisher</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.483406</lat>
    <lon>-101.9699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70257/H1SLR</id>
    <plant_name>Hawkeye Solar, LLC</plant_name>
    <generator_id>H1SLR</generator_id>
    <plant_id>70257</plant_id>
    <state>IA</state>
    <county>Clinton</county>
    <developer>Hawkeye Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.835204</lat>
    <lon>-90.69966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68490/BLS</id>
    <plant_name>Broadleaf Solar</plant_name>
    <generator_id>BLS</generator_id>
    <plant_id>68490</plant_id>
    <state>CT</state>
    <county>Hartford</county>
    <developer>Broadleaf Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.9241</lat>
    <lon>-72.7824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67250/ALIBS</id>
    <plant_name>Alina Energy LLC</plant_name>
    <generator_id>ALIBS</generator_id>
    <plant_id>67250</plant_id>
    <state>TX</state>
    <county>Wilson</county>
    <developer>Alina Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.161128</lat>
    <lon>-98.08988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67250/ALIPV</id>
    <plant_name>Alina Energy LLC</plant_name>
    <generator_id>ALIPV</generator_id>
    <plant_id>67250</plant_id>
    <state>TX</state>
    <county>Wilson</county>
    <developer>Alina Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.161128</lat>
    <lon>-98.08988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68604/DALPV</id>
    <plant_name>Dahlia Energy</plant_name>
    <generator_id>DALPV</generator_id>
    <plant_id>68604</plant_id>
    <state>TX</state>
    <county>La Salle</county>
    <developer>Dahlia Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.369598</lat>
    <lon>-98.96762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65847/ELDBS</id>
    <plant_name>Eldora Energy LLC</plant_name>
    <generator_id>ELDBS</generator_id>
    <plant_id>65847</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>Eldora Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.865989</lat>
    <lon>-96.12169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65847/ELDPV</id>
    <plant_name>Eldora Energy LLC</plant_name>
    <generator_id>ELDPV</generator_id>
    <plant_id>65847</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>Eldora Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.865989</lat>
    <lon>-96.12169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68347/ABPV1</id>
    <plant_name>Abeja Solar Farm</plant_name>
    <generator_id>ABPV1</generator_id>
    <plant_id>68347</plant_id>
    <state>TX</state>
    <county>Bee</county>
    <developer>Abeja Solar Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.288244</lat>
    <lon>-97.84019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68362/SABS1</id>
    <plant_name>Sun Angel ESS</plant_name>
    <generator_id>SABS1</generator_id>
    <plant_id>68362</plant_id>
    <state>TX</state>
    <county>Angelina</county>
    <developer>Sun Angel ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.345947</lat>
    <lon>-94.66785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69470/SVCSP</id>
    <plant_name>Silver Creek Solar Park</plant_name>
    <generator_id>SVCSP</generator_id>
    <plant_id>69470</plant_id>
    <state>MI</state>
    <county>Huron</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.837206</lat>
    <lon>-83.05481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69952/CH1</id>
    <plant_name>Cypress Harvest Solar Station</plant_name>
    <generator_id>CH1</generator_id>
    <plant_id>69952</plant_id>
    <state>LA</state>
    <county>Iberville</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.237835</lat>
    <lon>-91.26486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69776/DKVSP</id>
    <plant_name>Deckerville Solar Park</plant_name>
    <generator_id>DKVSP</generator_id>
    <plant_id>69776</plant_id>
    <state>MI</state>
    <county>Sanilac</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.5521</lat>
    <lon>-82.7649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61687/PLMCK</id>
    <plant_name>Plum Creek</plant_name>
    <generator_id>PLMCK</generator_id>
    <plant_id>61687</plant_id>
    <state>MN</state>
    <county>Cottonwood</county>
    <developer>Geronimo Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.14504</lat>
    <lon>-95.38272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64632/99MT8</id>
    <plant_name>Sienna Solar Farm</plant_name>
    <generator_id>99MT8</generator_id>
    <plant_id>64632</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>99MT 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.493659</lat>
    <lon>-116.915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64632/99MTB</id>
    <plant_name>Sienna Solar Farm</plant_name>
    <generator_id>99MTB</generator_id>
    <plant_id>64632</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>99MT 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.493659</lat>
    <lon>-116.915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68282/CENT</id>
    <plant_name>Centralia Battery Energy Storage System</plant_name>
    <generator_id>CENT</generator_id>
    <plant_id>68282</plant_id>
    <state>WA</state>
    <county>Thurston</county>
    <developer>CENT bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSEI</balancing_authority>
    <lat>46.779823</lat>
    <lon>-122.8848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68485/22SVA</id>
    <plant_name>Rexford 2 Solar Farm</plant_name>
    <generator_id>22SVA</generator_id>
    <plant_id>68485</plant_id>
    <state>CA</state>
    <county>Tulare</county>
    <developer>22SV 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.893525</lat>
    <lon>-119.0805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68485/22SVB</id>
    <plant_name>Rexford 2 Solar Farm</plant_name>
    <generator_id>22SVB</generator_id>
    <plant_id>68485</plant_id>
    <state>CA</state>
    <county>Tulare</county>
    <developer>22SV 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.893525</lat>
    <lon>-119.0805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69657/NS1</id>
    <plant_name>New Salem Wind I</plant_name>
    <generator_id>NS1</generator_id>
    <plant_id>69657</plant_id>
    <state>ND</state>
    <county>Morton</county>
    <developer>New Salem Wind I</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>83.1</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.730181</lat>
    <lon>-101.3054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69990/BW1</id>
    <plant_name>Bogalusa West Solar Station</plant_name>
    <generator_id>BW1</generator_id>
    <plant_id>69990</plant_id>
    <state>LA</state>
    <county>Washington</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.84</lat>
    <lon>-89.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68090/WILLO</id>
    <plant_name>Willow Beach Wind</plant_name>
    <generator_id>WILLO</generator_id>
    <plant_id>68090</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.249522</lat>
    <lon>-95.13416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67655/ELKRN</id>
    <plant_name>Elk Run</plant_name>
    <generator_id>ELKRN</generator_id>
    <plant_id>67655</plant_id>
    <state>CO</state>
    <county>Las Animas</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>37.454588</lat>
    <lon>-104.4887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68292/GGSO</id>
    <plant_name>Gage Solar</plant_name>
    <generator_id>GGSO</generator_id>
    <plant_id>68292</plant_id>
    <state>KY</state>
    <county>McCracken</county>
    <developer>GGSO, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.0967</lat>
    <lon>-88.7791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70138/CRAW1</id>
    <plant_name>Crawfish Creek Energy Storage</plant_name>
    <generator_id>CRAW1</generator_id>
    <plant_id>70138</plant_id>
    <state>AL</state>
    <county>Jackson</county>
    <developer>Crawfish Creek Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.83057</lat>
    <lon>-85.66845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68349/AVBS1</id>
    <plant_name>Avant Prairie ESS</plant_name>
    <generator_id>AVBS1</generator_id>
    <plant_id>68349</plant_id>
    <state>TX</state>
    <county>Freestone</county>
    <developer>Avant Prairie ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.625891</lat>
    <lon>-96.12222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68350/BESS1</id>
    <plant_name>Bravo ESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>68350</plant_id>
    <state>TX</state>
    <county>Zapata</county>
    <developer>Bravo ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.285037</lat>
    <lon>-99.41187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68360/PRESS</id>
    <plant_name>Prost ESS</plant_name>
    <generator_id>PRESS</generator_id>
    <plant_id>68360</plant_id>
    <state>TX</state>
    <county>Austin</county>
    <developer>Prost ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.957853</lat>
    <lon>-96.53331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68363/SSESS</id>
    <plant_name>SunShiner ESS</plant_name>
    <generator_id>SSESS</generator_id>
    <plant_id>68363</plant_id>
    <state>TX</state>
    <county>Zavala</county>
    <developer>SunShiner ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.937123</lat>
    <lon>-99.83407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68364/TBESS</id>
    <plant_name>Tex-Bar ESS</plant_name>
    <generator_id>TBESS</generator_id>
    <plant_id>68364</plant_id>
    <state>TX</state>
    <county>Madison</county>
    <developer>Tex-Bar ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.930573</lat>
    <lon>-96.03037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69952/CH2</id>
    <plant_name>Cypress Harvest Solar Station</plant_name>
    <generator_id>CH2</generator_id>
    <plant_id>69952</plant_id>
    <state>LA</state>
    <county>Iberville</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.237835</lat>
    <lon>-91.26486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68368/MYSO</id>
    <plant_name>Mayfield Solar and Storage</plant_name>
    <generator_id>MYSO</generator_id>
    <plant_id>68368</plant_id>
    <state>KY</state>
    <county>McCracken</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>36.8864</lat>
    <lon>-88.659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64904/1</id>
    <plant_name>Elliot Solar LLC</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64904</plant_id>
    <state>IN</state>
    <county>Gibson</county>
    <developer>Elliot Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.316297</lat>
    <lon>-87.42793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65808/SVEC</id>
    <plant_name>Sacramento Valley Energy Center, LLC</plant_name>
    <generator_id>SVEC</generator_id>
    <plant_id>65808</plant_id>
    <state>CA</state>
    <county>Sacramento</county>
    <developer>Sacramento Valley Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>38.57147</lat>
    <lon>-121.1845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68084/MLB</id>
    <plant_name>Morrow Lake BESS</plant_name>
    <generator_id>MLB</generator_id>
    <plant_id>68084</plant_id>
    <state>TX</state>
    <county>Frio</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.936239</lat>
    <lon>-99.08318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68288/MAHI</id>
    <plant_name>Flag Run Solar</plant_name>
    <generator_id>MAHI</generator_id>
    <plant_id>68288</plant_id>
    <state>IN</state>
    <county>Clark</county>
    <developer>MAHI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.556</lat>
    <lon>-85.201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68290/DYSP</id>
    <plant_name>Dyers Spring Solar</plant_name>
    <generator_id>DYSP</generator_id>
    <plant_id>68290</plant_id>
    <state>KY</state>
    <county>Breckinridge</county>
    <developer>DYSP, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.688411</lat>
    <lon>-86.26927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68332/DEGA1</id>
    <plant_name>Dega Solar and Storage</plant_name>
    <generator_id>DEGA1</generator_id>
    <plant_id>68332</plant_id>
    <state>AL</state>
    <county>Talladega</county>
    <developer>DEGA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.537201</lat>
    <lon>-86.0855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68332/DEGA2</id>
    <plant_name>Dega Solar and Storage</plant_name>
    <generator_id>DEGA2</generator_id>
    <plant_id>68332</plant_id>
    <state>AL</state>
    <county>Talladega</county>
    <developer>DEGA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.537201</lat>
    <lon>-86.0855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68843/TLCP</id>
    <plant_name>Tupper Lake Wind</plant_name>
    <generator_id>TLCP</generator_id>
    <plant_id>68843</plant_id>
    <state>MI</state>
    <county>Ionia</county>
    <developer>Tupper Lake</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>198</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.829</lat>
    <lon>-85.138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69633/99757</id>
    <plant_name>Lion Solar</plant_name>
    <generator_id>99757</generator_id>
    <plant_id>69633</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Lion Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.324581</lat>
    <lon>-91.9253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70186/SOLBS</id>
    <plant_name>Solstice Solar LLC</plant_name>
    <generator_id>SOLBS</generator_id>
    <plant_id>70186</plant_id>
    <state>OK</state>
    <county>Le Flore</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.291043</lat>
    <lon>-94.77891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70186/SOLPV</id>
    <plant_name>Solstice Solar LLC</plant_name>
    <generator_id>SOLPV</generator_id>
    <plant_id>70186</plant_id>
    <state>OK</state>
    <county>Le Flore</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.291043</lat>
    <lon>-94.77891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58652/1</id>
    <plant_name>La Paz Solar Tower</plant_name>
    <generator_id>1</generator_id>
    <plant_id>58652</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>Enviromission, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Thermal without Energy Storage</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>OT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>33.917222</lat>
    <lon>-114.2675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69637/28152</id>
    <plant_name>Oakley BESS</plant_name>
    <generator_id>28152</generator_id>
    <plant_id>69637</plant_id>
    <state>TX</state>
    <county>Denton</county>
    <developer>Oakley BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.41854</lat>
    <lon>-97.18809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69641/49453</id>
    <plant_name>Metro BESS</plant_name>
    <generator_id>49453</generator_id>
    <plant_id>69641</plant_id>
    <state>TX</state>
    <county>Caldwell</county>
    <developer>Metro BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.003245</lat>
    <lon>-97.67794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70136/MORL1</id>
    <plant_name>Morel Energy Storage</plant_name>
    <generator_id>MORL1</generator_id>
    <plant_id>70136</plant_id>
    <state>CO</state>
    <county>Moffat</county>
    <developer>Morel Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.469217</lat>
    <lon>-107.6032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68342/HOHI</id>
    <plant_name>Hop Hill Solar Generation and BESS</plant_name>
    <generator_id>HOHI</generator_id>
    <plant_id>68342</plant_id>
    <state>WA</state>
    <county>Benton</county>
    <developer>HOHI bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2031-09</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>46.324</lat>
    <lon>-119.822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68361/RUESS</id>
    <plant_name>Rush ESS</plant_name>
    <generator_id>RUESS</generator_id>
    <plant_id>68361</plant_id>
    <state>TX</state>
    <county>Bexar</county>
    <developer>Rush ESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.307639</lat>
    <lon>-98.29673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58835/ELK4</id>
    <plant_name>Elk Station</plant_name>
    <generator_id>ELK4</generator_id>
    <plant_id>58835</plant_id>
    <state>TX</state>
    <county>Hale</county>
    <developer>Golden Spread Electric Cooperative, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>199.8</nameplate_mw>
    <summer_mw>201</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>33.865</lat>
    <lon>-101.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68767/BRGSP</id>
    <plant_name>Greenalia Solar Power Blackwelder Ranch</plant_name>
    <generator_id>BRGSP</generator_id>
    <plant_id>68767</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>Greenalia Solar Power Blackwelder Ranch, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>199.7</nameplate_mw>
    <summer_mw>199.7</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.81256</lat>
    <lon>-102.1865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69946/SBA</id>
    <plant_name>Spindle BESS</plant_name>
    <generator_id>SBA</generator_id>
    <plant_id>69946</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Spindle Battery LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.092401</lat>
    <lon>-104.9012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68510/CFC1</id>
    <plant_name>Ritter Solar</plant_name>
    <generator_id>CFC1</generator_id>
    <plant_id>68510</plant_id>
    <state>OH</state>
    <county>Fulton</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.694902</lat>
    <lon>-84.31682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69278/1</id>
    <plant_name>Fortress 1</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69278</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Fortress Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.26</lat>
    <lon>-103.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68153/BA1</id>
    <plant_name>Fremont Solar</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>68153</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>Fremont Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>198</nameplate_mw>
    <summer_mw>198</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.9789</lat>
    <lon>-112.7761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69780/OCPV1</id>
    <plant_name>Oystercatcher Solar</plant_name>
    <generator_id>OCPV1</generator_id>
    <plant_id>69780</plant_id>
    <state>TX</state>
    <county>Ellis</county>
    <developer>Cardinal Investment Company, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>197</nameplate_mw>
    <summer_mw>197</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.192556</lat>
    <lon>-96.91867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70259/CHCS2</id>
    <plant_name>Cunningham Solar II</plant_name>
    <generator_id>CHCS2</generator_id>
    <plant_id>70259</plant_id>
    <state>NM</state>
    <county>Lea</county>
    <developer>Southwestern Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>196</nameplate_mw>
    <summer_mw>196</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.786412</lat>
    <lon>-103.3507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66908/BZES</id>
    <plant_name>Bonanza Solar and Storage Project</plant_name>
    <generator_id>BZES</generator_id>
    <plant_id>66908</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>195</nameplate_mw>
    <summer_mw>195</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.558</lat>
    <lon>-115.799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67798/GRS7</id>
    <plant_name>Steelhead Energy Storage</plant_name>
    <generator_id>GRS7</generator_id>
    <plant_id>67798</plant_id>
    <state>TX</state>
    <county>Fannin</county>
    <developer>GRS BESS Texas Seven, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>193.7</nameplate_mw>
    <summer_mw>190.1</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.633102</lat>
    <lon>-96.15789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67233/SOL1</id>
    <plant_name>Lawrence County Solar</plant_name>
    <generator_id>SOL1</generator_id>
    <plant_id>67233</plant_id>
    <state>AL</state>
    <county>Lawrence</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>193</nameplate_mw>
    <summer_mw>193</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.63928</lat>
    <lon>-87.25098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66673/66666</id>
    <plant_name>Accalia Point Solar, LLC</plant_name>
    <generator_id>66666</generator_id>
    <plant_id>66673</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Accalia Point Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>190.5</nameplate_mw>
    <summer_mw>190.5</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.098075</lat>
    <lon>-97.83752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68461/KEYBB</id>
    <plant_name>Key Energy Storage</plant_name>
    <generator_id>KEYBB</generator_id>
    <plant_id>68461</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Key Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.13681</lat>
    <lon>-120.1312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68029/PSP</id>
    <plant_name>Penton Solar Plant</plant_name>
    <generator_id>PSP</generator_id>
    <plant_id>68029</plant_id>
    <state>MS</state>
    <county>DeSoto</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.861567</lat>
    <lon>-90.263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67777/GRS4B</id>
    <plant_name>Harryoung PV and BESS</plant_name>
    <generator_id>GRS4B</generator_id>
    <plant_id>67777</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Gransolar Texas Four LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.276027</lat>
    <lon>-97.63249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67777/GRS4P</id>
    <plant_name>Harryoung PV and BESS</plant_name>
    <generator_id>GRS4P</generator_id>
    <plant_id>67777</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Gransolar Texas Four LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.276027</lat>
    <lon>-97.63249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59047/GEN 1</id>
    <plant_name>Gallegos Wind Farm, Phase 1</plant_name>
    <generator_id>GEN 1</generator_id>
    <plant_id>59047</plant_id>
    <state>NM</state>
    <county>Union</county>
    <developer>Gallegos Wind Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.580281</lat>
    <lon>-103.849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64658/AFS</id>
    <plant_name>AEUG Fleming Solar, LLC</plant_name>
    <generator_id>AFS</generator_id>
    <plant_id>64658</plant_id>
    <state>KY</state>
    <county>Fleming</county>
    <developer>Acciona Energy USA Global, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>188.5</nameplate_mw>
    <summer_mw>188.5</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.429925</lat>
    <lon>-83.77156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68411/NORPV</id>
    <plant_name>Noor Solar</plant_name>
    <generator_id>NORPV</generator_id>
    <plant_id>68411</plant_id>
    <state>TX</state>
    <county>Chambers</county>
    <developer>Industrial Kilo Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>188.2</nameplate_mw>
    <summer_mw>185</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.909115</lat>
    <lon>-94.96756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67555/RIC98</id>
    <plant_name>Zephyr Storage</plant_name>
    <generator_id>RIC98</generator_id>
    <plant_id>67555</plant_id>
    <state>TX</state>
    <county>Brown</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>185.6</nameplate_mw>
    <summer_mw>185.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.707049</lat>
    <lon>-98.85746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67556/RIC97</id>
    <plant_name>Serrano BESS</plant_name>
    <generator_id>RIC97</generator_id>
    <plant_id>67556</plant_id>
    <state>TX</state>
    <county>Maverick</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>185.6</nameplate_mw>
    <summer_mw>185.6</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.837905</lat>
    <lon>-100.5487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66893/TXJC2</id>
    <plant_name>Jones City 2 Solar</plant_name>
    <generator_id>TXJC2</generator_id>
    <plant_id>66893</plant_id>
    <state>TX</state>
    <county>Jones</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.794928</lat>
    <lon>-99.99293</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65935/14</id>
    <plant_name>Vermillion Rise Solar</plant_name>
    <generator_id>14</generator_id>
    <plant_id>65935</plant_id>
    <state>IN</state>
    <county>Vermillion</county>
    <developer>Vermillion Rise Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.83182</lat>
    <lon>-87.42895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69467/PETSP</id>
    <plant_name>Peatville Solar Park</plant_name>
    <generator_id>PETSP</generator_id>
    <plant_id>69467</plant_id>
    <state>MI</state>
    <county>Sanilac</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.64</lat>
    <lon>-82.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68319/NIM</id>
    <plant_name>Nimbus Wind Farm</plant_name>
    <generator_id>NIM</generator_id>
    <plant_id>68319</plant_id>
    <state>AR</state>
    <county>Carroll</county>
    <developer>Nimbus Wind Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>183</nameplate_mw>
    <summer_mw>183</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>36.27118</lat>
    <lon>-93.40682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69579/HMWT</id>
    <plant_name>Honey Mesquite Wind, LLC</plant_name>
    <generator_id>HMWT</generator_id>
    <plant_id>69579</plant_id>
    <state>TX</state>
    <county>Sterling</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>180.5</nameplate_mw>
    <summer_mw>180.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.030383</lat>
    <lon>-101.1672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67559/RIC95</id>
    <plant_name>Dunlay Solar</plant_name>
    <generator_id>RIC95</generator_id>
    <plant_id>67559</plant_id>
    <state>TX</state>
    <county>Medina</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180.4</nameplate_mw>
    <summer_mw>150.5</summer_mw>
    <planned_start>2030-05</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.314674</lat>
    <lon>-99.09725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69151/ARY_B</id>
    <plant_name>Arroyo Storage</plant_name>
    <generator_id>ARY_B</generator_id>
    <plant_id>69151</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>BT Cantwell Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.264311</lat>
    <lon>-97.61156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69245/NTFL</id>
    <plant_name>Nightfall Solar</plant_name>
    <generator_id>NTFL</generator_id>
    <plant_id>69245</plant_id>
    <state>TX</state>
    <county>Uvalde</county>
    <developer>Sol Systems</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.259299</lat>
    <lon>-99.72513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66891/245BS</id>
    <plant_name>Indigo Solar &amp; Storage</plant_name>
    <generator_id>245BS</generator_id>
    <plant_id>66891</plant_id>
    <state>TX</state>
    <county>Fisher</county>
    <developer>Innovative Solar 245 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.628061</lat>
    <lon>-100.236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67173/HLW00</id>
    <plant_name>Hoosier Line Solar</plant_name>
    <generator_id>HLW00</generator_id>
    <plant_id>67173</plant_id>
    <state>IN</state>
    <county>White</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.851153</lat>
    <lon>-86.94475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70183/FSPV</id>
    <plant_name>Flatland Solar</plant_name>
    <generator_id>FSPV</generator_id>
    <plant_id>70183</plant_id>
    <state>TX</state>
    <county>Scurry</county>
    <developer>Flatland Solar Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.618367</lat>
    <lon>-100.9789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62846/WWE1</id>
    <plant_name>Water Valley Wind Energy</plant_name>
    <generator_id>WWE1</generator_id>
    <plant_id>62846</plant_id>
    <state>TX</state>
    <county>Tom Green</county>
    <developer>Tri Global Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.611223</lat>
    <lon>-100.8133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63096/GEN1</id>
    <plant_name>Horseshoe Solar Energy</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>63096</plant_id>
    <state>NY</state>
    <county>Livingston</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.570762</lat>
    <lon>-77.45296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68814/ASHU2</id>
    <plant_name>Brazos River BESS LLC</plant_name>
    <generator_id>ASHU2</generator_id>
    <plant_id>68814</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Nexus Renewables U.S. Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.150409</lat>
    <lon>-95.62124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66238/1SPS</id>
    <plant_name>Sculpin Solar</plant_name>
    <generator_id>1SPS</generator_id>
    <plant_id>66238</plant_id>
    <state>IN</state>
    <county>DeKalb</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.364556</lat>
    <lon>-84.84381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69761/DBBES</id>
    <plant_name>Dawn Break Solar</plant_name>
    <generator_id>DBBES</generator_id>
    <plant_id>69761</plant_id>
    <state>WI</state>
    <county>Waushara</county>
    <developer>Dawn Break Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.140833</lat>
    <lon>-89.46472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69761/DBSOL</id>
    <plant_name>Dawn Break Solar</plant_name>
    <generator_id>DBSOL</generator_id>
    <plant_id>69761</plant_id>
    <state>WI</state>
    <county>Waushara</county>
    <developer>Dawn Break Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.140833</lat>
    <lon>-89.46472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65975/TXSD2</id>
    <plant_name>Starr Solar Ranch</plant_name>
    <generator_id>TXSD2</generator_id>
    <plant_id>65975</plant_id>
    <state>TX</state>
    <county>Starr</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.523359</lat>
    <lon>-99.01711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68413/OT</id>
    <plant_name>Old Town Wind</plant_name>
    <generator_id>OT</generator_id>
    <plant_id>68413</plant_id>
    <state>IL</state>
    <county>Marshall</county>
    <developer>Old Town Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>178</nameplate_mw>
    <summer_mw>178</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.988976</lat>
    <lon>-89.17326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68176/WILBA</id>
    <plant_name>Willis Storage</plant_name>
    <generator_id>WILBA</generator_id>
    <plant_id>68176</plant_id>
    <state>TX</state>
    <county>Rains</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>176.1</nameplate_mw>
    <summer_mw>176.1</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.870406</lat>
    <lon>-95.74785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68165/BROBA</id>
    <plant_name>Brotherton Storage</plant_name>
    <generator_id>BROBA</generator_id>
    <plant_id>68165</plant_id>
    <state>TX</state>
    <county>Anderson</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>176.1</nameplate_mw>
    <summer_mw>176.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.687913</lat>
    <lon>-95.73988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68171/MCMBA</id>
    <plant_name>Mcmurtre Storage</plant_name>
    <generator_id>MCMBA</generator_id>
    <plant_id>68171</plant_id>
    <state>TX</state>
    <county>Hunt</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>176.1</nameplate_mw>
    <summer_mw>176.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.179664</lat>
    <lon>-95.80922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68178/YOOBA</id>
    <plant_name>Yooperlite Storage</plant_name>
    <generator_id>YOOBA</generator_id>
    <plant_id>68178</plant_id>
    <state>TX</state>
    <county>Wise</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>175.7</nameplate_mw>
    <summer_mw>175.7</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.033186</lat>
    <lon>-97.88031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64349/6666</id>
    <plant_name>Armadillo Solar Center</plant_name>
    <generator_id>6666</generator_id>
    <plant_id>64349</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.00014</lat>
    <lon>-96.2027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65425/KWOOD</id>
    <plant_name>Kingwood Solar</plant_name>
    <generator_id>KWOOD</generator_id>
    <plant_id>65425</plant_id>
    <state>OH</state>
    <county>Greene</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.782</lat>
    <lon>-83.83</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69984/6059</id>
    <plant_name>Hackberry Creek Solar</plant_name>
    <generator_id>6059</generator_id>
    <plant_id>69984</plant_id>
    <state>TX</state>
    <county>Mitchell</county>
    <developer>Hackberry Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.393074</lat>
    <lon>-100.8702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68459/5961</id>
    <plant_name>Bob Creek Wind, LLC</plant_name>
    <generator_id>5961</generator_id>
    <plant_id>68459</plant_id>
    <state>TX</state>
    <county>Sterling</county>
    <developer>Bob Creek Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.868813</lat>
    <lon>-101.2275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69462/AUGSP</id>
    <plant_name>Au Gres Solar Park</plant_name>
    <generator_id>AUGSP</generator_id>
    <plant_id>69462</plant_id>
    <state>MI</state>
    <county>Arenac</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.118</lat>
    <lon>-83.794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68323/ALT8B</id>
    <plant_name>Atlas VIII</plant_name>
    <generator_id>ALT8B</generator_id>
    <plant_id>68323</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>Atlas VIII LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>172.4</nameplate_mw>
    <summer_mw>172.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68940/CABS</id>
    <plant_name>Country Acres Clean Power LLC</plant_name>
    <generator_id>CABS</generator_id>
    <plant_id>68940</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>172</nameplate_mw>
    <summer_mw>172</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>38.751744</lat>
    <lon>-121.4221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67956/CONPV</id>
    <plant_name>Concho Pearl Solar and Storage</plant_name>
    <generator_id>CONPV</generator_id>
    <plant_id>67956</plant_id>
    <state>TX</state>
    <county>Concho</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>171.9</nameplate_mw>
    <summer_mw>171.9</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.465492</lat>
    <lon>-99.93435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69110/CONEF</id>
    <plant_name>Coneflower Storage Project LLC</plant_name>
    <generator_id>CONEF</generator_id>
    <plant_id>69110</plant_id>
    <state>TX</state>
    <county>Chambers</county>
    <developer>Acciona Energy USA Global, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>170.9</nameplate_mw>
    <summer_mw>170.9</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.8547</lat>
    <lon>-94.9254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66390/GDYPV</id>
    <plant_name>MRG Goody Solar Project Hybrid</plant_name>
    <generator_id>GDYPV</generator_id>
    <plant_id>66390</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Nexus Renewable Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>170.8</nameplate_mw>
    <summer_mw>170.8</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.639193</lat>
    <lon>-95.62905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66397/TOKIO</id>
    <plant_name>Tokio Solar</plant_name>
    <generator_id>TOKIO</generator_id>
    <plant_id>66397</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Gransolar Texas Eight, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>170.4</nameplate_mw>
    <summer_mw>168</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.427419</lat>
    <lon>-97.31086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69967/FTS</id>
    <plant_name>Foxtail Flats Solar, LLC</plant_name>
    <generator_id>FTS</generator_id>
    <plant_id>69967</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Foxtail Flats Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.8685</lat>
    <lon>-108.277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67222/1</id>
    <plant_name>Yellow Viking Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>67222</plant_id>
    <state>TX</state>
    <county>Somervell</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.31664</lat>
    <lon>-97.62889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68082/BBP</id>
    <plant_name>Bluebonnet Prairie Wind</plant_name>
    <generator_id>BBP</generator_id>
    <plant_id>68082</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.143863</lat>
    <lon>-96.30097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68366/AGAT</id>
    <plant_name>AGATE BESS</plant_name>
    <generator_id>AGAT</generator_id>
    <plant_id>68366</plant_id>
    <state>WA</state>
    <county>Kitsap</county>
    <developer>BrightNight Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSEI</balancing_authority>
    <lat>47.76879</lat>
    <lon>-122.6078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69991/SN1</id>
    <plant_name>Segno Solar Station</plant_name>
    <generator_id>SN1</generator_id>
    <plant_id>69991</plant_id>
    <state>TX</state>
    <county>Polk</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.577</lat>
    <lon>-94.686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68769/M3GSP</id>
    <plant_name>Greenalia Solar Power Misae III</plant_name>
    <generator_id>M3GSP</generator_id>
    <plant_id>68769</plant_id>
    <state>TX</state>
    <county>Childress</county>
    <developer>Greenlia Solar Power Misae III, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>169.6</nameplate_mw>
    <summer_mw>169.6</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.343755</lat>
    <lon>-100.0668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68397/I168M</id>
    <plant_name>Ironwood Solar</plant_name>
    <generator_id>I168M</generator_id>
    <plant_id>68397</plant_id>
    <state>AZ</state>
    <county>Yuma</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.915556</lat>
    <lon>-113.5778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69722/BESS1</id>
    <plant_name>Salt Cod BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>69722</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>Somerset Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.73722</lat>
    <lon>-71.1489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66976/WAPPA</id>
    <plant_name>Carol Wind, LLC</plant_name>
    <generator_id>WAPPA</generator_id>
    <plant_id>66976</plant_id>
    <state>TX</state>
    <county>Potter</county>
    <developer>Carol Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>167.8</nameplate_mw>
    <summer_mw>167.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.259819</lat>
    <lon>-102.0643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69148/BESS1</id>
    <plant_name>Allen 2 BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>69148</plant_id>
    <state>NC</state>
    <county>Gaston</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>167</nameplate_mw>
    <summer_mw>167</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.192096</lat>
    <lon>-81.01013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66312/CHSL</id>
    <plant_name>Courthouse Solar</plant_name>
    <generator_id>CHSL</generator_id>
    <plant_id>66312</plant_id>
    <state>VA</state>
    <county>Charlotte</county>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>167</nameplate_mw>
    <summer_mw>167</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.04</lat>
    <lon>-78.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70441/PALO2</id>
    <plant_name>Palo Duro Energy Storage II</plant_name>
    <generator_id>PALO2</generator_id>
    <plant_id>70441</plant_id>
    <state>TX</state>
    <county>Ochiltree</county>
    <developer>Palo Duro Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>165.7</nameplate_mw>
    <summer_mw>165.7</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.410697</lat>
    <lon>-101.0149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66895/LP1PV</id>
    <plant_name>Lupinus Solar 1, LLC</plant_name>
    <generator_id>LP1PV</generator_id>
    <plant_id>66895</plant_id>
    <state>TX</state>
    <county>Franklin</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>165</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.303385</lat>
    <lon>-95.25692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67936/GS1</id>
    <plant_name>Goshen Solar</plant_name>
    <generator_id>GS1</generator_id>
    <plant_id>67936</plant_id>
    <state>WY</state>
    <county>Goshen</county>
    <developer>Goshen Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>163</nameplate_mw>
    <summer_mw>163</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.853445</lat>
    <lon>-104.5032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67956/CONBS</id>
    <plant_name>Concho Pearl Solar and Storage</plant_name>
    <generator_id>CONBS</generator_id>
    <plant_id>67956</plant_id>
    <state>TX</state>
    <county>Concho</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>162.4</nameplate_mw>
    <summer_mw>162.4</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.465492</lat>
    <lon>-99.93435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63342/BKII</id>
    <plant_name>McCrae Wind Energy II</plant_name>
    <generator_id>BKII</generator_id>
    <plant_id>63342</plant_id>
    <state>TX</state>
    <county>Glasscock</county>
    <developer>McCrae Wind Energy II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>162.1</nameplate_mw>
    <summer_mw>162.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.754037</lat>
    <lon>-101.6752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68993/ENX40</id>
    <plant_name>MPG Solar</plant_name>
    <generator_id>ENX40</generator_id>
    <plant_id>68993</plant_id>
    <state>PA</state>
    <county>Centre</county>
    <developer>MPG Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.060649</lat>
    <lon>-78.04193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68907/1</id>
    <plant_name>Vidal Energy Center</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68907</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>CDH Vidal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.084796</lat>
    <lon>-114.4707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68907/2</id>
    <plant_name>Vidal Energy Center</plant_name>
    <generator_id>2</generator_id>
    <plant_id>68907</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>CDH Vidal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.084796</lat>
    <lon>-114.4707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68559/MAGNA</id>
    <plant_name>SR Magnolia</plant_name>
    <generator_id>MAGNA</generator_id>
    <plant_id>68559</plant_id>
    <state>MS</state>
    <county>Monroe</county>
    <developer>SR Magnolia, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.856467</lat>
    <lon>-88.67488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69582/CSTP</id>
    <plant_name>Chester Solar Technology Park, LLC</plant_name>
    <generator_id>CSTP</generator_id>
    <plant_id>69582</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>Chester Solar Technology Park, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.317</lat>
    <lon>-77.466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70256/DCES</id>
    <plant_name>Dry Creek Energy Storage, LLC</plant_name>
    <generator_id>DCES</generator_id>
    <plant_id>70256</plant_id>
    <state>CA</state>
    <county>Sacramento</county>
    <developer>Dry Creek Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>38.347139</lat>
    <lon>-121.1209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68584/YBS</id>
    <plant_name>Yellow Barn Solar</plant_name>
    <generator_id>YBS</generator_id>
    <plant_id>68584</plant_id>
    <state>NY</state>
    <county>Tompkins</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.56495</lat>
    <lon>-76.43907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67653/CARRI</id>
    <plant_name>Carriger</plant_name>
    <generator_id>CARRI</generator_id>
    <plant_id>67653</plant_id>
    <state>WA</state>
    <county>Klickitat</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.8777</lat>
    <lon>-120.8865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69638/11767</id>
    <plant_name>Landshark Energy Generation Facility</plant_name>
    <generator_id>11767</generator_id>
    <plant_id>69638</plant_id>
    <state>MS</state>
    <county>Calhoun</county>
    <developer>Landshark Energy Generation Facility LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.898797</lat>
    <lon>-89.14577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67774/GRS3</id>
    <plant_name>Pecan BESS</plant_name>
    <generator_id>GRS3</generator_id>
    <plant_id>67774</plant_id>
    <state>TX</state>
    <county>Leon</county>
    <developer>Gransolar Texas Three, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>157.1</nameplate_mw>
    <summer_mw>157.1</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.078667</lat>
    <lon>-96.22328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68667/RIC89</id>
    <plant_name>Chimney Rock BESS</plant_name>
    <generator_id>RIC89</generator_id>
    <plant_id>68667</plant_id>
    <state>TX</state>
    <county>Taylor</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>156</nameplate_mw>
    <summer_mw>156</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.387494</lat>
    <lon>-99.84846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70584/SOSBA</id>
    <plant_name>SOSA Energy Center</plant_name>
    <generator_id>SOSBA</generator_id>
    <plant_id>70584</plant_id>
    <state>TX</state>
    <county>Madison</county>
    <developer>SOSA Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>155.8</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.927401</lat>
    <lon>-96.0738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65900/SPRIN</id>
    <plant_name>Springwater Solar, LLC</plant_name>
    <generator_id>SPRIN</generator_id>
    <plant_id>65900</plant_id>
    <state>OH</state>
    <county>Madison</county>
    <developer>Springwater Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>155</nameplate_mw>
    <summer_mw>155</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.82972</lat>
    <lon>-83.2498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70022/DCYSO</id>
    <plant_name>Decoy Solar Energy LLC</plant_name>
    <generator_id>DCYSO</generator_id>
    <plant_id>70022</plant_id>
    <state>AR</state>
    <county>Arkansas</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>155</nameplate_mw>
    <summer_mw>155</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.463496</lat>
    <lon>-91.52053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67078/GRS3</id>
    <plant_name>Quarter Ranch Solar</plant_name>
    <generator_id>GRS3</generator_id>
    <plant_id>67078</plant_id>
    <state>TX</state>
    <county>Webb</county>
    <developer>Gransolar Texas Three, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>154.1</nameplate_mw>
    <summer_mw>154</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.301064</lat>
    <lon>-99.43041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69945/WTRTN</id>
    <plant_name>Watertown Solar</plant_name>
    <generator_id>WTRTN</generator_id>
    <plant_id>69945</plant_id>
    <state>MI</state>
    <county>Sanilac</county>
    <developer>Watertown Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>154</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.399794</lat>
    <lon>-82.81425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67581/CIRSA</id>
    <plant_name>Cairos Solar and Storage</plant_name>
    <generator_id>CIRSA</generator_id>
    <plant_id>67581</plant_id>
    <state>TX</state>
    <county>Kinney</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>153.3</nameplate_mw>
    <summer_mw>153.3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.269974</lat>
    <lon>-100.1975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66651/37565</id>
    <plant_name>Arco Wind and Solar Project</plant_name>
    <generator_id>37565</generator_id>
    <plant_id>66651</plant_id>
    <state>ID</state>
    <county>Bonneville</county>
    <developer>PacifiCorp</developer>
    <sector>Electric Utility</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>153</nameplate_mw>
    <summer_mw>153</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>43.557</lat>
    <lon>-112.4415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59971/ESTR1</id>
    <plant_name>Easter</plant_name>
    <generator_id>ESTR1</generator_id>
    <plant_id>59971</plant_id>
    <state>TX</state>
    <county>Castro</county>
    <developer>Enbridge Wind (Easter), LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>152</nameplate_mw>
    <summer_mw>152</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.668882</lat>
    <lon>-102.3517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63584/NY2</id>
    <plant_name>NY2 Battery</plant_name>
    <generator_id>NY2</generator_id>
    <plant_id>63584</plant_id>
    <state>NY</state>
    <county>Orange</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>151.5</nameplate_mw>
    <summer_mw>151.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.52667</lat>
    <lon>-74.14226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66905/SOLAR</id>
    <plant_name>Ables Springs Solar &amp; Storage</plant_name>
    <generator_id>SOLAR</generator_id>
    <plant_id>66905</plant_id>
    <state>TX</state>
    <county>Kaufman</county>
    <developer>Ables Springs Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>151</nameplate_mw>
    <summer_mw>151</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.819566</lat>
    <lon>-96.18484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68478/DRK</id>
    <plant_name>Darkwood Solar</plant_name>
    <generator_id>DRK</generator_id>
    <plant_id>68478</plant_id>
    <state>TX</state>
    <county>Comanche</county>
    <developer>Mustang Creek Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150.7</nameplate_mw>
    <summer_mw>150.7</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.928528</lat>
    <lon>-98.4241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68866/SAN</id>
    <plant_name>Santa Teresa Solar</plant_name>
    <generator_id>SAN</generator_id>
    <plant_id>68866</plant_id>
    <state>NM</state>
    <county>Dona Ana</county>
    <developer>Santa Teresa Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>31.805525</lat>
    <lon>-106.6989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69540/RCS01</id>
    <plant_name>Rock Creek Solar</plant_name>
    <generator_id>RCS01</generator_id>
    <plant_id>69540</plant_id>
    <state>IA</state>
    <county>Clinton</county>
    <developer>Rock Creek Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.771603</lat>
    <lon>-90.35751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66960/BLKSL</id>
    <plant_name>Blackford Solar</plant_name>
    <generator_id>BLKSL</generator_id>
    <plant_id>66960</plant_id>
    <state>IN</state>
    <county>Blackford</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.41608</lat>
    <lon>-85.25979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67964/A400M</id>
    <plant_name>Agave</plant_name>
    <generator_id>A400M</generator_id>
    <plant_id>67964</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.32389</lat>
    <lon>-112.8397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69874/BHSF</id>
    <plant_name>Bee Hollow Solar, LLC</plant_name>
    <generator_id>BHSF</generator_id>
    <plant_id>69874</plant_id>
    <state>IL</state>
    <county>St Clair</county>
    <developer>Geronimo Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.323</lat>
    <lon>-89.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64215/45MGA</id>
    <plant_name>Aratina Solar Center 2</plant_name>
    <generator_id>45MGA</generator_id>
    <plant_id>64215</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>45MG 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.062965</lat>
    <lon>-118.0878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67347/OF1</id>
    <plant_name>Osagrove Flats Wind</plant_name>
    <generator_id>OF1</generator_id>
    <plant_id>67347</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.941383</lat>
    <lon>-88.97152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67755/LTRSP</id>
    <plant_name>Little Trout Solar</plant_name>
    <generator_id>LTRSP</generator_id>
    <plant_id>67755</plant_id>
    <state>MI</state>
    <county>Presque Isle</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.334045</lat>
    <lon>-83.75117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69277/GR001</id>
    <plant_name>Gunnar Reliability Project</plant_name>
    <generator_id>GR001</generator_id>
    <plant_id>69277</plant_id>
    <state>TX</state>
    <county>Hidalgo</county>
    <developer>Gunnar Reliability Project LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.315571</lat>
    <lon>-98.14851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69605/TENN</id>
    <plant_name>Tennyson Solar</plant_name>
    <generator_id>TENN</generator_id>
    <plant_id>69605</plant_id>
    <state>TX</state>
    <county>Coke</county>
    <developer>BNB Tennyson Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.726229</lat>
    <lon>-100.2771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68932/OSBA</id>
    <plant_name>Overnight Solar</plant_name>
    <generator_id>OSBA</generator_id>
    <plant_id>68932</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Overnight Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.016197</lat>
    <lon>-117.357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68932/OSPV</id>
    <plant_name>Overnight Solar</plant_name>
    <generator_id>OSPV</generator_id>
    <plant_id>68932</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Overnight Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.016197</lat>
    <lon>-117.357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67995/PWS</id>
    <plant_name>Piney Woods Solar</plant_name>
    <generator_id>PWS</generator_id>
    <plant_id>67995</plant_id>
    <state>TX</state>
    <county>Walker</county>
    <developer>Piney Woods Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.718683</lat>
    <lon>-95.66965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68321/ALT4</id>
    <plant_name>Atlas BESS IV LLC</plant_name>
    <generator_id>ALT4</generator_id>
    <plant_id>68321</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>ATLAS BESS IV, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66891/IS245</id>
    <plant_name>Indigo Solar &amp; Storage</plant_name>
    <generator_id>IS245</generator_id>
    <plant_id>66891</plant_id>
    <state>TX</state>
    <county>Fisher</county>
    <developer>Innovative Solar 245 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.628061</lat>
    <lon>-100.236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69929/WC001</id>
    <plant_name>Weirs Creek</plant_name>
    <generator_id>WC001</generator_id>
    <plant_id>69929</plant_id>
    <state>KY</state>
    <county>Hopkins</county>
    <developer>Weirs Creek Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.423648</lat>
    <lon>-87.69048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70377/BES</id>
    <plant_name>Boxcar Energy Storage</plant_name>
    <generator_id>BES</generator_id>
    <plant_id>70377</plant_id>
    <state>TX</state>
    <county>Collin</county>
    <developer>Boxcar Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.018516</lat>
    <lon>-96.52003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66671/CONEZ</id>
    <plant_name>Conez Solar, LLC</plant_name>
    <generator_id>CONEZ</generator_id>
    <plant_id>66671</plant_id>
    <state>GA</state>
    <county>Emanuel</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.458353</lat>
    <lon>-82.39457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67231/HS</id>
    <plant_name>Hinds Solar, LLC</plant_name>
    <generator_id>HS</generator_id>
    <plant_id>67231</plant_id>
    <state>MS</state>
    <county>Hinds</county>
    <developer>Hinds Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.416186</lat>
    <lon>-90.38886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66672/AG239</id>
    <plant_name>Stark Solar, LLC</plant_name>
    <generator_id>AG239</generator_id>
    <plant_id>66672</plant_id>
    <state>OH</state>
    <county>Stark</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.852661</lat>
    <lon>-81.15701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68901/PVCLA</id>
    <plant_name>Cedar Range Solar</plant_name>
    <generator_id>PVCLA</generator_id>
    <plant_id>68901</plant_id>
    <state>TX</state>
    <county>Hopkins</county>
    <developer>Cedar Range LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.057483</lat>
    <lon>-95.82701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69660/HS</id>
    <plant_name>El Patrimonio</plant_name>
    <generator_id>HS</generator_id>
    <plant_id>69660</plant_id>
    <state>TX</state>
    <county>Bexar</county>
    <developer>Heritage Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.240499</lat>
    <lon>-98.51006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69974/CRZN1</id>
    <plant_name>Corazon Energy Storage</plant_name>
    <generator_id>CRZN1</generator_id>
    <plant_id>69974</plant_id>
    <state>NM</state>
    <county>Bernalillo</county>
    <developer>Corazon Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>35.003482</lat>
    <lon>-106.742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60272/WT1</id>
    <plant_name>Cone Renewable Energy Project, LLC</plant_name>
    <generator_id>WT1</generator_id>
    <plant_id>60272</plant_id>
    <state>TX</state>
    <county>Crosby</county>
    <developer>Cone Renewable Energy Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.8093</lat>
    <lon>-101.3424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70195/MAMM1</id>
    <plant_name>Mammoth Plains Energy Storage</plant_name>
    <generator_id>MAMM1</generator_id>
    <plant_id>70195</plant_id>
    <state>OK</state>
    <county>Dewey</county>
    <developer>Mammoth Plains Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SPA</balancing_authority>
    <lat>35.981842</lat>
    <lon>-98.70672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70199/PALO1</id>
    <plant_name>Palo Duro Energy Storage</plant_name>
    <generator_id>PALO1</generator_id>
    <plant_id>70199</plant_id>
    <state>TX</state>
    <county>Ochiltree</county>
    <developer>Palo Duro Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.4106</lat>
    <lon>-101.0102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66558/LAMO1</id>
    <plant_name>Mowata Solar</plant_name>
    <generator_id>LAMO1</generator_id>
    <plant_id>66558</plant_id>
    <state>LA</state>
    <county>Acadia</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.3918</lat>
    <lon>-92.4044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67358/4670</id>
    <plant_name>Lake Whitney Solar</plant_name>
    <generator_id>4670</generator_id>
    <plant_id>67358</plant_id>
    <state>TX</state>
    <county>Bosque</county>
    <developer>Lake Whitney Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.837644</lat>
    <lon>-97.39844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67874/ENX32</id>
    <plant_name>Parks Valley Energy LLC</plant_name>
    <generator_id>ENX32</generator_id>
    <plant_id>67874</plant_id>
    <state>WV</state>
    <county>Hampshire</county>
    <developer>Parks Valley Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.288816</lat>
    <lon>-78.47481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69972/SP150</id>
    <plant_name>South Platte Solar</plant_name>
    <generator_id>SP150</generator_id>
    <plant_id>69972</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>South Platte Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.194947</lat>
    <lon>-103.7088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70218/SEL1B</id>
    <plant_name>Selma Energy Center</plant_name>
    <generator_id>SEL1B</generator_id>
    <plant_id>70218</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Selma Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DOPD</balancing_authority>
    <lat>32.849821</lat>
    <lon>-111.5251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70544/GBESS</id>
    <plant_name>Greer Energy Storage</plant_name>
    <generator_id>GBESS</generator_id>
    <plant_id>70544</plant_id>
    <state>MS</state>
    <county>Washington</county>
    <developer>Greer Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.113983</lat>
    <lon>-90.83066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69278/2</id>
    <plant_name>Fortress 1</plant_name>
    <generator_id>2</generator_id>
    <plant_id>69278</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Fortress Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.26</lat>
    <lon>-103.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65665/HEPU1</id>
    <plant_name>Hecate Energy Pulaski 1</plant_name>
    <generator_id>HEPU1</generator_id>
    <plant_id>65665</plant_id>
    <state>VA</state>
    <county>Pulaski</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.139595</lat>
    <lon>-80.68741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67986/MSPRB</id>
    <plant_name>Meadow Springs Renewable Energy (Hybrid)</plant_name>
    <generator_id>MSPRB</generator_id>
    <plant_id>67986</plant_id>
    <state>IL</state>
    <county>White</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.029</lat>
    <lon>-88.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67986/MSPRE</id>
    <plant_name>Meadow Springs Renewable Energy (Hybrid)</plant_name>
    <generator_id>MSPRE</generator_id>
    <plant_id>67986</plant_id>
    <state>IL</state>
    <county>White</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.029</lat>
    <lon>-88.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68480/LS1</id>
    <plant_name>Laurens Solar</plant_name>
    <generator_id>LS1</generator_id>
    <plant_id>68480</plant_id>
    <state>GA</state>
    <county>Laurens</county>
    <developer>Laurens Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.577504</lat>
    <lon>-83.11216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66132/TXTR1</id>
    <plant_name>Trinity River Solar 1</plant_name>
    <generator_id>TXTR1</generator_id>
    <plant_id>66132</plant_id>
    <state>TX</state>
    <county>Liberty</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.010255</lat>
    <lon>-94.48631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68061/GEMPV</id>
    <plant_name>Gemstone Solar LLC</plant_name>
    <generator_id>GEMPV</generator_id>
    <plant_id>68061</plant_id>
    <state>MI</state>
    <county>Cass</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.896754</lat>
    <lon>-86.0488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69577/SPROR</id>
    <plant_name>Superior Solar Project, LLC</plant_name>
    <generator_id>SPROR</generator_id>
    <plant_id>69577</plant_id>
    <state>MI</state>
    <county>Marquette</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.455</lat>
    <lon>-87.466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70055/AA1</id>
    <plant_name>Allen Acres Solar</plant_name>
    <generator_id>AA1</generator_id>
    <plant_id>70055</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.11792</lat>
    <lon>-88.64038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68333/CROS</id>
    <plant_name>Crossroads Solar - GA</plant_name>
    <generator_id>CROS</generator_id>
    <plant_id>68333</plant_id>
    <state>GA</state>
    <county>Liberty</county>
    <developer>Crossroads bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.71</lat>
    <lon>-81.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68105/JASP</id>
    <plant_name>SR Jasper</plant_name>
    <generator_id>JASP</generator_id>
    <plant_id>68105</plant_id>
    <state>MS</state>
    <county>Jasper</county>
    <developer>SR Jasper, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.048427</lat>
    <lon>-88.94419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67894/51LVA</id>
    <plant_name>Bellefield 3 Solar and Battery Storage</plant_name>
    <generator_id>51LVA</generator_id>
    <plant_id>67894</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>51LV 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2030-05</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.029153</lat>
    <lon>-117.9926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67894/51LVB</id>
    <plant_name>Bellefield 3 Solar and Battery Storage</plant_name>
    <generator_id>51LVB</generator_id>
    <plant_id>67894</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>51LV 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2030-05</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.029153</lat>
    <lon>-117.9926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61170/33UI9</id>
    <plant_name>Gale 1 Solar</plant_name>
    <generator_id>33UI9</generator_id>
    <plant_id>61170</plant_id>
    <state>UT</state>
    <county>Millard</county>
    <developer>33UI 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>39.523</lat>
    <lon>-112.546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67352/CPVCL</id>
    <plant_name>CPV County Line Solar, LLC</plant_name>
    <generator_id>CPVCL</generator_id>
    <plant_id>67352</plant_id>
    <state>VA</state>
    <county>Charlotte</county>
    <developer>CPV County Line Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.190161</lat>
    <lon>-78.68228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70236/SLRN1</id>
    <plant_name>Sierra Luna Energy Storage</plant_name>
    <generator_id>SLRN1</generator_id>
    <plant_id>70236</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Sierra Luna Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.408834</lat>
    <lon>-112.3042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70340/CAR15</id>
    <plant_name>Carousel Energy Storage, LLC</plant_name>
    <generator_id>CAR15</generator_id>
    <plant_id>70340</plant_id>
    <state>CO</state>
    <county>Kit Carson</county>
    <developer>Carousel Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>149.6</nameplate_mw>
    <summer_mw>149.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.213298</lat>
    <lon>-102.1036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68194/RIVER</id>
    <plant_name>Riverstone Solar</plant_name>
    <generator_id>RIVER</generator_id>
    <plant_id>68194</plant_id>
    <state>VA</state>
    <county>Buckingham</county>
    <developer>Riverstone Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>149.5</nameplate_mw>
    <summer_mw>149.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.72839</lat>
    <lon>-78.45188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68738/CANPV</id>
    <plant_name>Cannibal Draw Solar and Storage</plant_name>
    <generator_id>CANPV</generator_id>
    <plant_id>68738</plant_id>
    <state>TX</state>
    <county>Glasscock</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>149.5</nameplate_mw>
    <summer_mw>149.5</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.023861</lat>
    <lon>-101.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68900/BSS</id>
    <plant_name>Badger State Solar LLC</plant_name>
    <generator_id>BSS</generator_id>
    <plant_id>68900</plant_id>
    <state>WI</state>
    <county>Jefferson</county>
    <developer>Badger State Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.012287</lat>
    <lon>-88.86356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67773/GRS20</id>
    <plant_name>Cosper Solar</plant_name>
    <generator_id>GRS20</generator_id>
    <plant_id>67773</plant_id>
    <state>TX</state>
    <county>Bell</county>
    <developer>Gransolar Texas Twenty LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>148.2</nameplate_mw>
    <summer_mw>148</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.994225</lat>
    <lon>-97.79588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68078/CHIPV</id>
    <plant_name>Chisme Solar and Storage</plant_name>
    <generator_id>CHIPV</generator_id>
    <plant_id>68078</plant_id>
    <state>TX</state>
    <county>Brown</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>147</nameplate_mw>
    <summer_mw>147</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.568929</lat>
    <lon>-98.82195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68078/CHIBS</id>
    <plant_name>Chisme Solar and Storage</plant_name>
    <generator_id>CHIBS</generator_id>
    <plant_id>68078</plant_id>
    <state>TX</state>
    <county>Brown</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>146</nameplate_mw>
    <summer_mw>146</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.568929</lat>
    <lon>-98.82195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67567/WEGSP</id>
    <plant_name>Wensowitch Solar Park</plant_name>
    <generator_id>WEGSP</generator_id>
    <plant_id>67567</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Greenalia Solar Power Wensowitch, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>145.6</nameplate_mw>
    <summer_mw>145.6</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.300261</lat>
    <lon>-96.37123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69464/CDFSP</id>
    <plant_name>Cedar Field Solar Park</plant_name>
    <generator_id>CDFSP</generator_id>
    <plant_id>69464</plant_id>
    <state>MI</state>
    <county>Gladwin</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.95</lat>
    <lon>-84.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65344/66148</id>
    <plant_name>Noria Hondo Solar (Hybrid)</plant_name>
    <generator_id>66148</generator_id>
    <plant_id>65344</plant_id>
    <state>TX</state>
    <county>Kleberg</county>
    <developer>Nexus Renewable Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.553355</lat>
    <lon>-97.67528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68876/6339</id>
    <plant_name>Okolona Solar</plant_name>
    <generator_id>6339</generator_id>
    <plant_id>68876</plant_id>
    <state>MS</state>
    <county>Henderson</county>
    <developer>Okolona Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.693</lat>
    <lon>-87.549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68876/6340</id>
    <plant_name>Okolona Solar</plant_name>
    <generator_id>6340</generator_id>
    <plant_id>68876</plant_id>
    <state>MS</state>
    <county>Henderson</county>
    <developer>Okolona Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.693</lat>
    <lon>-87.549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68665/RIC87</id>
    <plant_name>Summerhill BESS</plant_name>
    <generator_id>RIC87</generator_id>
    <plant_id>68665</plant_id>
    <state>TX</state>
    <county>Taylor</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>143</nameplate_mw>
    <summer_mw>143</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.51289</lat>
    <lon>-99.79563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67784/GRS11</id>
    <plant_name>Vial BESS</plant_name>
    <generator_id>GRS11</generator_id>
    <plant_id>67784</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Gransolar Texas Eleven LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>141.4</nameplate_mw>
    <summer_mw>141.4</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.953772</lat>
    <lon>-97.06248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69993/VT1</id>
    <plant_name>Votaw Solar Station</plant_name>
    <generator_id>VT1</generator_id>
    <plant_id>69993</plant_id>
    <state>TX</state>
    <county>Hardin</county>
    <developer>Entergy Louisiana LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>141</nameplate_mw>
    <summer_mw>141</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.4355</lat>
    <lon>-94.673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67999/SCAEC</id>
    <plant_name>Spring Creek Agri-Energy Center</plant_name>
    <generator_id>SCAEC</generator_id>
    <plant_id>67999</plant_id>
    <state>MI</state>
    <county>Calhoun</county>
    <developer>Consumers Energy Co - (MI)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.2024</lat>
    <lon>-85.23803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69878/5869</id>
    <plant_name>Emmons-Logan Energy Storage</plant_name>
    <generator_id>5869</generator_id>
    <plant_id>69878</plant_id>
    <state>ND</state>
    <county>Emmons</county>
    <developer>Emmons-Logan Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.372883</lat>
    <lon>-99.9784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70455/BES</id>
    <plant_name>City Breeze Energy Storage</plant_name>
    <generator_id>BES</generator_id>
    <plant_id>70455</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>City Breeze Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.011</lat>
    <lon>-95.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66703/11103</id>
    <plant_name>Austin Creek Solar</plant_name>
    <generator_id>11103</generator_id>
    <plant_id>66703</plant_id>
    <state>IL</state>
    <county>Adams</county>
    <developer>Strata Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.790103</lat>
    <lon>-91.31508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64857/C0513</id>
    <plant_name>Canyonland Solar</plant_name>
    <generator_id>C0513</generator_id>
    <plant_id>64857</plant_id>
    <state>CO</state>
    <county>Montezuma</county>
    <developer>Canyonland Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>37.431</lat>
    <lon>-108.724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69482/BBS1</id>
    <plant_name>Bluebird Solar</plant_name>
    <generator_id>BBS1</generator_id>
    <plant_id>69482</plant_id>
    <state>WA</state>
    <county>Klickitat</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.896375</lat>
    <lon>-120.3031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67661/OXHIL</id>
    <plant_name>Oxbow Hill</plant_name>
    <generator_id>OXHIL</generator_id>
    <plant_id>67661</plant_id>
    <state>NY</state>
    <county>Niagara</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.9711</lat>
    <lon>-75.73553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68766/PFGWP</id>
    <plant_name>Pioneer Field Wind Power</plant_name>
    <generator_id>PFGWP</generator_id>
    <plant_id>68766</plant_id>
    <state>TX</state>
    <county>Tom Green</county>
    <developer>Greenalia Wind Power Pioneer Field, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>136.2</nameplate_mw>
    <summer_mw>163.2</summer_mw>
    <planned_start>2030-11</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.19494</lat>
    <lon>-100.2118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70098/BEB</id>
    <plant_name>Blue Lake BESS</plant_name>
    <generator_id>BEB</generator_id>
    <plant_id>70098</plant_id>
    <state>MN</state>
    <county>Scott</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>135.5</nameplate_mw>
    <summer_mw>135.5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.786793</lat>
    <lon>-93.4269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66409/GWNT</id>
    <plant_name>Hecate Grid Gwent Storage 1</plant_name>
    <generator_id>GWNT</generator_id>
    <plant_id>66409</plant_id>
    <state>CA</state>
    <county>Ventura</county>
    <developer>Hecate Grid Gwent Storage 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.28093</lat>
    <lon>-118.903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68666/RIC88</id>
    <plant_name>Stonewall BESS</plant_name>
    <generator_id>RIC88</generator_id>
    <plant_id>68666</plant_id>
    <state>TX</state>
    <county>Stonewall</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.2466</lat>
    <lon>-100.3982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64981/CPSS1</id>
    <plant_name>Pecan Prairie South Solar</plant_name>
    <generator_id>CPSS1</generator_id>
    <plant_id>64981</plant_id>
    <state>TX</state>
    <county>Leon</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>132.9</nameplate_mw>
    <summer_mw>132.9</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.05001</lat>
    <lon>-96.221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69101/MLB03</id>
    <plant_name>Millers Branch Solar</plant_name>
    <generator_id>MLB03</generator_id>
    <plant_id>69101</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Southern Power Co</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.22132</lat>
    <lon>-99.58652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68252/QUVAL</id>
    <plant_name>SR Quincy Valley</plant_name>
    <generator_id>QUVAL</generator_id>
    <plant_id>68252</plant_id>
    <state>WA</state>
    <county>Grant</county>
    <developer>SR Quincy Valley, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>GCPD</balancing_authority>
    <lat>47.27998</lat>
    <lon>-119.7046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70450/PV1</id>
    <plant_name>Wheatridge Optimization II</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70450</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Wheatridge Optimization II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.559975</lat>
    <lon>-119.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65141/BS301</id>
    <plant_name>Boulder Solar III LLC</plant_name>
    <generator_id>BS301</generator_id>
    <plant_id>65141</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>174 Power Global Corp.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>128</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>35.838769</lat>
    <lon>-114.9642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65141/BS3ES</id>
    <plant_name>Boulder Solar III LLC</plant_name>
    <generator_id>BS3ES</generator_id>
    <plant_id>65141</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>174 Power Global Corp.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>128</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>35.838769</lat>
    <lon>-114.9642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69965/RS</id>
    <plant_name>Roccasecca BESS LLC</plant_name>
    <generator_id>RS</generator_id>
    <plant_id>69965</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Roccasecca BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>126.5</nameplate_mw>
    <summer_mw>126.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.83</lat>
    <lon>-115.0128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68173/SANPV</id>
    <plant_name>Sandford Solar and Storage</plant_name>
    <generator_id>SANPV</generator_id>
    <plant_id>68173</plant_id>
    <state>TX</state>
    <county>Wise</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>126.2</nameplate_mw>
    <summer_mw>126.2</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.30726</lat>
    <lon>-97.52777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68191/HRTG</id>
    <plant_name>Heritage Wind</plant_name>
    <generator_id>HRTG</generator_id>
    <plant_id>68191</plant_id>
    <state>NY</state>
    <county>Orleans</county>
    <developer>Heritage Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.170976</lat>
    <lon>-78.17454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62263/GEN1</id>
    <plant_name>Saddle Mountain East Wind Farm</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>62263</plant_id>
    <state>WA</state>
    <county>Adams</county>
    <developer>EDP Renewables North America LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>AVA</balancing_authority>
    <lat>46.789</lat>
    <lon>-119.346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68166/DOLBA</id>
    <plant_name>Dolomite Storage</plant_name>
    <generator_id>DOLBA</generator_id>
    <plant_id>68166</plant_id>
    <state>TX</state>
    <county>Ellis</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>125.7</nameplate_mw>
    <summer_mw>125.7</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.456144</lat>
    <lon>-96.73774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68410/BRAZ</id>
    <plant_name>Brazoria Solar I</plant_name>
    <generator_id>BRAZ</generator_id>
    <plant_id>68410</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Brazoria Solar i, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.138777</lat>
    <lon>-95.37108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68410/BRAZ2</id>
    <plant_name>Brazoria Solar I</plant_name>
    <generator_id>BRAZ2</generator_id>
    <plant_id>68410</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Brazoria Solar i, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.138777</lat>
    <lon>-95.37108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1355/BESS</id>
    <plant_name>E W Brown</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>1355</plant_id>
    <state>KY</state>
    <county>Mercer</county>
    <developer>Kentucky Utilities Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.78831</lat>
    <lon>-84.71257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67552/ELMFL</id>
    <plant_name>Elm Flats Solar</plant_name>
    <generator_id>ELMFL</generator_id>
    <plant_id>67552</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.113579</lat>
    <lon>-96.30476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66663/EMPIR</id>
    <plant_name>Empire Solar (NY)</plant_name>
    <generator_id>EMPIR</generator_id>
    <plant_id>66663</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.2596</lat>
    <lon>-79.6142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67937/FLOSO</id>
    <plant_name>Flora Solar</plant_name>
    <generator_id>FLOSO</generator_id>
    <plant_id>67937</plant_id>
    <state>IL</state>
    <county>Clay</county>
    <developer>Flora Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.648852</lat>
    <lon>-88.51444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68316/BIGL1</id>
    <plant_name>Biglow Solar Generation and BESS</plant_name>
    <generator_id>BIGL1</generator_id>
    <plant_id>68316</plant_id>
    <state>OR</state>
    <county>Sherman</county>
    <developer>BIGL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PGE</balancing_authority>
    <lat>45.606</lat>
    <lon>-120.625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68316/BIGL2</id>
    <plant_name>Biglow Solar Generation and BESS</plant_name>
    <generator_id>BIGL2</generator_id>
    <plant_id>68316</plant_id>
    <state>OR</state>
    <county>Sherman</county>
    <developer>BIGL bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PGE</balancing_authority>
    <lat>45.606</lat>
    <lon>-120.625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70218/SEL1S</id>
    <plant_name>Selma Energy Center</plant_name>
    <generator_id>SEL1S</generator_id>
    <plant_id>70218</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Selma Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DOPD</balancing_authority>
    <lat>32.849821</lat>
    <lon>-111.5251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68673/OESLW</id>
    <plant_name>Sand Luis West</plant_name>
    <generator_id>OESLW</generator_id>
    <plant_id>68673</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Origis Energy USA, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.1676</lat>
    <lon>-120.054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65590/OCTNS</id>
    <plant_name>Octans</plant_name>
    <generator_id>OCTNS</generator_id>
    <plant_id>65590</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>Engie North America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.000575</lat>
    <lon>-102.6799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68671/RIC91</id>
    <plant_name>Houston County BESS</plant_name>
    <generator_id>RIC91</generator_id>
    <plant_id>68671</plant_id>
    <state>TX</state>
    <county>Houston</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.239009</lat>
    <lon>-95.57699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70492/WRES1</id>
    <plant_name>Willow Rock Energy Storage Center</plant_name>
    <generator_id>WRES1</generator_id>
    <plant_id>70492</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>GEM A-CAES LLC</developer>
    <sector>IPP Non-CHP</sector>
    <energy_source>MWH</energy_source>
    <prime_mover>CE</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.912528</lat>
    <lon>-118.1576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70492/WRES2</id>
    <plant_name>Willow Rock Energy Storage Center</plant_name>
    <generator_id>WRES2</generator_id>
    <plant_id>70492</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>GEM A-CAES LLC</developer>
    <sector>IPP Non-CHP</sector>
    <energy_source>MWH</energy_source>
    <prime_mover>CE</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.912528</lat>
    <lon>-118.1576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70492/WRES3</id>
    <plant_name>Willow Rock Energy Storage Center</plant_name>
    <generator_id>WRES3</generator_id>
    <plant_id>70492</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>GEM A-CAES LLC</developer>
    <sector>IPP Non-CHP</sector>
    <energy_source>MWH</energy_source>
    <prime_mover>CE</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.912528</lat>
    <lon>-118.1576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70492/WRES4</id>
    <plant_name>Willow Rock Energy Storage Center</plant_name>
    <generator_id>WRES4</generator_id>
    <plant_id>70492</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>GEM A-CAES LLC</developer>
    <sector>IPP Non-CHP</sector>
    <energy_source>MWH</energy_source>
    <prime_mover>CE</prime_mover>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.912528</lat>
    <lon>-118.1576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68925/MIDB</id>
    <plant_name>Midway BESS</plant_name>
    <generator_id>MIDB</generator_id>
    <plant_id>68925</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Midway BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>124.6</nameplate_mw>
    <summer_mw>119.9</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.652653</lat>
    <lon>-120.5783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68765/HUGSP</id>
    <plant_name>Hutcherson Solar</plant_name>
    <generator_id>HUGSP</generator_id>
    <plant_id>68765</plant_id>
    <state>TX</state>
    <county>Wilbarger</county>
    <developer>Greenalia Solar Power Hutcherson, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>123.3</nameplate_mw>
    <summer_mw>123.3</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>34.02533</lat>
    <lon>-99.26568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68155/RIOLA</id>
    <plant_name>Rio Lago Solar</plant_name>
    <generator_id>RIOLA</generator_id>
    <plant_id>68155</plant_id>
    <state>TX</state>
    <county>Bandera</county>
    <developer>Modal Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>123</nameplate_mw>
    <summer_mw>123</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.756134</lat>
    <lon>-99.09524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66896/LP2BA</id>
    <plant_name>Lupinus Solar 2, LLC</plant_name>
    <generator_id>LP2BA</generator_id>
    <plant_id>66896</plant_id>
    <state>TX</state>
    <county>Franklin</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>122.9</nameplate_mw>
    <summer_mw>122.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.303385</lat>
    <lon>-95.25692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69167/BCKBN</id>
    <plant_name>Backbone Creek BESS</plant_name>
    <generator_id>BCKBN</generator_id>
    <plant_id>69167</plant_id>
    <state>TX</state>
    <county>Burnet</county>
    <developer>Backbone BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>121</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.550207</lat>
    <lon>-98.25687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66778/HS1</id>
    <plant_name>Hart Solar Project</plant_name>
    <generator_id>HS1</generator_id>
    <plant_id>66778</plant_id>
    <state>MI</state>
    <county>Oceana</county>
    <developer>Hart Solar Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.692866</lat>
    <lon>-86.32097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68968/ENX37</id>
    <plant_name>Border Basin Solar</plant_name>
    <generator_id>ENX37</generator_id>
    <plant_id>68968</plant_id>
    <state>OH</state>
    <county>Hancock</county>
    <developer>Border Basin, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.107431</lat>
    <lon>-83.5722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67870/ENX34</id>
    <plant_name>Clermont Solar</plant_name>
    <generator_id>ENX34</generator_id>
    <plant_id>67870</plant_id>
    <state>PA</state>
    <county>McKean</county>
    <developer>Clermont Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.656025</lat>
    <lon>-78.56731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68898/ECS1</id>
    <plant_name>Eagle Creek Solar Park LLC</plant_name>
    <generator_id>ECS1</generator_id>
    <plant_id>68898</plant_id>
    <state>MI</state>
    <county>Saginaw</county>
    <developer>Eagle Creek Solar Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.308523</lat>
    <lon>-84.21895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68359/OCPSF</id>
    <plant_name>Pepper Solar Farm</plant_name>
    <generator_id>OCPSF</generator_id>
    <plant_id>68359</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Pepper Solar Farm, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.678359</lat>
    <lon>-97.04595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68293/FRON</id>
    <plant_name>Frontier Solar</plant_name>
    <generator_id>FRON</generator_id>
    <plant_id>68293</plant_id>
    <state>KY</state>
    <county>Washington</county>
    <developer>FRON bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.605063</lat>
    <lon>-85.24822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68877/WLDC1</id>
    <plant_name>Wildcat Ranch Energy Storage</plant_name>
    <generator_id>WLDC1</generator_id>
    <plant_id>68877</plant_id>
    <state>TX</state>
    <county>Cochran</county>
    <developer>Wildcat Ranch Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>107.5</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>33.524176</lat>
    <lon>-102.8773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65051/TSEC</id>
    <plant_name>Tracy Solar Energy Center</plant_name>
    <generator_id>TSEC</generator_id>
    <plant_id>65051</plant_id>
    <state>NY</state>
    <county>Jefferson</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>119</nameplate_mw>
    <summer_mw>119</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.175939</lat>
    <lon>-75.98513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67884/ENX27</id>
    <plant_name>Two Oaks Solar and Storage LLC</plant_name>
    <generator_id>ENX27</generator_id>
    <plant_id>67884</plant_id>
    <state>VA</state>
    <county>Louisa</county>
    <developer>Two Oaks Solar and Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>118</summer_mw>
    <planned_start>2029-11</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.013053</lat>
    <lon>-77.93117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70547/PV-1</id>
    <plant_name>Rippon Energy Facility</plant_name>
    <generator_id>PV-1</generator_id>
    <plant_id>70547</plant_id>
    <state>WV</state>
    <county>Jefferson</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>117.1</nameplate_mw>
    <summer_mw>117.1</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.198017</lat>
    <lon>-77.86053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68080/GRS8B</id>
    <plant_name>Marcos PV and BESS</plant_name>
    <generator_id>GRS8B</generator_id>
    <plant_id>68080</plant_id>
    <state>TX</state>
    <county>Victoria</county>
    <developer>GRS BESS Texas Eight LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>115.9</nameplate_mw>
    <summer_mw>115</summer_mw>
    <planned_start>2029-08</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.904979</lat>
    <lon>-97.71017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68080/GRS8P</id>
    <plant_name>Marcos PV and BESS</plant_name>
    <generator_id>GRS8P</generator_id>
    <plant_id>68080</plant_id>
    <state>TX</state>
    <county>Victoria</county>
    <developer>GRS BESS Texas Eight LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>115.9</nameplate_mw>
    <summer_mw>115</summer_mw>
    <planned_start>2029-08</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.904979</lat>
    <lon>-97.71017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66675/ALOAK</id>
    <plant_name>Alfred Oaks Solar, LLC</plant_name>
    <generator_id>ALOAK</generator_id>
    <plant_id>66675</plant_id>
    <state>NY</state>
    <county>Allegany</county>
    <developer>Alfred Oaks Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>115.2</nameplate_mw>
    <summer_mw>115.2</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.21</lat>
    <lon>-77.82</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68086/SBS</id>
    <plant_name>South Branch Solar</plant_name>
    <generator_id>SBS</generator_id>
    <plant_id>68086</plant_id>
    <state>OH</state>
    <county>Hancock</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>115</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.128477</lat>
    <lon>-83.51517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68553/BACN2</id>
    <plant_name>SR Bacon II</plant_name>
    <generator_id>BACN2</generator_id>
    <plant_id>68553</plant_id>
    <state>GA</state>
    <county>Bacon</county>
    <developer>SR Bacon II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>115</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.511392</lat>
    <lon>-82.33683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64543/1</id>
    <plant_name>Cedar Creek Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64543</plant_id>
    <state>DE</state>
    <county>New Castle</county>
    <developer>FPS Cedar Creek Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>114</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.37259</lat>
    <lon>-75.56455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67779/GRS5</id>
    <plant_name>Hayrick BESS</plant_name>
    <generator_id>GRS5</generator_id>
    <plant_id>67779</plant_id>
    <state>TX</state>
    <county>Coke</county>
    <developer>Gransolar Texas Five LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>113.9</nameplate_mw>
    <summer_mw>113.9</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.022914</lat>
    <lon>-100.2926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64215/45MGB</id>
    <plant_name>Aratina Solar Center 2</plant_name>
    <generator_id>45MGB</generator_id>
    <plant_id>64215</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>45MG 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>113</nameplate_mw>
    <summer_mw>113</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.062965</lat>
    <lon>-118.0878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65977/BF1PV</id>
    <plant_name>Boulder Flats Solar</plant_name>
    <generator_id>BF1PV</generator_id>
    <plant_id>65977</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>Boulder Flats Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>113</nameplate_mw>
    <summer_mw>113</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>35.878865</lat>
    <lon>-114.9833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65458/ANOD1</id>
    <plant_name>Anode (Springville) BESS</plant_name>
    <generator_id>ANOD1</generator_id>
    <plant_id>65458</plant_id>
    <state>CA</state>
    <county>Tulare</county>
    <developer>Southern California Edison Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>112.5</nameplate_mw>
    <summer_mw>112.5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.107903</lat>
    <lon>-118.9409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65458/ANOD2</id>
    <plant_name>Anode (Springville) BESS</plant_name>
    <generator_id>ANOD2</generator_id>
    <plant_id>65458</plant_id>
    <state>CA</state>
    <county>Tulare</county>
    <developer>Southern California Edison Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>112.5</nameplate_mw>
    <summer_mw>112.5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.107903</lat>
    <lon>-118.9409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68768/BRGWP</id>
    <plant_name>Blackwelder Ranch Wind</plant_name>
    <generator_id>BRGWP</generator_id>
    <plant_id>68768</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>Greenalia Wind Power Blackwelder Ranch, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>110.4</nameplate_mw>
    <summer_mw>110.4</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.81256</lat>
    <lon>-102.1865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66341/EGSS</id>
    <plant_name>Eagle Springs Hybrid</plant_name>
    <generator_id>EGSS</generator_id>
    <plant_id>66341</plant_id>
    <state>TX</state>
    <county>Delta</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>110.1</nameplate_mw>
    <summer_mw>110.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.433264</lat>
    <lon>-95.57444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70463/WSTBA</id>
    <plant_name>Westminster Reliability Project, LLC</plant_name>
    <generator_id>WSTBA</generator_id>
    <plant_id>70463</plant_id>
    <state>CA</state>
    <county>Orange</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.773169</lat>
    <lon>-118.0116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63850/BESS2</id>
    <plant_name>Cherry</plant_name>
    <generator_id>BESS2</generator_id>
    <plant_id>63850</plant_id>
    <state>CA</state>
    <county>Kings</county>
    <developer>Westlands Cherry, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.122457</lat>
    <lon>-119.9232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68099/COPE</id>
    <plant_name>SR Copeland</plant_name>
    <generator_id>COPE</generator_id>
    <plant_id>68099</plant_id>
    <state>TN</state>
    <county>Cumberland</county>
    <developer>SR Copeland, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.035453</lat>
    <lon>-85.10991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70420/PV1</id>
    <plant_name>Wheatridge Optimization I</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70420</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Wheatridge Optimization I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.560054</lat>
    <lon>-119.6224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69481/FXTRT</id>
    <plant_name>Foxtrot Solar Energy LLC</plant_name>
    <generator_id>FXTRT</generator_id>
    <plant_id>69481</plant_id>
    <state>MO</state>
    <county>Jasper</county>
    <developer>Evergy Missouri West</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>108.9</nameplate_mw>
    <summer_mw>108.9</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.352</lat>
    <lon>-94.606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65338/UNIS1</id>
    <plant_name>Union Ridge Solar</plant_name>
    <generator_id>UNIS1</generator_id>
    <plant_id>65338</plant_id>
    <state>OH</state>
    <county>Montgomery</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.984126</lat>
    <lon>-82.6413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70360/FNDRD</id>
    <plant_name>Foundry Ridge Energy Center LLC</plant_name>
    <generator_id>FNDRD</generator_id>
    <plant_id>70360</plant_id>
    <state>WI</state>
    <county>Walworth</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.583072</lat>
    <lon>-88.72461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70360/FNRD2</id>
    <plant_name>Foundry Ridge Energy Center LLC</plant_name>
    <generator_id>FNRD2</generator_id>
    <plant_id>70360</plant_id>
    <state>WI</state>
    <county>Walworth</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.583072</lat>
    <lon>-88.72461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70360/FNRD3</id>
    <plant_name>Foundry Ridge Energy Center LLC</plant_name>
    <generator_id>FNRD3</generator_id>
    <plant_id>70360</plant_id>
    <state>WI</state>
    <county>Walworth</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.583072</lat>
    <lon>-88.72461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68563/NORWD</id>
    <plant_name>SR Norwood</plant_name>
    <generator_id>NORWD</generator_id>
    <plant_id>68563</plant_id>
    <state>GA</state>
    <county>Warren</county>
    <developer>SR Norwood, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>107</nameplate_mw>
    <summer_mw>107</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.435993</lat>
    <lon>-82.76361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67564/REGSP</id>
    <plant_name>Reis Solar Park</plant_name>
    <generator_id>REGSP</generator_id>
    <plant_id>67564</plant_id>
    <state>TX</state>
    <county>Atascosa</county>
    <developer>Greenalia Solar Power Reis, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>105.5</nameplate_mw>
    <summer_mw>105.5</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.652762</lat>
    <lon>-98.45369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1S01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1S01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1S02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1S02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F1S03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F1S03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2S01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2S01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2S02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2S02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/F2S03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>F2S03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>104.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBS01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBS01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>101.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES001</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES001</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES002</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES002</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES003</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES003</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES004</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES004</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES005</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES005</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES006</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES006</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES007</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES007</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES008</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES008</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES009</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES009</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES010</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES010</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES011</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES011</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES012</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES012</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES013</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES013</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES014</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES014</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES015</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES015</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/ES016</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>ES016</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS001</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS001</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS002</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS002</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS003</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS003</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS004</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS004</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS005</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS005</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS006</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS006</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS007</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS007</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS008</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS008</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS009</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS009</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS010</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS010</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS011</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS011</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS012</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS012</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS013</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS013</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS014</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS014</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS015</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS015</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MS016</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MS016</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67346/Q1335</id>
    <plant_name>Hoffman Falls Wind 2</plant_name>
    <generator_id>Q1335</generator_id>
    <plant_id>67346</plant_id>
    <state>NY</state>
    <county>Madison</county>
    <developer>Liberty Renewables Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>102.5</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.964628</lat>
    <lon>-75.75371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68428/GTSBY</id>
    <plant_name>Gatsby Energy Storage Project</plant_name>
    <generator_id>GTSBY</generator_id>
    <plant_id>68428</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>Gatsby Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>103.4</nameplate_mw>
    <summer_mw>103.4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.664176</lat>
    <lon>-101.7801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62894/WT</id>
    <plant_name>High Bridge Wind Project</plant_name>
    <generator_id>WT</generator_id>
    <plant_id>62894</plant_id>
    <state>NY</state>
    <county>Chenango</county>
    <developer>High Bridge Wind, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>103.2</nameplate_mw>
    <summer_mw>103.2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.437923</lat>
    <lon>-75.48056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68334/EVCRK</id>
    <plant_name>Evans Creek Energy Storage Project</plant_name>
    <generator_id>EVCRK</generator_id>
    <plant_id>68334</plant_id>
    <state>TX</state>
    <county>Val Verde</county>
    <developer>Evans Creek Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>103</nameplate_mw>
    <summer_mw>103</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.746007</lat>
    <lon>-101.1406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69956/S9</id>
    <plant_name>Sanborn Hybrid 3</plant_name>
    <generator_id>S9</generator_id>
    <plant_id>69956</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Terra-Gen Operating Co-Hybrid</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>103</nameplate_mw>
    <summer_mw>103</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.996</lat>
    <lon>-118.114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65326/SS1</id>
    <plant_name>Sunset Solar</plant_name>
    <generator_id>SS1</generator_id>
    <plant_id>65326</plant_id>
    <state>OR</state>
    <county>Wasco</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>103</nameplate_mw>
    <summer_mw>103</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.165062</lat>
    <lon>-120.8804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64290/ATH1S</id>
    <plant_name>SE Athos II, LLC</plant_name>
    <generator_id>ATH1S</generator_id>
    <plant_id>64290</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>SE Athos II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>102.3</nameplate_mw>
    <summer_mw>102.3</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.751283</lat>
    <lon>-115.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66396/NDUAH</id>
    <plant_name>Naduah Solar</plant_name>
    <generator_id>NDUAH</generator_id>
    <plant_id>66396</plant_id>
    <state>TX</state>
    <county>Limestone</county>
    <developer>Gransolar Texas Fifteen, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>102.3</nameplate_mw>
    <summer_mw>77.6</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.521467</lat>
    <lon>-96.67385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70531/PV100</id>
    <plant_name>Newman Buffer</plant_name>
    <generator_id>PV100</generator_id>
    <plant_id>70531</plant_id>
    <state>TX</state>
    <county>El Paso</county>
    <developer>El Paso Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>102.2</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>31.98</lat>
    <lon>-106.44</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67341/NOSES</id>
    <plant_name>SGT Hoskins Solar Project Hybrid</plant_name>
    <generator_id>NOSES</generator_id>
    <plant_id>67341</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>SGT Hoskins Solar Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>102.1</nameplate_mw>
    <summer_mw>102.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.63124</lat>
    <lon>-95.33785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69969/PAS</id>
    <plant_name>Panhandle Solar</plant_name>
    <generator_id>PAS</generator_id>
    <plant_id>69969</plant_id>
    <state>OK</state>
    <county>Texas</county>
    <developer>Panhandle Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.609029</lat>
    <lon>-101.4743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67919/DOLCE</id>
    <plant_name>Dolce BESS, LLC</plant_name>
    <generator_id>DOLCE</generator_id>
    <plant_id>67919</plant_id>
    <state>TX</state>
    <county>Mitchell</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>101.4</nameplate_mw>
    <summer_mw>101.4</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.484063</lat>
    <lon>-100.9018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70443/MAMM2</id>
    <plant_name>Mammoth Plains Energy Storage II</plant_name>
    <generator_id>MAMM2</generator_id>
    <plant_id>70443</plant_id>
    <state>OK</state>
    <county>Dewey</county>
    <developer>Mammoth Plains Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.97972</lat>
    <lon>-98.70606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66894/ALBPV</id>
    <plant_name>Albatross Solar, LLC</plant_name>
    <generator_id>ALBPV</generator_id>
    <plant_id>66894</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>101</nameplate_mw>
    <summer_mw>101</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.484342</lat>
    <lon>-97.42239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66958/NOPR1</id>
    <plant_name>Northern Prairie 1</plant_name>
    <generator_id>NOPR1</generator_id>
    <plant_id>66958</plant_id>
    <state>WI</state>
    <county>St Croix</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>101</nameplate_mw>
    <summer_mw>101</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.131813</lat>
    <lon>-92.31686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68172/MYEPV</id>
    <plant_name>Myers Solar and Storage</plant_name>
    <generator_id>MYEPV</generator_id>
    <plant_id>68172</plant_id>
    <state>TX</state>
    <county>Goliad</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100.9</nameplate_mw>
    <summer_mw>100.9</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.420043</lat>
    <lon>-97.70934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68173/SANBT</id>
    <plant_name>Sandford Solar and Storage</plant_name>
    <generator_id>SANBT</generator_id>
    <plant_id>68173</plant_id>
    <state>TX</state>
    <county>Wise</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100.9</nameplate_mw>
    <summer_mw>100.9</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.30726</lat>
    <lon>-97.52777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68014/BRDFS</id>
    <plant_name>Bradford Solar PA</plant_name>
    <generator_id>BRDFS</generator_id>
    <plant_id>68014</plant_id>
    <state>PA</state>
    <county>Bradford</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.721657</lat>
    <lon>-76.53663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68851/HSPV1</id>
    <plant_name>Hermes Solar PV</plant_name>
    <generator_id>HSPV1</generator_id>
    <plant_id>68851</plant_id>
    <state>TX</state>
    <county>Bell</county>
    <developer>Bell 1 Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100.4</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.989842</lat>
    <lon>-97.14982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68852/HSBE1</id>
    <plant_name>Hermes Storage BESS</plant_name>
    <generator_id>HSBE1</generator_id>
    <plant_id>68852</plant_id>
    <state>TX</state>
    <county>Bell</county>
    <developer>Bell 1 Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100.4</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.981595</lat>
    <lon>-97.1429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68149/RAVEB</id>
    <plant_name>Raven Storage</plant_name>
    <generator_id>RAVEB</generator_id>
    <plant_id>68149</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Raven Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.575617</lat>
    <lon>-96.08872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69156/GEN01</id>
    <plant_name>Duff Solar Park</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>69156</plant_id>
    <state>IN</state>
    <county>Dubois</county>
    <developer>Duff Solar Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.31341</lat>
    <lon>-87.02063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69054/ALT2</id>
    <plant_name>ATLAS II</plant_name>
    <generator_id>ALT2</generator_id>
    <plant_id>69054</plant_id>
    <state>AZ</state>
    <county>La Paz</county>
    <developer>ATLAS Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63386/3RIVS</id>
    <plant_name>Three Rivers Solar Power, LLC</plant_name>
    <generator_id>3RIVS</generator_id>
    <plant_id>63386</plant_id>
    <state>ME</state>
    <county>Hancock</county>
    <developer>Three Rivers Solar Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.711644</lat>
    <lon>-68.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65043/DUSO</id>
    <plant_name>Dulles Solar and Storage</plant_name>
    <generator_id>DUSO</generator_id>
    <plant_id>65043</plant_id>
    <state>VA</state>
    <county>Loudoun</county>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.95</lat>
    <lon>-77.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68452/KITTB</id>
    <plant_name>Kitt Solar</plant_name>
    <generator_id>KITTB</generator_id>
    <plant_id>68452</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>301AK 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.73353</lat>
    <lon>-111.5691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68452/KITTS</id>
    <plant_name>Kitt Solar</plant_name>
    <generator_id>KITTS</generator_id>
    <plant_id>68452</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>301AK 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>32.73353</lat>
    <lon>-111.5691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69027/SSBA</id>
    <plant_name>Stoneridge Solar, LLC</plant_name>
    <generator_id>SSBA</generator_id>
    <plant_id>69027</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.569447</lat>
    <lon>-97.11043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69497/SLB</id>
    <plant_name>Star Light Energy Center</plant_name>
    <generator_id>SLB</generator_id>
    <plant_id>69497</plant_id>
    <state>NM</state>
    <county>Valencia</county>
    <developer>Star Light Energy Center</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.739572</lat>
    <lon>-106.7928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69497/SLS</id>
    <plant_name>Star Light Energy Center</plant_name>
    <generator_id>SLS</generator_id>
    <plant_id>69497</plant_id>
    <state>NM</state>
    <county>Valencia</county>
    <developer>Star Light Energy Center</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.739572</lat>
    <lon>-106.7928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69517/BV3BA</id>
    <plant_name>Buena Vista Energy Center III</plant_name>
    <generator_id>BV3BA</generator_id>
    <plant_id>69517</plant_id>
    <state>NM</state>
    <county>Otero</county>
    <developer>Buena Vista Energy Center III, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>32.06659</lat>
    <lon>-106.2853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69517/BV3SO</id>
    <plant_name>Buena Vista Energy Center III</plant_name>
    <generator_id>BV3SO</generator_id>
    <plant_id>69517</plant_id>
    <state>NM</state>
    <county>Otero</county>
    <developer>Buena Vista Energy Center III, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>EPE</balancing_authority>
    <lat>32.06659</lat>
    <lon>-106.2853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69586/GPS</id>
    <plant_name>Great Plains Solar, LLC</plant_name>
    <generator_id>GPS</generator_id>
    <plant_id>69586</plant_id>
    <state>IL</state>
    <county>Perry</county>
    <developer>Great Plains Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.177944</lat>
    <lon>-89.55289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69594/SPS</id>
    <plant_name>Switchgrass Plains Solar, LLC</plant_name>
    <generator_id>SPS</generator_id>
    <plant_id>69594</plant_id>
    <state>IL</state>
    <county>Fayette</county>
    <developer>Switchgrass Plains Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.172414</lat>
    <lon>-89.05787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69809/5756</id>
    <plant_name>Northern Divide Energy Storage</plant_name>
    <generator_id>5756</generator_id>
    <plant_id>69809</plant_id>
    <state>ND</state>
    <county>Burke</county>
    <developer>Northern Divide Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>48.769875</lat>
    <lon>-102.7678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70188/WES01</id>
    <plant_name>Weld Energy Storage</plant_name>
    <generator_id>WES01</generator_id>
    <plant_id>70188</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Weld Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.613467</lat>
    <lon>-104.8467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64290/ATH1N</id>
    <plant_name>SE Athos II, LLC</plant_name>
    <generator_id>ATH1N</generator_id>
    <plant_id>64290</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>SE Athos II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.751283</lat>
    <lon>-115.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68426/VOYGR</id>
    <plant_name>Voyager Energy Storage</plant_name>
    <generator_id>VOYGR</generator_id>
    <plant_id>68426</plant_id>
    <state>MI</state>
    <county>Washtenaw</county>
    <developer>Voyager Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.153167</lat>
    <lon>-83.8333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69393/PHIEC</id>
    <plant_name>Pamela Heights I Energy Center</plant_name>
    <generator_id>PHIEC</generator_id>
    <plant_id>69393</plant_id>
    <state>TX</state>
    <county>Harris</county>
    <developer>Pamela Heights I Energy Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.645345</lat>
    <lon>-95.45021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66441/INCV1</id>
    <plant_name>Crossvine Solar</plant_name>
    <generator_id>INCV1</generator_id>
    <plant_id>66441</plant_id>
    <state>IN</state>
    <county>Dubois</county>
    <developer>Crossvine Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.264271</lat>
    <lon>-87.00189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66658/NOTT</id>
    <plant_name>Nottingham Solar</plant_name>
    <generator_id>NOTT</generator_id>
    <plant_id>66658</plant_id>
    <state>OH</state>
    <county>Harrison</county>
    <developer>Nottingham Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.189455</lat>
    <lon>-81.04111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69356/PWLNB</id>
    <plant_name>Powerline Energy Storage</plant_name>
    <generator_id>PWLNB</generator_id>
    <plant_id>69356</plant_id>
    <state>FL</state>
    <county>Citrus</county>
    <developer>Duke Energy Florida, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>28.96684</lat>
    <lon>-82.61751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70403/GRBS1</id>
    <plant_name>Grand Basin Energy Storage</plant_name>
    <generator_id>GRBS1</generator_id>
    <plant_id>70403</plant_id>
    <state>MI</state>
    <county>Jackson</county>
    <developer>Grand Basin Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.420211</lat>
    <lon>-84.48752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69059/COBA</id>
    <plant_name>Crimson Orchard Solar and BESS</plant_name>
    <generator_id>COBA</generator_id>
    <plant_id>69059</plant_id>
    <state>ID</state>
    <county>Elmore</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>IPCO</balancing_authority>
    <lat>43.181239</lat>
    <lon>-115.7465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69059/COPV</id>
    <plant_name>Crimson Orchard Solar and BESS</plant_name>
    <generator_id>COPV</generator_id>
    <plant_id>69059</plant_id>
    <state>ID</state>
    <county>Elmore</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>IPCO</balancing_authority>
    <lat>43.181239</lat>
    <lon>-115.7465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70033/WT001</id>
    <plant_name>White Tank Energy Storage</plant_name>
    <generator_id>WT001</generator_id>
    <plant_id>70033</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>White Tank Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AZPS</balancing_authority>
    <lat>33.498</lat>
    <lon>-112.3176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68897/PVSI</id>
    <plant_name>New Frontiers Solar</plant_name>
    <generator_id>PVSI</generator_id>
    <plant_id>68897</plant_id>
    <state>KY</state>
    <county>Breckinridge</county>
    <developer>Clover Creek Solar Project LLC d/b/a New Frontiers Solar Park</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.79502</lat>
    <lon>-86.5068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68909/ISSBA</id>
    <plant_name>Imperial Sun Solar</plant_name>
    <generator_id>ISSBA</generator_id>
    <plant_id>68909</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Sun Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.6851</lat>
    <lon>-115.2977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68909/ISSPV</id>
    <plant_name>Imperial Sun Solar</plant_name>
    <generator_id>ISSPV</generator_id>
    <plant_id>68909</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Sun Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.6851</lat>
    <lon>-115.2977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69966/FMM</id>
    <plant_name>Four Mile Mesa Solar, LLC</plant_name>
    <generator_id>FMM</generator_id>
    <plant_id>69966</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Four Mile Mesa Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.8685</lat>
    <lon>-108.277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69966/FMMS</id>
    <plant_name>Four Mile Mesa Solar, LLC</plant_name>
    <generator_id>FMMS</generator_id>
    <plant_id>69966</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Four Mile Mesa Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.8685</lat>
    <lon>-108.277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68473/BROOK</id>
    <plant_name>Brookside Solar</plant_name>
    <generator_id>BROOK</generator_id>
    <plant_id>68473</plant_id>
    <state>NY</state>
    <county>Franklin</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.932</lat>
    <lon>-74.1302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69687/L7SF</id>
    <plant_name>Lucky 7 Solar Farm LLC</plant_name>
    <generator_id>L7SF</generator_id>
    <plant_id>69687</plant_id>
    <state>TX</state>
    <county>Hopkins</county>
    <developer>Lucky 7 Solar Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.082</lat>
    <lon>-95.721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67667/3COAS</id>
    <plant_name>Third Coast BESS, LLC</plant_name>
    <generator_id>3COAS</generator_id>
    <plant_id>67667</plant_id>
    <state>TX</state>
    <county>Jackson</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.852327</lat>
    <lon>-96.55642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64216/201LC</id>
    <plant_name>Rockmont Solar and Storage Project</plant_name>
    <generator_id>201LC</generator_id>
    <plant_id>64216</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>201LC 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.776579</lat>
    <lon>-108.3751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65471/RGS23</id>
    <plant_name>Rose Gold Solar</plant_name>
    <generator_id>RGS23</generator_id>
    <plant_id>65471</plant_id>
    <state>IN</state>
    <county>Jay</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.404357</lat>
    <lon>-85.19716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66113/NEBE1</id>
    <plant_name>Big Elk Solar</plant_name>
    <generator_id>NEBE1</generator_id>
    <plant_id>66113</plant_id>
    <state>NE</state>
    <county>Washington</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.475678</lat>
    <lon>-96.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66216/BESS</id>
    <plant_name>Yaupon Solar Project (Hybrid)</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>66216</plant_id>
    <state>TX</state>
    <county>Milam</county>
    <developer>Yaupon Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.0444</lat>
    <lon>-96.8514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68554/BACN3</id>
    <plant_name>SR Bacon III</plant_name>
    <generator_id>BACN3</generator_id>
    <plant_id>68554</plant_id>
    <state>GA</state>
    <county>Bacon</county>
    <developer>SR Bacon III, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.511392</lat>
    <lon>-82.33683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68555/CORDV</id>
    <plant_name>SR Cordova</plant_name>
    <generator_id>CORDV</generator_id>
    <plant_id>68555</plant_id>
    <state>SC</state>
    <county>Orangeburg</county>
    <developer>SR Cordova, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>33.45963</lat>
    <lon>-80.88897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68903/MUSPV</id>
    <plant_name>Solex Ridge Solar</plant_name>
    <generator_id>MUSPV</generator_id>
    <plant_id>68903</plant_id>
    <state>TX</state>
    <county>Henderson</county>
    <developer>Solex Ridge, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.169946</lat>
    <lon>-95.5803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68939/COGPV</id>
    <plant_name>Coggon Solar LLC</plant_name>
    <generator_id>COGPV</generator_id>
    <plant_id>68939</plant_id>
    <state>IA</state>
    <county>Linn</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.290594</lat>
    <lon>-91.57266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69170/FW2</id>
    <plant_name>Freshwater Solar II, LLC</plant_name>
    <generator_id>FW2</generator_id>
    <plant_id>69170</plant_id>
    <state>MI</state>
    <county>Montcalm</county>
    <developer>Freshwater Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.310581</lat>
    <lon>-85.05159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70583/HES01</id>
    <plant_name>Highland Solar I, LLC - (CO)</plant_name>
    <generator_id>HES01</generator_id>
    <plant_id>70583</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Highland Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.41955</lat>
    <lon>-104.2277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67090/FMS</id>
    <plant_name>Flint Mine Solar</plant_name>
    <generator_id>FMS</generator_id>
    <plant_id>67090</plant_id>
    <state>NY</state>
    <county>Greene</county>
    <developer>Flint Mine Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.313611</lat>
    <lon>-73.84556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70050/DRENN</id>
    <plant_name>Drennan Energy Storage</plant_name>
    <generator_id>DRENN</generator_id>
    <plant_id>70050</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>Drennan Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>38.772896</lat>
    <lon>-104.6671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66922/59957</id>
    <plant_name>Timber Cove Solar</plant_name>
    <generator_id>59957</generator_id>
    <plant_id>66922</plant_id>
    <state>TX</state>
    <county>Freestone</county>
    <developer>Freestone Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.870589</lat>
    <lon>-96.15247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69973/OSON1</id>
    <plant_name>Oso Negro</plant_name>
    <generator_id>OSON1</generator_id>
    <plant_id>69973</plant_id>
    <state>NM</state>
    <county>Bernalillo</county>
    <developer>Oso Negro, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>35.111657</lat>
    <lon>-106.7205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68032/SKLRE</id>
    <plant_name>Skylight Renewable Energy</plant_name>
    <generator_id>SKLRE</generator_id>
    <plant_id>68032</plant_id>
    <state>CA</state>
    <county>Sutter</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>38.947494</lat>
    <lon>-121.4792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68032/SKREB</id>
    <plant_name>Skylight Renewable Energy</plant_name>
    <generator_id>SKREB</generator_id>
    <plant_id>68032</plant_id>
    <state>CA</state>
    <county>Sutter</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>38.947494</lat>
    <lon>-121.4792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68205/GRNWD</id>
    <plant_name>Greenwood Solar I</plant_name>
    <generator_id>GRNWD</generator_id>
    <plant_id>68205</plant_id>
    <state>VA</state>
    <county>Culpeper</county>
    <developer>Greenwood Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.427261</lat>
    <lon>-77.90787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68604/DALBS</id>
    <plant_name>Dahlia Energy</plant_name>
    <generator_id>DALBS</generator_id>
    <plant_id>68604</plant_id>
    <state>TX</state>
    <county>La Salle</county>
    <developer>Dahlia Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.369598</lat>
    <lon>-98.96762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69762/425LM</id>
    <plant_name>Southern Bighorn Solar 2</plant_name>
    <generator_id>425LM</generator_id>
    <plant_id>69762</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>425LM 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.56117</lat>
    <lon>-114.7413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69762/BESS2</id>
    <plant_name>Southern Bighorn Solar 2</plant_name>
    <generator_id>BESS2</generator_id>
    <plant_id>69762</plant_id>
    <state>NV</state>
    <county>Clark</county>
    <developer>425LM 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>36.56117</lat>
    <lon>-114.7413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64659/AMS</id>
    <plant_name>AEUG Madison Solar, LLC</plant_name>
    <generator_id>AMS</generator_id>
    <plant_id>64659</plant_id>
    <state>KY</state>
    <county>Madison</county>
    <developer>Acciona Energy USA Global, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.822029</lat>
    <lon>-84.30052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64848/BEF1</id>
    <plant_name>Bedington Energy Facility, LLC</plant_name>
    <generator_id>BEF1</generator_id>
    <plant_id>64848</plant_id>
    <state>WV</state>
    <county>Berkeley</county>
    <developer>Bedington Energy Facility, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.531839</lat>
    <lon>-77.88709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69021/RH1PV</id>
    <plant_name>Rustic Hills Solar I</plant_name>
    <generator_id>RH1PV</generator_id>
    <plant_id>69021</plant_id>
    <state>IN</state>
    <county>Warrick</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.96707</lat>
    <lon>-87.30739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69022/RH2PV</id>
    <plant_name>Rustic Hills Solar II LLC</plant_name>
    <generator_id>RH2PV</generator_id>
    <plant_id>69022</plant_id>
    <state>IN</state>
    <county>Warrick</county>
    <developer>Clenera DevCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.974259</lat>
    <lon>-87.32197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66114/INRD1</id>
    <plant_name>Merrillville Solar</plant_name>
    <generator_id>INRD1</generator_id>
    <plant_id>66114</plant_id>
    <state>IN</state>
    <county>Lake</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.462794</lat>
    <lon>-87.27285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68352/GIPV1</id>
    <plant_name>Girasol Solar Farm</plant_name>
    <generator_id>GIPV1</generator_id>
    <plant_id>68352</plant_id>
    <state>MS</state>
    <county>Sunflower</county>
    <developer>Girasol Solar Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.676092</lat>
    <lon>-90.64287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69608/SNSPI</id>
    <plant_name>Sinnissippi Solar Energy LLC</plant_name>
    <generator_id>SNSPI</generator_id>
    <plant_id>69608</plant_id>
    <state>WI</state>
    <county>Jefferson</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.12592</lat>
    <lon>-88.67098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69775/STBSP</id>
    <plant_name>Strasburg Solar Park</plant_name>
    <generator_id>STBSP</generator_id>
    <plant_id>69775</plant_id>
    <state>MI</state>
    <county>Monroe</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.971933</lat>
    <lon>-83.45975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67896/229HD</id>
    <plant_name>Holstein 2 Battery Storage</plant_name>
    <generator_id>229HD</generator_id>
    <plant_id>67896</plant_id>
    <state>TX</state>
    <county>Nolan</county>
    <developer>229HD 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-05</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.081901</lat>
    <lon>-100.159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67325/NYRIV</id>
    <plant_name>Riverside Solar LLC</plant_name>
    <generator_id>NYRIV</generator_id>
    <plant_id>67325</plant_id>
    <state>NY</state>
    <county>St Lawrence</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.06585</lat>
    <lon>-76.1222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67324/NYSOM</id>
    <plant_name>Somerset Solar LLC</plant_name>
    <generator_id>NYSOM</generator_id>
    <plant_id>67324</plant_id>
    <state>NY</state>
    <county>Niagara</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>125</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.352072</lat>
    <lon>-78.61036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68343/GRVA1</id>
    <plant_name>Grand Valley Solar Generation and BESS</plant_name>
    <generator_id>GRVA1</generator_id>
    <plant_id>68343</plant_id>
    <state>CO</state>
    <county>Mesa</county>
    <developer>GRVA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.1987</lat>
    <lon>-108.782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68343/GRVA2</id>
    <plant_name>Grand Valley Solar Generation and BESS</plant_name>
    <generator_id>GRVA2</generator_id>
    <plant_id>68343</plant_id>
    <state>CO</state>
    <county>Mesa</county>
    <developer>GRVA bn, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.1987</lat>
    <lon>-108.782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65808/BSVEC</id>
    <plant_name>Sacramento Valley Energy Center, LLC</plant_name>
    <generator_id>BSVEC</generator_id>
    <plant_id>65808</plant_id>
    <state>CA</state>
    <county>Sacramento</county>
    <developer>Sacramento Valley Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>38.57147</lat>
    <lon>-121.1845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69636/69363</id>
    <plant_name>Main Horn Solar</plant_name>
    <generator_id>69363</generator_id>
    <plant_id>69636</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Main Horn Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.984498</lat>
    <lon>-96.36558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69642/96513</id>
    <plant_name>Arkana Solar</plant_name>
    <generator_id>96513</generator_id>
    <plant_id>69642</plant_id>
    <state>AR</state>
    <county>Columbia</county>
    <developer>Arkana Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.04521</lat>
    <lon>-93.44841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69639/16777</id>
    <plant_name>Triune Solar</plant_name>
    <generator_id>16777</generator_id>
    <plant_id>69639</plant_id>
    <state>TX</state>
    <county>Trinity</county>
    <developer>Triune Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.996927</lat>
    <lon>-95.12384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64531/KOV4A</id>
    <plant_name>Noosa Energy Storage LLC</plant_name>
    <generator_id>KOV4A</generator_id>
    <plant_id>64531</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Engie North America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.756292</lat>
    <lon>-121.1481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>4050/BESS1</id>
    <plant_name>Edgewater</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>4050</plant_id>
    <state>WI</state>
    <county>Sheboygan</county>
    <developer>Wisconsin Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.715142</lat>
    <lon>-87.70586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69981/GRNTS</id>
    <plant_name>Grant Solar, LLC</plant_name>
    <generator_id>GRNTS</generator_id>
    <plant_id>69981</plant_id>
    <state>SD</state>
    <county>McCook</county>
    <developer>Geronimo Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.550003</lat>
    <lon>-97.26738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68153/PV1</id>
    <plant_name>Fremont Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68153</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>Fremont Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.9789</lat>
    <lon>-112.7761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68228/Q1448</id>
    <plant_name>Agricola Wind</plant_name>
    <generator_id>Q1448</generator_id>
    <plant_id>68228</plant_id>
    <state>NY</state>
    <county>Cayuga</county>
    <developer>Liberty Renewables Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>97</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.755287</lat>
    <lon>-76.53902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68738/CANBS</id>
    <plant_name>Cannibal Draw Solar and Storage</plant_name>
    <generator_id>CANBS</generator_id>
    <plant_id>68738</plant_id>
    <state>TX</state>
    <county>Glasscock</county>
    <developer>Red River Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>98.6</nameplate_mw>
    <summer_mw>98.6</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.023861</lat>
    <lon>-101.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69742/PV3</id>
    <plant_name>Cooperative Solar Three-Marion</plant_name>
    <generator_id>PV3</generator_id>
    <plant_id>69742</plant_id>
    <state>KY</state>
    <county>Marion</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>96</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.605113</lat>
    <lon>-85.24824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65293/OEMS4</id>
    <plant_name>Covington (MS)</plant_name>
    <generator_id>OEMS4</generator_id>
    <plant_id>65293</plant_id>
    <state>MS</state>
    <county>Covington</county>
    <developer>Origis Energy USA, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>96</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.4395</lat>
    <lon>-89.4846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67568/WIGSP</id>
    <plant_name>Wittig Solar Park</plant_name>
    <generator_id>WIGSP</generator_id>
    <plant_id>67568</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Greenalia Solar Power Wittig, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>96</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.245055</lat>
    <lon>-95.87477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69629/BIGM1</id>
    <plant_name>Big Muddy Solar</plant_name>
    <generator_id>BIGM1</generator_id>
    <plant_id>69629</plant_id>
    <state>IL</state>
    <county>Jackson</county>
    <developer>Big Muddy Solar Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>95</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.86</lat>
    <lon>-89.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68073/BLUER</id>
    <plant_name>Blue Ridge Solar</plant_name>
    <generator_id>BLUER</generator_id>
    <plant_id>68073</plant_id>
    <state>VA</state>
    <county>Pittsylvania</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>95</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.790101</lat>
    <lon>-79.42875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68085/RMS1</id>
    <plant_name>Red Maple LRE</plant_name>
    <generator_id>RMS1</generator_id>
    <plant_id>68085</plant_id>
    <state>IL</state>
    <county>DeKalb</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>95</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.886064</lat>
    <lon>-88.72725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66484/GCA</id>
    <plant_name>Glen Canyon Solar A, LLC</plant_name>
    <generator_id>GCA</generator_id>
    <plant_id>66484</plant_id>
    <state>UT</state>
    <county>Kane</county>
    <developer>AES Distributed Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>95</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.091539</lat>
    <lon>-111.7255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68271/SWLS1</id>
    <plant_name>Sweetleaf Solar LLC</plant_name>
    <generator_id>SWLS1</generator_id>
    <plant_id>68271</plant_id>
    <state>NC</state>
    <county>Halifax</county>
    <developer>CleanChoice Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>93</nameplate_mw>
    <summer_mw>93</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.220711</lat>
    <lon>-77.68863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67650/BEARR</id>
    <plant_name>Bear Ridge</plant_name>
    <generator_id>BEARR</generator_id>
    <plant_id>67650</plant_id>
    <state>NY</state>
    <county>Niagara</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>93</nameplate_mw>
    <summer_mw>93</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.14244</lat>
    <lon>-78.79106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69648/RSBA</id>
    <plant_name>Rosamond South II</plant_name>
    <generator_id>RSBA</generator_id>
    <plant_id>69648</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Golden Fields Solar VI, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>92</nameplate_mw>
    <summer_mw>92</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.852326</lat>
    <lon>-118.4312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67544/LEGSP</id>
    <plant_name>Leitrim Solar Park</plant_name>
    <generator_id>LEGSP</generator_id>
    <plant_id>67544</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Greenalia Solar Power Leitrim, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>91.2</nameplate_mw>
    <summer_mw>91.2</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.79623</lat>
    <lon>-97.20278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64253/S1</id>
    <plant_name>Mohawk Solar</plant_name>
    <generator_id>S1</generator_id>
    <plant_id>64253</plant_id>
    <state>NY</state>
    <county>Montgomery</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90.5</nameplate_mw>
    <summer_mw>90.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.887133</lat>
    <lon>-74.63781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68253/ROCH1</id>
    <plant_name>SR Rochelle I</plant_name>
    <generator_id>ROCH1</generator_id>
    <plant_id>68253</plant_id>
    <state>GA</state>
    <county>Wilcox</county>
    <developer>SR Rochelle I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.923234</lat>
    <lon>-83.45427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69524/WLS</id>
    <plant_name>Windy Lane Energy Center</plant_name>
    <generator_id>WLS</generator_id>
    <plant_id>69524</plant_id>
    <state>NM</state>
    <county>De Baca</county>
    <developer>Windy Lane Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.587619</lat>
    <lon>-104.0312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64428/JVR1A</id>
    <plant_name>JVR Energy Park LLC</plant_name>
    <generator_id>JVR1A</generator_id>
    <plant_id>64428</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>JVR Energy Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.625903</lat>
    <lon>-116.1749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65052/HSEC</id>
    <plant_name>Homer Solar Energy Center</plant_name>
    <generator_id>HSEC</generator_id>
    <plant_id>65052</plant_id>
    <state>NY</state>
    <county>Cortland</county>
    <developer>EDF Renewables Development, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.658652</lat>
    <lon>-76.09993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67561/RIC93</id>
    <plant_name>Callan Solar</plant_name>
    <generator_id>RIC93</generator_id>
    <plant_id>67561</plant_id>
    <state>TX</state>
    <county>McCulloch</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.990928</lat>
    <lon>-99.60118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68585/YRS</id>
    <plant_name>York Run Solar</plant_name>
    <generator_id>YRS</generator_id>
    <plant_id>68585</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.011319</lat>
    <lon>-79.2243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64849/WILDC</id>
    <plant_name>Wildcat Solar Power Plant LLC</plant_name>
    <generator_id>WILDC</generator_id>
    <plant_id>64849</plant_id>
    <state>NM</state>
    <county>McKinley</county>
    <developer>Solariant Capital, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>35.580453</lat>
    <lon>-108.9023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70405/BA-1</id>
    <plant_name>Winchester Solar I, LLC</plant_name>
    <generator_id>BA-1</generator_id>
    <plant_id>70405</plant_id>
    <state>AZ</state>
    <county>Cochise</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>87.8</nameplate_mw>
    <summer_mw>87.8</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TEPC</balancing_authority>
    <lat>32.186372</lat>
    <lon>-109.9531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70405/PV-1</id>
    <plant_name>Winchester Solar I, LLC</plant_name>
    <generator_id>PV-1</generator_id>
    <plant_id>70405</plant_id>
    <state>AZ</state>
    <county>Cochise</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>87.8</nameplate_mw>
    <summer_mw>87.8</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TEPC</balancing_authority>
    <lat>32.186372</lat>
    <lon>-109.9531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70406/BA-2</id>
    <plant_name>Winchester Solar II, LLC</plant_name>
    <generator_id>BA-2</generator_id>
    <plant_id>70406</plant_id>
    <state>AZ</state>
    <county>Cochise</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>87.8</nameplate_mw>
    <summer_mw>87.8</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>32.207126</lat>
    <lon>-109.9435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70406/PV-2</id>
    <plant_name>Winchester Solar II, LLC</plant_name>
    <generator_id>PV-2</generator_id>
    <plant_id>70406</plant_id>
    <state>AZ</state>
    <county>Cochise</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>87.8</nameplate_mw>
    <summer_mw>87.8</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>32.207126</lat>
    <lon>-109.9435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70559/GEN1</id>
    <plant_name>Mammoth</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70559</plant_id>
    <state>WV</state>
    <county>Kanawha</county>
    <developer>MN8 Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>86</nameplate_mw>
    <summer_mw>86</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.20845</lat>
    <lon>-81.30893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69795/KEABE</id>
    <plant_name>Keamuku</plant_name>
    <generator_id>KEABE</generator_id>
    <plant_id>69795</plant_id>
    <state>HI</state>
    <county>Hawaii</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>86</nameplate_mw>
    <summer_mw>86</summer_mw>
    <planned_start>2030-05</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>19.8799</lat>
    <lon>-155.7373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69795/KEAMU</id>
    <plant_name>Keamuku</plant_name>
    <generator_id>KEAMU</generator_id>
    <plant_id>69795</plant_id>
    <state>HI</state>
    <county>Hawaii</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>86</nameplate_mw>
    <summer_mw>86</summer_mw>
    <planned_start>2030-05</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>19.8799</lat>
    <lon>-155.7373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68226/BACON</id>
    <plant_name>SR Bacon</plant_name>
    <generator_id>BACON</generator_id>
    <plant_id>68226</plant_id>
    <state>GA</state>
    <county>Bacon</county>
    <developer>SR Bacon, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>85</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>31.511392</lat>
    <lon>-82.33683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70089/MURCH</id>
    <plant_name>Murch Solar, LLC</plant_name>
    <generator_id>MURCH</generator_id>
    <plant_id>70089</plant_id>
    <state>MI</state>
    <county>Van Buren</county>
    <developer>Murch Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>85</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.401</lat>
    <lon>-86.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69925/SWBA1</id>
    <plant_name>Stellar Wright BESS</plant_name>
    <generator_id>SWBA1</generator_id>
    <plant_id>69925</plant_id>
    <state>CA</state>
    <county>Merced</county>
    <developer>Stellar Renewable Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>84.8</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.007998</lat>
    <lon>-120.9637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67782/GS22B</id>
    <plant_name>RedSun PV and BESS</plant_name>
    <generator_id>GS22B</generator_id>
    <plant_id>67782</plant_id>
    <state>TX</state>
    <county>Burnet</county>
    <developer>Gransolar Texas Twenty Two LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.784886</lat>
    <lon>-98.20217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67782/GS22P</id>
    <plant_name>RedSun PV and BESS</plant_name>
    <generator_id>GS22P</generator_id>
    <plant_id>67782</plant_id>
    <state>TX</state>
    <county>Burnet</county>
    <developer>Gransolar Texas Twenty Two LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.784886</lat>
    <lon>-98.20217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G1</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G1</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G2</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G2</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G3</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G3</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G4</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G4</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G5</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G5</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69147/G6</id>
    <plant_name>New Caledonia</plant_name>
    <generator_id>G6</generator_id>
    <plant_id>69147</plant_id>
    <state>MS</state>
    <county>Lowndes</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>81</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.649272</lat>
    <lon>-88.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66895/LP1BA</id>
    <plant_name>Lupinus Solar 1, LLC</plant_name>
    <generator_id>LP1BA</generator_id>
    <plant_id>66895</plant_id>
    <state>TX</state>
    <county>Franklin</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>83</nameplate_mw>
    <summer_mw>83</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.303385</lat>
    <lon>-95.25692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67566/ROGSP</id>
    <plant_name>Roscommon Solar Park</plant_name>
    <generator_id>ROGSP</generator_id>
    <plant_id>67566</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Greenalia Solar Power Roscommon, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>82.8</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.631719</lat>
    <lon>-95.69587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68002/FOLEY</id>
    <plant_name>Foley Solar, LLC</plant_name>
    <generator_id>FOLEY</generator_id>
    <plant_id>68002</plant_id>
    <state>AL</state>
    <county>Baldwin</county>
    <developer>Nofar USA Energy Investments and Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>30.377488</lat>
    <lon>-87.72751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69197/HALIF</id>
    <plant_name>Halifax County Solar</plant_name>
    <generator_id>HALIF</generator_id>
    <plant_id>69197</plant_id>
    <state>NC</state>
    <county>Halifax</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.2537</lat>
    <lon>-77.6884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70235/68372</id>
    <plant_name>Mulqueeney Wind Energy</plant_name>
    <generator_id>68372</generator_id>
    <plant_id>70235</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Mulqueeney Wind Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.69742</lat>
    <lon>-121.5891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67998/KSEC</id>
    <plant_name>Karn Solar Energy Center</plant_name>
    <generator_id>KSEC</generator_id>
    <plant_id>67998</plant_id>
    <state>MI</state>
    <county>Bay</county>
    <developer>Consumers Energy Co - (MI)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.644996</lat>
    <lon>-83.84007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70084/AC</id>
    <plant_name>Alligator Creek Solar</plant_name>
    <generator_id>AC</generator_id>
    <plant_id>70084</plant_id>
    <state>GA</state>
    <county>Wheeler</county>
    <developer>Alligator Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.104</lat>
    <lon>-82.844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70364/GEN1</id>
    <plant_name>Walker Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70364</plant_id>
    <state>PA</state>
    <county>Juniata</county>
    <developer>MN8 Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.585531</lat>
    <lon>-77.34537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70302/22</id>
    <plant_name>Gum Swamp Solar, LLC</plant_name>
    <generator_id>22</generator_id>
    <plant_id>70302</plant_id>
    <state>NC</state>
    <county>Scotland</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.867</lat>
    <lon>-79.599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70035/NSES</id>
    <plant_name>North Star Energy Storage, LLC</plant_name>
    <generator_id>NSES</generator_id>
    <plant_id>70035</plant_id>
    <state>MN</state>
    <county>Chisago</county>
    <developer>North Star Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.480911</lat>
    <lon>-92.90814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69967/FTB</id>
    <plant_name>Foxtail Flats Solar, LLC</plant_name>
    <generator_id>FTB</generator_id>
    <plant_id>69967</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Foxtail Flats Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.8685</lat>
    <lon>-108.277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69463/BCRSP</id>
    <plant_name>Beecher Solar Park</plant_name>
    <generator_id>BCRSP</generator_id>
    <plant_id>69463</plant_id>
    <state>MI</state>
    <county>Lenawee</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.923</lat>
    <lon>-83.917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67663/SGROV</id>
    <plant_name>Scotch Grove Solar</plant_name>
    <generator_id>SGROV</generator_id>
    <plant_id>67663</plant_id>
    <state>NC</state>
    <county>Scotland</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.84957</lat>
    <lon>-79.44656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67665/SDAVI</id>
    <plant_name>South Davidson</plant_name>
    <generator_id>SDAVI</generator_id>
    <plant_id>67665</plant_id>
    <state>NC</state>
    <county>Davidson</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.618203</lat>
    <lon>-80.10797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68057/BAMA1</id>
    <plant_name>Alabama Creek Solar</plant_name>
    <generator_id>BAMA1</generator_id>
    <plant_id>68057</plant_id>
    <state>AL</state>
    <county>Dallas</county>
    <developer>Alabama Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.315548</lat>
    <lon>-87.22312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70271/OKFL1</id>
    <plant_name>Fiddle Leaf Solar, LLC</plant_name>
    <generator_id>OKFL1</generator_id>
    <plant_id>70271</plant_id>
    <state>OK</state>
    <county>Delaware</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>76</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.256047</lat>
    <lon>-94.58653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70304/24</id>
    <plant_name>Sleepy Creek Solar, LLC</plant_name>
    <generator_id>24</generator_id>
    <plant_id>70304</plant_id>
    <state>NC</state>
    <county>Bladen</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.592</lat>
    <lon>-78.326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66363/GEN1</id>
    <plant_name>Black Walnut Solar, LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>66363</plant_id>
    <state>NC</state>
    <county>Jones</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.050032</lat>
    <lon>-77.15218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66383/GEN1</id>
    <plant_name>Hyco Solar LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>66383</plant_id>
    <state>NC</state>
    <county>Person</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>36.484574</lat>
    <lon>-79.13311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67989/PGR28</id>
    <plant_name>Drawhorn Solar</plant_name>
    <generator_id>PGR28</generator_id>
    <plant_id>67989</plant_id>
    <state>GA</state>
    <county>Hancock</county>
    <developer>Drawhorn Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.214449</lat>
    <lon>-83.04206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68028/DSP</id>
    <plant_name>Delta Solar Plant</plant_name>
    <generator_id>DSP</generator_id>
    <plant_id>68028</plant_id>
    <state>LA</state>
    <county>Bolivar</county>
    <developer>Entergy Mississippi LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.794007</lat>
    <lon>-90.71392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63653/SNDHC</id>
    <plant_name>Sand Hill C</plant_name>
    <generator_id>SNDHC</generator_id>
    <plant_id>63653</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Viracocha Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.769695</lat>
    <lon>-121.5961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67990/BM1</id>
    <plant_name>Bright Mountain Solar</plant_name>
    <generator_id>BM1</generator_id>
    <plant_id>67990</plant_id>
    <state>KY</state>
    <county>Perry</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.29003</lat>
    <lon>-83.28286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68104/HPHUL</id>
    <plant_name>SR Hope Hull</plant_name>
    <generator_id>HPHUL</generator_id>
    <plant_id>68104</plant_id>
    <state>AL</state>
    <county>Montgomery</county>
    <developer>SR Hope Hull, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.2555</lat>
    <lon>-86.3194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66385/GEN1</id>
    <plant_name>Panther Branch Solar, LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>66385</plant_id>
    <state>NC</state>
    <county>Duplin</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.145344</lat>
    <lon>-78.15963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68043/ROBES</id>
    <plant_name>Robeson Solar I</plant_name>
    <generator_id>ROBES</generator_id>
    <plant_id>68043</plant_id>
    <state>NC</state>
    <county>Robeson</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.614574</lat>
    <lon>-78.93468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68871/TIMIL</id>
    <plant_name>Timber Mill Solar</plant_name>
    <generator_id>TIMIL</generator_id>
    <plant_id>68871</plant_id>
    <state>NC</state>
    <county>Jones</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.96634</lat>
    <lon>-77.21299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65325/98936</id>
    <plant_name>High Top Solar</plant_name>
    <generator_id>98936</generator_id>
    <plant_id>65325</plant_id>
    <state>WA</state>
    <county>Yakima</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>46.522974</lat>
    <lon>-119.9586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58175/JWPI</id>
    <plant_name>Jawbone Wind Project</plant_name>
    <generator_id>JWPI</generator_id>
    <plant_id>58175</plant_id>
    <state>MT</state>
    <county>Wheatland</county>
    <developer>Triple Oak Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>46.508056</lat>
    <lon>-109.7278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68812/STVML</id>
    <plant_name>Stevens Mill Solar</plant_name>
    <generator_id>STVML</generator_id>
    <plant_id>68812</plant_id>
    <state>NC</state>
    <county>Wayne</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>35.35546</lat>
    <lon>-78.1192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61331/BA1</id>
    <plant_name>NISA Electric Generation Project</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>61331</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NYC Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>79.9</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.7065</lat>
    <lon>-73.9702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68249/METTR</id>
    <plant_name>SR Horus</plant_name>
    <generator_id>METTR</generator_id>
    <plant_id>68249</plant_id>
    <state>KY</state>
    <county>Simpson</county>
    <developer>SR Horus, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>79.7</nameplate_mw>
    <summer_mw>79.7</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.661</lat>
    <lon>-86.534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68969/ENX39</id>
    <plant_name>Strinestown Solar</plant_name>
    <generator_id>ENX39</generator_id>
    <plant_id>68969</plant_id>
    <state>PA</state>
    <county>York</county>
    <developer>Strinestown Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>79.6</nameplate_mw>
    <summer_mw>79.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.090105</lat>
    <lon>-76.73955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66862/NY29</id>
    <plant_name>KCE NY 29, LLC</plant_name>
    <generator_id>NY29</generator_id>
    <plant_id>66862</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>79</nameplate_mw>
    <summer_mw>79</summer_mw>
    <planned_start>2030-03</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.81278</lat>
    <lon>-73.21729</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67563/RAGSP</id>
    <plant_name>Ratcliff Solar Park</plant_name>
    <generator_id>RAGSP</generator_id>
    <plant_id>67563</plant_id>
    <state>TX</state>
    <county>Freestone</county>
    <developer>Greenalia Solar Power Ratcliff, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>78.8</nameplate_mw>
    <summer_mw>78.8</summer_mw>
    <planned_start>2029-08</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.217058</lat>
    <lon>-95.81602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67581/CIRSB</id>
    <plant_name>Cairos Solar and Storage</plant_name>
    <generator_id>CIRSB</generator_id>
    <plant_id>67581</plant_id>
    <state>TX</state>
    <county>Kinney</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>77.3</nameplate_mw>
    <summer_mw>77.3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.269974</lat>
    <lon>-100.1975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66315/CCSO</id>
    <plant_name>Clover Creek Solar</plant_name>
    <generator_id>CCSO</generator_id>
    <plant_id>66315</plant_id>
    <state>VA</state>
    <county>Halifax</county>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>77.2</nameplate_mw>
    <summer_mw>77.2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.816641</lat>
    <lon>-78.69262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69351/HNYBS</id>
    <plant_name>Honeycomb Solar and Storage</plant_name>
    <generator_id>HNYBS</generator_id>
    <plant_id>69351</plant_id>
    <state>TX</state>
    <county>Bee</county>
    <developer>Honeycomb Solar Holdco, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>76.5</nameplate_mw>
    <summer_mw>76.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.184344</lat>
    <lon>-97.77169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66398/EYTCH</id>
    <plant_name>Eytcheson Solar</plant_name>
    <generator_id>EYTCH</generator_id>
    <plant_id>66398</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Gransolar Texas Fourteen, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>76.4</nameplate_mw>
    <summer_mw>76.2</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.872617</lat>
    <lon>-96.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69823/CABOK</id>
    <plant_name>Cabokenze Energy Storage</plant_name>
    <generator_id>CABOK</generator_id>
    <plant_id>69823</plant_id>
    <state>GA</state>
    <county>Burke</county>
    <developer>Cabokenze Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>76</nameplate_mw>
    <summer_mw>76</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.037636</lat>
    <lon>-82.11924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70220/RSP1</id>
    <plant_name>Robinson Solar Plant</plant_name>
    <generator_id>RSP1</generator_id>
    <plant_id>70220</plant_id>
    <state>SC</state>
    <county>Chesterfield</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>76</nameplate_mw>
    <summer_mw>76</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.4168</lat>
    <lon>-80.1918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68172/MYEBT</id>
    <plant_name>Myers Solar and Storage</plant_name>
    <generator_id>MYEBT</generator_id>
    <plant_id>68172</plant_id>
    <state>TX</state>
    <county>Goliad</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75.7</nameplate_mw>
    <summer_mw>75.7</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.420043</lat>
    <lon>-97.70934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68461/KEYBA</id>
    <plant_name>Key Energy Storage</plant_name>
    <generator_id>KEYBA</generator_id>
    <plant_id>68461</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Key Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.13681</lat>
    <lon>-120.1312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68578/AC1S</id>
    <plant_name>AC Ranch I</plant_name>
    <generator_id>AC1S</generator_id>
    <plant_id>68578</plant_id>
    <state>NM</state>
    <county>Lea</county>
    <developer>Lydian Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>32.732263</lat>
    <lon>-103.2748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67676/GEN01</id>
    <plant_name>Zeta Solar &amp; Storage</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>67676</plant_id>
    <state>CA</state>
    <county>Merced</county>
    <developer>Zeta Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.911894</lat>
    <lon>-120.8101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67676/GEN02</id>
    <plant_name>Zeta Solar &amp; Storage</plant_name>
    <generator_id>GEN02</generator_id>
    <plant_id>67676</plant_id>
    <state>CA</state>
    <county>Merced</county>
    <developer>Zeta Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.911894</lat>
    <lon>-120.8101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70023/EDGCM</id>
    <plant_name>Edgecombe Solar LLC</plant_name>
    <generator_id>EDGCM</generator_id>
    <plant_id>70023</plant_id>
    <state>NC</state>
    <county>Edgecombe</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>35.949381</lat>
    <lon>-77.65926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68337/LOTUS</id>
    <plant_name>Lotus Solar</plant_name>
    <generator_id>LOTUS</generator_id>
    <plant_id>68337</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>Modal Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.447832</lat>
    <lon>-80.10356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68995/ENX38</id>
    <plant_name>Dover Solar (PA)</plant_name>
    <generator_id>ENX38</generator_id>
    <plant_id>68995</plant_id>
    <state>PA</state>
    <county>York</county>
    <developer>Dover Solar, LLC (PA)</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.01169</lat>
    <lon>-76.8234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65344/66149</id>
    <plant_name>Noria Hondo Solar (Hybrid)</plant_name>
    <generator_id>66149</generator_id>
    <plant_id>65344</plant_id>
    <state>TX</state>
    <county>Kleberg</county>
    <developer>Nexus Renewable Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.553355</lat>
    <lon>-97.67528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66851/FAIR1</id>
    <plant_name>Fairview Solar (AR)</plant_name>
    <generator_id>FAIR1</generator_id>
    <plant_id>66851</plant_id>
    <state>AR</state>
    <county>Ashley</county>
    <developer>Urban Grid Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.342883</lat>
    <lon>-91.89495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70545/WBESS</id>
    <plant_name>Wildwood Energy Storage</plant_name>
    <generator_id>WBESS</generator_id>
    <plant_id>70545</plant_id>
    <state>MS</state>
    <county>Tallahatchie</county>
    <developer>Wildwood Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>33.93316</lat>
    <lon>-90.33908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70454/BESS1</id>
    <plant_name>Big Bend III Battery Storage</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>70454</plant_id>
    <state>FL</state>
    <county>Hillsborough</county>
    <developer>Tampa Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TEC</balancing_authority>
    <lat>27.795</lat>
    <lon>-82.403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70365/BODES</id>
    <plant_name>Bodkin BESS</plant_name>
    <generator_id>BODES</generator_id>
    <plant_id>70365</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Bodkin BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.292</lat>
    <lon>-95.301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70366/BHBES</id>
    <plant_name>Boot Hill Energy Storage</plant_name>
    <generator_id>BHBES</generator_id>
    <plant_id>70366</plant_id>
    <state>KS</state>
    <county>Ford</county>
    <developer>Boot Hill Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.704</lat>
    <lon>-99.977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61511/BCNE</id>
    <plant_name>Burt County Wind</plant_name>
    <generator_id>BCNE</generator_id>
    <plant_id>61511</plant_id>
    <state>NE</state>
    <county>Burt</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.886</lat>
    <lon>-96.345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68331/CVSO</id>
    <plant_name>Caverns Solar</plant_name>
    <generator_id>CVSO</generator_id>
    <plant_id>68331</plant_id>
    <state>FL</state>
    <county>Jackson</county>
    <developer>CVSO, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>30.871983</lat>
    <lon>-85.29425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67666/SUNDN</id>
    <plant_name>Sundance (CO)</plant_name>
    <generator_id>SUNDN</generator_id>
    <plant_id>67666</plant_id>
    <state>CO</state>
    <county>Elbert</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.414779</lat>
    <lon>-104.4481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67723/SOLAR</id>
    <plant_name>Kingstree West 115</plant_name>
    <generator_id>SOLAR</generator_id>
    <plant_id>67723</plant_id>
    <state>SC</state>
    <county>Williamsburg</county>
    <developer>Kingstree West 115 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>33.693976</lat>
    <lon>-79.95404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62181/23</id>
    <plant_name>B &amp; K Solar</plant_name>
    <generator_id>23</generator_id>
    <plant_id>62181</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>B &amp; K Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.423425</lat>
    <lon>-80.06213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70223/TPSP1</id>
    <plant_name>Turnpike Solar Plant</plant_name>
    <generator_id>TPSP1</generator_id>
    <plant_id>70223</plant_id>
    <state>FL</state>
    <county>Osceola</county>
    <developer>Duke Energy Florida, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>28.063296</lat>
    <lon>-81.22305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62184/27</id>
    <plant_name>Big Fork Solar</plant_name>
    <generator_id>27</generator_id>
    <plant_id>62184</plant_id>
    <state>SC</state>
    <county>Barnwell</county>
    <developer>Big Fork Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>33.135275</lat>
    <lon>-81.23911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62234/48</id>
    <plant_name>Juniper Solar</plant_name>
    <generator_id>48</generator_id>
    <plant_id>62234</plant_id>
    <state>SC</state>
    <county>Chesterfield</county>
    <developer>Juniper Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.638189</lat>
    <lon>-79.86121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70222/LCSP1</id>
    <plant_name>Lonesome Camp Solar Plant</plant_name>
    <generator_id>LCSP1</generator_id>
    <plant_id>70222</plant_id>
    <state>FL</state>
    <county>Osceola</county>
    <developer>Duke Energy Florida, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>28.079121</lat>
    <lon>-81.24029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64345/1112</id>
    <plant_name>Highland Solar North</plant_name>
    <generator_id>1112</generator_id>
    <plant_id>64345</plant_id>
    <state>FL</state>
    <county>Highlands</county>
    <developer>Placid Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>27.2821</lat>
    <lon>-81.4256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62221/33</id>
    <plant_name>Culpepper Solar</plant_name>
    <generator_id>33</generator_id>
    <plant_id>62221</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>Culpepper Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.465864</lat>
    <lon>-79.96044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62295/67</id>
    <plant_name>Rollins Solar</plant_name>
    <generator_id>67</generator_id>
    <plant_id>62295</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>Rollins Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.353572</lat>
    <lon>-80.01618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62296/68</id>
    <plant_name>Ross Solar</plant_name>
    <generator_id>68</generator_id>
    <plant_id>62296</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>Ross Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.444756</lat>
    <lon>-79.85173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62184/26</id>
    <plant_name>Big Fork Solar</plant_name>
    <generator_id>26</generator_id>
    <plant_id>62184</plant_id>
    <state>SC</state>
    <county>Barnwell</county>
    <developer>Big Fork Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>33.135275</lat>
    <lon>-81.23911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62188/30</id>
    <plant_name>Colleton Solar</plant_name>
    <generator_id>30</generator_id>
    <plant_id>62188</plant_id>
    <state>SC</state>
    <county>Colleton</county>
    <developer>Colleton Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>33.123794</lat>
    <lon>-80.84248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68075/PINES</id>
    <plant_name>Pineside Solar</plant_name>
    <generator_id>PINES</generator_id>
    <plant_id>68075</plant_id>
    <state>VA</state>
    <county>Buckingham</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <planned_start>2030-01</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.5</lat>
    <lon>-78.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69351/HNYPV</id>
    <plant_name>Honeycomb Solar and Storage</plant_name>
    <generator_id>HNYPV</generator_id>
    <plant_id>69351</plant_id>
    <state>TX</state>
    <county>Bee</county>
    <developer>Honeycomb Solar Holdco, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.184344</lat>
    <lon>-97.77169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69474/SWTSU</id>
    <plant_name>Sweet Sue Solar</plant_name>
    <generator_id>SWTSU</generator_id>
    <plant_id>69474</plant_id>
    <state>VA</state>
    <county>King William</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.762</lat>
    <lon>-77.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69461/1</id>
    <plant_name>Keene Branch Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69461</plant_id>
    <state>FL</state>
    <county>Hillsborough</county>
    <developer>Tampa Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TEC</balancing_authority>
    <lat>27.658706</lat>
    <lon>-82.2657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69626/SMF</id>
    <plant_name>FRP Miller Solar</plant_name>
    <generator_id>SMF</generator_id>
    <plant_id>69626</plant_id>
    <state>FL</state>
    <county>Duval</county>
    <developer>FRP Miller Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>JEA</balancing_authority>
    <lat>30.320634</lat>
    <lon>-81.91274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68828/1</id>
    <plant_name>Tangelo</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68828</plant_id>
    <state>FL</state>
    <county>Okeechobee</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.507993</lat>
    <lon>-80.73651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68834/1</id>
    <plant_name>Hendry</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68834</plant_id>
    <state>FL</state>
    <county>Hendry</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>26.410345</lat>
    <lon>-81.03189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68824/1</id>
    <plant_name>Middle Lake</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68824</plant_id>
    <state>FL</state>
    <county>Madison</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>30.380511</lat>
    <lon>-83.34074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68829/1</id>
    <plant_name>Ambersweet</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68829</plant_id>
    <state>FL</state>
    <county>Indian River</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.567468</lat>
    <lon>-80.62782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68832/1</id>
    <plant_name>County Line</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68832</plant_id>
    <state>FL</state>
    <county>DeSoto</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.110556</lat>
    <lon>-81.80083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68830/1</id>
    <plant_name>Catfish</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68830</plant_id>
    <state>FL</state>
    <county>Okeechobee</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.277731</lat>
    <lon>-80.78854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68831/1</id>
    <plant_name>Cocoplum</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68831</plant_id>
    <state>FL</state>
    <county>Hendry</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>26.762027</lat>
    <lon>-81.1907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68833/1</id>
    <plant_name>Hardwood Hammock</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68833</plant_id>
    <state>FL</state>
    <county>Walton</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.282662</lat>
    <lon>-81.77522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68836/1</id>
    <plant_name>Maple Trail</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68836</plant_id>
    <state>FL</state>
    <county>Baker</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>30.314392</lat>
    <lon>-82.18501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68825/1</id>
    <plant_name>Pinecone</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68825</plant_id>
    <state>FL</state>
    <county>Calhoun</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>30.439415</lat>
    <lon>-85.25499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68826/1</id>
    <plant_name>Saddle</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68826</plant_id>
    <state>FL</state>
    <county>Calhoun</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>30.439415</lat>
    <lon>-85.25499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68827/1</id>
    <plant_name>Spanish Moss</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68827</plant_id>
    <state>FL</state>
    <county>St Lucie</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.509782</lat>
    <lon>-80.56447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68835/1</id>
    <plant_name>Joshua Creek</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68835</plant_id>
    <state>FL</state>
    <county>DeSoto</county>
    <developer>Florida Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPL</balancing_authority>
    <lat>27.282662</lat>
    <lon>-81.77522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65708/WMSS</id>
    <plant_name>Warren Meadow Solar Station</plant_name>
    <generator_id>WMSS</generator_id>
    <plant_id>65708</plant_id>
    <state>ME</state>
    <county>Knox</county>
    <developer>Warren Meadow Solar Station, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.16061</lat>
    <lon>-69.22341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62229/43</id>
    <plant_name>Holliday Solar I</plant_name>
    <generator_id>43</generator_id>
    <plant_id>62229</plant_id>
    <state>SC</state>
    <county>Horry</county>
    <developer>Holliday Solar I</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SC</balancing_authority>
    <lat>34.054128</lat>
    <lon>-79.20663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62309/73</id>
    <plant_name>Shining Sun Solar</plant_name>
    <generator_id>73</generator_id>
    <plant_id>62309</plant_id>
    <state>SC</state>
    <county>Orangeburg</county>
    <developer>Shining Sun Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74.4</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SC</balancing_authority>
    <lat>33.5425</lat>
    <lon>-80.57219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64634/90FIB</id>
    <plant_name>Kingsley Solar Farm</plant_name>
    <generator_id>90FIB</generator_id>
    <plant_id>64634</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>90FI 8me, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.742036</lat>
    <lon>-115.7354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64167/GEN</id>
    <plant_name>Hornet Solar</plant_name>
    <generator_id>GEN</generator_id>
    <plant_id>64167</plant_id>
    <state>NC</state>
    <county>Gaston</county>
    <developer>Hornet Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.387</lat>
    <lon>-81.029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67195/GEN</id>
    <plant_name>Maple Leaf Solar</plant_name>
    <generator_id>GEN</generator_id>
    <plant_id>67195</plant_id>
    <state>NC</state>
    <county>Johnston</county>
    <developer>Capital Power Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.595</lat>
    <lon>-78.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6085/19A</id>
    <plant_name>R M Schahfer</plant_name>
    <generator_id>19A</generator_id>
    <plant_id>6085</plant_id>
    <state>IN</state>
    <county>Jasper</county>
    <developer>Northern Indiana Pub Serv Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>71.5</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.2164</lat>
    <lon>-87.0261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6085/19B</id>
    <plant_name>R M Schahfer</plant_name>
    <generator_id>19B</generator_id>
    <plant_id>6085</plant_id>
    <state>IN</state>
    <county>Jasper</county>
    <developer>Northern Indiana Pub Serv Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>71.5</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.2164</lat>
    <lon>-87.0261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6085/19C</id>
    <plant_name>R M Schahfer</plant_name>
    <generator_id>19C</generator_id>
    <plant_id>6085</plant_id>
    <state>IN</state>
    <county>Jasper</county>
    <developer>Northern Indiana Pub Serv Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>71.5</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.2164</lat>
    <lon>-87.0261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62262/GEN1</id>
    <plant_name>Rolling Upland Wind Farm LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>62262</plant_id>
    <state>NY</state>
    <county>Madison</county>
    <developer>Rolling Upland Wind Farm LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>71.4</nameplate_mw>
    <summer_mw>71.4</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.524607</lat>
    <lon>-75.27744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70221/HPSP1</id>
    <plant_name>Hudson Place Solar Plant</plant_name>
    <generator_id>HPSP1</generator_id>
    <plant_id>70221</plant_id>
    <state>SC</state>
    <county>Newberry</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70.7</nameplate_mw>
    <summer_mw>70.7</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>34.2391</lat>
    <lon>-81.6922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66691/BRUGG</id>
    <plant_name>Briggs Solar, LLC</plant_name>
    <generator_id>BRUGG</generator_id>
    <plant_id>66691</plant_id>
    <state>TX</state>
    <county>Haskell</county>
    <developer>Intersect USA, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>70.5</nameplate_mw>
    <summer_mw>70.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.144326</lat>
    <lon>-99.55977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68000/BLUMN</id>
    <plant_name>Blue Moon</plant_name>
    <generator_id>BLUMN</generator_id>
    <plant_id>68000</plant_id>
    <state>KY</state>
    <county>Harrison</county>
    <developer>Blue Moon Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.37118</lat>
    <lon>-84.2578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66787/ELVPS</id>
    <plant_name>Elevate Pier S</plant_name>
    <generator_id>ELVPS</generator_id>
    <plant_id>66787</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Lighthouse Pier S, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.764993</lat>
    <lon>-118.2237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69947/GEN05</id>
    <plant_name>EDPR Scarlet III</plant_name>
    <generator_id>GEN05</generator_id>
    <plant_id>69947</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>EDPR Scarlet III LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.608742</lat>
    <lon>-120.3511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64428/JVR1B</id>
    <plant_name>JVR Energy Park LLC</plant_name>
    <generator_id>JVR1B</generator_id>
    <plant_id>64428</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>JVR Energy Park LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.625903</lat>
    <lon>-116.1749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>50736/FSS17</id>
    <plant_name>Pure Hedge LLC</plant_name>
    <generator_id>FSS17</generator_id>
    <plant_id>50736</plant_id>
    <state>CT</state>
    <county>Windham</county>
    <developer>Pure Hedge LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.712448</lat>
    <lon>-71.82225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70109/JASMI</id>
    <plant_name>Jasmine</plant_name>
    <generator_id>JASMI</generator_id>
    <plant_id>70109</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.1006</lat>
    <lon>-119.1187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67560/RIC94</id>
    <plant_name>Edens Solar</plant_name>
    <generator_id>RIC94</generator_id>
    <plant_id>67560</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.063132</lat>
    <lon>-97.11104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66124/SSPV</id>
    <plant_name>Switchgrass Solar, LLC</plant_name>
    <generator_id>SSPV</generator_id>
    <plant_id>66124</plant_id>
    <state>VA</state>
    <county>Suffolk City</county>
    <developer>RWE Americas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.676484</lat>
    <lon>-76.58588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70559/BESS1</id>
    <plant_name>Mammoth</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>70559</plant_id>
    <state>WV</state>
    <county>Kanawha</county>
    <developer>MN8 Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.20845</lat>
    <lon>-81.30893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>201/4</id>
    <plant_name>Thomas Fitzhugh</plant_name>
    <generator_id>4</generator_id>
    <plant_id>201</plant_id>
    <state>AR</state>
    <county>Franklin</county>
    <developer>Arkansas Electric Coop Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>69.3</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>35.462382</lat>
    <lon>-93.80493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69524/WLB</id>
    <plant_name>Windy Lane Energy Center</plant_name>
    <generator_id>WLB</generator_id>
    <plant_id>69524</plant_id>
    <state>NM</state>
    <county>De Baca</county>
    <developer>Windy Lane Energy Center, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>68</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.587619</lat>
    <lon>-104.0312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68416/CTS1</id>
    <plant_name>Crooked Trail Solar</plant_name>
    <generator_id>CTS1</generator_id>
    <plant_id>68416</plant_id>
    <state>ME</state>
    <county>Penobscot</county>
    <developer>VCP Realty, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>68</summer_mw>
    <planned_start>2029-10</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>45.144194</lat>
    <lon>-68.58603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67379/1</id>
    <plant_name>Whitetail Wind Farm</plant_name>
    <generator_id>1</generator_id>
    <plant_id>67379</plant_id>
    <state>WI</state>
    <county>Grant</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>67.2</nameplate_mw>
    <summer_mw>67.2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.951448</lat>
    <lon>-90.4407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68175/SYMPV</id>
    <plant_name>Symank Solar</plant_name>
    <generator_id>SYMPV</generator_id>
    <plant_id>68175</plant_id>
    <state>TX</state>
    <county>Bosque</county>
    <developer>Belltown Power Texas 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>66.6</nameplate_mw>
    <summer_mw>66.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.626039</lat>
    <lon>-97.64211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68926/BLUEJ</id>
    <plant_name>Blue Jay Road Solar, LLC</plant_name>
    <generator_id>BLUEJ</generator_id>
    <plant_id>68926</plant_id>
    <state>MO</state>
    <county>Ralls</county>
    <developer>Birch Creek Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.380782</lat>
    <lon>-91.53206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68556/DURHM</id>
    <plant_name>SR Durhamville</plant_name>
    <generator_id>DURHM</generator_id>
    <plant_id>68556</plant_id>
    <state>TN</state>
    <county>Haywood</county>
    <developer>SR Durhamville, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.626611</lat>
    <lon>-89.46162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G1</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G1</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G10</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G10</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G11</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G11</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G12</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G12</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G13</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G13</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G14</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G14</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G15</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G15</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G16</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G16</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G2</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G2</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G3</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G3</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G4</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G4</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G5</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G5</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G6</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G6</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G7</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G7</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G8</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G8</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3407/G9</id>
    <plant_name>Kingston</plant_name>
    <generator_id>G9</generator_id>
    <plant_id>3407</plant_id>
    <state>TN</state>
    <county>Roane</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>65.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69631/SFS01</id>
    <plant_name>Sunflower Sky Energy Center</plant_name>
    <generator_id>SFS01</generator_id>
    <plant_id>69631</plant_id>
    <state>KS</state>
    <county>Wilson</county>
    <developer>Evergy Missouri West</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.502223</lat>
    <lon>-95.64868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70420/BA1</id>
    <plant_name>Wheatridge Optimization I</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>70420</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Wheatridge Optimization I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.560054</lat>
    <lon>-119.6224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62280/58</id>
    <plant_name>Melsam Solar</plant_name>
    <generator_id>58</generator_id>
    <plant_id>62280</plant_id>
    <state>SC</state>
    <county>Dillon</county>
    <developer>Melsam Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.344878</lat>
    <lon>-79.37456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68672/OECHA</id>
    <plant_name>Chalan</plant_name>
    <generator_id>OECHA</generator_id>
    <plant_id>68672</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Origis Energy USA, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>64.9</nameplate_mw>
    <summer_mw>64.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.7803</lat>
    <lon>-119.911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70109/JASBE</id>
    <plant_name>Jasmine</plant_name>
    <generator_id>JASBE</generator_id>
    <plant_id>70109</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>64.4</nameplate_mw>
    <summer_mw>64.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.1006</lat>
    <lon>-119.1187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68074/CERUL</id>
    <plant_name>Cerulean Solar</plant_name>
    <generator_id>CERUL</generator_id>
    <plant_id>68074</plant_id>
    <state>VA</state>
    <county>Richmond</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>62</nameplate_mw>
    <summer_mw>62</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.867194</lat>
    <lon>-76.58987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69773/GT1</id>
    <plant_name>Mohave Energy Park</plant_name>
    <generator_id>GT1</generator_id>
    <plant_id>69773</plant_id>
    <state>AZ</state>
    <county>Mohave</county>
    <developer>Arizona Electric Pwr Coop Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>43</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>34.932499</lat>
    <lon>-114.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69773/GT2</id>
    <plant_name>Mohave Energy Park</plant_name>
    <generator_id>GT2</generator_id>
    <plant_id>69773</plant_id>
    <state>AZ</state>
    <county>Mohave</county>
    <developer>Arizona Electric Pwr Coop Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>43</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>34.932499</lat>
    <lon>-114.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69773/GT3</id>
    <plant_name>Mohave Energy Park</plant_name>
    <generator_id>GT3</generator_id>
    <plant_id>69773</plant_id>
    <state>AZ</state>
    <county>Mohave</county>
    <developer>Arizona Electric Pwr Coop Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>43</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>34.932499</lat>
    <lon>-114.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69773/GT4</id>
    <plant_name>Mohave Energy Park</plant_name>
    <generator_id>GT4</generator_id>
    <plant_id>69773</plant_id>
    <state>AZ</state>
    <county>Mohave</county>
    <developer>Arizona Electric Pwr Coop Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>43</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>34.932499</lat>
    <lon>-114.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN1</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN10</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN10</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN11</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN11</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN12</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN12</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN13</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN13</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN14</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN14</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN15</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN15</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN16</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN16</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN17</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN17</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN18</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN18</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN2</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN3</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN3</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN4</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN4</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN5</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN5</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN6</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN6</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN7</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN7</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN8</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN8</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66478/GEN9</id>
    <plant_name>NTEC Gas Plant</plant_name>
    <generator_id>GEN9</generator_id>
    <plant_id>66478</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Navajo Transitional Energy Company</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.682944</lat>
    <lon>-108.4502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67871/ENX29</id>
    <plant_name>Gladys Solar LLC</plant_name>
    <generator_id>ENX29</generator_id>
    <plant_id>67871</plant_id>
    <state>VA</state>
    <county>Campbell</county>
    <developer>Gladys Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60.4</nameplate_mw>
    <summer_mw>60.4</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.143719</lat>
    <lon>-79.14207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67781/GRS7</id>
    <plant_name>Lampe Solar</plant_name>
    <generator_id>GRS7</generator_id>
    <plant_id>67781</plant_id>
    <state>TX</state>
    <county>Washington</county>
    <developer>Gransolar Texas Seven LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60.2</nameplate_mw>
    <summer_mw>60.2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.310524</lat>
    <lon>-96.47887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67562/RIC92</id>
    <plant_name>Stonewall Solar</plant_name>
    <generator_id>RIC92</generator_id>
    <plant_id>67562</plant_id>
    <state>TX</state>
    <county>Stonewall</county>
    <developer>RIC Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60.2</nameplate_mw>
    <summer_mw>60.2</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.174177</lat>
    <lon>-100.2308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66313/MOCO</id>
    <plant_name>Moon Corner Solar</plant_name>
    <generator_id>MOCO</generator_id>
    <plant_id>66313</plant_id>
    <state>VA</state>
    <county>Richmond</county>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.89</lat>
    <lon>-76.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68495/BDOG1</id>
    <plant_name>Bird Dog Energy Storage</plant_name>
    <generator_id>BDOG1</generator_id>
    <plant_id>68495</plant_id>
    <state>TX</state>
    <county>San Patricio</county>
    <developer>VESI 37 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.158672</lat>
    <lon>-97.86231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62310/74</id>
    <plant_name>Shorthorn Solar</plant_name>
    <generator_id>74</generator_id>
    <plant_id>62310</plant_id>
    <state>SC</state>
    <county>Lee</county>
    <developer>Shorthorn Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.246975</lat>
    <lon>-80.15782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68810/MORA</id>
    <plant_name>Mora Solar</plant_name>
    <generator_id>MORA</generator_id>
    <plant_id>68810</plant_id>
    <state>PA</state>
    <county>Carbon</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.062982</lat>
    <lon>-75.63435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70450/BA1</id>
    <plant_name>Wheatridge Optimization II</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>70450</plant_id>
    <state>OR</state>
    <county>Morrow</county>
    <developer>Wheatridge Optimization II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.559975</lat>
    <lon>-119.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63567/WSMTR</id>
    <plant_name>Westminister NC</plant_name>
    <generator_id>WSMTR</generator_id>
    <plant_id>63567</plant_id>
    <state>NC</state>
    <county>Rutherford</county>
    <developer>Ecoplexus, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.452</lat>
    <lon>-81.919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64767/TC001</id>
    <plant_name>Pigeon Run Solar Project</plant_name>
    <generator_id>TC001</generator_id>
    <plant_id>64767</plant_id>
    <state>VA</state>
    <county>Campbell</county>
    <developer>Pigeon Run Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.158473</lat>
    <lon>-79.05564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64768/TC001</id>
    <plant_name>Zenith Solar</plant_name>
    <generator_id>TC001</generator_id>
    <plant_id>64768</plant_id>
    <state>VA</state>
    <county>Pittsylvania</county>
    <developer>Zenith Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <planned_start>2030-07</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.817763</lat>
    <lon>-79.23328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68924/IROB</id>
    <plant_name>Iron BESS</plant_name>
    <generator_id>IROB</generator_id>
    <plant_id>68924</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Panoche BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>59.5</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.652653</lat>
    <lon>-120.5783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69541/VACB</id>
    <plant_name>Vaca BESS</plant_name>
    <generator_id>VACB</generator_id>
    <plant_id>69541</plant_id>
    <state>CA</state>
    <county>Solano</county>
    <developer>Vaca Dixon BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>59.5</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.398379</lat>
    <lon>-121.924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65823/PARB</id>
    <plant_name>Parowan Solar</plant_name>
    <generator_id>PARB</generator_id>
    <plant_id>65823</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.875795</lat>
    <lon>-112.8885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65823/PARS0</id>
    <plant_name>Parowan Solar</plant_name>
    <generator_id>PARS0</generator_id>
    <plant_id>65823</plant_id>
    <state>UT</state>
    <county>Iron</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>37.875795</lat>
    <lon>-112.8885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>708/5</id>
    <plant_name>Hammond</plant_name>
    <generator_id>5</generator_id>
    <plant_id>708</plant_id>
    <state>GA</state>
    <county>Floyd</county>
    <developer>Georgia Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>57.5</nameplate_mw>
    <summer_mw>57.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>34.2528</lat>
    <lon>-85.3456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6249/5</id>
    <plant_name>Winyah</plant_name>
    <generator_id>5</generator_id>
    <plant_id>6249</plant_id>
    <state>SC</state>
    <county>Georgetown</county>
    <developer>South Carolina Public Service Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>44</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SC</balancing_authority>
    <lat>33.33184</lat>
    <lon>-79.35724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6249/6</id>
    <plant_name>Winyah</plant_name>
    <generator_id>6</generator_id>
    <plant_id>6249</plant_id>
    <state>SC</state>
    <county>Georgetown</county>
    <developer>South Carolina Public Service Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>44</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SC</balancing_authority>
    <lat>33.33184</lat>
    <lon>-79.35724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG001</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG001</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG002</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG002</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG003</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG003</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG004</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG004</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG005</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG005</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG006</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG006</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG007</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG007</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG008</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG008</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG009</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG009</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG010</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG010</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG011</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG011</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG012</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG012</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG013</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG013</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG014</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG014</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG015</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG015</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG016</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG016</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG017</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG017</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG018</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG018</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG019</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG019</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG020</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG020</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG021</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG021</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG022</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG022</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG023</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG023</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG024</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG024</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG025</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG025</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG026</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG026</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG027</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG027</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG028</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG028</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG029</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG029</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG030</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG030</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG031</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG031</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG032</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG032</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG033</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG033</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG034</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG034</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG035</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG035</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG036</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG036</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG037</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG037</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG038</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG038</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG039</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG039</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG040</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG040</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG041</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG041</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG042</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG042</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG043</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG043</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG044</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG044</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG045</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG045</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG046</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG046</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG047</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG047</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/EG048</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>EG048</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG001</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG001</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG002</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG002</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG003</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG003</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG004</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG004</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG005</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG005</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG006</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG006</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG007</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG007</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG008</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG008</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG009</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG009</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG010</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG010</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG011</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG011</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG012</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG012</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG013</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG013</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG014</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG014</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG015</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG015</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG016</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG016</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG017</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG017</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG018</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG018</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG019</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG019</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG020</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG020</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG021</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG021</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG022</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG022</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG023</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG023</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG024</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG024</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG025</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG025</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG026</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG026</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG027</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG027</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG028</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG028</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG029</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG029</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG030</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG030</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG031</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG031</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG032</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG032</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG033</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG033</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG034</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG034</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG035</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG035</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG036</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG036</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG037</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG037</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG038</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG038</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG039</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG039</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG040</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG040</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG041</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG041</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG042</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG042</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG043</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG043</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG044</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG044</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG045</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG045</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG046</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG046</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG047</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG047</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/MG048</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>MG048</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67785/GRS19</id>
    <plant_name>Whistle Solar</plant_name>
    <generator_id>GRS19</generator_id>
    <plant_id>67785</plant_id>
    <state>TX</state>
    <county>Navarro</county>
    <developer>Gransolar Texas Nineteen LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>56.3</nameplate_mw>
    <summer_mw>56.3</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.985</lat>
    <lon>-96.43658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69119/NHBA1</id>
    <plant_name>New Hill 1 Battery</plant_name>
    <generator_id>NHBA1</generator_id>
    <plant_id>69119</plant_id>
    <state>NC</state>
    <county>Wake</county>
    <developer>Duke Energy Progress - (NC)</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>56</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>35.659692</lat>
    <lon>-78.94412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67157/PV1</id>
    <plant_name>Powell Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>67157</plant_id>
    <state>OR</state>
    <county>Crook</county>
    <developer>Invenergy Services LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>55.9</nameplate_mw>
    <summer_mw>55.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>44.258414</lat>
    <lon>-120.8895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66341/EGSB</id>
    <plant_name>Eagle Springs Hybrid</plant_name>
    <generator_id>EGSB</generator_id>
    <plant_id>66341</plant_id>
    <state>TX</state>
    <county>Delta</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>55.1</nameplate_mw>
    <summer_mw>55.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.433264</lat>
    <lon>-95.57444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69956/S8</id>
    <plant_name>Sanborn Hybrid 3</plant_name>
    <generator_id>S8</generator_id>
    <plant_id>69956</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Terra-Gen Operating Co-Hybrid</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.996</lat>
    <lon>-118.114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68561/MIDDN</id>
    <plant_name>SR Middleton</plant_name>
    <generator_id>MIDDN</generator_id>
    <plant_id>68561</plant_id>
    <state>TN</state>
    <county>Hardeman</county>
    <developer>SR Middleton, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.176939</lat>
    <lon>-88.87867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66382/GEN1</id>
    <plant_name>Healing Springs Solar, LLC</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>66382</plant_id>
    <state>NC</state>
    <county>Davidson</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.623627</lat>
    <lon>-80.15972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68486/44STA</id>
    <plant_name>Sienna 2 Solar and Storage Project</plant_name>
    <generator_id>44STA</generator_id>
    <plant_id>68486</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>44ST 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.506711</lat>
    <lon>-116.8901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68486/44STB</id>
    <plant_name>Sienna 2 Solar and Storage Project</plant_name>
    <generator_id>44STB</generator_id>
    <plant_id>68486</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>44ST 8ME LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <planned_start>2029-03</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.506711</lat>
    <lon>-116.8901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68923/ENTB</id>
    <plant_name>Enterprise BESS</plant_name>
    <generator_id>ENTB</generator_id>
    <plant_id>68923</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>Enterprise BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>54.1</nameplate_mw>
    <summer_mw>52</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.12181</lat>
    <lon>-117.1174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69523/1</id>
    <plant_name>Mattaniah Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69523</plant_id>
    <state>FL</state>
    <county>Polk</county>
    <developer>Tampa Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>TEC</balancing_authority>
    <lat>27.893214</lat>
    <lon>-82.04614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7887/5</id>
    <plant_name>Terry Bundy Generating Station</plant_name>
    <generator_id>5</generator_id>
    <plant_id>7887</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Lincoln Electric System</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>46.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.909653</lat>
    <lon>-96.61309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7887/6</id>
    <plant_name>Terry Bundy Generating Station</plant_name>
    <generator_id>6</generator_id>
    <plant_id>7887</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Lincoln Electric System</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>46.9</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.909653</lat>
    <lon>-96.61309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68380/ISCPV</id>
    <plant_name>Isaac Solar</plant_name>
    <generator_id>ISCPV</generator_id>
    <plant_id>68380</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>Industrial Bravo Project, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>51.4</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.797223</lat>
    <lon>-95.93717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69793/HEPV1</id>
    <plant_name>Henderson County Solar</plant_name>
    <generator_id>HEPV1</generator_id>
    <plant_id>69793</plant_id>
    <state>KY</state>
    <county>Henderson</county>
    <developer>Stellar Renewable Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>51.1</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.799412</lat>
    <lon>-87.62325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66390/GDYES</id>
    <plant_name>MRG Goody Solar Project Hybrid</plant_name>
    <generator_id>GDYES</generator_id>
    <plant_id>66390</plant_id>
    <state>TX</state>
    <county>Lamar</county>
    <developer>Nexus Renewable Power, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>33.639193</lat>
    <lon>-95.62905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66894/ALBBA</id>
    <plant_name>Albatross Solar, LLC</plant_name>
    <generator_id>ALBBA</generator_id>
    <plant_id>66894</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Sunraycer Assets I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.484342</lat>
    <lon>-97.42239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67778/GR16B</id>
    <plant_name>Findley PV and BESS</plant_name>
    <generator_id>GR16B</generator_id>
    <plant_id>67778</plant_id>
    <state>TX</state>
    <county>Limestone</county>
    <developer>Gransolar Texas Sixteen, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50.3</nameplate_mw>
    <summer_mw>50.3</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.643389</lat>
    <lon>-96.77961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67778/GR16P</id>
    <plant_name>Findley PV and BESS</plant_name>
    <generator_id>GR16P</generator_id>
    <plant_id>67778</plant_id>
    <state>TX</state>
    <county>Limestone</county>
    <developer>Gransolar Texas Sixteen, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50.3</nameplate_mw>
    <summer_mw>50.3</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.643389</lat>
    <lon>-96.77961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68970/HOFEL</id>
    <plant_name>Ho-Fel Solar</plant_name>
    <generator_id>HOFEL</generator_id>
    <plant_id>68970</plant_id>
    <state>VA</state>
    <county>Isle of Wight</county>
    <developer>Ho-Fel Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>50.2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.673032</lat>
    <lon>-76.88201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT01</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT01</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT02</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT02</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT03</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT03</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT04</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT04</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT05</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT05</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT06</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT06</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT07</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT07</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT08</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT08</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT09</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT09</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT10</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT10</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT11</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT11</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70485/GT12</id>
    <plant_name>White Cloud Generating</plant_name>
    <generator_id>GT12</generator_id>
    <plant_id>70485</plant_id>
    <state>MO</state>
    <county>Nodaway</county>
    <developer>White Cloud Generating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>47.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.228497</lat>
    <lon>-94.85165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67666/SUNBA</id>
    <plant_name>Sundance (CO)</plant_name>
    <generator_id>SUNBA</generator_id>
    <plant_id>67666</plant_id>
    <state>CO</state>
    <county>Elbert</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.414779</lat>
    <lon>-104.4481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68850/GRTSP</id>
    <plant_name>Gratiot Solar Park</plant_name>
    <generator_id>GRTSP</generator_id>
    <plant_id>68850</plant_id>
    <state>MI</state>
    <county>Gratiot</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.436999</lat>
    <lon>-84.49845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68929/RUBY</id>
    <plant_name>Ruby Solar, LLC</plant_name>
    <generator_id>RUBY</generator_id>
    <plant_id>68929</plant_id>
    <state>IL</state>
    <county>Clinton</county>
    <developer>Birch Creek Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.595759</lat>
    <lon>-89.16983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68938/OHJE1</id>
    <plant_name>Juliet Energy Project, LLC</plant_name>
    <generator_id>OHJE1</generator_id>
    <plant_id>68938</plant_id>
    <state>OH</state>
    <county>Wood</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.343803</lat>
    <lon>-83.81598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67215/ENX25</id>
    <plant_name>Sun Ridge Solar</plant_name>
    <generator_id>ENX25</generator_id>
    <plant_id>67215</plant_id>
    <state>VA</state>
    <county>Rockingham</county>
    <developer>Sun Ridge Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.314898</lat>
    <lon>-78.74463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65043/DUST</id>
    <plant_name>Dulles Solar and Storage</plant_name>
    <generator_id>DUST</generator_id>
    <plant_id>65043</plant_id>
    <state>VA</state>
    <county>Loudoun</county>
    <developer>Dominion Energy Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.95</lat>
    <lon>-77.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68247/GRGTN</id>
    <plant_name>SR Georgetown</plant_name>
    <generator_id>GRGTN</generator_id>
    <plant_id>68247</plant_id>
    <state>SC</state>
    <county>Georgetown</county>
    <developer>SR Georgetown. LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>33.333354</lat>
    <lon>-79.51325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68340/1</id>
    <plant_name>Solway Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68340</plant_id>
    <state>MN</state>
    <county>Beltrami</county>
    <developer>Otter Tail Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>47.546501</lat>
    <lon>-95.13</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68953/KB1</id>
    <plant_name>Kifer BESS 1</plant_name>
    <generator_id>KB1</generator_id>
    <plant_id>68953</plant_id>
    <state>CA</state>
    <county>Santa Clara</county>
    <developer>Kifer Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.376214</lat>
    <lon>-121.952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69548/SFE</id>
    <plant_name>FRP Forest Trail Solar</plant_name>
    <generator_id>SFE</generator_id>
    <plant_id>69548</plant_id>
    <state>FL</state>
    <county>Duval</county>
    <developer>FRP Forest Trail Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>JEA</balancing_authority>
    <lat>30.440764</lat>
    <lon>-81.83423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69626/BMF</id>
    <plant_name>FRP Miller Solar</plant_name>
    <generator_id>BMF</generator_id>
    <plant_id>69626</plant_id>
    <state>FL</state>
    <county>Duval</county>
    <developer>FRP Miller Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>JEA</balancing_authority>
    <lat>30.320634</lat>
    <lon>-81.91274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70107/MSP</id>
    <plant_name>Mills Solar Project</plant_name>
    <generator_id>MSP</generator_id>
    <plant_id>70107</plant_id>
    <state>IA</state>
    <county>Mills</county>
    <developer>MidAmerican Energy Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.033333</lat>
    <lon>-95.45192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70345/SFES</id>
    <plant_name>Steele Flats Energy Storage</plant_name>
    <generator_id>SFES</generator_id>
    <plant_id>70345</plant_id>
    <state>NE</state>
    <county>Jefferson</county>
    <developer>Steele Flats Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.051306</lat>
    <lon>-96.95178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68930/ENX36</id>
    <plant_name>MC Solar</plant_name>
    <generator_id>ENX36</generator_id>
    <plant_id>68930</plant_id>
    <state>PA</state>
    <county>Mercer</county>
    <developer>MC Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.412805</lat>
    <lon>-80.43245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69770/BRS</id>
    <plant_name>Ryan Storage</plant_name>
    <generator_id>BRS</generator_id>
    <plant_id>69770</plant_id>
    <state>TX</state>
    <county>Coryell</county>
    <developer>Ryan Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.53576</lat>
    <lon>-97.79874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69964/BALBE</id>
    <plant_name>Baldy Mesa Storage</plant_name>
    <generator_id>BALBE</generator_id>
    <plant_id>69964</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.6029</lat>
    <lon>-117.449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63846/RACE</id>
    <plant_name>Raceway Solar</plant_name>
    <generator_id>RACE</generator_id>
    <plant_id>63846</plant_id>
    <state>DE</state>
    <county>Kent</county>
    <developer>Freepoint Commodities LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.909956</lat>
    <lon>-75.58819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69194/MCBA</id>
    <plant_name>Maiden Creek Battery</plant_name>
    <generator_id>MCBA</generator_id>
    <plant_id>69194</plant_id>
    <state>NC</state>
    <county>Catawba</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.613673</lat>
    <lon>-81.18707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68564/PURYR</id>
    <plant_name>SR Puryear</plant_name>
    <generator_id>PURYR</generator_id>
    <plant_id>68564</plant_id>
    <state>TN</state>
    <county>Henry</county>
    <developer>SR Puryear, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.449856</lat>
    <lon>-88.30107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67988/PGR28</id>
    <plant_name>Sandersville Solar</plant_name>
    <generator_id>PGR28</generator_id>
    <plant_id>67988</plant_id>
    <state>GA</state>
    <county>Washington</county>
    <developer>Sandersville Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>32.987105</lat>
    <lon>-82.75254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67884/ENX28</id>
    <plant_name>Two Oaks Solar and Storage LLC</plant_name>
    <generator_id>ENX28</generator_id>
    <plant_id>67884</plant_id>
    <state>VA</state>
    <county>Louisa</county>
    <developer>Two Oaks Solar and Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.013053</lat>
    <lon>-77.93117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70197/LORE1</id>
    <plant_name>Lorenzo Energy Storage</plant_name>
    <generator_id>LORE1</generator_id>
    <plant_id>70197</plant_id>
    <state>TX</state>
    <county>Crosby</county>
    <developer>Lorenzo Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>33.749367</lat>
    <lon>-101.4829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56998/BA7</id>
    <plant_name>Pueblo Airport Generating Station</plant_name>
    <generator_id>BA7</generator_id>
    <plant_id>56998</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Black Hills Service Company LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.320833</lat>
    <lon>-104.5264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63202/701-S</id>
    <plant_name>TREX US Red Holly</plant_name>
    <generator_id>701-S</generator_id>
    <plant_id>63202</plant_id>
    <state>TX</state>
    <county>Lynn</county>
    <developer>TREX US Red Holly LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.952</lat>
    <lon>-101.737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65407/BEAR1</id>
    <plant_name>Beartooth Energy Storage LLC</plant_name>
    <generator_id>BEAR1</generator_id>
    <plant_id>65407</plant_id>
    <state>MT</state>
    <county>Yellowstone</county>
    <developer>Beartooth Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>45.7843</lat>
    <lon>-108.7178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68562/MTPLT</id>
    <plant_name>SR Mount Pleasant</plant_name>
    <generator_id>MTPLT</generator_id>
    <plant_id>68562</plant_id>
    <state>MS</state>
    <county>Marshall</county>
    <developer>SR Mount Pleasant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.951675</lat>
    <lon>-89.58282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68565/ROCH2</id>
    <plant_name>SR Rochelle II</plant_name>
    <generator_id>ROCH2</generator_id>
    <plant_id>68565</plant_id>
    <state>GA</state>
    <county>Wilcox</county>
    <developer>SR Rochelle II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>32.030665</lat>
    <lon>-83.506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG04</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG04</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG05</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG05</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/FBG06</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>FBG06</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67983/AURRB</id>
    <plant_name>Aurora Renewable Energy (Hybrid)</plant_name>
    <generator_id>AURRB</generator_id>
    <plant_id>67983</plant_id>
    <state>CA</state>
    <county>Stanislaus</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>37.628805</lat>
    <lon>-121.0714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67983/AURRE</id>
    <plant_name>Aurora Renewable Energy (Hybrid)</plant_name>
    <generator_id>AURRE</generator_id>
    <plant_id>67983</plant_id>
    <state>CA</state>
    <county>Stanislaus</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>BANC</balancing_authority>
    <lat>37.628805</lat>
    <lon>-121.0714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62190/32</id>
    <plant_name>Crossroads Solar</plant_name>
    <generator_id>32</generator_id>
    <plant_id>62190</plant_id>
    <state>SC</state>
    <county>Barnwell</county>
    <developer>Crossroads Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>33.368886</lat>
    <lon>-81.36497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62217/40</id>
    <plant_name>GEB Solar</plant_name>
    <generator_id>40</generator_id>
    <plant_id>62217</plant_id>
    <state>SC</state>
    <county>Darlington</county>
    <developer>GEB Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.412367</lat>
    <lon>-80.04192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62299/66</id>
    <plant_name>Quest Solar</plant_name>
    <generator_id>66</generator_id>
    <plant_id>62299</plant_id>
    <state>SC</state>
    <county>Allendale</county>
    <developer>Quest Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SCEG</balancing_authority>
    <lat>32.976531</lat>
    <lon>-81.22681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64849/ATMWS</id>
    <plant_name>Wildcat Solar Power Plant LLC</plant_name>
    <generator_id>ATMWS</generator_id>
    <plant_id>64849</plant_id>
    <state>NM</state>
    <county>McKinley</county>
    <developer>Solariant Capital, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>35.580453</lat>
    <lon>-108.9023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65286/ENX18</id>
    <plant_name>Caden Energix Piney River LLC</plant_name>
    <generator_id>ENX18</generator_id>
    <plant_id>65286</plant_id>
    <state>VA</state>
    <county>Amherst</county>
    <developer>Caden Energix Piney River LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.696818</lat>
    <lon>-79.02306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68019/RICBA</id>
    <plant_name>Richwood Solar and Storage</plant_name>
    <generator_id>RICBA</generator_id>
    <plant_id>68019</plant_id>
    <state>OH</state>
    <county>Union</county>
    <developer>Samsung C&amp;T Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.353175</lat>
    <lon>-83.33117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68213/1</id>
    <plant_name>Panton</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68213</plant_id>
    <state>VT</state>
    <county>Addison</county>
    <developer>Viridis Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.1328</lat>
    <lon>-73.31151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69099/HEWA1</id>
    <plant_name>Orion - Helion</plant_name>
    <generator_id>HEWA1</generator_id>
    <plant_id>69099</plant_id>
    <state>WA</state>
    <county>Chelan</county>
    <developer>Helion Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>All Other</technology>
    <energy_source>H2</energy_source>
    <prime_mover>OT</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CHPD</balancing_authority>
    <lat>47.3368</lat>
    <lon>-120.1043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60670/1</id>
    <plant_name>CE&amp;P Imperial Valley 1</plant_name>
    <generator_id>1</generator_id>
    <plant_id>60670</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>California Ethanol Power, LLC</developer>
    <sector>Industrial CHP</sector>
    <technology>All Other</technology>
    <energy_source>OTH</energy_source>
    <prime_mover>CC</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.912778</lat>
    <lon>-115.5183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65445/RBESS</id>
    <plant_name>Ridgely Energy Farm</plant_name>
    <generator_id>RBESS</generator_id>
    <plant_id>65445</plant_id>
    <state>TN</state>
    <county>Lake</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.306319</lat>
    <lon>-89.46202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67838/NY30</id>
    <plant_name>KCE NY 30, LLC</plant_name>
    <generator_id>NY30</generator_id>
    <plant_id>67838</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.69477</lat>
    <lon>-73.35182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67839/NY31</id>
    <plant_name>KCE NY 31, LLC</plant_name>
    <generator_id>NY31</generator_id>
    <plant_id>67839</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <planned_start>2031-05</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.9581</lat>
    <lon>-72.86654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69278/3</id>
    <plant_name>Fortress 1</plant_name>
    <generator_id>3</generator_id>
    <plant_id>69278</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Fortress Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.26</lat>
    <lon>-103.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56964/BESS1</id>
    <plant_name>Bayonne Energy Center</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>56964</plant_id>
    <state>NJ</state>
    <county>Hudson</county>
    <developer>Bayonne Energy Center LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>49.8</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.652834</lat>
    <lon>-74.09155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE19</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE19</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE20</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE20</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE21</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE21</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE22</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE22</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE23</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE23</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56948/COE24</id>
    <plant_name>Coolidge Generation Station</plant_name>
    <generator_id>COE24</generator_id>
    <plant_id>56948</plant_id>
    <state>AZ</state>
    <county>Pinal</county>
    <developer>Salt River Project</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT10</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT10</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT3</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT3</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT4</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT4</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT5</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT5</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT6</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT6</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT7</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT7</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT8</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT8</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55455/CT9</id>
    <plant_name>Red Hawk</plant_name>
    <generator_id>CT9</generator_id>
    <plant_id>55455</plant_id>
    <state>AZ</state>
    <county>Maricopa</county>
    <developer>Arizona Public Service Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SRP</balancing_authority>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7903/MGS3</id>
    <plant_name>McCartney</plant_name>
    <generator_id>MGS3</generator_id>
    <plant_id>7903</plant_id>
    <state>MO</state>
    <county>Greene</county>
    <developer>City Utilities of Springfield - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48.9</nameplate_mw>
    <summer_mw>47.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.248431</lat>
    <lon>-93.17084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7903/MGS4</id>
    <plant_name>McCartney</plant_name>
    <generator_id>MGS4</generator_id>
    <plant_id>7903</plant_id>
    <state>MO</state>
    <county>Greene</county>
    <developer>City Utilities of Springfield - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48.9</nameplate_mw>
    <summer_mw>47.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.248431</lat>
    <lon>-93.17084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7903/MGS5</id>
    <plant_name>McCartney</plant_name>
    <generator_id>MGS5</generator_id>
    <plant_id>7903</plant_id>
    <state>MO</state>
    <county>Greene</county>
    <developer>City Utilities of Springfield - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48.9</nameplate_mw>
    <summer_mw>47.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.248431</lat>
    <lon>-93.17084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69648/BSBA2</id>
    <plant_name>Rosamond South II</plant_name>
    <generator_id>BSBA2</generator_id>
    <plant_id>69648</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Golden Fields Solar VI, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.852326</lat>
    <lon>-118.4312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H01</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H01</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H02</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H02</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H03</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H03</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H04</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H04</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H05</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H05</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H06</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H06</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H07</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H07</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H08</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H08</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H09</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H09</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68705/H10</id>
    <plant_name>Horizon</plant_name>
    <generator_id>H10</generator_id>
    <plant_id>68705</plant_id>
    <state>CO</state>
    <county>El Paso</county>
    <developer>City of Colorado Springs - (CO)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>37</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.775</lat>
    <lon>-104.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64073/GBS</id>
    <plant_name>Great Bear Solar, LLC</plant_name>
    <generator_id>GBS</generator_id>
    <plant_id>64073</plant_id>
    <state>OH</state>
    <county>Van Wert</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.9397</lat>
    <lon>-84.5828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69772/BRSP1</id>
    <plant_name>Bush River Solar Plant</plant_name>
    <generator_id>BRSP1</generator_id>
    <plant_id>69772</plant_id>
    <state>SC</state>
    <county>Laurens</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLW</balancing_authority>
    <lat>34.3861</lat>
    <lon>-81.7944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66879/CT1</id>
    <plant_name>KCE CT 1, LLC</plant_name>
    <generator_id>CT1</generator_id>
    <plant_id>66879</plant_id>
    <state>CT</state>
    <county>Windham</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <planned_start>2031-04</planned_start>
    <planned_year>2031</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.882568</lat>
    <lon>-71.89481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6761/G</id>
    <plant_name>Rawhide</plant_name>
    <generator_id>G</generator_id>
    <plant_id>6761</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Platte River Power Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6761/H</id>
    <plant_name>Rawhide</plant_name>
    <generator_id>H</generator_id>
    <plant_id>6761</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Platte River Power Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6761/LM3</id>
    <plant_name>Rawhide</plant_name>
    <generator_id>LM3</generator_id>
    <plant_id>6761</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Platte River Power Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6761/LM4</id>
    <plant_name>Rawhide</plant_name>
    <generator_id>LM4</generator_id>
    <plant_id>6761</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Platte River Power Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6761/LM5</id>
    <plant_name>Rawhide</plant_name>
    <generator_id>LM5</generator_id>
    <plant_id>6761</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Platte River Power Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67772/GRS9</id>
    <plant_name>Braswell Solar</plant_name>
    <generator_id>GRS9</generator_id>
    <plant_id>67772</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Gransolar Texas Nine LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>44.2</nameplate_mw>
    <summer_mw>42.6</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.34904</lat>
    <lon>-97.21786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70343/WAGT1</id>
    <plant_name>GPI WACO Power</plant_name>
    <generator_id>WAGT1</generator_id>
    <plant_id>70343</plant_id>
    <state>TX</state>
    <county>McLennan</county>
    <developer>Graphic Packaging International - WACO</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>43.4</nameplate_mw>
    <summer_mw>43.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.47682</lat>
    <lon>-97.18766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>6211/GEN4</id>
    <plant_name>Dynegy Oakland Power Plant</plant_name>
    <generator_id>GEN4</generator_id>
    <plant_id>6211</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Dynegy Oakland, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>43.3</nameplate_mw>
    <summer_mw>43.3</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.79675</lat>
    <lon>-122.2819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68068/CP1G2</id>
    <plant_name>Cape Generating Station</plant_name>
    <generator_id>CP1G2</generator_id>
    <plant_id>68068</plant_id>
    <state>UT</state>
    <county>Beaver</county>
    <developer>Cape HoldCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>BT</prime_mover>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>38.506706</lat>
    <lon>-112.9175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68068/CP1G3</id>
    <plant_name>Cape Generating Station</plant_name>
    <generator_id>CP1G3</generator_id>
    <plant_id>68068</plant_id>
    <state>UT</state>
    <county>Beaver</county>
    <developer>Cape HoldCo LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>BT</prime_mover>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>38.506706</lat>
    <lon>-112.9175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66657/STEUB</id>
    <plant_name>Steubenville Solar</plant_name>
    <generator_id>STEUB</generator_id>
    <plant_id>66657</plant_id>
    <state>OH</state>
    <county>Jefferson</county>
    <developer>BQ Energy Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>43</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.351722</lat>
    <lon>-80.67036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68229/DEMRK</id>
    <plant_name>SR Denmark</plant_name>
    <generator_id>DEMRK</generator_id>
    <plant_id>68229</plant_id>
    <state>TN</state>
    <county>Madison</county>
    <developer>SR Denmark, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.563633</lat>
    <lon>-88.93254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64188/PV</id>
    <plant_name>Shepherd's Run Solar</plant_name>
    <generator_id>PV</generator_id>
    <plant_id>64188</plant_id>
    <state>NY</state>
    <county>Columbia</county>
    <developer>Shepherd's Run Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.16141</lat>
    <lon>-73.57453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69294/OTS</id>
    <plant_name>Oregon Trail Solar</plant_name>
    <generator_id>OTS</generator_id>
    <plant_id>69294</plant_id>
    <state>OR</state>
    <county>Gilliam</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>41</nameplate_mw>
    <summer_mw>41</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>45.553436</lat>
    <lon>-120.1861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70225/SES</id>
    <plant_name>Shutler Energy Storage</plant_name>
    <generator_id>SES</generator_id>
    <plant_id>70225</plant_id>
    <state>OR</state>
    <county>Gilliam</county>
    <developer>Avangrid Power LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>41</nameplate_mw>
    <summer_mw>41</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>AVRN</balancing_authority>
    <lat>45.54</lat>
    <lon>-120.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62892/SONR2</id>
    <plant_name>EDPR CA Solar Park VI LLC (CA) Hybrid</plant_name>
    <generator_id>SONR2</generator_id>
    <plant_id>62892</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>EDPR CA Solar Park VI LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.62543</lat>
    <lon>-120.3789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68054/SNSB</id>
    <plant_name>Sunnyside Solar Energy Center</plant_name>
    <generator_id>SNSB</generator_id>
    <plant_id>68054</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Madison Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.985244</lat>
    <lon>-89.43607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69522/1</id>
    <plant_name>Brewster Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69522</plant_id>
    <state>FL</state>
    <county>Polk</county>
    <developer>Tampa Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>TEC</balancing_authority>
    <lat>27.74188</lat>
    <lon>-81.96187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70306/21</id>
    <plant_name>Westfield Solar, LLC</plant_name>
    <generator_id>21</generator_id>
    <plant_id>70306</plant_id>
    <state>NC</state>
    <county>Hoke</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.943</lat>
    <lon>-79.242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70092/2BLUE</id>
    <plant_name>Two Blues Solar, LLC</plant_name>
    <generator_id>2BLUE</generator_id>
    <plant_id>70092</plant_id>
    <state>IL</state>
    <county>Perry</county>
    <developer>Two Blues Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.1633</lat>
    <lon>-89.37</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69539/TRAB</id>
    <plant_name>Tracy BESS</plant_name>
    <generator_id>TRAB</generator_id>
    <plant_id>69539</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Middle River Power</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.711459</lat>
    <lon>-121.4895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/G6B01</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>G6B01</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>38.7</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/G6B02</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>G6B02</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>38.7</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/G6B03</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>G6B03</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>38.7</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69978/STPV</id>
    <plant_name>Station Solar</plant_name>
    <generator_id>STPV</generator_id>
    <plant_id>69978</plant_id>
    <state>IL</state>
    <county>Mercer</county>
    <developer>Birch Creek Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.0777</lat>
    <lon>-90.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63806/PGR28</id>
    <plant_name>West River Solar, LLC</plant_name>
    <generator_id>PGR28</generator_id>
    <plant_id>63806</plant_id>
    <state>NC</state>
    <county>Guilford</county>
    <developer>West River Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>36.043671</lat>
    <lon>-79.64174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68035/SYTOB</id>
    <plant_name>Syracuse and Tours Renewable Energy</plant_name>
    <generator_id>SYTOB</generator_id>
    <plant_id>68035</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.951078</lat>
    <lon>-118.3083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68035/SYTOR</id>
    <plant_name>Syracuse and Tours Renewable Energy</plant_name>
    <generator_id>SYTOR</generator_id>
    <plant_id>68035</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Vesper Energy Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.951078</lat>
    <lon>-118.3083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69741/PV2</id>
    <plant_name>Cooperative Solar Two-Fayette</plant_name>
    <generator_id>PV2</generator_id>
    <plant_id>69741</plant_id>
    <state>KY</state>
    <county>Fayette</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.035403</lat>
    <lon>-84.31579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69771/CCSP1</id>
    <plant_name>Clark Creek Solar Plant</plant_name>
    <generator_id>CCSP1</generator_id>
    <plant_id>69771</plant_id>
    <state>NC</state>
    <county>Lincoln</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLW</balancing_authority>
    <lat>35.532689</lat>
    <lon>-81.24866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69743/KUIHE</id>
    <plant_name>Kuihelani Phase 2</plant_name>
    <generator_id>KUIHE</generator_id>
    <plant_id>69743</plant_id>
    <state>HI</state>
    <county>Maui</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>20.8026</lat>
    <lon>-156.4984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>57703/02B</id>
    <plant_name>Cheyenne Prairie Generating Station</plant_name>
    <generator_id>02B</generator_id>
    <plant_id>57703</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Black Hills Service Company LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.123611</lat>
    <lon>-104.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>57703/03A</id>
    <plant_name>Cheyenne Prairie Generating Station</plant_name>
    <generator_id>03A</generator_id>
    <plant_id>57703</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Black Hills Service Company LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.123611</lat>
    <lon>-104.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>57703/03B</id>
    <plant_name>Cheyenne Prairie Generating Station</plant_name>
    <generator_id>03B</generator_id>
    <plant_id>57703</plant_id>
    <state>WY</state>
    <county>Laramie</county>
    <developer>Black Hills Service Company LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>41.123611</lat>
    <lon>-104.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67221/NY128</id>
    <plant_name>Foothills Solar (NY)</plant_name>
    <generator_id>NY128</generator_id>
    <plant_id>67221</plant_id>
    <state>NY</state>
    <county>Fulton</county>
    <developer>Boralex US Operations LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.113678</lat>
    <lon>-74.24503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67966/NEWJ1</id>
    <plant_name>New Jay PV &amp; BESS</plant_name>
    <generator_id>NEWJ1</generator_id>
    <plant_id>67966</plant_id>
    <state>IN</state>
    <county>Jay</county>
    <developer>Hodson Greendefine Jay Desoto LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>39</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.369376</lat>
    <lon>-85.18392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69890/UNIT3</id>
    <plant_name>Marshall Energy Center</plant_name>
    <generator_id>UNIT3</generator_id>
    <plant_id>69890</plant_id>
    <state>MO</state>
    <county>Saline</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>33.7</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.12358</lat>
    <lon>-93.20592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69890/UNIT4</id>
    <plant_name>Marshall Energy Center</plant_name>
    <generator_id>UNIT4</generator_id>
    <plant_id>69890</plant_id>
    <state>MO</state>
    <county>Saline</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>33.7</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.12358</lat>
    <lon>-93.20592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69869/UNIT1</id>
    <plant_name>Hannibal Energy Center</plant_name>
    <generator_id>UNIT1</generator_id>
    <plant_id>69869</plant_id>
    <state>MO</state>
    <county>Marion</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>32.2</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.70965</lat>
    <lon>-91.44026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69869/UNIT2</id>
    <plant_name>Hannibal Energy Center</plant_name>
    <generator_id>UNIT2</generator_id>
    <plant_id>69869</plant_id>
    <state>MO</state>
    <county>Marion</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>32.2</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.70965</lat>
    <lon>-91.44026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69102/U1</id>
    <plant_name>Toronto Power Plant</plant_name>
    <generator_id>U1</generator_id>
    <plant_id>69102</plant_id>
    <state>SD</state>
    <county>Deuel</county>
    <developer>Western Minnesota Mun Pwr Agny</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>35.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.594752</lat>
    <lon>-96.62219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69102/U2</id>
    <plant_name>Toronto Power Plant</plant_name>
    <generator_id>U2</generator_id>
    <plant_id>69102</plant_id>
    <state>SD</state>
    <county>Deuel</county>
    <developer>Western Minnesota Mun Pwr Agny</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>35.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.594752</lat>
    <lon>-96.62219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69102/U3</id>
    <plant_name>Toronto Power Plant</plant_name>
    <generator_id>U3</generator_id>
    <plant_id>69102</plant_id>
    <state>SD</state>
    <county>Deuel</county>
    <developer>Western Minnesota Mun Pwr Agny</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>35.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.594752</lat>
    <lon>-96.62219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69102/U4</id>
    <plant_name>Toronto Power Plant</plant_name>
    <generator_id>U4</generator_id>
    <plant_id>69102</plant_id>
    <state>SD</state>
    <county>Deuel</county>
    <developer>Western Minnesota Mun Pwr Agny</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>35.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.594752</lat>
    <lon>-96.62219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70093/WSPV1</id>
    <plant_name>Wallace Solar - (TX)</plant_name>
    <generator_id>WSPV1</generator_id>
    <plant_id>70093</plant_id>
    <state>TX</state>
    <county>Culberson</county>
    <developer>Delaware Ranch Solar, LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>36</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.917641</lat>
    <lon>-104.3148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61364/HHB</id>
    <plant_name>Hu Honua Bioenergy Facility</plant_name>
    <generator_id>HHB</generator_id>
    <plant_id>61364</plant_id>
    <state>HI</state>
    <county>Hawaii</county>
    <developer>Hu Honua Bioenergy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBS</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>32</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>19.843504</lat>
    <lon>-155.0871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69977/BBPV</id>
    <plant_name>Blue Branch Solar</plant_name>
    <generator_id>BBPV</generator_id>
    <plant_id>69977</plant_id>
    <state>IL</state>
    <county>Johnson</county>
    <developer>Birch Creek Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>35.9</nameplate_mw>
    <summer_mw>35.9</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.467778</lat>
    <lon>-88.96889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68461/KEYBC</id>
    <plant_name>Key Energy Storage</plant_name>
    <generator_id>KEYBC</generator_id>
    <plant_id>68461</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Key Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.13681</lat>
    <lon>-120.1312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1167/10</id>
    <plant_name>Muscatine Plant #1</plant_name>
    <generator_id>10</generator_id>
    <plant_id>1167</plant_id>
    <state>IA</state>
    <county>Muscatine</county>
    <developer>Board of Water Electric &amp; Communications</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>32.8</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.3917</lat>
    <lon>-91.0569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67977/QUACR</id>
    <plant_name>Quaker Creek Farm Solar</plant_name>
    <generator_id>QUACR</generator_id>
    <plant_id>67977</plant_id>
    <state>NC</state>
    <county>Alamance</county>
    <developer>Quaker Creek Farm Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>34.9</nameplate_mw>
    <summer_mw>34.9</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>36.156688</lat>
    <lon>-79.32292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64168/GEN</id>
    <plant_name>Bear Branch Solar</plant_name>
    <generator_id>GEN</generator_id>
    <plant_id>64168</plant_id>
    <state>NC</state>
    <county>Stokes</county>
    <developer>Bear Branch Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>34.5</nameplate_mw>
    <summer_mw>34.5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>36.340427</lat>
    <lon>-80.12974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66850/BEAC1</id>
    <plant_name>Beaver Creek Solar</plant_name>
    <generator_id>BEAC1</generator_id>
    <plant_id>66850</plant_id>
    <state>PA</state>
    <county>Franklin</county>
    <developer>Urban Grid Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>34.2</nameplate_mw>
    <summer_mw>34.2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.086625</lat>
    <lon>-77.66283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66363/GEN1B</id>
    <plant_name>Black Walnut Solar, LLC</plant_name>
    <generator_id>GEN1B</generator_id>
    <plant_id>66363</plant_id>
    <state>NC</state>
    <county>Jones</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.050032</lat>
    <lon>-77.15218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68871/TIMIB</id>
    <plant_name>Timber Mill Solar</plant_name>
    <generator_id>TIMIB</generator_id>
    <plant_id>68871</plant_id>
    <state>NC</state>
    <county>Jones</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.96634</lat>
    <lon>-77.21299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66385/GEN1B</id>
    <plant_name>Panther Branch Solar, LLC</plant_name>
    <generator_id>GEN1B</generator_id>
    <plant_id>66385</plant_id>
    <state>NC</state>
    <county>Duplin</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.145344</lat>
    <lon>-78.15963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68673/SLW_S</id>
    <plant_name>Sand Luis West</plant_name>
    <generator_id>SLW_S</generator_id>
    <plant_id>68673</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Origis Energy USA, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>31.3</nameplate_mw>
    <summer_mw>31.3</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.1676</lat>
    <lon>-120.054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2161/BAT1</id>
    <plant_name>James River Power Station</plant_name>
    <generator_id>BAT1</generator_id>
    <plant_id>2161</plant_id>
    <state>MO</state>
    <county>Greene</county>
    <developer>City Utilities of Springfield - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.108611</lat>
    <lon>-93.26194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60434/PV1</id>
    <plant_name>Baxter Creek Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>60434</plant_id>
    <state>NC</state>
    <county>Davie</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.865502</lat>
    <lon>-80.55309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66066/WAIBA</id>
    <plant_name>AES Waiawa Phase 2 Solar</plant_name>
    <generator_id>WAIBA</generator_id>
    <plant_id>66066</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>AES Distributed Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.43026</lat>
    <lon>-157.9779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66066/WAIPV</id>
    <plant_name>AES Waiawa Phase 2 Solar</plant_name>
    <generator_id>WAIPV</generator_id>
    <plant_id>66066</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>AES Distributed Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.43026</lat>
    <lon>-157.9779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64216/309SJ</id>
    <plant_name>Rockmont Solar and Storage Project</plant_name>
    <generator_id>309SJ</generator_id>
    <plant_id>64216</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>201LC 8me LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.776579</lat>
    <lon>-108.3751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65930/10</id>
    <plant_name>Redbud Run Solar</plant_name>
    <generator_id>10</generator_id>
    <plant_id>65930</plant_id>
    <state>VA</state>
    <county>Frederick</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.21157</lat>
    <lon>-78.08417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65981/TXSD2</id>
    <plant_name>Second Division Solar</plant_name>
    <generator_id>TXSD2</generator_id>
    <plant_id>65981</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Lightsource Renewable Energy Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <planned_start>2031-12</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.170545</lat>
    <lon>-95.74157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70090/SNPDR</id>
    <plant_name>Snapdragon Solar, LLC</plant_name>
    <generator_id>SNPDR</generator_id>
    <plant_id>70090</plant_id>
    <state>IL</state>
    <county>Perry</county>
    <developer>Snapdragon Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.1703</lat>
    <lon>-89.5532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68043/ROBSS</id>
    <plant_name>Robeson Solar I</plant_name>
    <generator_id>ROBSS</generator_id>
    <plant_id>68043</plant_id>
    <state>NC</state>
    <county>Robeson</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.614574</lat>
    <lon>-78.93468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59969/GEN01</id>
    <plant_name>Windhub Solar B, LLC</plant_name>
    <generator_id>GEN01</generator_id>
    <plant_id>59969</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Windhub Solar B, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>26.4</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.0133</lat>
    <lon>-118.2698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67669/ABESS</id>
    <plant_name>Arlington Battery Energy Storage System</plant_name>
    <generator_id>ABESS</generator_id>
    <plant_id>67669</plant_id>
    <state>WA</state>
    <county>Snohomish</county>
    <developer>PUD No 1 of Snohomish County - (WA)</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>48.15617</lat>
    <lon>-122.1437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68672/CHA_B</id>
    <plant_name>Chalan</plant_name>
    <generator_id>CHA_B</generator_id>
    <plant_id>68672</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Origis Energy USA, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.7803</lat>
    <lon>-119.911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70303/20</id>
    <plant_name>Midfield Solar, LLC</plant_name>
    <generator_id>20</generator_id>
    <plant_id>70303</plant_id>
    <state>NC</state>
    <county>Columbus</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.394</lat>
    <lon>-78.771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69024/GLNB1</id>
    <plant_name>Glenarm BESS Plant</plant_name>
    <generator_id>GLNB1</generator_id>
    <plant_id>69024</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Glenarm BESS LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.12739</lat>
    <lon>-118.1477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70049/NUCPV</id>
    <plant_name>Sierra Solar</plant_name>
    <generator_id>NUCPV</generator_id>
    <plant_id>70049</plant_id>
    <state>AZ</state>
    <county>Mohave</county>
    <developer>Sierra Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>WALC</balancing_authority>
    <lat>35.129649</lat>
    <lon>-114.0803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66695/HRSPN</id>
    <plant_name>Horsepen Branch Solar</plant_name>
    <generator_id>HRSPN</generator_id>
    <plant_id>66695</plant_id>
    <state>VA</state>
    <county>Louisa</county>
    <developer>Horsepen Branch Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.961</lat>
    <lon>-77.792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68528/77</id>
    <plant_name>Dynamo Solar LLC</plant_name>
    <generator_id>77</generator_id>
    <plant_id>68528</plant_id>
    <state>CA</state>
    <county>Napa</county>
    <developer>Laketricity USA Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>24.5</nameplate_mw>
    <summer_mw>24.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.229106</lat>
    <lon>-122.2937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68240/SS3PV</id>
    <plant_name>Solar Star 3</plant_name>
    <generator_id>SS3PV</generator_id>
    <plant_id>68240</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Solar Star 3, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.84166</lat>
    <lon>-118.4551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68241/SS4PV</id>
    <plant_name>Solar Star 4</plant_name>
    <generator_id>SS4PV</generator_id>
    <plant_id>68241</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Solar Star 4, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.84166</lat>
    <lon>-118.4551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66978/MS1</id>
    <plant_name>MPW Solar 1</plant_name>
    <generator_id>MS1</generator_id>
    <plant_id>66978</plant_id>
    <state>IA</state>
    <county>Muscatine</county>
    <developer>MPW Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.3849</lat>
    <lon>-91.0964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70261/WS02</id>
    <plant_name>Westside - (NM)</plant_name>
    <generator_id>WS02</generator_id>
    <plant_id>70261</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Saddle Butte Energy Farmington, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.752288</lat>
    <lon>-108.3148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69890/UNIT1</id>
    <plant_name>Marshall Energy Center</plant_name>
    <generator_id>UNIT1</generator_id>
    <plant_id>69890</plant_id>
    <state>MO</state>
    <county>Saline</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>23.1</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.12358</lat>
    <lon>-93.20592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69890/UNIT2</id>
    <plant_name>Marshall Energy Center</plant_name>
    <generator_id>UNIT2</generator_id>
    <plant_id>69890</plant_id>
    <state>MO</state>
    <county>Saline</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>23.1</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.12358</lat>
    <lon>-93.20592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68240/SS3BT</id>
    <plant_name>Solar Star 3</plant_name>
    <generator_id>SS3BT</generator_id>
    <plant_id>68240</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Solar Star 3, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.84166</lat>
    <lon>-118.4551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68241/SS4BT</id>
    <plant_name>Solar Star 4</plant_name>
    <generator_id>SS4BT</generator_id>
    <plant_id>68241</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Solar Star 4, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.84166</lat>
    <lon>-118.4551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70546/JAR-3</id>
    <plant_name>Jarratt Energy Facility</plant_name>
    <generator_id>JAR-3</generator_id>
    <plant_id>70546</plant_id>
    <state>VA</state>
    <county>Greensville</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>22.4</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.822306</lat>
    <lon>-77.51345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69628/GBPV1</id>
    <plant_name>GBG SOLAR</plant_name>
    <generator_id>GBPV1</generator_id>
    <plant_id>69628</plant_id>
    <state>TX</state>
    <county>Midland</county>
    <developer>Greater Bryant G Solar, LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>22.2</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.92835</lat>
    <lon>-102.1617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69806/GWBS1</id>
    <plant_name>Gaskell West Storage 1, LLC</plant_name>
    <generator_id>GWBS1</generator_id>
    <plant_id>69806</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Matrix Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>21.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.833541</lat>
    <lon>-118.5469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70495/WEL02</id>
    <plant_name>Welcome Solar II</plant_name>
    <generator_id>WEL02</generator_id>
    <plant_id>70495</plant_id>
    <state>PA</state>
    <county>Crawford</county>
    <developer>Welcome Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.527468</lat>
    <lon>-80.40419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70496/WEL03</id>
    <plant_name>Welcome Solar III</plant_name>
    <generator_id>WEL03</generator_id>
    <plant_id>70496</plant_id>
    <state>PA</state>
    <county>Crawford</county>
    <developer>Welcome Solar III, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.530575</lat>
    <lon>-80.39229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70240/PFNON</id>
    <plant_name>PF Onsite BESS</plant_name>
    <generator_id>PFNON</generator_id>
    <plant_id>70240</plant_id>
    <state>PA</state>
    <county>Luzerne</county>
    <developer>PF Onsite Generation LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.918616</lat>
    <lon>-76.07934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63088/ROONR</id>
    <plant_name>Rooney Ranch</plant_name>
    <generator_id>ROONR</generator_id>
    <plant_id>63088</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Viracocha Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.737366</lat>
    <lon>-121.6521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG1</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG1</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG2</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG2</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG3</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG3</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG4</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG4</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG5</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG5</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69760/RIG6</id>
    <plant_name>Rock Island Generation Project</plant_name>
    <generator_id>RIG6</generator_id>
    <plant_id>69760</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>Kerrville Public Utility Board Public Facility Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.55068</lat>
    <lon>-96.53675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69535/NS1</id>
    <plant_name>Nutes Solar</plant_name>
    <generator_id>NS1</generator_id>
    <plant_id>69535</plant_id>
    <state>NH</state>
    <county>Strafford</county>
    <developer>Walden Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.375125</lat>
    <lon>-71.023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70232/EVERG</id>
    <plant_name>Evergreen Energy Center, LLC</plant_name>
    <generator_id>EVERG</generator_id>
    <plant_id>70232</plant_id>
    <state>VA</state>
    <county>Loudoun</county>
    <developer>East Point Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.044885</lat>
    <lon>-77.58191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68054/SNSS</id>
    <plant_name>Sunnyside Solar Energy Center</plant_name>
    <generator_id>SNSS</generator_id>
    <plant_id>68054</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Madison Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.985244</lat>
    <lon>-89.43607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64255/VBESS</id>
    <plant_name>Vonore Battery Energy Storage System</plant_name>
    <generator_id>VBESS</generator_id>
    <plant_id>64255</plant_id>
    <state>TN</state>
    <county>Monroe</county>
    <developer>Tennessee Valley Authority</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.61543</lat>
    <lon>-84.27489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70231/BETHL</id>
    <plant_name>Bethlehem Energy Center, LLC - (VA)</plant_name>
    <generator_id>BETHL</generator_id>
    <plant_id>70231</plant_id>
    <state>VA</state>
    <county>Prince William</county>
    <developer>East Point Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.781889</lat>
    <lon>-77.5426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70233/RAILR</id>
    <plant_name>Railroad Energy Center, LLC</plant_name>
    <generator_id>RAILR</generator_id>
    <plant_id>70233</plant_id>
    <state>VA</state>
    <county>Prince William</county>
    <developer>East Point Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.781689</lat>
    <lon>-77.54202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70234/REID</id>
    <plant_name>Reid Energy Center, LLC</plant_name>
    <generator_id>REID</generator_id>
    <plant_id>70234</plant_id>
    <state>VA</state>
    <county>Prince William</county>
    <developer>East Point Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.729874</lat>
    <lon>-77.59242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62823/Q584</id>
    <plant_name>SunEast Dog Corners Solar Project</plant_name>
    <generator_id>Q584</generator_id>
    <plant_id>62823</plant_id>
    <state>NY</state>
    <county>Cayuga</county>
    <developer>Altus Power America Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.744301</lat>
    <lon>-76.66531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63862/Q#828</id>
    <plant_name>SunEast Valley Solar Project</plant_name>
    <generator_id>Q#828</generator_id>
    <plant_id>63862</plant_id>
    <state>NY</state>
    <county>Tioga</county>
    <developer>Altus Power America Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.083795</lat>
    <lon>-76.2477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62816/Q670</id>
    <plant_name>SunEast Skyline Solar Project</plant_name>
    <generator_id>Q670</generator_id>
    <plant_id>62816</plant_id>
    <state>NY</state>
    <county>Oneida</county>
    <developer>SunEast Skyline Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.063069</lat>
    <lon>-75.45195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64037/Q#913</id>
    <plant_name>SunEast Manchester Solar Project</plant_name>
    <generator_id>Q#913</generator_id>
    <plant_id>64037</plant_id>
    <state>NY</state>
    <county>Ontario</county>
    <developer>SunEast Manchester Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.958318</lat>
    <lon>-77.19503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63901/Q#865</id>
    <plant_name>SunEast Flat Hill Solar Project</plant_name>
    <generator_id>Q#865</generator_id>
    <plant_id>63901</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Altus Power America Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.044363</lat>
    <lon>-74.79632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>50736/FSS13</id>
    <plant_name>Pure Hedge LLC</plant_name>
    <generator_id>FSS13</generator_id>
    <plant_id>50736</plant_id>
    <state>CT</state>
    <county>Windham</county>
    <developer>Pure Hedge LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.712448</lat>
    <lon>-71.82225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62895/Q581</id>
    <plant_name>SunEast Hills Solar Project</plant_name>
    <generator_id>Q581</generator_id>
    <plant_id>62895</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Hills Solar NY LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.068296</lat>
    <lon>-74.84923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63863/Q#885</id>
    <plant_name>SunEast Grassy Knoll Solar Project</plant_name>
    <generator_id>Q#885</generator_id>
    <plant_id>63863</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Grassy Knoll Solar NY LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.065379</lat>
    <lon>-74.84372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70395/BESS1</id>
    <plant_name>Pace Road Battery Storage</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>70395</plant_id>
    <state>FL</state>
    <county>Polk</county>
    <developer>Tampa Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TEC</balancing_authority>
    <lat>28.136235</lat>
    <lon>-81.82978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62896/Q586</id>
    <plant_name>SunEast Watkins Road Solar Project</plant_name>
    <generator_id>Q586</generator_id>
    <plant_id>62896</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Watkins Road Solar NY LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.06127</lat>
    <lon>-75.05584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65901/6</id>
    <plant_name>Hatchery Solar</plant_name>
    <generator_id>6</generator_id>
    <plant_id>65901</plant_id>
    <state>NY</state>
    <county>Livingston</county>
    <developer>Hatchery Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.976583</lat>
    <lon>-77.76974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64911/CSRB1</id>
    <plant_name>South Ripley Solar</plant_name>
    <generator_id>CSRB1</generator_id>
    <plant_id>64911</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>Repsol Renewables NA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.198116</lat>
    <lon>-79.75789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65821/HNYBA</id>
    <plant_name>Honey Creek Solar</plant_name>
    <generator_id>HNYBA</generator_id>
    <plant_id>65821</plant_id>
    <state>IN</state>
    <county>White</county>
    <developer>Leeward Asset Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.7971</lat>
    <lon>-86.8572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65931/3</id>
    <plant_name>Clear View Solar</plant_name>
    <generator_id>3</generator_id>
    <plant_id>65931</plant_id>
    <state>NY</state>
    <county>Steuben</county>
    <developer>Clear View Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.57062</lat>
    <lon>-77.46378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68278/21066</id>
    <plant_name>Greater Wise Solar Project</plant_name>
    <generator_id>21066</generator_id>
    <plant_id>68278</plant_id>
    <state>VA</state>
    <county>Wise</county>
    <developer>BQ Energy Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>36.932469</lat>
    <lon>-82.6769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69667/FHS1</id>
    <plant_name>Fair Haven Solar</plant_name>
    <generator_id>FHS1</generator_id>
    <plant_id>69667</plant_id>
    <state>VT</state>
    <county>Rutland</county>
    <developer>Freepoint Commodities LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.636</lat>
    <lon>-73.279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70261/WS03</id>
    <plant_name>Westside - (NM)</plant_name>
    <generator_id>WS03</generator_id>
    <plant_id>70261</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Saddle Butte Energy Farmington, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.752288</lat>
    <lon>-108.3148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64036/ENX08</id>
    <plant_name>Caden Energix New Kent, LLC</plant_name>
    <generator_id>ENX08</generator_id>
    <plant_id>64036</plant_id>
    <state>VA</state>
    <county>New Kent</county>
    <developer>Caden Energix New Kent, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.49004</lat>
    <lon>-77.0616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66682/NY10</id>
    <plant_name>KCE NY 10, LLC</plant_name>
    <generator_id>NY10</generator_id>
    <plant_id>66682</plant_id>
    <state>NY</state>
    <county>Erie</county>
    <developer>Key Capture Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.907908</lat>
    <lon>-78.66011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68072/BRIDL</id>
    <plant_name>Bridleton Solar</plant_name>
    <generator_id>BRIDL</generator_id>
    <plant_id>68072</plant_id>
    <state>VA</state>
    <county>Henrico</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.46</lat>
    <lon>-77.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64064/SHAFT</id>
    <plant_name>Shaftsbury Solar</plant_name>
    <generator_id>SHAFT</generator_id>
    <plant_id>64064</plant_id>
    <state>VT</state>
    <county>Bennington</county>
    <developer>Freepoint Commodities LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.96463</lat>
    <lon>-73.16841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65934/7</id>
    <plant_name>Highbanks Solar</plant_name>
    <generator_id>7</generator_id>
    <plant_id>65934</plant_id>
    <state>NY</state>
    <county>Livingston</county>
    <developer>Highbanks Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.737227</lat>
    <lon>-77.91431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65709/TRNR</id>
    <plant_name>Turner Meadow Solar Station</plant_name>
    <generator_id>TRNR</generator_id>
    <plant_id>65709</plant_id>
    <state>ME</state>
    <county>Androscoggin</county>
    <developer>Turner Meadow Solar Station, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.229478</lat>
    <lon>-70.28027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM001</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM001</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM002</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM002</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM003</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM003</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM004</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM004</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM005</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM005</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM006</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM006</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69799/TM007</id>
    <plant_name>Project Matador Gas Plant (PMG)</plant_name>
    <generator_id>TM007</generator_id>
    <plant_id>69799</plant_id>
    <state>TX</state>
    <county>Carson</county>
    <developer>Fermi America</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>35.283762</lat>
    <lon>-101.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68453/1</id>
    <plant_name>KYMEA Energy Center I</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68453</plant_id>
    <state>KY</state>
    <county>Hopkins</county>
    <developer>Kentucky Municipal Energy Agency</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.319733</lat>
    <lon>-87.55111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68453/2</id>
    <plant_name>KYMEA Energy Center I</plant_name>
    <generator_id>2</generator_id>
    <plant_id>68453</plant_id>
    <state>KY</state>
    <county>Hopkins</county>
    <developer>Kentucky Municipal Energy Agency</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.319733</lat>
    <lon>-87.55111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68453/3</id>
    <plant_name>KYMEA Energy Center I</plant_name>
    <generator_id>3</generator_id>
    <plant_id>68453</plant_id>
    <state>KY</state>
    <county>Hopkins</county>
    <developer>Kentucky Municipal Energy Agency</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.319733</lat>
    <lon>-87.55111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68453/4</id>
    <plant_name>KYMEA Energy Center I</plant_name>
    <generator_id>4</generator_id>
    <plant_id>68453</plant_id>
    <state>KY</state>
    <county>Hopkins</county>
    <developer>Kentucky Municipal Energy Agency</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LGEE</balancing_authority>
    <lat>37.319733</lat>
    <lon>-87.55111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE1</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE1</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE2</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE2</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE3</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE3</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE4</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE4</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE5</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE5</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>389/RICE6</id>
    <plant_name>El Centro Hybrid</plant_name>
    <generator_id>RICE6</generator_id>
    <plant_id>389</plant_id>
    <state>CA</state>
    <county>Imperial</county>
    <developer>Imperial Irrigation District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <planned_start>2029-09</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>IID</balancing_authority>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L1</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L1</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L10</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L10</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L11</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L11</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L12</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L12</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L2</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L2</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L3</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L3</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L4</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L4</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L5</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L5</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L6</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L6</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L7</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L7</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L8</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L8</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69726/L9</id>
    <plant_name>Liberty Station</plant_name>
    <generator_id>L9</generator_id>
    <plant_id>69726</plant_id>
    <state>KY</state>
    <county>Casey</county>
    <developer>East Kentucky Power Coop, Inc</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.369331</lat>
    <lon>-84.95767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R01</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R01</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R02</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R02</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R03</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R03</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R04</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R04</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R05</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R05</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R06</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R06</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R07</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R07</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R08</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R08</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R09</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R09</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R10</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R10</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R11</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R11</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69808/R12</id>
    <plant_name>Princeton Road Station</plant_name>
    <generator_id>R12</generator_id>
    <plant_id>69808</plant_id>
    <state>NE</state>
    <county>Lancaster</county>
    <developer>Nebraska Public Power District</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>18.1</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.570394</lat>
    <lon>-96.78647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70108/PIKE</id>
    <plant_name>PIKE Solar</plant_name>
    <generator_id>PIKE</generator_id>
    <plant_id>70108</plant_id>
    <state>IL</state>
    <county>Fayette</county>
    <developer>Pike Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.9577</lat>
    <lon>-89.169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70260/SCIPI</id>
    <plant_name>Scipio Solar</plant_name>
    <generator_id>SCIPI</generator_id>
    <plant_id>70260</plant_id>
    <state>NY</state>
    <county>Cayuga</county>
    <developer>Altus Power America Management, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.78732</lat>
    <lon>-76.32378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69782/CW216</id>
    <plant_name>Cartwright Solar II</plant_name>
    <generator_id>CW216</generator_id>
    <plant_id>69782</plant_id>
    <state>OR</state>
    <county>Crook</county>
    <developer>Cartwright Solar II LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>BPAT</balancing_authority>
    <lat>44.244</lat>
    <lon>-120.938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65305/BESS</id>
    <plant_name>Powells Creek Solar - Hybrid</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>65305</plant_id>
    <state>VA</state>
    <county>Halifax</county>
    <developer>Powells Creek Farm Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.55467</lat>
    <lon>-79.0286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65369/TMSS</id>
    <plant_name>Topsham Meadow Solar Station</plant_name>
    <generator_id>TMSS</generator_id>
    <plant_id>65369</plant_id>
    <state>ME</state>
    <county>Sagadahoc</county>
    <developer>Topsham Meadow Solar Station LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>17.2</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.975183</lat>
    <lon>-70.0113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65371/WBSS</id>
    <plant_name>West Baldwin Solar Station</plant_name>
    <generator_id>WBSS</generator_id>
    <plant_id>65371</plant_id>
    <state>ME</state>
    <county>Cumberland</county>
    <developer>West Baldwin Solar Station LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>17.1</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.867403</lat>
    <lon>-70.7866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>50666/GEN2</id>
    <plant_name>Pasco Cnty Solid Waste Resource Recovery</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>50666</plant_id>
    <state>FL</state>
    <county>Pasco</county>
    <developer>Pasco County - (FL)</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Municipal Solid Waste</technology>
    <energy_source>MSW</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>FPC</balancing_authority>
    <lat>28.3681</lat>
    <lon>-82.5583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63652/SNDHB</id>
    <plant_name>Sand Hill B</plant_name>
    <generator_id>SNDHB</generator_id>
    <plant_id>63652</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Viracocha Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.755007</lat>
    <lon>-121.5968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC01</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC01</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC02</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC02</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC03</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC03</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC04</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC04</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC05</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC05</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55478/IC06</id>
    <plant_name>Lange Generating Station</plant_name>
    <generator_id>IC06</generator_id>
    <plant_id>55478</plant_id>
    <state>SD</state>
    <county>Pennington</county>
    <developer>Black Hills Power, Inc.</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69868/UNIT1</id>
    <plant_name>Fulton Energy Center</plant_name>
    <generator_id>UNIT1</generator_id>
    <plant_id>69868</plant_id>
    <state>MO</state>
    <county>Callaway</county>
    <developer>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>15.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.8676</lat>
    <lon>-91.94778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65366/EMSS</id>
    <plant_name>Emery Meadow Solar Station</plant_name>
    <generator_id>EMSS</generator_id>
    <plant_id>65366</plant_id>
    <state>ME</state>
    <county>York</county>
    <developer>Emery Meadow Solar Station, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>16.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.643433</lat>
    <lon>-70.55837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1024/8</id>
    <plant_name>Crawfordsville Power Plant</plant_name>
    <generator_id>8</generator_id>
    <plant_id>1024</plant_id>
    <state>IN</state>
    <county>Montgomery</county>
    <developer>Crawfordsville Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CS</prime_mover>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.048889</lat>
    <lon>-86.8992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70546/JAR-1</id>
    <plant_name>Jarratt Energy Facility</plant_name>
    <generator_id>JAR-1</generator_id>
    <plant_id>70546</plant_id>
    <state>VA</state>
    <county>Greensville</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.822306</lat>
    <lon>-77.51345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3338/3</id>
    <plant_name>Aberdeen CT</plant_name>
    <generator_id>3</generator_id>
    <plant_id>3338</plant_id>
    <state>SD</state>
    <county>Brown</county>
    <developer>NorthWestern Energy - (SD)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>45.429884</lat>
    <lon>-98.49396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>3338/4</id>
    <plant_name>Aberdeen CT</plant_name>
    <generator_id>4</generator_id>
    <plant_id>3338</plant_id>
    <state>SD</state>
    <county>Brown</county>
    <developer>NorthWestern Energy - (SD)</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>45.429884</lat>
    <lon>-98.49396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69602/90918</id>
    <plant_name>Essex VT BESS 1</plant_name>
    <generator_id>90918</generator_id>
    <plant_id>69602</plant_id>
    <state>VT</state>
    <county>Chittenden</county>
    <developer>Essex VT BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.483701</lat>
    <lon>-73.10717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70261/WS01</id>
    <plant_name>Westside - (NM)</plant_name>
    <generator_id>WS01</generator_id>
    <plant_id>70261</plant_id>
    <state>NM</state>
    <county>San Juan</county>
    <developer>Saddle Butte Energy Farmington, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>36.752288</lat>
    <lon>-108.3148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59572/PV1</id>
    <plant_name>Cotton Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>59572</plant_id>
    <state>SC</state>
    <county>Dillon</county>
    <developer>Cotton Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.455</lat>
    <lon>-79.41028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67954/BRPV1</id>
    <plant_name>BAI-Boyles Run-Phase I</plant_name>
    <generator_id>BRPV1</generator_id>
    <plant_id>67954</plant_id>
    <state>PA</state>
    <county>Northumberland</county>
    <developer>Boyles Run Solar I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>15.9</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.771847</lat>
    <lon>-76.78119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67955/BRPV2</id>
    <plant_name>BAI-Boyles Run-Phase 2</plant_name>
    <generator_id>BRPV2</generator_id>
    <plant_id>67955</plant_id>
    <state>PA</state>
    <county>Northumberland</county>
    <developer>Boyles Run Solar II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>15.9</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.771847</lat>
    <lon>-76.78119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66785/ELVAK</id>
    <plant_name>Elevate Arthur Kill</plant_name>
    <generator_id>ELVAK</generator_id>
    <plant_id>66785</plant_id>
    <state>NY</state>
    <county>Richmond</county>
    <developer>Lighthouse Arthur Kill, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>15.1</nameplate_mw>
    <summer_mw>15.1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.590066</lat>
    <lon>-74.19836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68560/MARJT</id>
    <plant_name>SR Marion Junction</plant_name>
    <generator_id>MARJT</generator_id>
    <plant_id>68560</plant_id>
    <state>AL</state>
    <county>Dallas</county>
    <developer>SR Marion Junction, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>32.418685</lat>
    <lon>-87.36171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>10328/GEN11</id>
    <plant_name>T B Simon Power Plant</plant_name>
    <generator_id>GEN11</generator_id>
    <plant_id>10328</plant_id>
    <state>MI</state>
    <county>Ingham</county>
    <developer>Michigan State University</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.7178</lat>
    <lon>-84.4836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67879/ENX26</id>
    <plant_name>Stony Creek Solar</plant_name>
    <generator_id>ENX26</generator_id>
    <plant_id>67879</plant_id>
    <state>PA</state>
    <county>Somerset</county>
    <developer>Stony Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.222386</lat>
    <lon>-78.8812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70546/JAR-2</id>
    <plant_name>Jarratt Energy Facility</plant_name>
    <generator_id>JAR-2</generator_id>
    <plant_id>70546</plant_id>
    <state>VA</state>
    <county>Greensville</county>
    <developer>Torch Operating Company, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>14.9</nameplate_mw>
    <summer_mw>14.9</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.822306</lat>
    <lon>-77.51345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60642/1</id>
    <plant_name>M&amp;G Resins USA</plant_name>
    <generator_id>1</generator_id>
    <plant_id>60642</plant_id>
    <state>TX</state>
    <county>Nueces</county>
    <developer>CC Polymers LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>All Other</technology>
    <energy_source>WH</energy_source>
    <prime_mover>OT</prime_mover>
    <nameplate_mw>14.3</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.833756</lat>
    <lon>-97.49652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60642/2</id>
    <plant_name>M&amp;G Resins USA</plant_name>
    <generator_id>2</generator_id>
    <plant_id>60642</plant_id>
    <state>TX</state>
    <county>Nueces</county>
    <developer>CC Polymers LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>All Other</technology>
    <energy_source>WH</energy_source>
    <prime_mover>OT</prime_mover>
    <nameplate_mw>14.3</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.833756</lat>
    <lon>-97.49652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70203/GEN1</id>
    <plant_name>Bealeton Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70203</plant_id>
    <state>VA</state>
    <county>Fauquier</county>
    <developer>TerraForm Power Operating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>14.2</nameplate_mw>
    <summer_mw>14</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.555832</lat>
    <lon>-77.77828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61912/MHSOL</id>
    <plant_name>McGinness Hills 3</plant_name>
    <generator_id>MHSOL</generator_id>
    <plant_id>61912</plant_id>
    <state>NV</state>
    <county>Lander</county>
    <developer>Ormat Nevada Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>39.5963</lat>
    <lon>-116.8942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69771/CCBS1</id>
    <plant_name>Clark Creek Solar Plant</plant_name>
    <generator_id>CCBS1</generator_id>
    <plant_id>69771</plant_id>
    <state>NC</state>
    <county>Lincoln</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLW</balancing_authority>
    <lat>35.532689</lat>
    <lon>-81.24866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1239/13</id>
    <plant_name>Riverton</plant_name>
    <generator_id>13</generator_id>
    <plant_id>1239</plant_id>
    <state>KS</state>
    <county>Cherokee</county>
    <developer>Empire District Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.072616</lat>
    <lon>-94.6987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1239/14</id>
    <plant_name>Riverton</plant_name>
    <generator_id>14</generator_id>
    <plant_id>1239</plant_id>
    <state>KS</state>
    <county>Cherokee</county>
    <developer>Empire District Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.072616</lat>
    <lon>-94.6987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63126/SNDHA</id>
    <plant_name>Sand Hill A</plant_name>
    <generator_id>SNDHA</generator_id>
    <plant_id>63126</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Viracocha Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.743809</lat>
    <lon>-121.6078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70409/ENX41</id>
    <plant_name>Hera Solar</plant_name>
    <generator_id>ENX41</generator_id>
    <plant_id>70409</plant_id>
    <state>VA</state>
    <county>Tazewell</county>
    <developer>Hera Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>13.3</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.167141</lat>
    <lon>-81.50336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70296/MTBAT</id>
    <plant_name>Milltown Onsite BESS</plant_name>
    <generator_id>MTBAT</generator_id>
    <plant_id>70296</plant_id>
    <state>NJ</state>
    <county>Middlesex</county>
    <developer>Milltown Onsite Generation, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.453346</lat>
    <lon>-74.43502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67836/GSP1</id>
    <plant_name>Gibson Solar Project - Hybrid</plant_name>
    <generator_id>GSP1</generator_id>
    <plant_id>67836</plant_id>
    <state>CA</state>
    <county>Yolo</county>
    <developer>Emeren US, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.678386</lat>
    <lon>-121.9876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67836/GSP2</id>
    <plant_name>Gibson Solar Project - Hybrid</plant_name>
    <generator_id>GSP2</generator_id>
    <plant_id>67836</plant_id>
    <state>CA</state>
    <county>Yolo</county>
    <developer>Emeren US, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.678386</lat>
    <lon>-121.9876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65302/BESS</id>
    <plant_name>Salt City Solar Project - Hybrid</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>65302</plant_id>
    <state>OH</state>
    <county>Ross</county>
    <developer>Salt City Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.41473</lat>
    <lon>-82.96285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65304/BESS</id>
    <plant_name>ENGIE Solidago Solar Project - Hybrid</plant_name>
    <generator_id>BESS</generator_id>
    <plant_id>65304</plant_id>
    <state>DE</state>
    <county>New Castle</county>
    <developer>ENGIE Solidago Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.395187</lat>
    <lon>-75.7535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65307/SUNB</id>
    <plant_name>Sunnybrook Solar Project - Hybrid</plant_name>
    <generator_id>SUNB</generator_id>
    <plant_id>65307</plant_id>
    <state>VA</state>
    <county>Halifax</county>
    <developer>Sunnybrook Farm Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.798717</lat>
    <lon>-78.83961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67253/761</id>
    <plant_name>Cherry Valley</plant_name>
    <generator_id>761</generator_id>
    <plant_id>67253</plant_id>
    <state>IL</state>
    <county>Boone</county>
    <developer>Greenbacker Renewable Energy Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.240017</lat>
    <lon>-88.93076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70410/ENX42</id>
    <plant_name>Willow Solar</plant_name>
    <generator_id>ENX42</generator_id>
    <plant_id>70410</plant_id>
    <state>VA</state>
    <county>Franklin</county>
    <developer>Willow Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.968749</lat>
    <lon>-79.93001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58639/BESS8</id>
    <plant_name>KRS I Anahola Solar Hybrid</plant_name>
    <generator_id>BESS8</generator_id>
    <plant_id>58639</plant_id>
    <state>HI</state>
    <county>Kauai</county>
    <developer>Kauai Island Utility Cooperative</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <lat>22.131667</lat>
    <lon>-159.3031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58640/BESS7</id>
    <plant_name>KRS II Koloa Solar</plant_name>
    <generator_id>BESS7</generator_id>
    <plant_id>58640</plant_id>
    <state>HI</state>
    <county>Kauai</county>
    <developer>Kauai Island Utility Cooperative</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <lat>21.900833</lat>
    <lon>-159.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>57472/CTG</id>
    <plant_name>TBE-Montgomery LLC</plant_name>
    <generator_id>CTG</generator_id>
    <plant_id>57472</plant_id>
    <state>NY</state>
    <county>Orange</county>
    <developer>TBE Montgomery LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <planned_start>2039-12</planned_start>
    <planned_year>2039</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.4885</lat>
    <lon>-74.2262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69870/BAT1</id>
    <plant_name>Parkwood BESS</plant_name>
    <generator_id>BAT1</generator_id>
    <plant_id>69870</plant_id>
    <state>NC</state>
    <county>Union</county>
    <developer>North Carolina El Member Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>34.891701</lat>
    <lon>-80.63255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66870/DAVS</id>
    <plant_name>Davis Solar (WV)</plant_name>
    <generator_id>DAVS</generator_id>
    <plant_id>66870</plant_id>
    <state>WV</state>
    <county>Tucker</county>
    <developer>Monongahela Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.155005</lat>
    <lon>-79.44334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69552/90916</id>
    <plant_name>Danville VA BESS 2</plant_name>
    <generator_id>90916</generator_id>
    <plant_id>69552</plant_id>
    <state>VA</state>
    <county>Pittsylvania</county>
    <developer>Danville VA BESS 2 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.6052</lat>
    <lon>-79.4358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70542/WHI1</id>
    <plant_name>Mount Whitney BESS</plant_name>
    <generator_id>WHI1</generator_id>
    <plant_id>70542</plant_id>
    <state>TX</state>
    <county>Waller</county>
    <developer>Mount Whitney BESS LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.159658</lat>
    <lon>-95.92763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70543/DEN1</id>
    <plant_name>Denali Energy Storage</plant_name>
    <generator_id>DEN1</generator_id>
    <plant_id>70543</plant_id>
    <state>TX</state>
    <county>Austin</county>
    <developer>Denali Energy Storage LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.632317</lat>
    <lon>-96.07565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69864/COBA1</id>
    <plant_name>Colorado Clean Energy Center (BESS)</plant_name>
    <generator_id>COBA1</generator_id>
    <plant_id>69864</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>On Energy Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.649</lat>
    <lon>-96.51519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69865/CLBA1</id>
    <plant_name>Columbus Clean Energy Center (BESS)</plant_name>
    <generator_id>CLBA1</generator_id>
    <plant_id>69865</plant_id>
    <state>TX</state>
    <county>Colorado</county>
    <developer>On Energy Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.6789</lat>
    <lon>-96.53042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69866/MGBA1</id>
    <plant_name>Matagorda Clean Energy Center (BESS)</plant_name>
    <generator_id>MGBA1</generator_id>
    <plant_id>69866</plant_id>
    <state>TX</state>
    <county>Matagorda</county>
    <developer>On Energy Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>28.99489</lat>
    <lon>-96.12536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67283/6569</id>
    <plant_name>Six Flags Magic Mountain</plant_name>
    <generator_id>6569</generator_id>
    <plant_id>67283</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Magic Mountain Parkway Solar Project 2023, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.428209</lat>
    <lon>-118.5993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69226/KNBA1</id>
    <plant_name>Knapp BESS</plant_name>
    <generator_id>KNBA1</generator_id>
    <plant_id>69226</plant_id>
    <state>TX</state>
    <county>Scurry</county>
    <developer>GoldenMax Energy Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.6913</lat>
    <lon>-101.0515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69252/HABA1</id>
    <plant_name>Harlingen #1 BESS 1</plant_name>
    <generator_id>HABA1</generator_id>
    <plant_id>69252</plant_id>
    <state>TX</state>
    <county>Cameron</county>
    <developer>Harlingen ESS Assets LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.206111</lat>
    <lon>-97.70842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69253/NEBA1</id>
    <plant_name>North Edinburg BESS 1</plant_name>
    <generator_id>NEBA1</generator_id>
    <plant_id>69253</plant_id>
    <state>TX</state>
    <county>Hidalgo</county>
    <developer>Edinburg ESS Assets LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>26.347194</lat>
    <lon>-98.18844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69465/CSTSP</id>
    <plant_name>City of Detroit Castle Solar</plant_name>
    <generator_id>CSTSP</generator_id>
    <plant_id>69465</plant_id>
    <state>MI</state>
    <county>Wayne</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.411333</lat>
    <lon>-83.01867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69665/ORCH</id>
    <plant_name>Orchard BESS</plant_name>
    <generator_id>ORCH</generator_id>
    <plant_id>69665</plant_id>
    <state>TX</state>
    <county>Fort Bend</county>
    <developer>IEP Tejas Verde, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.539579</lat>
    <lon>-95.95732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66410/596</id>
    <plant_name>Grizzly Ridge Solar</plant_name>
    <generator_id>596</generator_id>
    <plant_id>66410</plant_id>
    <state>TX</state>
    <county>Hamilton</county>
    <developer>Grizzly Ridge Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.738177</lat>
    <lon>-98.21374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68439/17184</id>
    <plant_name>NorCal FPV 1</plant_name>
    <generator_id>17184</generator_id>
    <plant_id>68439</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Madison Energy Investments LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.6778</lat>
    <lon>-121.8275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70560/GWF-1</id>
    <plant_name>Grey Wolf</plant_name>
    <generator_id>GWF-1</generator_id>
    <plant_id>70560</plant_id>
    <state>TX</state>
    <county>Winkler</county>
    <developer>ET Genco LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.769814</lat>
    <lon>-103.2694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70561/WT2-1</id>
    <plant_name>WT2</plant_name>
    <generator_id>WT2-1</generator_id>
    <plant_id>70561</plant_id>
    <state>TX</state>
    <county>Winkler</county>
    <developer>ET Genco LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.83611</lat>
    <lon>-103.305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67858/DILL1</id>
    <plant_name>Dill Holdings LLC</plant_name>
    <generator_id>DILL1</generator_id>
    <plant_id>67858</plant_id>
    <state>NC</state>
    <county>Iredell</county>
    <developer>Dill Holdings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.966645</lat>
    <lon>-80.71882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70533/NASH</id>
    <plant_name>Nash Solar</plant_name>
    <generator_id>NASH</generator_id>
    <plant_id>70533</plant_id>
    <state>TX</state>
    <county>Brazoria</county>
    <developer>Ellomay USA Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.253813</lat>
    <lon>-95.59608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64616/1</id>
    <plant_name>South Portland ESS, LLC</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64616</plant_id>
    <state>ME</state>
    <county>Cumberland</county>
    <developer>South Portland ESS, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.622939</lat>
    <lon>-70.33098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68566/SIPSY</id>
    <plant_name>SR Sipsey</plant_name>
    <generator_id>SIPSY</generator_id>
    <plant_id>68566</plant_id>
    <state>AL</state>
    <county>Fayette</county>
    <developer>SR Sipsey, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.694556</lat>
    <lon>-87.81805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68988/SHB01</id>
    <plant_name>Sherco LDES</plant_name>
    <generator_id>SHB01</generator_id>
    <plant_id>68988</plant_id>
    <state>MN</state>
    <county>Sherburne</county>
    <developer>Northern States Power Co - Minnesota</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.374997</lat>
    <lon>-93.89719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64171/1</id>
    <plant_name>Tygart Hydropower</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64171</plant_id>
    <state>WV</state>
    <county>Taylor</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.279354</lat>
    <lon>-80.00891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64171/2</id>
    <plant_name>Tygart Hydropower</plant_name>
    <generator_id>2</generator_id>
    <plant_id>64171</plant_id>
    <state>WV</state>
    <county>Taylor</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.279354</lat>
    <lon>-80.00891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64171/3</id>
    <plant_name>Tygart Hydropower</plant_name>
    <generator_id>3</generator_id>
    <plant_id>64171</plant_id>
    <state>WV</state>
    <county>Taylor</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.279354</lat>
    <lon>-80.00891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69702/PI-1</id>
    <plant_name>Pike Island Hydroelectric Project</plant_name>
    <generator_id>PI-1</generator_id>
    <plant_id>69702</plant_id>
    <state>OH</state>
    <county>Jefferson</county>
    <developer>Pike Island Hydropower Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.151</lat>
    <lon>-80.70569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69702/PI-2</id>
    <plant_name>Pike Island Hydroelectric Project</plant_name>
    <generator_id>PI-2</generator_id>
    <plant_id>69702</plant_id>
    <state>OH</state>
    <county>Jefferson</county>
    <developer>Pike Island Hydropower Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2029-01</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.151</lat>
    <lon>-80.70569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69701/NC-1</id>
    <plant_name>New Cumberland Hydroelectric Project</plant_name>
    <generator_id>NC-1</generator_id>
    <plant_id>69701</plant_id>
    <state>WV</state>
    <county>Hancock</county>
    <developer>Current Hydro Project 19, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.52821</lat>
    <lon>-80.62574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69701/NC-2</id>
    <plant_name>New Cumberland Hydroelectric Project</plant_name>
    <generator_id>NC-2</generator_id>
    <plant_id>69701</plant_id>
    <state>WV</state>
    <county>Hancock</county>
    <developer>Current Hydro Project 19, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.52821</lat>
    <lon>-80.62574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70559/BESS2</id>
    <plant_name>Mammoth</plant_name>
    <generator_id>BESS2</generator_id>
    <plant_id>70559</plant_id>
    <state>WV</state>
    <county>Kanawha</county>
    <developer>MN8 Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2029-06</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.20845</lat>
    <lon>-81.30893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67570/3004</id>
    <plant_name>Cedar Hill ESS</plant_name>
    <generator_id>3004</generator_id>
    <plant_id>67570</plant_id>
    <state>TX</state>
    <county>Dallas</county>
    <developer>Cedar Hill ESS Assets, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <planned_start>2030-06</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.612139</lat>
    <lon>-96.92511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69318/APPLE</id>
    <plant_name>Apple BESS</plant_name>
    <generator_id>APPLE</generator_id>
    <plant_id>69318</plant_id>
    <state>TX</state>
    <county>Ector</county>
    <developer>Apple Infra, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.675697</lat>
    <lon>-102.3638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69338/LEAKY</id>
    <plant_name>Regis Leakey</plant_name>
    <generator_id>LEAKY</generator_id>
    <plant_id>69338</plant_id>
    <state>TX</state>
    <county>Real</county>
    <developer>Regis Leakey LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.681012</lat>
    <lon>-99.76172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65834/SDBTD</id>
    <plant_name>Saddleback BESS2</plant_name>
    <generator_id>SDBTD</generator_id>
    <plant_id>65834</plant_id>
    <state>TX</state>
    <county>Reeves</county>
    <developer>HEN Infrastructure, L.L.C.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>All Other</technology>
    <energy_source>OTH</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.332883</lat>
    <lon>-103.4984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69340/MEDIN</id>
    <plant_name>Regis Medina</plant_name>
    <generator_id>MEDIN</generator_id>
    <plant_id>69340</plant_id>
    <state>TX</state>
    <county>Bandera</county>
    <developer>Regis Medina LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.807877</lat>
    <lon>-99.25467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69534/TOR_B</id>
    <plant_name>Torrecillas Energy Storage</plant_name>
    <generator_id>TOR_B</generator_id>
    <plant_id>69534</plant_id>
    <state>TX</state>
    <county>Webb</county>
    <developer>Torrecillas Energy Storage, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>27.618936</lat>
    <lon>-98.83924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69246/BSOU1</id>
    <plant_name>BESS TX Camarine - BSHOU001</plant_name>
    <generator_id>BSOU1</generator_id>
    <plant_id>69246</plant_id>
    <state>TX</state>
    <county>Harris</county>
    <developer>Prologis Logistics Services Incorporated BESS</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.86648</lat>
    <lon>-95.43066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70549/DARST</id>
    <plant_name>CF BESS NINE</plant_name>
    <generator_id>DARST</generator_id>
    <plant_id>70549</plant_id>
    <state>TX</state>
    <county>Guadalupe</county>
    <developer>CF BESS Nine, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.586397</lat>
    <lon>-97.77525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65811/CYSTD</id>
    <plant_name>Coyote Springs (TX)</plant_name>
    <generator_id>CYSTD</generator_id>
    <plant_id>65811</plant_id>
    <state>TX</state>
    <county>Reeves</county>
    <developer>HEN Infrastructure, L.L.C.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.39471</lat>
    <lon>-103.6303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69902/HOCKL</id>
    <plant_name>Hockley</plant_name>
    <generator_id>HOCKL</generator_id>
    <plant_id>69902</plant_id>
    <state>TX</state>
    <county>Harris</county>
    <developer>Hockley LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.021964</lat>
    <lon>-95.84826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65897/INPKY</id>
    <plant_name>Industrial Parkway Storage</plant_name>
    <generator_id>INPKY</generator_id>
    <plant_id>65897</plant_id>
    <state>CA</state>
    <county>Santa Barbara</county>
    <developer>RPCA Storage 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.907345</lat>
    <lon>-120.4465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68255/SHELB</id>
    <plant_name>SR Shelby</plant_name>
    <generator_id>SHELB</generator_id>
    <plant_id>68255</plant_id>
    <state>TN</state>
    <county>Shelby</county>
    <developer>SR Shelby, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.353292</lat>
    <lon>-89.81498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59596/PV1</id>
    <plant_name>Rhubarb One SC</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>59596</plant_id>
    <state>SC</state>
    <county>Marion</county>
    <developer>SolRiver Capital LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>34.151111</lat>
    <lon>-79.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59027/GEN 1</id>
    <plant_name>Mahoney Lake Hydroelectric</plant_name>
    <generator_id>GEN 1</generator_id>
    <plant_id>59027</plant_id>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <developer>Ketchikan Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <lat>55.419444</lat>
    <lon>-131.5378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69903/EBERN</id>
    <plant_name>East Bernard</plant_name>
    <generator_id>EBERN</generator_id>
    <plant_id>69903</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>East Bernard LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.52854</lat>
    <lon>-96.07052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69904/PLEDG</id>
    <plant_name>Pledger</plant_name>
    <generator_id>PLEDG</generator_id>
    <plant_id>69904</plant_id>
    <state>TX</state>
    <county>Wharton</county>
    <developer>Pledger LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>29.187719</lat>
    <lon>-95.91223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69357/PV1</id>
    <plant_name>Asheville Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>69357</plant_id>
    <state>NC</state>
    <county>Buncombe</county>
    <developer>Duke Energy Progress - (NC)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CPLW</balancing_authority>
    <lat>35.470591</lat>
    <lon>-82.54223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69819/TRNTN</id>
    <plant_name>Trenton Solar - (OH)</plant_name>
    <generator_id>TRNTN</generator_id>
    <plant_id>69819</plant_id>
    <state>OH</state>
    <county>Butler</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.455321</lat>
    <lon>-84.46788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-1</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-1</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-10</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-10</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-11</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-11</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-2</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-2</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-3</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-3</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-4</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-4</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-5</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-5</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-6</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-6</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-7</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-7</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-8</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-8</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68284/PE-9</id>
    <plant_name>Puuloa Energy</plant_name>
    <generator_id>PE-9</generator_id>
    <plant_id>68284</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBL</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <planned_start>2029-04</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.347833</lat>
    <lon>-157.9506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>50969/GEN10</id>
    <plant_name>MU Combined Heat and Power Plant</plant_name>
    <generator_id>GEN10</generator_id>
    <plant_id>50969</plant_id>
    <state>MO</state>
    <county>Boone</county>
    <developer>Curators of the University of Missouri</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Steam Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.9461</lat>
    <lon>-92.3328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66618/FL5</id>
    <plant_name>Fish Lake Geothermal</plant_name>
    <generator_id>FL5</generator_id>
    <plant_id>66618</plant_id>
    <state>NV</state>
    <county>Esmeralda</county>
    <developer>Fish Lake Geothermal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>37.860925</lat>
    <lon>-118.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>57472/STG</id>
    <plant_name>TBE-Montgomery LLC</plant_name>
    <generator_id>STG</generator_id>
    <plant_id>57472</plant_id>
    <state>NY</state>
    <county>Orange</county>
    <developer>TBE Montgomery LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <planned_start>2039-12</planned_start>
    <planned_year>2039</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.4885</lat>
    <lon>-74.2262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69695/CCM-1</id>
    <plant_name>Colonel Charles D. Maynard Project</plant_name>
    <generator_id>CCM-1</generator_id>
    <plant_id>69695</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Maynard Hydroelectric LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <planned_start>2031-11</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.411873</lat>
    <lon>-92.10319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69695/CCM-2</id>
    <plant_name>Colonel Charles D. Maynard Project</plant_name>
    <generator_id>CCM-2</generator_id>
    <plant_id>69695</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Maynard Hydroelectric LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <planned_start>2031-11</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.411873</lat>
    <lon>-92.10319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69695/CCM-3</id>
    <plant_name>Colonel Charles D. Maynard Project</plant_name>
    <generator_id>CCM-3</generator_id>
    <plant_id>69695</plant_id>
    <state>AR</state>
    <county>Jefferson</county>
    <developer>Maynard Hydroelectric LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <planned_start>2031-11</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.411873</lat>
    <lon>-92.10319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70305/23</id>
    <plant_name>Tanglewood Solar, LLC</plant_name>
    <generator_id>23</generator_id>
    <plant_id>70305</plant_id>
    <state>NC</state>
    <county>Pasquotank</county>
    <developer>Headwater Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CPLE</balancing_authority>
    <lat>36.25</lat>
    <lon>-76.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66901/WRS</id>
    <plant_name>Wylie Ridge Solar</plant_name>
    <generator_id>WRS</generator_id>
    <plant_id>66901</plant_id>
    <state>WV</state>
    <county>Hancock</county>
    <developer>Monongahela Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.452683</lat>
    <lon>-80.57255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68558/LOTT</id>
    <plant_name>SR Lott</plant_name>
    <generator_id>LOTT</generator_id>
    <plant_id>68558</plant_id>
    <state>AL</state>
    <county>Mobile</county>
    <developer>SR Lott, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>30.940181</lat>
    <lon>-88.29926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA1</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA2</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA3</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA3</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA4</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA4</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA5</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA5</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62391/NA6</id>
    <plant_name>Overton Hydroelectric Project</plant_name>
    <generator_id>NA6</generator_id>
    <plant_id>62391</plant_id>
    <state>LA</state>
    <county>Rapides</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>31.185978</lat>
    <lon>-92.29309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70466/NSP</id>
    <plant_name>Nine Springs Solar</plant_name>
    <generator_id>NSP</generator_id>
    <plant_id>70466</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Madison Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.029352</lat>
    <lon>-89.36307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54918/TM02</id>
    <plant_name>Ergon Refining Vicksburg</plant_name>
    <generator_id>TM02</generator_id>
    <plant_id>54918</plant_id>
    <state>MS</state>
    <county>Warren</county>
    <developer>Ergon Refining Inc</developer>
    <sector>Industrial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.388271</lat>
    <lon>-90.90834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54918/TM03</id>
    <plant_name>Ergon Refining Vicksburg</plant_name>
    <generator_id>TM03</generator_id>
    <plant_id>54918</plant_id>
    <state>MS</state>
    <county>Warren</county>
    <developer>Ergon Refining Inc</developer>
    <sector>Industrial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.388271</lat>
    <lon>-90.90834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69992/BA1</id>
    <plant_name>Sherwood Forest BESS</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>69992</plant_id>
    <state>LA</state>
    <county>Orleans</county>
    <developer>Entergy New Orleans, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.01266</lat>
    <lon>-89.94403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/CTG1</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>CTG1</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CT</prime_mover>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62425/NA1</id>
    <plant_name>Sardis Lake Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62425</plant_id>
    <state>MS</state>
    <county>Panola</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.399125</lat>
    <lon>-89.77246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62425/NA2</id>
    <plant_name>Sardis Lake Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62425</plant_id>
    <state>MS</state>
    <county>Panola</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.399125</lat>
    <lon>-89.77246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55369/BESS1</id>
    <plant_name>Hamakua Energy Plant</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>55369</plant_id>
    <state>HI</state>
    <county>Hawaii</county>
    <developer>Hamakua Energy LP</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <planned_start>2030-11</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <lat>20.0939</lat>
    <lon>-155.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70333/KBPV1</id>
    <plant_name>Keenesburg</plant_name>
    <generator_id>KBPV1</generator_id>
    <plant_id>70333</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.187364</lat>
    <lon>-104.5061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66002/MVSBA</id>
    <plant_name>AES Mountain View Solar</plant_name>
    <generator_id>MVSBA</generator_id>
    <plant_id>66002</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>AES Distributed Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.45799</lat>
    <lon>-158.1767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66002/MVSPV</id>
    <plant_name>AES Mountain View Solar</plant_name>
    <generator_id>MVSPV</generator_id>
    <plant_id>66002</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>AES Distributed Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.45799</lat>
    <lon>-158.1767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70465/NFREC</id>
    <plant_name>New Florence Renewable Energy Center</plant_name>
    <generator_id>NFREC</generator_id>
    <plant_id>70465</plant_id>
    <state>MO</state>
    <county>Montgomery</county>
    <developer>Union Electric Co - (MO)</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.8908</lat>
    <lon>-91.4186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70119/GEN1</id>
    <plant_name>Raceway Solar - (CO)</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70119</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Raceway Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.262222</lat>
    <lon>-103.8292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69466/GRESP</id>
    <plant_name>City of Detroit Greenfield</plant_name>
    <generator_id>GRESP</generator_id>
    <plant_id>69466</plant_id>
    <state>MI</state>
    <county>Wayne</county>
    <developer>DTE Electric Company</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.420589</lat>
    <lon>-83.09909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62400/NA1</id>
    <plant_name>Montgomery L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62400</plant_id>
    <state>PA</state>
    <county>Beaver</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.652478</lat>
    <lon>-80.38687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62400/NA2</id>
    <plant_name>Montgomery L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62400</plant_id>
    <state>PA</state>
    <county>Beaver</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.652478</lat>
    <lon>-80.38687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62400/NA3</id>
    <plant_name>Montgomery L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA3</generator_id>
    <plant_id>62400</plant_id>
    <state>PA</state>
    <county>Beaver</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.652478</lat>
    <lon>-80.38687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62433/NA1</id>
    <plant_name>Emsworth L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62433</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-10</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50305</lat>
    <lon>-80.08944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62433/NA2</id>
    <plant_name>Emsworth L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62433</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-11</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50305</lat>
    <lon>-80.08944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62433/NA3</id>
    <plant_name>Emsworth L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA3</generator_id>
    <plant_id>62433</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50305</lat>
    <lon>-80.08944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62434/NA3</id>
    <plant_name>Emsworth BC Hydroelectric Project</plant_name>
    <generator_id>NA3</generator_id>
    <plant_id>62434</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50083</lat>
    <lon>-80.10306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60588/JHI01</id>
    <plant_name>Sweetheart Lake Hydroelectric Facility</plant_name>
    <generator_id>JHI01</generator_id>
    <plant_id>60588</plant_id>
    <state>AK</state>
    <county>Juneau</county>
    <developer>Juneau Hydropower, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <lat>57.9449</lat>
    <lon>-133.6867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60588/JHI02</id>
    <plant_name>Sweetheart Lake Hydroelectric Facility</plant_name>
    <generator_id>JHI02</generator_id>
    <plant_id>60588</plant_id>
    <state>AK</state>
    <county>Juneau</county>
    <developer>Juneau Hydropower, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <lat>57.9449</lat>
    <lon>-133.6867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>60588/JHI03</id>
    <plant_name>Sweetheart Lake Hydroelectric Facility</plant_name>
    <generator_id>JHI03</generator_id>
    <plant_id>60588</plant_id>
    <state>AK</state>
    <county>Juneau</county>
    <developer>Juneau Hydropower, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <lat>57.9449</lat>
    <lon>-133.6867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68285/PS-1</id>
    <plant_name>Puuloa Solar</plant_name>
    <generator_id>PS-1</generator_id>
    <plant_id>68285</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.351522</lat>
    <lon>-157.9269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66618/FL4</id>
    <plant_name>Fish Lake Geothermal</plant_name>
    <generator_id>FL4</generator_id>
    <plant_id>66618</plant_id>
    <state>NV</state>
    <county>Esmeralda</county>
    <developer>Fish Lake Geothermal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>37.860925</lat>
    <lon>-118.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63972/TR1</id>
    <plant_name>Two Rivers Wind Facility</plant_name>
    <generator_id>TR1</generator_id>
    <plant_id>63972</plant_id>
    <state>WY</state>
    <county>Carbon</county>
    <developer>Two Rivers Wind LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>41.97508</lat>
    <lon>-106.1805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69516/HAMM</id>
    <plant_name>Hamms Landfill</plant_name>
    <generator_id>HAMM</generator_id>
    <plant_id>69516</plant_id>
    <state>NJ</state>
    <county>Sussex</county>
    <developer>NJR Clean Energy Ventures Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.1015</lat>
    <lon>-74.6706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70467/PHS</id>
    <plant_name>Pine Hill Solar</plant_name>
    <generator_id>PHS</generator_id>
    <plant_id>70467</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Madison Gas &amp; Electric Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.06999</lat>
    <lon>-89.6452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70468/20265</id>
    <plant_name>Big Rapids Solar WI, LLC</plant_name>
    <generator_id>20265</generator_id>
    <plant_id>70468</plant_id>
    <state>WI</state>
    <county>Marathon</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.815532</lat>
    <lon>-90.07455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70469/20261</id>
    <plant_name>Campbellsport Solar WI, LLC</plant_name>
    <generator_id>20261</generator_id>
    <plant_id>70469</plant_id>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.583212</lat>
    <lon>-88.27886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70470/20262</id>
    <plant_name>Honey Creek Solar WI, LLC</plant_name>
    <generator_id>20262</generator_id>
    <plant_id>70470</plant_id>
    <state>WI</state>
    <county>Walworth</county>
    <developer>Wisconsin Electric Power Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.790988</lat>
    <lon>-88.50094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70471/20263</id>
    <plant_name>Germantown - Rockfield Rd Solar WI, LLC</plant_name>
    <generator_id>20263</generator_id>
    <plant_id>70471</plant_id>
    <state>WI</state>
    <county>Washington</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.257821</lat>
    <lon>-88.1316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70472/20268</id>
    <plant_name>Lime Kiln Solar, LLC</plant_name>
    <generator_id>20268</generator_id>
    <plant_id>70472</plant_id>
    <state>WI</state>
    <county>Washington</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.277345</lat>
    <lon>-88.0684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70473/20267</id>
    <plant_name>Little Rose Solar WI, LLC</plant_name>
    <generator_id>20267</generator_id>
    <plant_id>70473</plant_id>
    <state>WI</state>
    <county>Marathon</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.800623</lat>
    <lon>-90.1303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70476/20260</id>
    <plant_name>Root River Solar WI, LLC</plant_name>
    <generator_id>20260</generator_id>
    <plant_id>70476</plant_id>
    <state>WI</state>
    <county>Racine</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.818594</lat>
    <lon>-87.93895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70478/20259</id>
    <plant_name>Tichigan Solar WI, LLC</plant_name>
    <generator_id>20259</generator_id>
    <plant_id>70478</plant_id>
    <state>WI</state>
    <county>Racine</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.732266</lat>
    <lon>-88.16411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68285/PS-2</id>
    <plant_name>Puuloa Solar</plant_name>
    <generator_id>PS-2</generator_id>
    <plant_id>68285</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Puuloa Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.351522</lat>
    <lon>-157.9269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69867/SHEII</id>
    <plant_name>SR Shelby II, LLC</plant_name>
    <generator_id>SHEII</generator_id>
    <plant_id>69867</plant_id>
    <state>TN</state>
    <county>Shelby</county>
    <developer>SR Shelby II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.353646</lat>
    <lon>-89.8109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62388/NA1</id>
    <plant_name>Grays Landing L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62388</plant_id>
    <state>PA</state>
    <county>Greene</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.823738</lat>
    <lon>-79.92302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62388/NA2</id>
    <plant_name>Grays Landing L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62388</plant_id>
    <state>PA</state>
    <county>Greene</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.823738</lat>
    <lon>-79.92302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62404/NA1</id>
    <plant_name>Monongahela L&amp;D4 Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62404</plant_id>
    <state>PA</state>
    <county>Washington</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.145943</lat>
    <lon>-79.90095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62385/NA1</id>
    <plant_name>Maxwell L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62385</plant_id>
    <state>PA</state>
    <county>Fayette</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.002401</lat>
    <lon>-79.95883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62404/NA2</id>
    <plant_name>Monongahela L&amp;D4 Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62404</plant_id>
    <state>PA</state>
    <county>Washington</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.145943</lat>
    <lon>-79.90095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62385/NA2</id>
    <plant_name>Maxwell L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62385</plant_id>
    <state>PA</state>
    <county>Fayette</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.002401</lat>
    <lon>-79.95883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62434/NA1</id>
    <plant_name>Emsworth BC Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62434</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2030-11</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50083</lat>
    <lon>-80.10306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62434/NA2</id>
    <plant_name>Emsworth BC Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62434</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.50083</lat>
    <lon>-80.10306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67265/CTG-1</id>
    <plant_name>CHP Plant</plant_name>
    <generator_id>CTG-1</generator_id>
    <plant_id>67265</plant_id>
    <state>DC</state>
    <county>District of Columbia</county>
    <developer>Howard University</developer>
    <sector>IPP CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.92033</lat>
    <lon>-77.021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68543/3850B</id>
    <plant_name>Town of Sharon Portfolio -Mt St Landfill</plant_name>
    <generator_id>3850B</generator_id>
    <plant_id>68543</plant_id>
    <state>MA</state>
    <county>Norfolk</county>
    <developer>Mountain Street Solar Project 2019, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.102685</lat>
    <lon>-71.15906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>59091/GEN1</id>
    <plant_name>Braddock Lock and Dam</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>59091</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Lock+ Hydro Friends Fund XLII, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.388889</lat>
    <lon>-79.85889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63677/STURB</id>
    <plant_name>Sturbridge Road Solar</plant_name>
    <generator_id>STURB</generator_id>
    <plant_id>63677</plant_id>
    <state>MA</state>
    <county>Worcester</county>
    <developer>Madison Energy Investments LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.174611</lat>
    <lon>-72.01786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68975/17340</id>
    <plant_name>Washington Street Solar 1 LLC</plant_name>
    <generator_id>17340</generator_id>
    <plant_id>68975</plant_id>
    <state>IL</state>
    <county>Mclean</county>
    <developer>Washington Street Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.477287</lat>
    <lon>-89.04986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69551/90915</id>
    <plant_name>Holyoke MA BESS 1</plant_name>
    <generator_id>90915</generator_id>
    <plant_id>69551</plant_id>
    <state>MA</state>
    <county>Hampden</county>
    <developer>Holyoke MA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.16774</lat>
    <lon>-72.64898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69844/HORSE</id>
    <plant_name>Horseshoe Solar Project, LLC</plant_name>
    <generator_id>HORSE</generator_id>
    <plant_id>69844</plant_id>
    <state>IL</state>
    <county>Montgomery</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.14706</lat>
    <lon>-89.4426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69931/BJORN</id>
    <plant_name>Bjorn</plant_name>
    <generator_id>BJORN</generator_id>
    <plant_id>69931</plant_id>
    <state>WI</state>
    <county>Barron</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.395931</lat>
    <lon>-91.881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70176/KIESE</id>
    <plant_name>Kieser</plant_name>
    <generator_id>KIESE</generator_id>
    <plant_id>70176</plant_id>
    <state>IL</state>
    <county>McLean</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.4396</lat>
    <lon>-89.0078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70386/BESS1</id>
    <plant_name>Chicopee BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>70386</plant_id>
    <state>MA</state>
    <county>Hampden</county>
    <developer>Uriel Renovables S.A</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.173653</lat>
    <lon>-72.6119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70387/BESS1</id>
    <plant_name>Framingham BESS</plant_name>
    <generator_id>BESS1</generator_id>
    <plant_id>70387</plant_id>
    <state>MA</state>
    <county>Middlesex</county>
    <developer>Uriel Renovables S.A</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.313107</lat>
    <lon>-71.38953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70563/HIBIS</id>
    <plant_name>Hibiscus Solar, LLC</plant_name>
    <generator_id>HIBIS</generator_id>
    <plant_id>70563</plant_id>
    <state>IL</state>
    <county>Macoupin</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.06927</lat>
    <lon>-90.14414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67279/6572</id>
    <plant_name>Borrego - Highland Ave</plant_name>
    <generator_id>6572</generator_id>
    <plant_id>67279</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>Highland Ave Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.661525</lat>
    <lon>-71.05998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67279/6572B</id>
    <plant_name>Borrego - Highland Ave</plant_name>
    <generator_id>6572B</generator_id>
    <plant_id>67279</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>Highland Ave Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.661525</lat>
    <lon>-71.05998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67637/GILLD</id>
    <plant_name>Gillard</plant_name>
    <generator_id>GILLD</generator_id>
    <plant_id>67637</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>38DN Asset Management LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.19401</lat>
    <lon>-88.29454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67643/SOLIT</id>
    <plant_name>Solitude</plant_name>
    <generator_id>SOLIT</generator_id>
    <plant_id>67643</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>38DN Asset Management LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.130185</lat>
    <lon>-89.04407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69178/11237</id>
    <plant_name>Cherry Solar 1</plant_name>
    <generator_id>11237</generator_id>
    <plant_id>69178</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.450314</lat>
    <lon>-89.22483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69180/11254</id>
    <plant_name>Cold Springs</plant_name>
    <generator_id>11254</generator_id>
    <plant_id>69180</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.137912</lat>
    <lon>-76.27779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69182/11225</id>
    <plant_name>KA 340</plant_name>
    <generator_id>11225</generator_id>
    <plant_id>69182</plant_id>
    <state>IL</state>
    <county>Kankakee</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.245</lat>
    <lon>-87.753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69310/23220</id>
    <plant_name>SL Pembroke 2</plant_name>
    <generator_id>23220</generator_id>
    <plant_id>69310</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>SL Pembroke 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.028056</lat>
    <lon>-78.45694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69384/MALL2</id>
    <plant_name>Mallory South PV II</plant_name>
    <generator_id>MALL2</generator_id>
    <plant_id>69384</plant_id>
    <state>NY</state>
    <county>Oswego</county>
    <developer>Mallory South PV II LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.2669</lat>
    <lon>-76.137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69603/90917</id>
    <plant_name>Ipswich MA BESS 1</plant_name>
    <generator_id>90917</generator_id>
    <plant_id>69603</plant_id>
    <state>MA</state>
    <county>Essex</county>
    <developer>Ipswich MA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.716353</lat>
    <lon>-70.84202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69756/23212</id>
    <plant_name>SL Dunkirk</plant_name>
    <generator_id>23212</generator_id>
    <plant_id>69756</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>SL Dunkirk, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.463685</lat>
    <lon>-79.34316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70294/EAST</id>
    <plant_name>NL IL 2700 East</plant_name>
    <generator_id>EAST</generator_id>
    <plant_id>70294</plant_id>
    <state>IL</state>
    <county>Livingston</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.050261</lat>
    <lon>-88.42827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70295/LAKE</id>
    <plant_name>NL IL Lake</plant_name>
    <generator_id>LAKE</generator_id>
    <plant_id>70295</plant_id>
    <state>IL</state>
    <county>Lake</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.464881</lat>
    <lon>-87.88974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70440/BRACE</id>
    <plant_name>NL IL Braceville</plant_name>
    <generator_id>BRACE</generator_id>
    <plant_id>70440</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.230511</lat>
    <lon>-88.25037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70464/BAT1</id>
    <plant_name>Blackman Battery Energy Storage System</plant_name>
    <generator_id>BAT1</generator_id>
    <plant_id>70464</plant_id>
    <state>MO</state>
    <county>Greene</county>
    <developer>City Utilities of Springfield - (MO)</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.163516</lat>
    <lon>-93.22325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70562/BUNGA</id>
    <plant_name>Bungalow Solar, LLC</plant_name>
    <generator_id>BUNGA</generator_id>
    <plant_id>70562</plant_id>
    <state>IL</state>
    <county>Tazewell</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.630326</lat>
    <lon>-89.44935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70565/TREN1</id>
    <plant_name>Trenton CSG 1 LLC</plant_name>
    <generator_id>TREN1</generator_id>
    <plant_id>70565</plant_id>
    <state>IL</state>
    <county>Clinton</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.588043</lat>
    <lon>-89.68674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70580/OLSTG</id>
    <plant_name>NL IL Old Stage</plant_name>
    <generator_id>OLSTG</generator_id>
    <plant_id>70580</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.311417</lat>
    <lon>-88.58678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67609/21599</id>
    <plant_name>NY ELBA 7195 OAK ORCHARD RD - Genesee 1</plant_name>
    <generator_id>21599</generator_id>
    <plant_id>67609</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>NY CDG Genesee 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.064414</lat>
    <lon>-78.18456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69159/DIEL</id>
    <plant_name>SV CSG Diel 1</plant_name>
    <generator_id>DIEL</generator_id>
    <plant_id>69159</plant_id>
    <state>IL</state>
    <county>Richland</county>
    <developer>SV CSG Diel 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.70762</lat>
    <lon>-88.22238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69205/11249</id>
    <plant_name>Lodi I</plant_name>
    <generator_id>11249</generator_id>
    <plant_id>69205</plant_id>
    <state>NY</state>
    <county>Schuyler</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.588337</lat>
    <lon>-76.84425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69206/11250</id>
    <plant_name>Lodi II</plant_name>
    <generator_id>11250</generator_id>
    <plant_id>69206</plant_id>
    <state>NY</state>
    <county>Schuyler</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.586527</lat>
    <lon>-76.84413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69218/11247</id>
    <plant_name>Vienna</plant_name>
    <generator_id>11247</generator_id>
    <plant_id>69218</plant_id>
    <state>NY</state>
    <county>Oneida</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.23835</lat>
    <lon>-75.69039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69383/MALL1</id>
    <plant_name>Mallory South PV I</plant_name>
    <generator_id>MALL1</generator_id>
    <plant_id>69383</plant_id>
    <state>NY</state>
    <county>Oswego</county>
    <developer>Mallory South PV I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.2669</lat>
    <lon>-76.137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69814/SUNSO</id>
    <plant_name>SV CSG Sun Trust Solar</plant_name>
    <generator_id>SUNSO</generator_id>
    <plant_id>69814</plant_id>
    <state>IL</state>
    <county>Kane</county>
    <developer>SV CSG Sun Trust Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.0969</lat>
    <lon>-88.3865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69815/KINGS</id>
    <plant_name>SV CSG Kingston Solar 1</plant_name>
    <generator_id>KINGS</generator_id>
    <plant_id>69815</plant_id>
    <state>IL</state>
    <county>DeKalb</county>
    <developer>SV CSG Kingston Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.0971</lat>
    <lon>-88.7318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69837/FALCH</id>
    <plant_name>Falconhead Solar, LLC</plant_name>
    <generator_id>FALCH</generator_id>
    <plant_id>69837</plant_id>
    <state>IL</state>
    <county>Will</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.43149</lat>
    <lon>-87.63821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69882/USMID</id>
    <plant_name>USS Middle Solar</plant_name>
    <generator_id>USMID</generator_id>
    <plant_id>69882</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>USS Middle Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.413923</lat>
    <lon>-88.44451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69883/USJOR</id>
    <plant_name>USS Jornada Solar</plant_name>
    <generator_id>USJOR</generator_id>
    <plant_id>69883</plant_id>
    <state>NM</state>
    <county>Dona Ana</county>
    <developer>USS Jornada Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>32.431485</lat>
    <lon>-106.6832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69997/FASTA</id>
    <plant_name>Fast Ave Solar LLC</plant_name>
    <generator_id>FASTA</generator_id>
    <plant_id>69997</plant_id>
    <state>IL</state>
    <county>Tazewell</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.534803</lat>
    <lon>-89.28959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70001/HARPC</id>
    <plant_name>Harper Creek Solar, LLC</plant_name>
    <generator_id>HARPC</generator_id>
    <plant_id>70001</plant_id>
    <state>IL</state>
    <county>Jefferson</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.301552</lat>
    <lon>-88.91451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70382/GEN3</id>
    <plant_name>Mazaska Garden</plant_name>
    <generator_id>GEN3</generator_id>
    <plant_id>70382</plant_id>
    <state>MN</state>
    <county>Rice</county>
    <developer>Bullrock-NxtGenREA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.48723</lat>
    <lon>-93.13416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70474/20266</id>
    <plant_name>Lyndon Solar WI, LLC</plant_name>
    <generator_id>20266</generator_id>
    <plant_id>70474</plant_id>
    <state>WI</state>
    <county>Sheboygan</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.662209</lat>
    <lon>-87.95873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70475/20264</id>
    <plant_name>Maple Creek Solar WI, LLC</plant_name>
    <generator_id>20264</generator_id>
    <plant_id>70475</plant_id>
    <state>WI</state>
    <county>Outagamie</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.436056</lat>
    <lon>-88.73581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70493/FMCS</id>
    <plant_name>Four Mile Creek</plant_name>
    <generator_id>FMCS</generator_id>
    <plant_id>70493</plant_id>
    <state>IL</state>
    <county>Jefferson</county>
    <developer>Four Mile Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.326636</lat>
    <lon>-88.75427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70499/NP</id>
    <plant_name>North Pana</plant_name>
    <generator_id>NP</generator_id>
    <plant_id>70499</plant_id>
    <state>IL</state>
    <county>Christian</county>
    <developer>North Pana Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.410586</lat>
    <lon>-89.0835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70500/PAW</id>
    <plant_name>Pawpaw (IL)</plant_name>
    <generator_id>PAW</generator_id>
    <plant_id>70500</plant_id>
    <state>IL</state>
    <county>White</county>
    <developer>Pawpaw Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.941607</lat>
    <lon>-88.34041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70501/SCS1</id>
    <plant_name>South Cherry Solar 1</plant_name>
    <generator_id>SCS1</generator_id>
    <plant_id>70501</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>South Cherry Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.41675</lat>
    <lon>-89.21233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70517/1400E</id>
    <plant_name>NL IL 1400 East</plant_name>
    <generator_id>1400E</generator_id>
    <plant_id>70517</plant_id>
    <state>IL</state>
    <county>Livingston</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.0858</lat>
    <lon>-88.6618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70548/WRDEN</id>
    <plant_name>Cenergy IL - Worden</plant_name>
    <generator_id>WRDEN</generator_id>
    <plant_id>70548</plant_id>
    <state>IL</state>
    <county>Madison</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.93278</lat>
    <lon>-89.82896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66497/BHBA1</id>
    <plant_name>Bensonhurst Energy Storage 1 LLC</plant_name>
    <generator_id>BHBA1</generator_id>
    <plant_id>66497</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>Convergent Energy and Power LP</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>40.636787</lat>
    <lon>-73.93435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68543/3850G</id>
    <plant_name>Town of Sharon Portfolio -Mt St Landfill</plant_name>
    <generator_id>3850G</generator_id>
    <plant_id>68543</plant_id>
    <state>MA</state>
    <county>Norfolk</county>
    <developer>Mountain Street Solar Project 2019, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.102685</lat>
    <lon>-71.15906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69035/PI36</id>
    <plant_name>Pivot Solar 36</plant_name>
    <generator_id>PI36</generator_id>
    <plant_id>69035</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>40.346119</lat>
    <lon>-104.7314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69262/HILL1</id>
    <plant_name>Hillsboro Solar Project</plant_name>
    <generator_id>HILL1</generator_id>
    <plant_id>69262</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Ellomay USA Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.029636</lat>
    <lon>-97.14555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69262/HILL2</id>
    <plant_name>Hillsboro Solar Project</plant_name>
    <generator_id>HILL2</generator_id>
    <plant_id>69262</plant_id>
    <state>TX</state>
    <county>Hill</county>
    <developer>Ellomay USA Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.029636</lat>
    <lon>-97.14555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69372/KNOXS</id>
    <plant_name>Knox II PV</plant_name>
    <generator_id>KNOXS</generator_id>
    <plant_id>69372</plant_id>
    <state>NY</state>
    <county>Albany</county>
    <developer>Knox II PV LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.67591</lat>
    <lon>-74.07563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70009/WILL1</id>
    <plant_name>Willis Solar 1, LLC - (IL)</plant_name>
    <generator_id>WILL1</generator_id>
    <plant_id>70009</plant_id>
    <state>IL</state>
    <county>Macoupin</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.118354</lat>
    <lon>-89.84199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70102/PS33</id>
    <plant_name>Pivot Solar 33 LLC</plant_name>
    <generator_id>PS33</generator_id>
    <plant_id>70102</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.32508</lat>
    <lon>-104.731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70177/ALLEN</id>
    <plant_name>Allen CSG</plant_name>
    <generator_id>ALLEN</generator_id>
    <plant_id>70177</plant_id>
    <state>IL</state>
    <county>Peoria</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.9166</lat>
    <lon>-89.5273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70376/IL52</id>
    <plant_name>Pivot Energy IL 52</plant_name>
    <generator_id>IL52</generator_id>
    <plant_id>70376</plant_id>
    <state>IL</state>
    <county>McHenry</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.329332</lat>
    <lon>-88.41144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70586/RAVEN</id>
    <plant_name>Raven Sol Solar CSG</plant_name>
    <generator_id>RAVEN</generator_id>
    <plant_id>70586</plant_id>
    <state>NM</state>
    <county>Hidalgo</county>
    <developer>Raven Sol Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>32.3704</lat>
    <lon>-108.6905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70587/GONZO</id>
    <plant_name>Gonzo Sol Solar CSG</plant_name>
    <generator_id>GONZO</generator_id>
    <plant_id>70587</plant_id>
    <state>NM</state>
    <county>Union</county>
    <developer>Gonzo Sol Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>36.444384</lat>
    <lon>-103.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67639/LLEAF</id>
    <plant_name>Leatherleaf</plant_name>
    <generator_id>LLEAF</generator_id>
    <plant_id>67639</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.048657</lat>
    <lon>-78.03491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68855/TRP01</id>
    <plant_name>Tracy Renewable Power Plant</plant_name>
    <generator_id>TRP01</generator_id>
    <plant_id>68855</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Tracy Renewable Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>AB</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.77158</lat>
    <lon>-121.4251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69181/11150</id>
    <plant_name>Hillview</plant_name>
    <generator_id>11150</generator_id>
    <plant_id>69181</plant_id>
    <state>NY</state>
    <county>Warren</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.29864</lat>
    <lon>-73.56023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70100/IL070</id>
    <plant_name>Pivot Energy IL 70 LLC</plant_name>
    <generator_id>IL070</generator_id>
    <plant_id>70100</plant_id>
    <state>IL</state>
    <county>Boone</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.227709</lat>
    <lon>-88.8679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68215/BRAES</id>
    <plant_name>Braley Hill North Solar</plant_name>
    <generator_id>BRAES</generator_id>
    <plant_id>68215</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.776</lat>
    <lon>-70.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68215/BRAPV</id>
    <plant_name>Braley Hill North Solar</plant_name>
    <generator_id>BRAPV</generator_id>
    <plant_id>68215</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.776</lat>
    <lon>-70.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68218/RANES</id>
    <plant_name>Randall Lane Solar</plant_name>
    <generator_id>RANES</generator_id>
    <plant_id>68218</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.663</lat>
    <lon>-70.844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68218/RANPV</id>
    <plant_name>Randall Lane Solar</plant_name>
    <generator_id>RANPV</generator_id>
    <plant_id>68218</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.663</lat>
    <lon>-70.844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70002/MACED</id>
    <plant_name>Macedon CSG LLC</plant_name>
    <generator_id>MACED</generator_id>
    <plant_id>70002</plant_id>
    <state>NY</state>
    <county>Wayne</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.083573</lat>
    <lon>-77.26768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70025/CINC1</id>
    <plant_name>Cincinnati CSG 1 LLC</plant_name>
    <generator_id>CINC1</generator_id>
    <plant_id>70025</plant_id>
    <state>IL</state>
    <county>Tazewell</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.526203</lat>
    <lon>-89.63886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70026/CINC2</id>
    <plant_name>Cincinnati CSG 2 LLC</plant_name>
    <generator_id>CINC2</generator_id>
    <plant_id>70026</plant_id>
    <state>IL</state>
    <county>Tazewell</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.526203</lat>
    <lon>-89.63886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70030/FABIU</id>
    <plant_name>Fabius CSG LLC</plant_name>
    <generator_id>FABIU</generator_id>
    <plant_id>70030</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.830007</lat>
    <lon>-76.06217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70378/GEN5</id>
    <plant_name>Crane Creek Garden</plant_name>
    <generator_id>GEN5</generator_id>
    <plant_id>70378</plant_id>
    <state>MN</state>
    <county>Waseca</county>
    <developer>Bullrock-NxtGenREA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.09501</lat>
    <lon>-93.65467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70554/PV1</id>
    <plant_name>EESolar29</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70554</plant_id>
    <state>MN</state>
    <county>Stearns</county>
    <developer>EESolar29 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.684973</lat>
    <lon>-94.21776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67257/BVEB1</id>
    <plant_name>Bear Valley Battery Plant</plant_name>
    <generator_id>BVEB1</generator_id>
    <plant_id>67257</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Bear Valley Electric Service</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.25</lat>
    <lon>-116.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68520/MNDA4</id>
    <plant_name>Madena 4</plant_name>
    <generator_id>MNDA4</generator_id>
    <plant_id>68520</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.977582</lat>
    <lon>-121.3765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68934/EAST1</id>
    <plant_name>SV CSG East St Louis</plant_name>
    <generator_id>EAST1</generator_id>
    <plant_id>68934</plant_id>
    <state>IL</state>
    <county>St Clair</county>
    <developer>SV CSG East St Louis LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.6056</lat>
    <lon>-90.0705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68863/PV1</id>
    <plant_name>Bloomfield Solar</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68863</plant_id>
    <state>NY</state>
    <county>Saratoga</county>
    <developer>Bloomfield Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.989691</lat>
    <lon>-73.88121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70007/RICHR</id>
    <plant_name>Richmond Road Solar LLC</plant_name>
    <generator_id>RICHR</generator_id>
    <plant_id>70007</plant_id>
    <state>VA</state>
    <county>James City</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.39976</lat>
    <lon>-76.82053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70210/PV1</id>
    <plant_name>Cypert - Fallsburg I</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70210</plant_id>
    <state>NY</state>
    <county>Sullivan</county>
    <developer>NY Fallsburg II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.783296</lat>
    <lon>-74.60056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67645/TWNDA</id>
    <plant_name>Varnsen</plant_name>
    <generator_id>TWNDA</generator_id>
    <plant_id>67645</plant_id>
    <state>IL</state>
    <county>Winnebago</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.315822</lat>
    <lon>-89.31315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70401/CLEM</id>
    <plant_name>Clems Way Solar</plant_name>
    <generator_id>CLEM</generator_id>
    <plant_id>70401</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>CleanCapital Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.732</lat>
    <lon>-70.894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70437/GROTN</id>
    <plant_name>Groton Flanders Road Landfill</plant_name>
    <generator_id>GROTN</generator_id>
    <plant_id>70437</plant_id>
    <state>CT</state>
    <county>New London</county>
    <developer>NJR Clean Energy Ventures Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.35</lat>
    <lon>-72.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69825/MADCR</id>
    <plant_name>Madden Creek Solar</plant_name>
    <generator_id>MADCR</generator_id>
    <plant_id>69825</plant_id>
    <state>IL</state>
    <county>Piatt</county>
    <developer>Madden Creek Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.201889</lat>
    <lon>-88.46611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70402/LOGN</id>
    <plant_name>Logging Swamp North</plant_name>
    <generator_id>LOGN</generator_id>
    <plant_id>70402</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>CleanCapital Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.775</lat>
    <lon>-70.881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70404/LOGS</id>
    <plant_name>Logging Swamp South</plant_name>
    <generator_id>LOGS</generator_id>
    <plant_id>70404</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>CleanCapital Holdings</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.774</lat>
    <lon>-70.88</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69894/13PV1</id>
    <plant_name>E 1300 Street Solar LLC</plant_name>
    <generator_id>13PV1</generator_id>
    <plant_id>69894</plant_id>
    <state>IL</state>
    <county>Henry</county>
    <developer>HQCA Energy Solutions, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.310529</lat>
    <lon>-90.18478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70134/243</id>
    <plant_name>Westhampton - NY 0243 (Giaquinto 1)</plant_name>
    <generator_id>243</generator_id>
    <plant_id>70134</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>CVE US NY Westhampton 243 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.83636</lat>
    <lon>-72.69044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69859/MURP1</id>
    <plant_name>Murphysboro 1</plant_name>
    <generator_id>MURP1</generator_id>
    <plant_id>69859</plant_id>
    <state>IL</state>
    <county>Jackson</county>
    <developer>Navisun LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.794585</lat>
    <lon>-89.35141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70027/CORT2</id>
    <plant_name>Cortland CSG 2 LLC</plant_name>
    <generator_id>CORT2</generator_id>
    <plant_id>70027</plant_id>
    <state>NY</state>
    <county>Cortland</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.54409</lat>
    <lon>-75.99276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70130/141</id>
    <plant_name>Suffolk - VA 0141 (Johnson South)</plant_name>
    <generator_id>141</generator_id>
    <plant_id>70130</plant_id>
    <state>VA</state>
    <county>Suffolk City</county>
    <developer>CVE US VA Suffolk 141 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>36.70257</lat>
    <lon>-76.79211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70132/426</id>
    <plant_name>Waynesboro - VA 0426 (Patterson B)</plant_name>
    <generator_id>426</generator_id>
    <plant_id>70132</plant_id>
    <state>VA</state>
    <county>Augusta</county>
    <developer>CVE US VA Patterson 426 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.14701</lat>
    <lon>-78.87457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58151/STG03</id>
    <plant_name>Central Utility Plant - Texas A&amp;M</plant_name>
    <generator_id>STG03</generator_id>
    <plant_id>58151</plant_id>
    <state>TX</state>
    <county>Brazos</county>
    <developer>Texas A&amp;M, Utilities &amp; Energy Services</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.617778</lat>
    <lon>-96.34333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64615/1</id>
    <plant_name>Sanford ESS, LLC</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64615</plant_id>
    <state>ME</state>
    <county>York</county>
    <developer>Sanford ESS, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.407648</lat>
    <lon>-70.71209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67647/KINGL</id>
    <plant_name>Kinglet</plant_name>
    <generator_id>KINGL</generator_id>
    <plant_id>67647</plant_id>
    <state>VA</state>
    <county>Stafford</county>
    <developer>Cypress Creek Renewables</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.350511</lat>
    <lon>-77.47619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68859/PV1</id>
    <plant_name>Endicott</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68859</plant_id>
    <state>NY</state>
    <county>Broome</county>
    <developer>Endicott NY Solar Farm, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.139575</lat>
    <lon>-76.09664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68861/PV1</id>
    <plant_name>Tully 4</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68861</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>CP Tully Four LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.810918</lat>
    <lon>-76.12014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68862/PV1</id>
    <plant_name>Emerson NY</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68862</plant_id>
    <state>NY</state>
    <county>Columbia</county>
    <developer>Emerson Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.275414</lat>
    <lon>-73.73512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69158/REEDR</id>
    <plant_name>SV CSG Reeder Solar</plant_name>
    <generator_id>REEDR</generator_id>
    <plant_id>69158</plant_id>
    <state>IL</state>
    <county>Knox</county>
    <developer>SV CSG Reeder Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.92886</lat>
    <lon>-90.49347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69817/SANNE</id>
    <plant_name>SV CSG St Anne 1</plant_name>
    <generator_id>SANNE</generator_id>
    <plant_id>69817</plant_id>
    <state>IL</state>
    <county>Kankakee</county>
    <developer>SV CSG St Anne 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.041</lat>
    <lon>-87.6999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69948/MANTB</id>
    <plant_name>SV CSG Manteno</plant_name>
    <generator_id>MANTB</generator_id>
    <plant_id>69948</plant_id>
    <state>IL</state>
    <county>Kankakee</county>
    <developer>SV CSG Manteno, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.221257</lat>
    <lon>-87.88186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69948/MANTO</id>
    <plant_name>SV CSG Manteno</plant_name>
    <generator_id>MANTO</generator_id>
    <plant_id>69948</plant_id>
    <state>IL</state>
    <county>Kankakee</county>
    <developer>SV CSG Manteno, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.221257</lat>
    <lon>-87.88186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69949/BLOMB</id>
    <plant_name>SV CSG Bloomington</plant_name>
    <generator_id>BLOMB</generator_id>
    <plant_id>69949</plant_id>
    <state>IL</state>
    <county>McLean</county>
    <developer>SV CSG Bloomington, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.465889</lat>
    <lon>-89.03208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69949/BLOOM</id>
    <plant_name>SV CSG Bloomington</plant_name>
    <generator_id>BLOOM</generator_id>
    <plant_id>69949</plant_id>
    <state>IL</state>
    <county>McLean</county>
    <developer>SV CSG Bloomington, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.465889</lat>
    <lon>-89.03208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69816/WILSN</id>
    <plant_name>SV CSG Wilson School Solar</plant_name>
    <generator_id>WILSN</generator_id>
    <plant_id>69816</plant_id>
    <state>IL</state>
    <county>Kane</county>
    <developer>SV CSG Wilson School Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.053991</lat>
    <lon>-88.35269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69821/SROX</id>
    <plant_name>SV CSG South Roxana</plant_name>
    <generator_id>SROX</generator_id>
    <plant_id>69821</plant_id>
    <state>IL</state>
    <county>Madison</county>
    <developer>SV CSG South Roxana, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.811582</lat>
    <lon>-90.0515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64067/AUBPV</id>
    <plant_name>Auburn PV - BD Solar Auburn LLC</plant_name>
    <generator_id>AUBPV</generator_id>
    <plant_id>64067</plant_id>
    <state>ME</state>
    <county>Androscoggin</county>
    <developer>BD Solar Auburn LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.05</lat>
    <lon>-70.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64071/LJNPV</id>
    <plant_name>Lewiston Jn PV - BD Solar Lewiston Jn LL</plant_name>
    <generator_id>LJNPV</generator_id>
    <plant_id>64071</plant_id>
    <state>ME</state>
    <county>Androscoggin</county>
    <developer>BD Solar Lewiston Junction LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.05</lat>
    <lon>-70.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62430/NA1</id>
    <plant_name>Grenada Lake Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62430</plant_id>
    <state>MS</state>
    <county>Grenada</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.808842</lat>
    <lon>-89.77246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62430/NA2</id>
    <plant_name>Grenada Lake Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62430</plant_id>
    <state>MS</state>
    <county>Grenada</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2028-05</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>33.808842</lat>
    <lon>-89.77246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68864/PV1</id>
    <plant_name>Bridgewater 2</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68864</plant_id>
    <state>NY</state>
    <county>Saratoga</county>
    <developer>Bridgewater Solar 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.831613</lat>
    <lon>-73.67479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68865/PV1</id>
    <plant_name>Bridgewater 1</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68865</plant_id>
    <state>NY</state>
    <county>Saratoga</county>
    <developer>Bridgewater Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.831613</lat>
    <lon>-73.67479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68277/1</id>
    <plant_name>Brookings Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>68277</plant_id>
    <state>SD</state>
    <county>Brookings</county>
    <developer>Western Minnesota Mun Pwr Agny</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>44.340596</lat>
    <lon>-96.72945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68392/IL2PV</id>
    <plant_name>IL2 - W109</plant_name>
    <generator_id>IL2PV</generator_id>
    <plant_id>68392</plant_id>
    <state>IL</state>
    <county>Will</county>
    <developer>Madison Energy Investments LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.470454</lat>
    <lon>-88.02366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70010/167</id>
    <plant_name>Pescara 1</plant_name>
    <generator_id>167</generator_id>
    <plant_id>70010</plant_id>
    <state>NY</state>
    <county>Orleans</county>
    <developer>Pescara 1 Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.304517</lat>
    <lon>-78.2196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70011/168</id>
    <plant_name>Pescara 2</plant_name>
    <generator_id>168</generator_id>
    <plant_id>70011</plant_id>
    <state>NY</state>
    <county>Orleans</county>
    <developer>Pescara 2 Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.30713</lat>
    <lon>-78.22121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70242/215</id>
    <plant_name>Riverhead - CVE</plant_name>
    <generator_id>215</generator_id>
    <plant_id>70242</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>CVE US NY Riverhead 215 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.94233</lat>
    <lon>-72.71824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68208/LRZBR</id>
    <plant_name>City of Little Rock Solar Array</plant_name>
    <generator_id>LRZBR</generator_id>
    <plant_id>68208</plant_id>
    <state>AR</state>
    <county>Pulaski</county>
    <developer>City of Little Rock - (AR)</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.69761</lat>
    <lon>-92.21437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70491/11558</id>
    <plant_name>Hacadam Hill Solar</plant_name>
    <generator_id>11558</generator_id>
    <plant_id>70491</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Hacadam Hill Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.015718</lat>
    <lon>-75.19334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70327/ND012</id>
    <plant_name>Heron Clean Energy, LLC</plant_name>
    <generator_id>ND012</generator_id>
    <plant_id>70327</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.618159</lat>
    <lon>-73.93242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70442/11224</id>
    <plant_name>KN216</plant_name>
    <generator_id>11224</generator_id>
    <plant_id>70442</plant_id>
    <state>IL</state>
    <county>Kane</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.852991</lat>
    <lon>-88.43975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70490/11886</id>
    <plant_name>Grassy Grove Solar East</plant_name>
    <generator_id>11886</generator_id>
    <plant_id>70490</plant_id>
    <state>NY</state>
    <county>St Lawrence</county>
    <developer>Grassy Grove Solar East, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.612392</lat>
    <lon>-75.15269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70328/ND013</id>
    <plant_name>Jamaica Community Energy, LLC</plant_name>
    <generator_id>ND013</generator_id>
    <plant_id>70328</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.637975</lat>
    <lon>-73.92817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68870/PV1</id>
    <plant_name>Watson 2</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68870</plant_id>
    <state>NY</state>
    <county>Broome</county>
    <developer>NY Union II, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.124945</lat>
    <lon>-75.99177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64541/1</id>
    <plant_name>Potic Solar</plant_name>
    <generator_id>1</generator_id>
    <plant_id>64541</plant_id>
    <state>NY</state>
    <county>Greene</county>
    <developer>FPS Potic Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.29559</lat>
    <lon>-73.9012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70312/ND022</id>
    <plant_name>Lobelia Clean Energy LLC</plant_name>
    <generator_id>ND022</generator_id>
    <plant_id>70312</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.853531</lat>
    <lon>-73.89531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70313/ND024</id>
    <plant_name>Lobelia 4452 Clean Energy LLC</plant_name>
    <generator_id>ND024</generator_id>
    <plant_id>70313</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.853722</lat>
    <lon>-73.89525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70322/ND025</id>
    <plant_name>Wintergreen Clean Energy, LLC</plant_name>
    <generator_id>ND025</generator_id>
    <plant_id>70322</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.812557</lat>
    <lon>-73.89</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70323/ND027</id>
    <plant_name>Wintergreen B Clean Energy LLC</plant_name>
    <generator_id>ND027</generator_id>
    <plant_id>70323</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.812516</lat>
    <lon>-73.89011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70324/ND023</id>
    <plant_name>Wintergreen C Clean Energy LLC</plant_name>
    <generator_id>ND023</generator_id>
    <plant_id>70324</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.812516</lat>
    <lon>-73.89011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70325/ND026</id>
    <plant_name>Wintergreen D Clean Energy LLC</plant_name>
    <generator_id>ND026</generator_id>
    <plant_id>70325</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.812516</lat>
    <lon>-73.89011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70308/ND030</id>
    <plant_name>Blue Aster Clean Energy LLC</plant_name>
    <generator_id>ND030</generator_id>
    <plant_id>70308</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.674137</lat>
    <lon>-73.90102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70309/ND031</id>
    <plant_name>Blue Aster B Clean Energy LLC</plant_name>
    <generator_id>ND031</generator_id>
    <plant_id>70309</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.674137</lat>
    <lon>-73.90102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70310/ND028</id>
    <plant_name>Blue Aster C Clean Energy LLC</plant_name>
    <generator_id>ND028</generator_id>
    <plant_id>70310</plant_id>
    <state>NY</state>
    <county>Kings</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.674137</lat>
    <lon>-73.90102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67749/TWISS</id>
    <plant_name>Pistachio Road 1726-WD</plant_name>
    <generator_id>TWISS</generator_id>
    <plant_id>67749</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Russell Pacific LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.70789</lat>
    <lon>-119.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68230/DESAR</id>
    <plant_name>SR Des Arc</plant_name>
    <generator_id>DESAR</generator_id>
    <plant_id>68230</plant_id>
    <state>AR</state>
    <county>Prairie</county>
    <developer>SR Des Arc, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.977439</lat>
    <lon>-91.52516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67134/MARSH</id>
    <plant_name>SR Marshall, LLC</plant_name>
    <generator_id>MARSH</generator_id>
    <plant_id>67134</plant_id>
    <state>MS</state>
    <county>Marshall</county>
    <developer>SR Marshall, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.959526</lat>
    <lon>-89.58856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68256/SBAST</id>
    <plant_name>SR South Bastrop</plant_name>
    <generator_id>SBAST</generator_id>
    <plant_id>68256</plant_id>
    <state>LA</state>
    <county>Morehouse</county>
    <developer>SR South Bastrop, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.747456</lat>
    <lon>-91.91091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68257/WINN</id>
    <plant_name>SR Winnsboro</plant_name>
    <generator_id>WINN</generator_id>
    <plant_id>68257</plant_id>
    <state>LA</state>
    <county>Franklin</county>
    <developer>SR Winnsboro, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>32.159745</lat>
    <lon>-91.67586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68869/PV1</id>
    <plant_name>Watson 1</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68869</plant_id>
    <state>NY</state>
    <county>Broome</county>
    <developer>NY Union I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.124945</lat>
    <lon>-75.99177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70116/GEN1</id>
    <plant_name>La Junta Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70116</plant_id>
    <state>CO</state>
    <county>Otero</county>
    <developer>Clay Creek Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.038</lat>
    <lon>-103.5237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70117/GEN1</id>
    <plant_name>Lamar Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70117</plant_id>
    <state>CO</state>
    <county>Prowers</county>
    <developer>Clay Creek Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.043192</lat>
    <lon>-102.5922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68557/FORRC</id>
    <plant_name>SR Forrest City</plant_name>
    <generator_id>FORRC</generator_id>
    <plant_id>68557</plant_id>
    <state>AR</state>
    <county>St Francis</county>
    <developer>SR Forrest City, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.984256</lat>
    <lon>-90.78602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68569/ULM</id>
    <plant_name>SR Ulm</plant_name>
    <generator_id>ULM</generator_id>
    <plant_id>68569</plant_id>
    <state>AR</state>
    <county>Prairie</county>
    <developer>SR Ulm, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.577902</lat>
    <lon>-91.45184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68570/WHELN</id>
    <plant_name>SR West Helena</plant_name>
    <generator_id>WHELN</generator_id>
    <plant_id>68570</plant_id>
    <state>AR</state>
    <county>Phillips</county>
    <developer>SR West Helena, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>34.552639</lat>
    <lon>-90.68421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-1</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-1</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-2</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-2</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-3</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-3</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-4</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-4</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-5</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-5</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69704/RC-6</id>
    <plant_name>R.C. Byrd L&amp;D Hydroelectric Project</plant_name>
    <generator_id>RC-6</generator_id>
    <plant_id>69704</plant_id>
    <state>WV</state>
    <county>Mason</county>
    <developer>Ohio Power and Light LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <planned_start>2029-02</planned_start>
    <planned_year>2029</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.68</lat>
    <lon>-82.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66618/FL3</id>
    <plant_name>Fish Lake Geothermal</plant_name>
    <generator_id>FL3</generator_id>
    <plant_id>66618</plant_id>
    <state>NV</state>
    <county>Esmeralda</county>
    <developer>Fish Lake Geothermal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>37.860925</lat>
    <lon>-118.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70048/AIREX</id>
    <plant_name>City of Milwaukee- Airport Expansion</plant_name>
    <generator_id>AIREX</generator_id>
    <plant_id>70048</plant_id>
    <state>WI</state>
    <county>Milwaukee</county>
    <developer>WEC: City of Milwaukee - Airport Expansion</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.930271</lat>
    <lon>-87.88801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70585/TRIGO</id>
    <plant_name>Trigo Sol Solar CSG</plant_name>
    <generator_id>TRIGO</generator_id>
    <plant_id>70585</plant_id>
    <state>NM</state>
    <county>Valencia</county>
    <developer>Trigo Sol Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.659066</lat>
    <lon>-106.7352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69195/LONTB</id>
    <plant_name>Longtown Energy Storage</plant_name>
    <generator_id>LONTB</generator_id>
    <plant_id>69195</plant_id>
    <state>SC</state>
    <county>Fairfield</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>34.416433</lat>
    <lon>-80.86814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69828/MEXIC</id>
    <plant_name>Mexico PV, LLC</plant_name>
    <generator_id>MEXIC</generator_id>
    <plant_id>69828</plant_id>
    <state>NY</state>
    <county>Oswego</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.429675</lat>
    <lon>-76.16547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69932/CSTLO</id>
    <plant_name>Castle Rock Lake Solar</plant_name>
    <generator_id>CSTLO</generator_id>
    <plant_id>69932</plant_id>
    <state>WI</state>
    <county>Juneau</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.972048</lat>
    <lon>-90.06761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70488/BOBW</id>
    <plant_name>IL - Renewable Properties - Bobcat - Wes</plant_name>
    <generator_id>BOBW</generator_id>
    <plant_id>70488</plant_id>
    <state>IL</state>
    <county>Lake</county>
    <developer>RPIL Solar 14, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.463396</lat>
    <lon>-87.92959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69174/11238</id>
    <plant_name>Arlington 1</plant_name>
    <generator_id>11238</generator_id>
    <plant_id>69174</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.454037</lat>
    <lon>-89.29509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69175/11239</id>
    <plant_name>Arlington 2</plant_name>
    <generator_id>11239</generator_id>
    <plant_id>69175</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.454503</lat>
    <lon>-89.29475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69207/11215</id>
    <plant_name>Osman Trust</plant_name>
    <generator_id>11215</generator_id>
    <plant_id>69207</plant_id>
    <state>IL</state>
    <county>McHenry</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.267124</lat>
    <lon>-88.45245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70357/PS58</id>
    <plant_name>Pivot Solar 58 LLC</plant_name>
    <generator_id>PS58</generator_id>
    <plant_id>70357</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.474398</lat>
    <lon>-104.623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70498/LS3</id>
    <plant_name>Ladd Solar 3</plant_name>
    <generator_id>LS3</generator_id>
    <plant_id>70498</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>Ladd Solar 3, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.40225</lat>
    <lon>-89.22147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68972/11253</id>
    <plant_name>Gilman Solar LLC</plant_name>
    <generator_id>11253</generator_id>
    <plant_id>68972</plant_id>
    <state>IL</state>
    <county>Iroquois</county>
    <developer>Gilman Solar LLC PV</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.764392</lat>
    <lon>-87.99916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68243/BEAR</id>
    <plant_name>SR Bear Creek</plant_name>
    <generator_id>BEAR</generator_id>
    <plant_id>68243</plant_id>
    <state>AL</state>
    <county>Marion</county>
    <developer>SR Bear Creek, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>34.275559</lat>
    <lon>-87.70564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62401/NA1</id>
    <plant_name>Allegheny L&amp;D2 Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62401</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2030-11</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.89444</lat>
    <lon>-79.91361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62401/NA2</id>
    <plant_name>Allegheny L&amp;D2 Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62401</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.89444</lat>
    <lon>-79.91361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70311/ND020</id>
    <plant_name>Eastern BlueBird Clean Energy LLC</plant_name>
    <generator_id>ND020</generator_id>
    <plant_id>70311</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.884948</lat>
    <lon>-73.82901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70315/ND021</id>
    <plant_name>Northern Cardinal Clean Energy, LLC</plant_name>
    <generator_id>ND021</generator_id>
    <plant_id>70315</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.884948</lat>
    <lon>-73.82901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56615/G200</id>
    <plant_name>Rancho Penasquitos</plant_name>
    <generator_id>G200</generator_id>
    <plant_id>56615</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>San Diego County Water Auth</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.93695</lat>
    <lon>-117.1137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69276/23219</id>
    <plant_name>SL Ashville 2</plant_name>
    <generator_id>23219</generator_id>
    <plant_id>69276</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>SL Ashville 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.071667</lat>
    <lon>-79.41167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69473/23211</id>
    <plant_name>SL Brockport</plant_name>
    <generator_id>23211</generator_id>
    <plant_id>69473</plant_id>
    <state>NY</state>
    <county>Monroe</county>
    <developer>SL Brockport, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.201111</lat>
    <lon>-77.89806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69889/USGOL</id>
    <plant_name>USS Gold Solar</plant_name>
    <generator_id>USGOL</generator_id>
    <plant_id>69889</plant_id>
    <state>NM</state>
    <county>Luna</county>
    <developer>USS Gold Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>32.26144</lat>
    <lon>-107.7778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68567/SUNST</id>
    <plant_name>SR Sunset</plant_name>
    <generator_id>SUNST</generator_id>
    <plant_id>68567</plant_id>
    <state>LA</state>
    <county>St Landry</county>
    <developer>SR Sunset, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>30.421588</lat>
    <lon>-92.07507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70516/PV1</id>
    <plant_name>Fry Ontario Solar Project</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70516</plant_id>
    <state>OR</state>
    <county>Malheur</county>
    <developer>Fry Foods, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>IPCO</balancing_authority>
    <lat>44.0926</lat>
    <lon>-117.0344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>52021/GEN3</id>
    <plant_name>ITT Cogen Facility</plant_name>
    <generator_id>GEN3</generator_id>
    <plant_id>52021</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>ITT Energy Tech Partners, LLC</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.83442</lat>
    <lon>-87.62847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>52021/GEN4</id>
    <plant_name>ITT Cogen Facility</plant_name>
    <generator_id>GEN4</generator_id>
    <plant_id>52021</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>ITT Energy Tech Partners, LLC</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.83442</lat>
    <lon>-87.62847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68195/DEAVE</id>
    <plant_name>Delaware Ave Solar</plant_name>
    <generator_id>DEAVE</generator_id>
    <plant_id>68195</plant_id>
    <state>DE</state>
    <county>Kent</county>
    <developer>Delaware Ave Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.930578</lat>
    <lon>-75.57075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70201/PS50</id>
    <plant_name>Pivot Solar 50 LLC</plant_name>
    <generator_id>PS50</generator_id>
    <plant_id>70201</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.3657</lat>
    <lon>-104.6336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70242/216</id>
    <plant_name>Riverhead - CVE</plant_name>
    <generator_id>216</generator_id>
    <plant_id>70242</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>CVE US NY Riverhead 215 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.94233</lat>
    <lon>-72.71824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70380/GEN4</id>
    <plant_name>Kraemer Garden</plant_name>
    <generator_id>GEN4</generator_id>
    <plant_id>70380</plant_id>
    <state>MN</state>
    <county>Stearns</county>
    <developer>Bullrock-NxtGenREA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.53123</lat>
    <lon>-94.24932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69204/11241</id>
    <plant_name>Little Creek</plant_name>
    <generator_id>11241</generator_id>
    <plant_id>69204</plant_id>
    <state>IL</state>
    <county>McDonough</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.564286</lat>
    <lon>-90.88035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69309/23215</id>
    <plant_name>SL Pembroke</plant_name>
    <generator_id>23215</generator_id>
    <plant_id>69309</plant_id>
    <state>NY</state>
    <county>Genesee</county>
    <developer>SL Pembroke, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.028056</lat>
    <lon>-78.45694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70510/MCD4</id>
    <plant_name>McDonough Solar 4 LLC</plant_name>
    <generator_id>MCD4</generator_id>
    <plant_id>70510</plant_id>
    <state>IL</state>
    <county>McDonough</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.447671</lat>
    <lon>-90.7127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70550/9014</id>
    <plant_name>Meadow Creek VA BESS 1</plant_name>
    <generator_id>9014</generator_id>
    <plant_id>70550</plant_id>
    <state>VA</state>
    <county>Craig</county>
    <developer>Meadow Creek VA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.4897</lat>
    <lon>-80.1189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70551/90915</id>
    <plant_name>Piney River VA BESS 1</plant_name>
    <generator_id>90915</generator_id>
    <plant_id>70551</plant_id>
    <state>VA</state>
    <county>Nelson</county>
    <developer>Piney River VA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.7187</lat>
    <lon>-79.0054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70552/90913</id>
    <plant_name>Colleen VA BESS 1</plant_name>
    <generator_id>90913</generator_id>
    <plant_id>70552</plant_id>
    <state>VA</state>
    <county>Nelson</county>
    <developer>Colleen VA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.7103</lat>
    <lon>-78.9463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70553/90912</id>
    <plant_name>Salem VA BESS 1</plant_name>
    <generator_id>90912</generator_id>
    <plant_id>70553</plant_id>
    <state>VA</state>
    <county>Salem City</county>
    <developer>Salem VA BESS 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.2892</lat>
    <lon>-80.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68196/RIFPV</id>
    <plant_name>Rifle Range Road Solar</plant_name>
    <generator_id>RIFPV</generator_id>
    <plant_id>68196</plant_id>
    <state>DE</state>
    <county>Sussex</county>
    <developer>Rifle Range Road Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.725699</lat>
    <lon>-75.57144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69620/WTS2</id>
    <plant_name>Waterton Solar II</plant_name>
    <generator_id>WTS2</generator_id>
    <plant_id>69620</plant_id>
    <state>CO</state>
    <county>Douglas</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.5</lat>
    <lon>-105.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70504/PV1</id>
    <plant_name>EESolar33</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70504</plant_id>
    <state>MN</state>
    <county>Steele</county>
    <developer>EESolar33 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.122066</lat>
    <lon>-93.27361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70374/CSC52</id>
    <plant_name>Chaberton Solar Crestone</plant_name>
    <generator_id>CSC52</generator_id>
    <plant_id>70374</plant_id>
    <state>DE</state>
    <county>Kent</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.946876</lat>
    <lon>-75.57677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70104/PS53</id>
    <plant_name>Pivot Solar 53 LLC</plant_name>
    <generator_id>PS53</generator_id>
    <plant_id>70104</plant_id>
    <state>CO</state>
    <county>Adams</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.748549</lat>
    <lon>-104.6673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68219/SNIES</id>
    <plant_name>Snipatuit Road Solar</plant_name>
    <generator_id>SNIES</generator_id>
    <plant_id>68219</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.768</lat>
    <lon>-70.882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68219/SNIPV</id>
    <plant_name>Snipatuit Road Solar</plant_name>
    <generator_id>SNIPV</generator_id>
    <plant_id>68219</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.768</lat>
    <lon>-70.882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69293/WTS1</id>
    <plant_name>Waterton Solar I</plant_name>
    <generator_id>WTS1</generator_id>
    <plant_id>69293</plant_id>
    <state>CO</state>
    <county>Douglas</county>
    <developer>Public Service Co of Colorado</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.5</lat>
    <lon>-105.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65710/PTNM</id>
    <plant_name>Putnam Meadow Solar Station</plant_name>
    <generator_id>PTNM</generator_id>
    <plant_id>65710</plant_id>
    <state>CT</state>
    <county>Windham</county>
    <developer>Putnam Meadow Solar Station, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.902261</lat>
    <lon>-71.91154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68211/GRER</id>
    <plant_name>Grears Corner Solar</plant_name>
    <generator_id>GRER</generator_id>
    <plant_id>68211</plant_id>
    <state>DE</state>
    <county>New Castle</county>
    <developer>Grears Corner Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.380083</lat>
    <lon>-75.70611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70461/PLNFD</id>
    <plant_name>Plainfield Solar One</plant_name>
    <generator_id>PLNFD</generator_id>
    <plant_id>70461</plant_id>
    <state>CT</state>
    <county>Windham</county>
    <developer>NJR Clean Energy Ventures Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.65</lat>
    <lon>-71.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66513/18229</id>
    <plant_name>MA Acushnet 540R Main St</plant_name>
    <generator_id>18229</generator_id>
    <plant_id>66513</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>TJA 540R Main St. Acushnet, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.702987</lat>
    <lon>-70.8888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65146/VCP16</id>
    <plant_name>CT Airport Authority Solar One</plant_name>
    <generator_id>VCP16</generator_id>
    <plant_id>65146</plant_id>
    <state>CT</state>
    <county>Hartford</county>
    <developer>CAA CT Solar One, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.933776</lat>
    <lon>-72.6714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69593/1</id>
    <plant_name>MCCo BESS Generating Facility</plant_name>
    <generator_id>1</generator_id>
    <plant_id>69593</plant_id>
    <state>OH</state>
    <county>Cuyahoga</county>
    <developer>The Medical Center Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.3026</lat>
    <lon>-81.3604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69593/2</id>
    <plant_name>MCCo BESS Generating Facility</plant_name>
    <generator_id>2</generator_id>
    <plant_id>69593</plant_id>
    <state>OH</state>
    <county>Cuyahoga</county>
    <developer>The Medical Center Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.3026</lat>
    <lon>-81.3604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69593/3</id>
    <plant_name>MCCo BESS Generating Facility</plant_name>
    <generator_id>3</generator_id>
    <plant_id>69593</plant_id>
    <state>OH</state>
    <county>Cuyahoga</county>
    <developer>The Medical Center Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.3026</lat>
    <lon>-81.3604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69593/4</id>
    <plant_name>MCCo BESS Generating Facility</plant_name>
    <generator_id>4</generator_id>
    <plant_id>69593</plant_id>
    <state>OH</state>
    <county>Cuyahoga</county>
    <developer>The Medical Center Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.3026</lat>
    <lon>-81.3604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68936/NAP1</id>
    <plant_name>SV CSG Naplate</plant_name>
    <generator_id>NAP1</generator_id>
    <plant_id>68936</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>SV CSG Naplate, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.332158</lat>
    <lon>-88.88482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68519/MDNA3</id>
    <plant_name>Madena 3</plant_name>
    <generator_id>MDNA3</generator_id>
    <plant_id>68519</plant_id>
    <state>CA</state>
    <county>Yuba</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>39.026009</lat>
    <lon>-121.5441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69137/ALP2</id>
    <plant_name>Althea Avenue Solar</plant_name>
    <generator_id>ALP2</generator_id>
    <plant_id>69137</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>RPCA Solar 8, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.893121</lat>
    <lon>-120.6569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69871/BAT1</id>
    <plant_name>Tanglewood BESS</plant_name>
    <generator_id>BAT1</generator_id>
    <plant_id>69871</plant_id>
    <state>NC</state>
    <county>Pasquotank</county>
    <developer>North Carolina El Member Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.272111</lat>
    <lon>-76.30127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69872/BAT1</id>
    <plant_name>Windsor BESS</plant_name>
    <generator_id>BAT1</generator_id>
    <plant_id>69872</plant_id>
    <state>NC</state>
    <county>Bertie</county>
    <developer>North Carolina El Member Corp</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.025838</lat>
    <lon>-76.98179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70320/ND018</id>
    <plant_name>Water Willow A Clean Energy LLC</plant_name>
    <generator_id>ND018</generator_id>
    <plant_id>70320</plant_id>
    <state>NY</state>
    <county>Queens</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.708897</lat>
    <lon>-73.77939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70321/ND019</id>
    <plant_name>Water Willow B Clean Energy LLC</plant_name>
    <generator_id>ND019</generator_id>
    <plant_id>70321</plant_id>
    <state>NY</state>
    <county>Queens</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.708897</lat>
    <lon>-73.77939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69275/23210</id>
    <plant_name>SL Ashville</plant_name>
    <generator_id>23210</generator_id>
    <plant_id>69275</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>SL Ashville, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.071667</lat>
    <lon>-79.41167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69935/GILMN</id>
    <plant_name>Gilman</plant_name>
    <generator_id>GILMN</generator_id>
    <plant_id>69935</plant_id>
    <state>WI</state>
    <county>Chippewa</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.119204</lat>
    <lon>-90.87405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70019/23221</id>
    <plant_name>SL Portland Community 2, LLC</plant_name>
    <generator_id>23221</generator_id>
    <plant_id>70019</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>SL Portland Community 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.37773</lat>
    <lon>-79.45972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>7907/4</id>
    <plant_name>Pine Flat</plant_name>
    <generator_id>4</generator_id>
    <plant_id>7907</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>Kings River Conservation Dist</developer>
    <sector>Electric Utility</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.8326</lat>
    <lon>-119.327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70326/ND014</id>
    <plant_name>Coral Honeysuckle Clean Energy LLC</plant_name>
    <generator_id>ND014</generator_id>
    <plant_id>70326</plant_id>
    <state>NY</state>
    <county>Queens</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.679023</lat>
    <lon>-73.82032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70329/ND015</id>
    <plant_name>Linden Clean Energy, LLC</plant_name>
    <generator_id>ND015</generator_id>
    <plant_id>70329</plant_id>
    <state>NY</state>
    <county>Queens</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.679074</lat>
    <lon>-73.82041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69811/ANGEL</id>
    <plant_name>SV CSG Angelly 1</plant_name>
    <generator_id>ANGEL</generator_id>
    <plant_id>69811</plant_id>
    <state>IL</state>
    <county>Saline</county>
    <developer>SV CSG Angelly 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.7164</lat>
    <lon>-88.5303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70497/GF1</id>
    <plant_name>Greenfield Solar 1 (IL)</plant_name>
    <generator_id>GF1</generator_id>
    <plant_id>70497</plant_id>
    <state>IL</state>
    <county>Greene</county>
    <developer>Greenfield Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.360626</lat>
    <lon>-90.25397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70202/PS56</id>
    <plant_name>Pivot Solar 56 LLC</plant_name>
    <generator_id>PS56</generator_id>
    <plant_id>70202</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.350547</lat>
    <lon>-104.7226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69472/18198</id>
    <plant_name>NYSolar06</plant_name>
    <generator_id>18198</generator_id>
    <plant_id>69472</plant_id>
    <state>NY</state>
    <county>Erie</county>
    <developer>NYSolar06, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.021667</lat>
    <lon>-78.98806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70103/PS43</id>
    <plant_name>Pivot Solar 43 LLC</plant_name>
    <generator_id>PS43</generator_id>
    <plant_id>70103</plant_id>
    <state>CO</state>
    <county>Adams</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.748549</lat>
    <lon>-104.6673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70018/23216</id>
    <plant_name>SL Portland Community, LLC</plant_name>
    <generator_id>23216</generator_id>
    <plant_id>70018</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>SL Portland Community, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.383832</lat>
    <lon>-79.4718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69810/MAHOM</id>
    <plant_name>SV CSG Mahomet</plant_name>
    <generator_id>MAHOM</generator_id>
    <plant_id>69810</plant_id>
    <state>IL</state>
    <county>Champaign</county>
    <developer>SV CSG Mahomet, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.193189</lat>
    <lon>-88.37984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2185/HAU9</id>
    <plant_name>Hauser</plant_name>
    <generator_id>HAU9</generator_id>
    <plant_id>2185</plant_id>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <developer>NorthWestern Energy (MT Hydro)</developer>
    <sector>Electric Utility</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>46.765941</lat>
    <lon>-111.8873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65060/VCP02</id>
    <plant_name>Hope Solar One</plant_name>
    <generator_id>VCP02</generator_id>
    <plant_id>65060</plant_id>
    <state>RI</state>
    <county>Providence</county>
    <developer>Hope Solar One, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.729285</lat>
    <lon>-71.63759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2185/HAU12</id>
    <plant_name>Hauser</plant_name>
    <generator_id>HAU12</generator_id>
    <plant_id>2185</plant_id>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <developer>NorthWestern Energy (MT Hydro)</developer>
    <sector>Electric Utility</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NWMT</balancing_authority>
    <lat>46.765941</lat>
    <lon>-111.8873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70228/LOCKW</id>
    <plant_name>AC IL - Lockport West</plant_name>
    <generator_id>LOCKW</generator_id>
    <plant_id>70228</plant_id>
    <state>IL</state>
    <county>Will</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.5944</lat>
    <lon>-88.0624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/EG11</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>EG11</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/EG12</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>EG12</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/EG13</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>EG13</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/EG14</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>EG14</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/EG15</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>EG15</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68884/PV1</id>
    <plant_name>Glen Mary</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68884</plant_id>
    <state>NY</state>
    <county>Tioga</county>
    <developer>NY Tioga IV, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.128604</lat>
    <lon>-76.27895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69271/STAG1</id>
    <plant_name>Staghorn Gas</plant_name>
    <generator_id>STAG1</generator_id>
    <plant_id>69271</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.457838</lat>
    <lon>-103.0847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69271/STAG2</id>
    <plant_name>Staghorn Gas</plant_name>
    <generator_id>STAG2</generator_id>
    <plant_id>69271</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.457838</lat>
    <lon>-103.0847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69271/STAG3</id>
    <plant_name>Staghorn Gas</plant_name>
    <generator_id>STAG3</generator_id>
    <plant_id>69271</plant_id>
    <state>TX</state>
    <county>Ward</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.457838</lat>
    <lon>-103.0847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69854/GLWAY</id>
    <plant_name>TJA-NY-1806 Perth Rd Galway, LLC</plant_name>
    <generator_id>GLWAY</generator_id>
    <plant_id>69854</plant_id>
    <state>NY</state>
    <county>Saratoga</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.017403</lat>
    <lon>-74.05131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70457/DEVIZ</id>
    <plant_name>DeVillez</plant_name>
    <generator_id>DEVIZ</generator_id>
    <plant_id>70457</plant_id>
    <state>IL</state>
    <county>Saline</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.7685</lat>
    <lon>-88.5155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69881/USHER</id>
    <plant_name>USS Hermanas Solar</plant_name>
    <generator_id>USHER</generator_id>
    <plant_id>69881</plant_id>
    <state>NM</state>
    <county>Luna</county>
    <developer>USS Hermanas Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>32.210444</lat>
    <lon>-107.8114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70439/PV1</id>
    <plant_name>SR 415 - NY Avoca I</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70439</plant_id>
    <state>NY</state>
    <county>Steuben</county>
    <developer>NY Avoca I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.401191</lat>
    <lon>-77.41787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70317/ND029</id>
    <plant_name>Roseate Tern Clean Energy LLC</plant_name>
    <generator_id>ND029</generator_id>
    <plant_id>70317</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.715572</lat>
    <lon>-73.88673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66618/FL1</id>
    <plant_name>Fish Lake Geothermal</plant_name>
    <generator_id>FL1</generator_id>
    <plant_id>66618</plant_id>
    <state>NV</state>
    <county>Esmeralda</county>
    <developer>Fish Lake Geothermal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>37.860925</lat>
    <lon>-118.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66618/FL2</id>
    <plant_name>Fish Lake Geothermal</plant_name>
    <generator_id>FL2</generator_id>
    <plant_id>66618</plant_id>
    <state>NV</state>
    <county>Esmeralda</county>
    <developer>Fish Lake Geothermal LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>ST</prime_mover>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>37.860925</lat>
    <lon>-118.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69861/NORR2</id>
    <plant_name>Norris City 2</plant_name>
    <generator_id>NORR2</generator_id>
    <plant_id>69861</plant_id>
    <state>IL</state>
    <county>White</county>
    <developer>Navisun LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.020585</lat>
    <lon>-88.27321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70227/LOCKE</id>
    <plant_name>AC IL - Lockport East</plant_name>
    <generator_id>LOCKE</generator_id>
    <plant_id>70227</plant_id>
    <state>IL</state>
    <county>Will</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.6044</lat>
    <lon>-88.0603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70339/IL55B</id>
    <plant_name>Pivot Energy IL 55 LLC</plant_name>
    <generator_id>IL55B</generator_id>
    <plant_id>70339</plant_id>
    <state>IL</state>
    <county>McHenry</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.339848</lat>
    <lon>-88.50452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54224/DG9</id>
    <plant_name>Franklin Heating Station</plant_name>
    <generator_id>DG9</generator_id>
    <plant_id>54224</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>Franklin Heating Station</developer>
    <sector>Commercial CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68070/ALBER</id>
    <plant_name>Alberta Solar</plant_name>
    <generator_id>ALBER</generator_id>
    <plant_id>68070</plant_id>
    <state>VA</state>
    <county>Brunswick</county>
    <developer>Dominion Renewable Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>36.841728</lat>
    <lon>-77.91051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69937/MNDVI</id>
    <plant_name>Mondovi</plant_name>
    <generator_id>MNDVI</generator_id>
    <plant_id>69937</plant_id>
    <state>WI</state>
    <county>Buffalo</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.569282</lat>
    <lon>-91.70856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70486/WHWIL</id>
    <plant_name>IL - Renewable Properties - Bobcat - Whi</plant_name>
    <generator_id>WHWIL</generator_id>
    <plant_id>70486</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>RPIL Solar 9, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.470074</lat>
    <lon>-88.42523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66552/MH162</id>
    <plant_name>EnerSmart Mesa Heights Sub Station</plant_name>
    <generator_id>MH162</generator_id>
    <plant_id>66552</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>EnerSmart Storage</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.82412</lat>
    <lon>-117.1513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68018/MRCDB</id>
    <plant_name>Merced BESS</plant_name>
    <generator_id>MRCDB</generator_id>
    <plant_id>68018</plant_id>
    <state>CA</state>
    <county>Merced</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.989396</lat>
    <lon>-120.8775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69562/MINNE</id>
    <plant_name>Minneola Solar</plant_name>
    <generator_id>MINNE</generator_id>
    <plant_id>69562</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Minneola Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.846914</lat>
    <lon>-116.7698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69855/POMFR</id>
    <plant_name>Pomfret PV, LLC</plant_name>
    <generator_id>POMFR</generator_id>
    <plant_id>69855</plant_id>
    <state>NY</state>
    <county>Chautauqua</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.447083</lat>
    <lon>-79.35516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69884/USMED</id>
    <plant_name>USS Meadow Lake Solar</plant_name>
    <generator_id>USMED</generator_id>
    <plant_id>69884</plant_id>
    <state>NM</state>
    <county>Valencia</county>
    <developer>USS Meadow Lake Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>34.79756</lat>
    <lon>-106.6542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69996/HEMLK</id>
    <plant_name>Penn Hemlock Solar LLC</plant_name>
    <generator_id>HEMLK</generator_id>
    <plant_id>69996</plant_id>
    <state>PA</state>
    <county>Snyder</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.693001</lat>
    <lon>-77.10099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70004/MONRO</id>
    <plant_name>Monroe Route 35 Solar LLC</plant_name>
    <generator_id>MONRO</generator_id>
    <plant_id>70004</plant_id>
    <state>PA</state>
    <county>Juniata</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.685584</lat>
    <lon>-77.13704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70006/PERRR</id>
    <plant_name>Perry Route 104 Solar LLC</plant_name>
    <generator_id>PERRR</generator_id>
    <plant_id>70006</plant_id>
    <state>PA</state>
    <county>Snyder</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.740172</lat>
    <lon>-77.01011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70487/TABER</id>
    <plant_name>NJ - CS Energy - Tabernacle Sands Solar</plant_name>
    <generator_id>TABER</generator_id>
    <plant_id>70487</plant_id>
    <state>NJ</state>
    <county>Burlington</county>
    <developer>Tabernacle Sand Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.810889</lat>
    <lon>-74.69672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70494/FMCS2</id>
    <plant_name>Four Mile Creek Solar Two</plant_name>
    <generator_id>FMCS2</generator_id>
    <plant_id>70494</plant_id>
    <state>IL</state>
    <county>Jefferson</county>
    <developer>Four Mile Creek Solar Two, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.326811</lat>
    <lon>-88.75557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2678/ENG13</id>
    <plant_name>Plant No 1 Freeport</plant_name>
    <generator_id>ENG13</generator_id>
    <plant_id>2678</plant_id>
    <state>NY</state>
    <county>Nassau</county>
    <developer>Village of Freeport - (NY)</developer>
    <sector>Electric Utility</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.6561</lat>
    <lon>-73.5922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68140/CH547</id>
    <plant_name>Melrose Park 2-SLCHI547</plant_name>
    <generator_id>CH547</generator_id>
    <plant_id>68140</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.9809</lat>
    <lon>-87.8633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69427/WAXWI</id>
    <plant_name>Waxwing Solar CSG</plant_name>
    <generator_id>WAXWI</generator_id>
    <plant_id>69427</plant_id>
    <state>CO</state>
    <county>Pueblo</county>
    <developer>Waxwing Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>38.2963</lat>
    <lon>-104.5525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70477/20269</id>
    <plant_name>Stone Elephant Solar WI, LLC</plant_name>
    <generator_id>20269</generator_id>
    <plant_id>70477</plant_id>
    <state>WI</state>
    <county>Jefferson</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.852196</lat>
    <lon>-88.56412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69369/BARTE</id>
    <plant_name>Bartell South PV I</plant_name>
    <generator_id>BARTE</generator_id>
    <plant_id>69369</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>Bartell South PV I LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.208874</lat>
    <lon>-76.12219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69749/U1</id>
    <plant_name>Scholl Canyon</plant_name>
    <generator_id>U1</generator_id>
    <plant_id>69749</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>City of Glendale - (CA)</developer>
    <sector>Electric Utility</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.15638</lat>
    <lon>-118.1927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69749/U2</id>
    <plant_name>Scholl Canyon</plant_name>
    <generator_id>U2</generator_id>
    <plant_id>69749</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>City of Glendale - (CA)</developer>
    <sector>Electric Utility</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.15638</lat>
    <lon>-118.1927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69749/U3</id>
    <plant_name>Scholl Canyon</plant_name>
    <generator_id>U3</generator_id>
    <plant_id>69749</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>City of Glendale - (CA)</developer>
    <sector>Electric Utility</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.15638</lat>
    <lon>-118.1927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69749/U4</id>
    <plant_name>Scholl Canyon</plant_name>
    <generator_id>U4</generator_id>
    <plant_id>69749</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>City of Glendale - (CA)</developer>
    <sector>Electric Utility</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.15638</lat>
    <lon>-118.1927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70008/WPERR</id>
    <plant_name>West Perry Planing Mill Road Solar LLC</plant_name>
    <generator_id>WPERR</generator_id>
    <plant_id>70008</plant_id>
    <state>PA</state>
    <county>Snyder</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.689203</lat>
    <lon>-77.14223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1263/9</id>
    <plant_name>Belleville</plant_name>
    <generator_id>9</generator_id>
    <plant_id>1263</plant_id>
    <state>KS</state>
    <county>Republic</county>
    <developer>City of Belleville - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.832769</lat>
    <lon>-97.63204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69998/WHTCH</id>
    <plant_name>Franklin White Church Road Solar LLC</plant_name>
    <generator_id>WHTCH</generator_id>
    <plant_id>69998</plant_id>
    <state>PA</state>
    <county>Snyder</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.780457</lat>
    <lon>-77.08402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69999/GREEB</id>
    <plant_name>Greenwood Bottom Road Solar LLC</plant_name>
    <generator_id>GREEB</generator_id>
    <plant_id>69999</plant_id>
    <state>PA</state>
    <county>Columbia</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.117527</lat>
    <lon>-76.48308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70000/GREER</id>
    <plant_name>Greenwood Route 254 Solar LLC</plant_name>
    <generator_id>GREER</generator_id>
    <plant_id>70000</plant_id>
    <state>PA</state>
    <county>Columbia</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.130477</lat>
    <lon>-76.51152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70003/TAYLR</id>
    <plant_name>Madison Taylor Road Solar LLC</plant_name>
    <generator_id>TAYLR</generator_id>
    <plant_id>70003</plant_id>
    <state>PA</state>
    <county>Columbia</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.112516</lat>
    <lon>-76.538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70564/SALER</id>
    <plant_name>Salem Route 11 Solar LLC</plant_name>
    <generator_id>SALER</generator_id>
    <plant_id>70564</plant_id>
    <state>PA</state>
    <county>Luzerne</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.072294</lat>
    <lon>-76.2001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65828/1666</id>
    <plant_name>Chidsey Hill Road Solar</plant_name>
    <generator_id>1666</generator_id>
    <plant_id>65828</plant_id>
    <state>NY</state>
    <county>Steuben</county>
    <developer>NY Pulteney I, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.573062</lat>
    <lon>-77.16598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68216/CUSES</id>
    <plant_name>Cushman Road Solar</plant_name>
    <generator_id>CUSES</generator_id>
    <plant_id>68216</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>ReWild Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.732</lat>
    <lon>-70.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68216/CUSPV</id>
    <plant_name>Cushman Road Solar</plant_name>
    <generator_id>CUSPV</generator_id>
    <plant_id>68216</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>ReWild Renewables, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.732</lat>
    <lon>-70.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69560/MAGNO</id>
    <plant_name>Sunrise Magnolia DE</plant_name>
    <generator_id>MAGNO</generator_id>
    <plant_id>69560</plant_id>
    <state>DE</state>
    <county>Kent</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.071366</lat>
    <lon>-75.49303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70005/SHOOF</id>
    <plant_name>Penn Shoofly Solar LLC</plant_name>
    <generator_id>SHOOF</generator_id>
    <plant_id>70005</plant_id>
    <state>PA</state>
    <county>Columbia</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.115059</lat>
    <lon>-76.4738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70105/GDNAB</id>
    <plant_name>Gardenia 1</plant_name>
    <generator_id>GDNAB</generator_id>
    <plant_id>70105</plant_id>
    <state>CA</state>
    <county>Kings</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.790785</lat>
    <lon>-119.8777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70105/GDNAS</id>
    <plant_name>Gardenia 1</plant_name>
    <generator_id>GDNAS</generator_id>
    <plant_id>70105</plant_id>
    <state>CA</state>
    <county>Kings</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.790785</lat>
    <lon>-119.8777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>56895/7</id>
    <plant_name>Ameresco Ox Mountain</plant_name>
    <generator_id>7</generator_id>
    <plant_id>56895</plant_id>
    <state>CA</state>
    <county>San Mateo</county>
    <developer>AMERESCO Ox Mountain Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.5</lat>
    <lon>-122.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69994/MONTR</id>
    <plant_name>Montour Tower Drive Solar LLC</plant_name>
    <generator_id>MONTR</generator_id>
    <plant_id>69994</plant_id>
    <state>PA</state>
    <county>Columbia</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.981975</lat>
    <lon>-76.52315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70170/429</id>
    <plant_name>Jones - PA 0429 (Rhodes South)</plant_name>
    <generator_id>429</generator_id>
    <plant_id>70170</plant_id>
    <state>PA</state>
    <county>Elk</county>
    <developer>CVE US PA Jones 429 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.56421</lat>
    <lon>-78.69733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69160/OTTA1</id>
    <plant_name>SV CSG Ottawa 1</plant_name>
    <generator_id>OTTA1</generator_id>
    <plant_id>69160</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>SV CSG Ottawa 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.340799</lat>
    <lon>-88.77689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69995/MUNCL</id>
    <plant_name>Muncy Creek Lime Bluff Road Solar</plant_name>
    <generator_id>MUNCL</generator_id>
    <plant_id>69995</plant_id>
    <state>PA</state>
    <county>Lycoming</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.22184</lat>
    <lon>-76.75467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70075/409</id>
    <plant_name>Bigler - PA 0409 (Flango 1)</plant_name>
    <generator_id>409</generator_id>
    <plant_id>70075</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Bigler 409 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.803436</lat>
    <lon>-78.42275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70079/151</id>
    <plant_name>Buckingham - PA 0151 (Crea)</plant_name>
    <generator_id>151</generator_id>
    <plant_id>70079</plant_id>
    <state>PA</state>
    <county>Wayne</county>
    <developer>CVE US PA BUCKINGHAM 151 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.86605</lat>
    <lon>-78.42275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70080/396</id>
    <plant_name>Burrell - PA 0396 (Copeland)</plant_name>
    <generator_id>396</generator_id>
    <plant_id>70080</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Burrell 396 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.65921</lat>
    <lon>-79.43822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70081/379</id>
    <plant_name>CVE US PA Dayton 379</plant_name>
    <generator_id>379</generator_id>
    <plant_id>70081</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Dayton 379 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.89056</lat>
    <lon>-79.27027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70083/399</id>
    <plant_name>Jones - PA 0399 (Rhodes)</plant_name>
    <generator_id>399</generator_id>
    <plant_id>70083</plant_id>
    <state>PA</state>
    <county>Elk</county>
    <developer>CVE US PA Jones 399 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.564214</lat>
    <lon>-78.69733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70166/385</id>
    <plant_name>Unity - PA 0385 (Soccerhound)</plant_name>
    <generator_id>385</generator_id>
    <plant_id>70166</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Latrobe 385 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.25174</lat>
    <lon>-79.35354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70171/187</id>
    <plant_name>Wetmore - PA 0187 (Chittester)</plant_name>
    <generator_id>187</generator_id>
    <plant_id>70171</plant_id>
    <state>PA</state>
    <county>McKean</county>
    <developer>CVE US PA Kane 187 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.66753</lat>
    <lon>-78.73295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70172/383</id>
    <plant_name>Kittanning - PA 0383 (Hoeter)</plant_name>
    <generator_id>383</generator_id>
    <plant_id>70172</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Kittanning 383 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.82161</lat>
    <lon>-79.33393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70077/437</id>
    <plant_name>Bigler - PA 0437 (Flango 3)</plant_name>
    <generator_id>437</generator_id>
    <plant_id>70077</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Bigler 437 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.80344</lat>
    <lon>-78.42275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70120/185</id>
    <plant_name>New Alexandria - PA 0185 (Weimer)</plant_name>
    <generator_id>185</generator_id>
    <plant_id>70120</plant_id>
    <state>PA</state>
    <county>Westmoreland</county>
    <developer>CVE US PA New Alexandria 185 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.40255</lat>
    <lon>-79.42805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70169/486</id>
    <plant_name>Monroe - PA 0486 (Acey)</plant_name>
    <generator_id>486</generator_id>
    <plant_id>70169</plant_id>
    <state>PA</state>
    <county>Clarion</county>
    <developer>CVE US PA Monroe 486 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.13178</lat>
    <lon>-79.4476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1263/7A</id>
    <plant_name>Belleville</plant_name>
    <generator_id>7A</generator_id>
    <plant_id>1263</plant_id>
    <state>KS</state>
    <county>Republic</county>
    <developer>City of Belleville - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>39.832769</lat>
    <lon>-97.63204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70076/436</id>
    <plant_name>Bigler - PA 0436 (Flango 2)</plant_name>
    <generator_id>436</generator_id>
    <plant_id>70076</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Bigler 436 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-02</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.80344</lat>
    <lon>-78.42252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70024/BEAVE</id>
    <plant_name>Beaver Gross Road Solar LLC</plant_name>
    <generator_id>BEAVE</generator_id>
    <plant_id>70024</plant_id>
    <state>PA</state>
    <county>Snyder</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.747397</lat>
    <lon>-77.18922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70028/CONRR</id>
    <plant_name>Delaware Conrath Road Solar LLC</plant_name>
    <generator_id>CONRR</generator_id>
    <plant_id>70028</plant_id>
    <state>PA</state>
    <county>Northumberland</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.113012</lat>
    <lon>-76.85038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69970/MPLRA</id>
    <plant_name>Maple Ridge A</plant_name>
    <generator_id>MPLRA</generator_id>
    <plant_id>69970</plant_id>
    <state>PA</state>
    <county>Franklin</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.901992</lat>
    <lon>-77.578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69971/MPLRB</id>
    <plant_name>Maple Ridge B</plant_name>
    <generator_id>MPLRB</generator_id>
    <plant_id>69971</plant_id>
    <state>PA</state>
    <county>Franklin</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-04</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.901992</lat>
    <lon>-77.578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70032/KEEFE</id>
    <plant_name>Liberty Keefer Mill Road Solar LLC</plant_name>
    <generator_id>KEEFE</generator_id>
    <plant_id>70032</plant_id>
    <state>PA</state>
    <county>Montour</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.030468</lat>
    <lon>-76.68827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62386/NA1</id>
    <plant_name>Opekiska L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62386</plant_id>
    <state>WV</state>
    <county>Monongalia</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.564917</lat>
    <lon>-80.05114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62386/NA2</id>
    <plant_name>Opekiska L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62386</plant_id>
    <state>WV</state>
    <county>Monongalia</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.564917</lat>
    <lon>-80.05114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65313/ES</id>
    <plant_name>Elm Spring Solar 1</plant_name>
    <generator_id>ES</generator_id>
    <plant_id>65313</plant_id>
    <state>VA</state>
    <county>Augusta</county>
    <developer>Antares Group Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.0945</lat>
    <lon>-78.9595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70164/406</id>
    <plant_name>Kittanning - PA 0406 (Hoeter B)</plant_name>
    <generator_id>406</generator_id>
    <plant_id>70164</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Kittanning 406 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.82161</lat>
    <lon>-79.33393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70165/407</id>
    <plant_name>Kittanning - PA 0407 (Hoeter C)</plant_name>
    <generator_id>407</generator_id>
    <plant_id>70165</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Kittanning 407 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.82161</lat>
    <lon>-79.33393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65312/SV</id>
    <plant_name>Shenvalee Solar</plant_name>
    <generator_id>SV</generator_id>
    <plant_id>65312</plant_id>
    <state>VA</state>
    <county>Augusta</county>
    <developer>Antares Group Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.0249</lat>
    <lon>-79.0335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69220/11253</id>
    <plant_name>West Genesee</plant_name>
    <generator_id>11253</generator_id>
    <plant_id>69220</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.165134</lat>
    <lon>-76.41876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54808/STG1</id>
    <plant_name>New York University Central Plant</plant_name>
    <generator_id>STG1</generator_id>
    <plant_id>54808</plant_id>
    <state>NY</state>
    <county>New York</county>
    <developer>New York University</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Natural Gas Fired Combined Cycle</technology>
    <energy_source>NG</energy_source>
    <prime_mover>CA</prime_mover>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.7899</lat>
    <lon>-73.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67770/30200</id>
    <plant_name>Pittsburg RV Solar</plant_name>
    <generator_id>30200</generator_id>
    <plant_id>67770</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Pittsburg RV &amp; Boat Storage, LLC</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.01155</lat>
    <lon>-121.8453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70538/BRH</id>
    <plant_name>Belchertown Solar PV + Battery Project</plant_name>
    <generator_id>BRH</generator_id>
    <plant_id>70538</plant_id>
    <state>MA</state>
    <county>Hampshire</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.3</lat>
    <lon>-72.37</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70538/BRHBA</id>
    <plant_name>Belchertown Solar PV + Battery Project</plant_name>
    <generator_id>BRHBA</generator_id>
    <plant_id>70538</plant_id>
    <state>MA</state>
    <county>Hampshire</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.3</lat>
    <lon>-72.37</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70334/IL55B</id>
    <plant_name>Pivot Energy IL 55b LLC</plant_name>
    <generator_id>IL55B</generator_id>
    <plant_id>70334</plant_id>
    <state>IL</state>
    <county>McHenry</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.3455</lat>
    <lon>-88.50561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69804/MEPV1</id>
    <plant_name>Menard 1</plant_name>
    <generator_id>MEPV1</generator_id>
    <plant_id>69804</plant_id>
    <state>IL</state>
    <county>Menard</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2027-09</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.089</lat>
    <lon>-89.723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68110/MILAN</id>
    <plant_name>SR Milan</plant_name>
    <generator_id>MILAN</generator_id>
    <plant_id>68110</plant_id>
    <state>TN</state>
    <county>Gibson</county>
    <developer>SR Milan, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>35.945285</lat>
    <lon>-88.75989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69196/NEBOB</id>
    <plant_name>Nebo Energy Storage</plant_name>
    <generator_id>NEBOB</generator_id>
    <plant_id>69196</plant_id>
    <state>NC</state>
    <county>Burke</county>
    <developer>Duke Energy Carolinas, LLC</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.791718</lat>
    <lon>-81.85104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>54808/GR1</id>
    <plant_name>New York University Central Plant</plant_name>
    <generator_id>GR1</generator_id>
    <plant_id>54808</plant_id>
    <state>NY</state>
    <county>New York</county>
    <developer>New York University</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.7899</lat>
    <lon>-73.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70012/IN609</id>
    <plant_name>Redlands DC 9 - sline609</plant_name>
    <generator_id>IN609</generator_id>
    <plant_id>70012</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.083141</lat>
    <lon>-117.2035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70375/CLIN5</id>
    <plant_name>Clinton Solar 5</plant_name>
    <generator_id>CLIN5</generator_id>
    <plant_id>70375</plant_id>
    <state>IL</state>
    <county>Clinton</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.595381</lat>
    <lon>-89.18656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70503/PV1</id>
    <plant_name>EESolar22</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70503</plant_id>
    <state>MN</state>
    <county>Le Sueur</county>
    <developer>EESolar22 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.248616</lat>
    <lon>-93.96164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58903/UNIT1</id>
    <plant_name>Marseilles Lock and Dam Hydro</plant_name>
    <generator_id>UNIT1</generator_id>
    <plant_id>58903</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Marseilles Land and Water Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.327778</lat>
    <lon>-88.70111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58903/UNIT2</id>
    <plant_name>Marseilles Lock and Dam Hydro</plant_name>
    <generator_id>UNIT2</generator_id>
    <plant_id>58903</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Marseilles Land and Water Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.327778</lat>
    <lon>-88.70111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58903/UNIT3</id>
    <plant_name>Marseilles Lock and Dam Hydro</plant_name>
    <generator_id>UNIT3</generator_id>
    <plant_id>58903</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Marseilles Land and Water Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.327778</lat>
    <lon>-88.70111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58903/UNIT4</id>
    <plant_name>Marseilles Lock and Dam Hydro</plant_name>
    <generator_id>UNIT4</generator_id>
    <plant_id>58903</plant_id>
    <state>IL</state>
    <county>LaSalle</county>
    <developer>Marseilles Land and Water Company</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.327778</lat>
    <lon>-88.70111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70123/224</id>
    <plant_name>Petersburg - VA 0224 (Murphy)</plant_name>
    <generator_id>224</generator_id>
    <plant_id>70123</plant_id>
    <state>VA</state>
    <county>Chesterfield</county>
    <developer>CVE US VA Petersburg 224 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.24348</lat>
    <lon>-77.43647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70126/467</id>
    <plant_name>Roulette - PA 0467</plant_name>
    <generator_id>467</generator_id>
    <plant_id>70126</plant_id>
    <state>PA</state>
    <county>Potter</county>
    <developer>CVE US PA Roulette 467 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.777</lat>
    <lon>-78.1995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69371/HALIF</id>
    <plant_name>Middle Road Solar Partners</plant_name>
    <generator_id>HALIF</generator_id>
    <plant_id>69371</plant_id>
    <state>PA</state>
    <county>Dauphin</county>
    <developer>Middle Road Solar Partners LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.516</lat>
    <lon>-76.937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69592/PSKBS</id>
    <plant_name>NL NY- Pulaski</plant_name>
    <generator_id>PSKBS</generator_id>
    <plant_id>69592</plant_id>
    <state>NY</state>
    <county>Orange</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.334309</lat>
    <lon>-74.40401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69592/PSKPV</id>
    <plant_name>NL NY- Pulaski</plant_name>
    <generator_id>PSKPV</generator_id>
    <plant_id>69592</plant_id>
    <state>NY</state>
    <county>Orange</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>41.334309</lat>
    <lon>-74.40401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70031/ZEBRA</id>
    <plant_name>Zebrawood Solar, LLC</plant_name>
    <generator_id>ZEBRA</generator_id>
    <plant_id>70031</plant_id>
    <state>IL</state>
    <county>Hancock</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.613821</lat>
    <lon>-91.28497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55027/1600B</id>
    <plant_name>Papillion Creek Wastewater</plant_name>
    <generator_id>1600B</generator_id>
    <plant_id>55027</plant_id>
    <state>NE</state>
    <county>Sarpy</county>
    <developer>City of Omaha - (NE)</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.0772</lat>
    <lon>-95.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55027/1600C</id>
    <plant_name>Papillion Creek Wastewater</plant_name>
    <generator_id>1600C</generator_id>
    <plant_id>55027</plant_id>
    <state>NE</state>
    <county>Sarpy</county>
    <developer>City of Omaha - (NE)</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.0772</lat>
    <lon>-95.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>55027/1600D</id>
    <plant_name>Papillion Creek Wastewater</plant_name>
    <generator_id>1600D</generator_id>
    <plant_id>55027</plant_id>
    <state>NE</state>
    <county>Sarpy</county>
    <developer>City of Omaha - (NE)</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.0772</lat>
    <lon>-95.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69377/NEWFR</id>
    <plant_name>New Freedom Solar Partners</plant_name>
    <generator_id>NEWFR</generator_id>
    <plant_id>69377</plant_id>
    <state>PA</state>
    <county>York</county>
    <developer>New Freedom Solar Partners LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.745</lat>
    <lon>-76.696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69934/FALUN</id>
    <plant_name>Falun</plant_name>
    <generator_id>FALUN</generator_id>
    <plant_id>69934</plant_id>
    <state>WI</state>
    <county>Burnett</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.779061</lat>
    <lon>-92.5306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69936/KALMR</id>
    <plant_name>Kalmar</plant_name>
    <generator_id>KALMR</generator_id>
    <plant_id>69936</plant_id>
    <state>MN</state>
    <county>Olmsted</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.024642</lat>
    <lon>-92.578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69940/TEEPL</id>
    <plant_name>Teeple Creek</plant_name>
    <generator_id>TEEPL</generator_id>
    <plant_id>69940</plant_id>
    <state>IA</state>
    <county>Allamakee</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.234672</lat>
    <lon>-91.50468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>52149/GEN21</id>
    <plant_name>West Point (PA)</plant_name>
    <generator_id>GEN21</generator_id>
    <plant_id>52149</plant_id>
    <state>PA</state>
    <county>Montgomery</county>
    <developer>Merck &amp; Co Inc-West Point</developer>
    <sector>Industrial CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.217963</lat>
    <lon>-75.29882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68935/ROX1</id>
    <plant_name>SV CSG Roxana 1</plant_name>
    <generator_id>ROX1</generator_id>
    <plant_id>68935</plant_id>
    <state>IL</state>
    <county>Madison</county>
    <developer>SV CSG Roxana 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.836055</lat>
    <lon>-90.03685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70489/17405</id>
    <plant_name>Bakers Falls Solar</plant_name>
    <generator_id>17405</generator_id>
    <plant_id>70489</plant_id>
    <state>NY</state>
    <county>Saratoga</county>
    <developer>Bakers Falls Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.283387</lat>
    <lon>-73.60827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70502/SRS2</id>
    <plant_name>Sunset Road Solar 2</plant_name>
    <generator_id>SRS2</generator_id>
    <plant_id>70502</plant_id>
    <state>IL</state>
    <county>Macoupin</county>
    <developer>Sunset Road Solar 2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.158531</lat>
    <lon>-89.77262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70205/BURS2</id>
    <plant_name>Bureau Solar 2 LLC</plant_name>
    <generator_id>BURS2</generator_id>
    <plant_id>70205</plant_id>
    <state>IL</state>
    <county>Bureau</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.463853</lat>
    <lon>-89.46756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70336/NCBP1</id>
    <plant_name>NCBP ONE, LLC</plant_name>
    <generator_id>NCBP1</generator_id>
    <plant_id>70336</plant_id>
    <state>MD</state>
    <county>Prince Georges</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.8698</lat>
    <lon>-76.7394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69176/11218</id>
    <plant_name>Bonacci 1</plant_name>
    <generator_id>11218</generator_id>
    <plant_id>69176</plant_id>
    <state>IL</state>
    <county>Champaign</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.083997</lat>
    <lon>-88.16215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69177/11218</id>
    <plant_name>Bonacci 2</plant_name>
    <generator_id>11218</generator_id>
    <plant_id>69177</plant_id>
    <state>IL</state>
    <county>Champaign</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.083997</lat>
    <lon>-88.16215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69268/COYA1</id>
    <plant_name>Coyanosa Gas</plant_name>
    <generator_id>COYA1</generator_id>
    <plant_id>69268</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.275177</lat>
    <lon>-103.1126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69268/COYA2</id>
    <plant_name>Coyanosa Gas</plant_name>
    <generator_id>COYA2</generator_id>
    <plant_id>69268</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.275177</lat>
    <lon>-103.1126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69268/COYA3</id>
    <plant_name>Coyanosa Gas</plant_name>
    <generator_id>COYA3</generator_id>
    <plant_id>69268</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.275177</lat>
    <lon>-103.1126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69268/COYA4</id>
    <plant_name>Coyanosa Gas</plant_name>
    <generator_id>COYA4</generator_id>
    <plant_id>69268</plant_id>
    <state>TX</state>
    <county>Pecos</county>
    <developer>RPC Merchant, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>31.275177</lat>
    <lon>-103.1126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69373/LITTL</id>
    <plant_name>Little Falls PV</plant_name>
    <generator_id>LITTL</generator_id>
    <plant_id>69373</plant_id>
    <state>NY</state>
    <county>Herkimer</county>
    <developer>Little Falls PV LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.98791</lat>
    <lon>-74.86305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68212/MDLN</id>
    <plant_name>Maryland Line Road Solar</plant_name>
    <generator_id>MDLN</generator_id>
    <plant_id>68212</plant_id>
    <state>DE</state>
    <county>New Castle</county>
    <developer>Maryland Line Road Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.372</lat>
    <lon>-75.763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>935/8</id>
    <plant_name>Bushnell</plant_name>
    <generator_id>8</generator_id>
    <plant_id>935</plant_id>
    <state>IL</state>
    <county>McDonough</county>
    <developer>City of Bushnell - (IL)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.548586</lat>
    <lon>-90.51381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68144/CH305</id>
    <plant_name>Northlake 5-SLCHI305</plant_name>
    <generator_id>CH305</generator_id>
    <plant_id>68144</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.929004</lat>
    <lon>-87.91716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66340/PV1</id>
    <plant_name>Canyonville Solar LLC (CSG)</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>66340</plant_id>
    <state>OR</state>
    <county>Douglas</county>
    <developer>SolRiver Capital LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>42.956886</lat>
    <lon>-123.2618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70082/404</id>
    <plant_name>Dayton - PA 0404 (Good East)</plant_name>
    <generator_id>404</generator_id>
    <plant_id>70082</plant_id>
    <state>PA</state>
    <county>Armstrong</county>
    <developer>CVE US PA Dayton 404 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.89056</lat>
    <lon>-79.27027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62402/NA1</id>
    <plant_name>Arkabutla Lake Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62402</plant_id>
    <state>MS</state>
    <county>DeSoto</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-06</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.757926</lat>
    <lon>-90.12569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62402/NA2</id>
    <plant_name>Arkabutla Lake Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62402</plant_id>
    <state>MS</state>
    <county>DeSoto</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-07</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.757926</lat>
    <lon>-90.12569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62387/NA1</id>
    <plant_name>Morgantown L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62387</plant_id>
    <state>WV</state>
    <county>Monongalia</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.619589</lat>
    <lon>-79.96811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69668/BCIC1</id>
    <plant_name>Brigham City Gas</plant_name>
    <generator_id>BCIC1</generator_id>
    <plant_id>69668</plant_id>
    <state>UT</state>
    <county>Box Elder</county>
    <developer>Brigham City Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>41.507163</lat>
    <lon>-112.0027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69668/BCIC2</id>
    <plant_name>Brigham City Gas</plant_name>
    <generator_id>BCIC2</generator_id>
    <plant_id>69668</plant_id>
    <state>UT</state>
    <county>Box Elder</county>
    <developer>Brigham City Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>41.507163</lat>
    <lon>-112.0027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69668/BCIC3</id>
    <plant_name>Brigham City Gas</plant_name>
    <generator_id>BCIC3</generator_id>
    <plant_id>69668</plant_id>
    <state>UT</state>
    <county>Box Elder</county>
    <developer>Brigham City Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Internal Combustion Engine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <planned_start>2028-08</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>41.507163</lat>
    <lon>-112.0027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62387/NA2</id>
    <plant_name>Morgantown L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62387</plant_id>
    <state>WV</state>
    <county>Monongalia</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-09</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.619589</lat>
    <lon>-79.96811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62432/NA1</id>
    <plant_name>Enid Lake Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62432</plant_id>
    <state>MS</state>
    <county>Panola</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-10</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.158065</lat>
    <lon>-89.90553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62384/NA1</id>
    <plant_name>Point Marion L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62384</plant_id>
    <state>PA</state>
    <county>Fayette</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.726855</lat>
    <lon>-79.91013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62432/NA2</id>
    <plant_name>Enid Lake Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62432</plant_id>
    <state>MS</state>
    <county>Panola</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-11</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>TVA</balancing_authority>
    <lat>34.158065</lat>
    <lon>-89.90553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62384/NA2</id>
    <plant_name>Point Marion L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62384</plant_id>
    <state>PA</state>
    <county>Fayette</county>
    <developer>Rye Development</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2028-12</planned_start>
    <planned_year>2028</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.726855</lat>
    <lon>-79.91013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70372/LERMI</id>
    <plant_name>Lerdo Middle</plant_name>
    <generator_id>LERMI</generator_id>
    <plant_id>70372</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Wonderful Renewable Energy, LLC.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.50622</lat>
    <lon>-119.162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69375/LYSAN</id>
    <plant_name>Lysander III PV</plant_name>
    <generator_id>LYSAN</generator_id>
    <plant_id>69375</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>Lysander III PV LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>43.219759</lat>
    <lon>-76.38847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70012/BA609</id>
    <plant_name>Redlands DC 9 - sline609</plant_name>
    <generator_id>BA609</generator_id>
    <plant_id>70012</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.083141</lat>
    <lon>-117.2035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70458/SAPHI</id>
    <plant_name>Sapphire Solar NY</plant_name>
    <generator_id>SAPHI</generator_id>
    <plant_id>70458</plant_id>
    <state>NY</state>
    <county>Jefferson</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>43.9543</lat>
    <lon>-76.0739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69767/NCBP7</id>
    <plant_name>NCBP Seven</plant_name>
    <generator_id>NCBP7</generator_id>
    <plant_id>69767</plant_id>
    <state>MD</state>
    <county>Prince Georges</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.8692</lat>
    <lon>-76.7368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70452/OCS62</id>
    <plant_name>Buckaroo Solar 1</plant_name>
    <generator_id>OCS62</generator_id>
    <plant_id>70452</plant_id>
    <state>OR</state>
    <county>Umatilla</county>
    <developer>Buckaroo Solar 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>45.660992</lat>
    <lon>-118.7721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70168/485</id>
    <plant_name>Monroe - PA 0485 (Lawrence)</plant_name>
    <generator_id>485</generator_id>
    <plant_id>70168</plant_id>
    <state>PA</state>
    <county>Clarion</county>
    <developer>CVE US PA Monroe 485 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.11339</lat>
    <lon>-79.4146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61592/WT1</id>
    <plant_name>Cody Road Wind Farm</plant_name>
    <generator_id>WT1</generator_id>
    <plant_id>61592</plant_id>
    <state>NY</state>
    <county>Madison</county>
    <developer>Green Power Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.967145</lat>
    <lon>-75.75592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61592/WT2</id>
    <plant_name>Cody Road Wind Farm</plant_name>
    <generator_id>WT2</generator_id>
    <plant_id>61592</plant_id>
    <state>NY</state>
    <county>Madison</county>
    <developer>Green Power Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.967145</lat>
    <lon>-75.75592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61592/WT3</id>
    <plant_name>Cody Road Wind Farm</plant_name>
    <generator_id>WT3</generator_id>
    <plant_id>61592</plant_id>
    <state>NY</state>
    <county>Madison</county>
    <developer>Green Power Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Onshore Wind Turbine</technology>
    <energy_source>WND</energy_source>
    <prime_mover>WT</prime_mover>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <planned_start>2029-07</planned_start>
    <planned_year>2029</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.967145</lat>
    <lon>-75.75592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69939/SPOON</id>
    <plant_name>Spooner</plant_name>
    <generator_id>SPOON</generator_id>
    <plant_id>69939</plant_id>
    <state>WI</state>
    <county>Washburn</county>
    <developer>OneEnergy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.84628</lat>
    <lon>-91.8634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70370/R4701</id>
    <plant_name>Ranch 4701</plant_name>
    <generator_id>R4701</generator_id>
    <plant_id>70370</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Wonderful Renewable Energy, LLC.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.742656</lat>
    <lon>-119.0809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68571/7481</id>
    <plant_name>Lowe's - 1440 - Rockford, IL RDC (POI 1)</plant_name>
    <generator_id>7481</generator_id>
    <plant_id>68571</plant_id>
    <state>IL</state>
    <county>Winnebago</county>
    <developer>South Springfield Avenue Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.239075</lat>
    <lon>-89.13187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68572/7824</id>
    <plant_name>Lowe's - 1440 - Rockford, IL RDC (POI 2)</plant_name>
    <generator_id>7824</generator_id>
    <plant_id>68572</plant_id>
    <state>IL</state>
    <county>Winnebago</county>
    <developer>South Springfield Avenue II Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.239075</lat>
    <lon>-89.13187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70555/ZIONP</id>
    <plant_name>Cenergy IL - Zion Park District</plant_name>
    <generator_id>ZIONP</generator_id>
    <plant_id>70555</plant_id>
    <state>IL</state>
    <county>Lake</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.4645</lat>
    <lon>-87.8476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65070/A04</id>
    <plant_name>Austin TX GigaFactory</plant_name>
    <generator_id>A04</generator_id>
    <plant_id>65070</plant_id>
    <state>TX</state>
    <county>Travis</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>30.22021</lat>
    <lon>-97.61968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66516/19500</id>
    <plant_name>TX Dallas 7750 Dynasty Drive</plant_name>
    <generator_id>19500</generator_id>
    <plant_id>66516</plant_id>
    <state>TX</state>
    <county>Dallas</county>
    <developer>Catalyze Dallas 7750 Dynasty Drive Microgrid, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>ERCO</balancing_authority>
    <lat>32.652269</lat>
    <lon>-96.75577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66830/P5376</id>
    <plant_name>Harrah's Atlantic City - POI 1 (Meeting</plant_name>
    <generator_id>P5376</generator_id>
    <plant_id>66830</plant_id>
    <state>NJ</state>
    <county>Atlantic</county>
    <developer>Distributed Solar Development, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.384389</lat>
    <lon>-74.42627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70319/ND016</id>
    <plant_name>Warbler Clean Energy LLC</plant_name>
    <generator_id>ND016</generator_id>
    <plant_id>70319</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.815404</lat>
    <lon>-73.86023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70316/ND017</id>
    <plant_name>Piping Plover Clean Energy, LLC</plant_name>
    <generator_id>ND017</generator_id>
    <plant_id>70316</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>NineDot Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.815382</lat>
    <lon>-73.86015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1267/15</id>
    <plant_name>Chanute 1</plant_name>
    <generator_id>15</generator_id>
    <plant_id>1267</plant_id>
    <state>KS</state>
    <county>Neosho</county>
    <developer>City of Chanute (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.683333</lat>
    <lon>-95.45472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1267/16</id>
    <plant_name>Chanute 1</plant_name>
    <generator_id>16</generator_id>
    <plant_id>1267</plant_id>
    <state>KS</state>
    <county>Neosho</county>
    <developer>City of Chanute (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.683333</lat>
    <lon>-95.45472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1267/17</id>
    <plant_name>Chanute 1</plant_name>
    <generator_id>17</generator_id>
    <plant_id>1267</plant_id>
    <state>KS</state>
    <county>Neosho</county>
    <developer>City of Chanute (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.683333</lat>
    <lon>-95.45472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70101/PPA29</id>
    <plant_name>Pivot Energy PPA 29 LLC</plant_name>
    <generator_id>PPA29</generator_id>
    <plant_id>70101</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.828466</lat>
    <lon>-121.3049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2308/6</id>
    <plant_name>Tecumseh</plant_name>
    <generator_id>6</generator_id>
    <plant_id>2308</plant_id>
    <state>NE</state>
    <county>Johnson</county>
    <developer>City of Tecumseh - (NE)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.3664</lat>
    <lon>-96.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2308/7</id>
    <plant_name>Tecumseh</plant_name>
    <generator_id>7</generator_id>
    <plant_id>2308</plant_id>
    <state>NE</state>
    <county>Johnson</county>
    <developer>City of Tecumseh - (NE)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>40.3664</lat>
    <lon>-96.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69818/NCREK</id>
    <plant_name>SV CSG North Creek 1</plant_name>
    <generator_id>NCREK</generator_id>
    <plant_id>69818</plant_id>
    <state>IL</state>
    <county>Livingston</county>
    <developer>SV CSG North Creek 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.916213</lat>
    <lon>-88.60821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67283/6569B</id>
    <plant_name>Six Flags Magic Mountain</plant_name>
    <generator_id>6569B</generator_id>
    <plant_id>67283</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Magic Mountain Parkway Solar Project 2023, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.428209</lat>
    <lon>-118.5993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70574/14237</id>
    <plant_name>Sandoval 2</plant_name>
    <generator_id>14237</generator_id>
    <plant_id>70574</plant_id>
    <state>IL</state>
    <county>Clinton</county>
    <developer>Nautilus Solar Solutions</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.589399</lat>
    <lon>-89.14667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1291/17</id>
    <plant_name>Iola</plant_name>
    <generator_id>17</generator_id>
    <plant_id>1291</plant_id>
    <state>KS</state>
    <county>Allen</county>
    <developer>City of Iola - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.923076</lat>
    <lon>-95.42557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1291/18</id>
    <plant_name>Iola</plant_name>
    <generator_id>18</generator_id>
    <plant_id>1291</plant_id>
    <state>KS</state>
    <county>Allen</county>
    <developer>City of Iola - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.923076</lat>
    <lon>-95.42557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1291/19</id>
    <plant_name>Iola</plant_name>
    <generator_id>19</generator_id>
    <plant_id>1291</plant_id>
    <state>KS</state>
    <county>Allen</county>
    <developer>City of Iola - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.923076</lat>
    <lon>-95.42557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>1291/20</id>
    <plant_name>Iola</plant_name>
    <generator_id>20</generator_id>
    <plant_id>1291</plant_id>
    <state>KS</state>
    <county>Allen</county>
    <developer>City of Iola - (KS)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>37.923076</lat>
    <lon>-95.42557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63541/BCRV1</id>
    <plant_name>Solar Carver 1 Hybrid</plant_name>
    <generator_id>BCRV1</generator_id>
    <plant_id>63541</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Solar Carver 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.824474</lat>
    <lon>-70.75292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63541/SCRV1</id>
    <plant_name>Solar Carver 1 Hybrid</plant_name>
    <generator_id>SCRV1</generator_id>
    <plant_id>63541</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Solar Carver 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.824474</lat>
    <lon>-70.75292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67857/MCDOW</id>
    <plant_name>McDowell Creek Solar LLC</plant_name>
    <generator_id>MCDOW</generator_id>
    <plant_id>67857</plant_id>
    <state>NC</state>
    <county>Mecklenburg</county>
    <developer>McDowell Creek Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>DUK</balancing_authority>
    <lat>35.394168</lat>
    <lon>-80.94389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68139/CH102</id>
    <plant_name>McCook 2-SLCHI102</plant_name>
    <generator_id>CH102</generator_id>
    <plant_id>68139</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.803083</lat>
    <lon>-87.81935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70182/PV1</id>
    <plant_name>Steger</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70182</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Steger Road Solar 1 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.4701</lat>
    <lon>-87.5793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70206/PS57</id>
    <plant_name>Pivot Solar 57 LLC</plant_name>
    <generator_id>PS57</generator_id>
    <plant_id>70206</plant_id>
    <state>CO</state>
    <county>Mesa</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>39.051557</lat>
    <lon>-108.4522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70393/S1</id>
    <plant_name>Stephenson County IL S1</plant_name>
    <generator_id>S1</generator_id>
    <plant_id>70393</plant_id>
    <state>IL</state>
    <county>Stephenson</county>
    <developer>SolAmerica Energy / Stephenson County IL S1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.304234</lat>
    <lon>-89.58015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70448/22258</id>
    <plant_name>Keithsburg North Solar LLC PV</plant_name>
    <generator_id>22258</generator_id>
    <plant_id>70448</plant_id>
    <state>IL</state>
    <county>Mercer</county>
    <developer>Keithsburg North Solar, LLC PV</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>41.120819</lat>
    <lon>-90.94078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66511/18262</id>
    <plant_name>CA Riverside 2356 Fleetwood Dr.</plant_name>
    <generator_id>18262</generator_id>
    <plant_id>66511</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.012142</lat>
    <lon>-117.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66511/B8262</id>
    <plant_name>CA Riverside 2356 Fleetwood Dr.</plant_name>
    <generator_id>B8262</generator_id>
    <plant_id>66511</plant_id>
    <state>CA</state>
    <county>Riverside</county>
    <developer>Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.012142</lat>
    <lon>-117.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66768/694</id>
    <plant_name>Hogs Bay</plant_name>
    <generator_id>694</generator_id>
    <plant_id>66768</plant_id>
    <state>ME</state>
    <county>Hancock</county>
    <developer>Greenbacker Renewable Energy Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.57579</lat>
    <lon>-68.19965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68933/CORB</id>
    <plant_name>SV CSG Corbell</plant_name>
    <generator_id>CORB</generator_id>
    <plant_id>68933</plant_id>
    <state>IL</state>
    <county>Williamson</county>
    <developer>SV CSG Corbell, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.758343</lat>
    <lon>-89.05748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70373/SDF1A</id>
    <plant_name>100a Swiss Dale Farm</plant_name>
    <generator_id>SDF1A</generator_id>
    <plant_id>70373</plant_id>
    <state>MD</state>
    <county>Cecil</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.661976</lat>
    <lon>-76.05111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70537/DOWII</id>
    <plant_name>Downsville II</plant_name>
    <generator_id>DOWII</generator_id>
    <plant_id>70537</plant_id>
    <state>MD</state>
    <county>Washington</county>
    <developer>AES Clean Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.5922</lat>
    <lon>-77.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65130/PV2</id>
    <plant_name>City of Bowie</plant_name>
    <generator_id>PV2</generator_id>
    <plant_id>65130</plant_id>
    <state>MD</state>
    <county>Prince Georges</county>
    <developer>Tesla Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.904641</lat>
    <lon>-76.68877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68465/22324</id>
    <plant_name>Imperator Solar</plant_name>
    <generator_id>22324</generator_id>
    <plant_id>68465</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Imperator Solar, LLC</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.4932</lat>
    <lon>-119.1659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69885/USMOU</id>
    <plant_name>USS Mourning</plant_name>
    <generator_id>USMOU</generator_id>
    <plant_id>69885</plant_id>
    <state>IL</state>
    <county>Schuyler</county>
    <developer>USS Mourning Lane</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.160741</lat>
    <lon>-90.59832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70350/RT40</id>
    <plant_name>IL - Forefront Ameren- Route 40</plant_name>
    <generator_id>RT40</generator_id>
    <plant_id>70350</plant_id>
    <state>IL</state>
    <county>Peoria</county>
    <developer>IL Solar Route 40 Project2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.923873</lat>
    <lon>-89.63042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70353/TRU1</id>
    <plant_name>IL-Forefront Ameren-Truitt 1</plant_name>
    <generator_id>TRU1</generator_id>
    <plant_id>70353</plant_id>
    <state>IL</state>
    <county>Peoria</county>
    <developer>IL Solar Truitt Project1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.929207</lat>
    <lon>-89.64177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70354/TRU2</id>
    <plant_name>IL-Forefront Ameren-Truitt 2</plant_name>
    <generator_id>TRU2</generator_id>
    <plant_id>70354</plant_id>
    <state>IL</state>
    <county>Peoria</county>
    <developer>IL Solar Truitt Project2, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.929207</lat>
    <lon>-89.64177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70508/4786A</id>
    <plant_name>4786A George Washington, LLC</plant_name>
    <generator_id>4786A</generator_id>
    <plant_id>70508</plant_id>
    <state>MD</state>
    <county>Garrett</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.30012</lat>
    <lon>-79.41319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70509/4786B</id>
    <plant_name>4786B George Washington, LLC</plant_name>
    <generator_id>4786B</generator_id>
    <plant_id>70509</plant_id>
    <state>MD</state>
    <county>Garrett</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.3312</lat>
    <lon>-79.41319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70523/BA005</id>
    <plant_name>Marley Neck 3 - SLBAL005</plant_name>
    <generator_id>BA005</generator_id>
    <plant_id>70523</plant_id>
    <state>MD</state>
    <county>Anne Arundel</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.194143</lat>
    <lon>-76.55178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70196/DEL22</id>
    <plant_name>DEL022-30423B Thorogoods Rd, LLC</plant_name>
    <generator_id>DEL22</generator_id>
    <plant_id>70196</plant_id>
    <state>DE</state>
    <county>Sussex</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.569503</lat>
    <lon>-75.26468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70198/FLOR2</id>
    <plant_name>CF IL Solar Marigold Lane, Flora2 LLC</plant_name>
    <generator_id>FLOR2</generator_id>
    <plant_id>70198</plant_id>
    <state>IL</state>
    <county>Clay</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.632489</lat>
    <lon>-88.43829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63535/GEN02</id>
    <plant_name>Solar BESS Hybrid</plant_name>
    <generator_id>GEN02</generator_id>
    <plant_id>63535</plant_id>
    <state>GA</state>
    <county>Cobb</county>
    <developer>Cobb Electric Membership Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.979348</lat>
    <lon>-84.55613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63535/GEN03</id>
    <plant_name>Solar BESS Hybrid</plant_name>
    <generator_id>GEN03</generator_id>
    <plant_id>63535</plant_id>
    <state>GA</state>
    <county>Cobb</county>
    <developer>Cobb Electric Membership Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.979348</lat>
    <lon>-84.55613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63535/GEN04</id>
    <plant_name>Solar BESS Hybrid</plant_name>
    <generator_id>GEN04</generator_id>
    <plant_id>63535</plant_id>
    <state>GA</state>
    <county>Cobb</county>
    <developer>Cobb Electric Membership Corporation</developer>
    <sector>Electric Utility</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>SOCO</balancing_authority>
    <lat>33.979348</lat>
    <lon>-84.55613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70460/WILS1</id>
    <plant_name>Willington Solar One, LLC</plant_name>
    <generator_id>WILS1</generator_id>
    <plant_id>70460</plant_id>
    <state>CT</state>
    <county>Tolland</county>
    <developer>NJR Clean Energy Ventures Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.92</lat>
    <lon>-72.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>61037/APPL</id>
    <plant_name>Apple Hill Solar</plant_name>
    <generator_id>APPL</generator_id>
    <plant_id>61037</plant_id>
    <state>VT</state>
    <county>Bennington</county>
    <developer>Ecos Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>42.9077</lat>
    <lon>-73.2041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66513/B8229</id>
    <plant_name>MA Acushnet 540R Main St</plant_name>
    <generator_id>B8229</generator_id>
    <plant_id>66513</plant_id>
    <state>MA</state>
    <county>Bristol</county>
    <developer>TJA 540R Main St. Acushnet, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.702987</lat>
    <lon>-70.8888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69215/11216</id>
    <plant_name>Sommer</plant_name>
    <generator_id>11216</generator_id>
    <plant_id>69215</plant_id>
    <state>IL</state>
    <county>Massac</county>
    <developer>Generate Capital</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-08</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>37.205915</lat>
    <lon>-88.8179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67741/I</id>
    <plant_name>OIT BESS</plant_name>
    <generator_id>I</generator_id>
    <plant_id>67741</plant_id>
    <state>OR</state>
    <county>Klamath</county>
    <developer>PacifiCorp</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>42.259366</lat>
    <lon>-121.7864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68858/PV1</id>
    <plant_name>Cavern</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68858</plant_id>
    <state>NY</state>
    <county>Clinton</county>
    <developer>Cavern Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>44.711557</lat>
    <lon>-73.54126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68860/PV1</id>
    <plant_name>Tully 5</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68860</plant_id>
    <state>NY</state>
    <county>Onondaga</county>
    <developer>CP Tully Five LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>42.810918</lat>
    <lon>-76.12014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70078/438</id>
    <plant_name>Bigler - PA 0438 (Flango 4)</plant_name>
    <generator_id>438</generator_id>
    <plant_id>70078</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Bigler 438 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.80344</lat>
    <lon>-78.42275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68122/CH526</id>
    <plant_name>Bensenville 2-SLCHI526</plant_name>
    <generator_id>CH526</generator_id>
    <plant_id>68122</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.971289</lat>
    <lon>-87.95462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70335/PS42</id>
    <plant_name>Pivot Solar 42 LLC</plant_name>
    <generator_id>PS42</generator_id>
    <plant_id>70335</plant_id>
    <state>CO</state>
    <county>Larimer</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.692398</lat>
    <lon>-104.9833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69591/20525</id>
    <plant_name>20525 Nordhoff PV (North)</plant_name>
    <generator_id>20525</generator_id>
    <plant_id>69591</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Amiscope Nordhoff, LP</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.235572</lat>
    <lon>-118.5811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68119/CH307</id>
    <plant_name>Aurora 7-SLCHI307</plant_name>
    <generator_id>CH307</generator_id>
    <plant_id>68119</plant_id>
    <state>IL</state>
    <county>Kane</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.79698</lat>
    <lon>-88.26809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69222/5381</id>
    <plant_name>American Canyon RV Boat Storage</plant_name>
    <generator_id>5381</generator_id>
    <plant_id>69222</plant_id>
    <state>CA</state>
    <county>Napa</county>
    <developer>Napa Junction RV Storage LLC</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.198033</lat>
    <lon>-122.257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68129/CH603</id>
    <plant_name>Cicero 3-SLCHI603</plant_name>
    <generator_id>CH603</generator_id>
    <plant_id>68129</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.86464</lat>
    <lon>-87.75757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69554/BELMO</id>
    <plant_name>BPL NJ - Belmont</plant_name>
    <generator_id>BELMO</generator_id>
    <plant_id>69554</plant_id>
    <state>NJ</state>
    <county>Somerset</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.530503</lat>
    <lon>-74.54493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69807/WNSRL</id>
    <plant_name>Windsor Locks</plant_name>
    <generator_id>WNSRL</generator_id>
    <plant_id>69807</plant_id>
    <state>CT</state>
    <county>Hartford</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.928086</lat>
    <lon>-72.68693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70337/PS71</id>
    <plant_name>Pivot Solar 71 LLC</plant_name>
    <generator_id>PS71</generator_id>
    <plant_id>70337</plant_id>
    <state>CO</state>
    <county>Morgan</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.267178</lat>
    <lon>-103.6512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68787/23889</id>
    <plant_name>NorCal FPV 1 (Pond 2)</plant_name>
    <generator_id>23889</generator_id>
    <plant_id>68787</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>NorCal FPV 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.6779</lat>
    <lon>-121.8276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70115/GEN1</id>
    <plant_name>Fort Lyon Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70115</plant_id>
    <state>CO</state>
    <county>Bent</county>
    <developer>Clay Creek Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>38.081</lat>
    <lon>-103.133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70118/GEN1</id>
    <plant_name>Trinidad Solar</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70118</plant_id>
    <state>CO</state>
    <county>Las Animas</county>
    <developer>Clay Creek Energy, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>WACM</balancing_authority>
    <lat>37.185879</lat>
    <lon>-104.4924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68138/CH321</id>
    <plant_name>Internationale Ctr 11-SLCHI321</plant_name>
    <generator_id>CH321</generator_id>
    <plant_id>68138</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.70053</lat>
    <lon>-88.02744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68044/RODA1</id>
    <plant_name>Rodatherm Milford 1</plant_name>
    <generator_id>RODA1</generator_id>
    <plant_id>68044</plant_id>
    <state>UT</state>
    <county>Beaver</county>
    <developer>Rodatherm Energy Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Geothermal</technology>
    <energy_source>GEO</energy_source>
    <prime_mover>BT</prime_mover>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2028-01</planned_start>
    <planned_year>2028</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PACE</balancing_authority>
    <lat>38.572873</lat>
    <lon>-112.9786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70428/DRIVS</id>
    <plant_name>Bakersfield Driver</plant_name>
    <generator_id>DRIVS</generator_id>
    <plant_id>70428</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Pacifico Bakersfield Driver LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.562181</lat>
    <lon>-119.202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69888/USFLE</id>
    <plant_name>USS Fletcher Solar</plant_name>
    <generator_id>USFLE</generator_id>
    <plant_id>69888</plant_id>
    <state>NM</state>
    <county>Hidalgo</county>
    <developer>USS Fletcher Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PNM</balancing_authority>
    <lat>32.366814</lat>
    <lon>-108.6934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68132/CH701</id>
    <plant_name>Elk Grove 1-SLCHI701</plant_name>
    <generator_id>CH701</generator_id>
    <plant_id>68132</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.010416</lat>
    <lon>-87.958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68541/7169</id>
    <plant_name>Palmdale Water District HQ</plant_name>
    <generator_id>7169</generator_id>
    <plant_id>68541</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>East Avenue Q Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.587916</lat>
    <lon>-118.0931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68127/CH424</id>
    <plant_name>Bensenville Ind Park 4-SLCHI424</plant_name>
    <generator_id>CH424</generator_id>
    <plant_id>68127</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.983893</lat>
    <lon>-87.95172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69766/KHLS</id>
    <plant_name>Kalaeloa Home Lands Solar</plant_name>
    <generator_id>KHLS</generator_id>
    <plant_id>69766</plant_id>
    <state>HI</state>
    <county>Honolulu</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>HECO</balancing_authority>
    <lat>21.310594</lat>
    <lon>-158.0863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68118/CH404</id>
    <plant_name>Addison 11-SLCHI404</plant_name>
    <generator_id>CH404</generator_id>
    <plant_id>68118</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.930327</lat>
    <lon>-88.04848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68130/CH211</id>
    <plant_name>Des Plaines 11-SLCHI211</plant_name>
    <generator_id>CH211</generator_id>
    <plant_id>68130</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.015</lat>
    <lon>-87.915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69711/6672</id>
    <plant_name>L3 Harris San Diego</plant_name>
    <generator_id>6672</generator_id>
    <plant_id>69711</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>Balboa Avenue I Solar Project 2023, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.822588</lat>
    <lon>-117.1352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70451/OCS24</id>
    <plant_name>Tutuilla Solar</plant_name>
    <generator_id>OCS24</generator_id>
    <plant_id>70451</plant_id>
    <state>OR</state>
    <county>Umatilla</county>
    <developer>Tutuilla Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PACW</balancing_authority>
    <lat>45.63153</lat>
    <lon>-119.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70507/NN036</id>
    <plant_name>Prologis - SLNNJ036 - Community Solar</plant_name>
    <generator_id>NN036</generator_id>
    <plant_id>70507</plant_id>
    <state>NJ</state>
    <county>Union</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.66225</lat>
    <lon>-74.1644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68141/CH302</id>
    <plant_name>Northlake 2-SLCHI302</plant_name>
    <generator_id>CH302</generator_id>
    <plant_id>68141</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.9118</lat>
    <lon>-87.9081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69385/GEN1</id>
    <plant_name>Hastings Generating Facility</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>69385</plant_id>
    <state>MI</state>
    <county>Barry</county>
    <developer>NAPS - Hastings LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>42.67856</lat>
    <lon>-85.29629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>10748/FUTR1</id>
    <plant_name>Marina Landfill Gas</plant_name>
    <generator_id>FUTR1</generator_id>
    <plant_id>10748</plant_id>
    <state>CA</state>
    <county>Monterey</county>
    <developer>Monterey Regional Waste Mgmt</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.7131</lat>
    <lon>-121.7686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>10748/FUTR2</id>
    <plant_name>Marina Landfill Gas</plant_name>
    <generator_id>FUTR2</generator_id>
    <plant_id>10748</plant_id>
    <state>CA</state>
    <county>Monterey</county>
    <developer>Monterey Regional Waste Mgmt</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.7131</lat>
    <lon>-121.7686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>10748/FUTR3</id>
    <plant_name>Marina Landfill Gas</plant_name>
    <generator_id>FUTR3</generator_id>
    <plant_id>10748</plant_id>
    <state>CA</state>
    <county>Monterey</county>
    <developer>Monterey Regional Waste Mgmt</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.7131</lat>
    <lon>-121.7686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>10748/FUTR4</id>
    <plant_name>Marina Landfill Gas</plant_name>
    <generator_id>FUTR4</generator_id>
    <plant_id>10748</plant_id>
    <state>CA</state>
    <county>Monterey</county>
    <developer>Monterey Regional Waste Mgmt</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Landfill Gas</technology>
    <energy_source>LFG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.7131</lat>
    <lon>-121.7686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69242/PV1</id>
    <plant_name>AB Van Nuys</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>69242</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Roscoe Boulevard Operating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>34.220959</lat>
    <lon>-118.4768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69791/NJUDC</id>
    <plant_name>BPL NJ - Union Distribution Center</plant_name>
    <generator_id>NJUDC</generator_id>
    <plant_id>69791</plant_id>
    <state>NJ</state>
    <county>Union</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.6834</lat>
    <lon>-74.2422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70445/PV1</id>
    <plant_name>W 167th St</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70445</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>555 W 167th St Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.59009</lat>
    <lon>-87.63044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66475/18263</id>
    <plant_name>CA Bloomington 2551 S Lilac Avenue Micro</plant_name>
    <generator_id>18263</generator_id>
    <plant_id>66475</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.05523</lat>
    <lon>-117.3778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>66475/B8263</id>
    <plant_name>CA Bloomington 2551 S Lilac Avenue Micro</plant_name>
    <generator_id>B8263</generator_id>
    <plant_id>66475</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.05523</lat>
    <lon>-117.3778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69753/13790</id>
    <plant_name>50 Meister Ave</plant_name>
    <generator_id>13790</generator_id>
    <plant_id>69753</plant_id>
    <state>NJ</state>
    <county>Somerset</county>
    <developer>Meister Avenue Branchburg Solar Project 2024, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.600337</lat>
    <lon>-74.69818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69813/ARGEN</id>
    <plant_name>Argenta Solar</plant_name>
    <generator_id>ARGEN</generator_id>
    <plant_id>69813</plant_id>
    <state>IL</state>
    <county>Macon</county>
    <developer>Argenta Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.989915</lat>
    <lon>-88.81196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2316/6</id>
    <plant_name>Wisner</plant_name>
    <generator_id>6</generator_id>
    <plant_id>2316</plant_id>
    <state>NE</state>
    <county>Cuming</county>
    <developer>City of Wisner (NE)</developer>
    <sector>Electric Utility</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>SWPP</balancing_authority>
    <lat>41.988069</lat>
    <lon>-96.91599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65072/GA3</id>
    <plant_name>Fremont CA AutoFactory</plant_name>
    <generator_id>GA3</generator_id>
    <plant_id>65072</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.49254</lat>
    <lon>-121.9446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69805/RFRD7</id>
    <plant_name>Rockford Plant 7</plant_name>
    <generator_id>RFRD7</generator_id>
    <plant_id>69805</plant_id>
    <state>IL</state>
    <county>Winnebago</county>
    <developer>ENGIE Distributed Renewables Development LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.232527</lat>
    <lon>-89.02408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70106/JADEB</id>
    <plant_name>Jade Solar 3</plant_name>
    <generator_id>JADEB</generator_id>
    <plant_id>70106</plant_id>
    <state>CA</state>
    <county>Madera</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.056528</lat>
    <lon>-119.9805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70106/JADES</id>
    <plant_name>Jade Solar 3</plant_name>
    <generator_id>JADES</generator_id>
    <plant_id>70106</plant_id>
    <state>CA</state>
    <county>Madera</county>
    <developer>ZGlobal Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.056528</lat>
    <lon>-119.9805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69862/GALF</id>
    <plant_name>Galva School</plant_name>
    <generator_id>GALF</generator_id>
    <plant_id>69862</plant_id>
    <state>IL</state>
    <county>Henry</county>
    <developer>Navisun LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.179241</lat>
    <lon>-90.04677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70114/363</id>
    <plant_name>New Alexandria - PA 0363 (Weimer North)</plant_name>
    <generator_id>363</generator_id>
    <plant_id>70114</plant_id>
    <state>PA</state>
    <county>Westmoreland</county>
    <developer>CVE US PA New Alexandria 363 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.40255</lat>
    <lon>-79.42806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68120/CH513</id>
    <plant_name>Bensenville 13-SLCHI513</plant_name>
    <generator_id>CH513</generator_id>
    <plant_id>68120</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.987884</lat>
    <lon>-87.95258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69891/LA100</id>
    <plant_name>Torrance Dis Ctr 2 - SLLAX100</plant_name>
    <generator_id>LA100</generator_id>
    <plant_id>69891</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.84516</lat>
    <lon>-118.3164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70099/IL007</id>
    <plant_name>Pivot Energy IL 7 LLC</plant_name>
    <generator_id>IL007</generator_id>
    <plant_id>70099</plant_id>
    <state>IL</state>
    <county>Logan</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>40.268856</lat>
    <lon>-89.23746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70456/PV1</id>
    <plant_name>W Belmont Ave</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>70456</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>9100 W Belmont Ave, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.9378</lat>
    <lon>-87.85318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70524/BA006</id>
    <plant_name>Marley Neck 4 - SLBAL006</plant_name>
    <generator_id>BA006</generator_id>
    <plant_id>70524</plant_id>
    <state>MD</state>
    <county>Anne Arundel</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>39.193805</lat>
    <lon>-76.55171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65072/STAMP</id>
    <plant_name>Fremont CA AutoFactory</plant_name>
    <generator_id>STAMP</generator_id>
    <plant_id>65072</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.49254</lat>
    <lon>-121.9446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70338/NCB10</id>
    <plant_name>NCBP TEN, LLC</plant_name>
    <generator_id>NCB10</generator_id>
    <plant_id>70338</plant_id>
    <state>MD</state>
    <county>Prince Georges</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>38.867</lat>
    <lon>-76.7386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68143/CH304</id>
    <plant_name>Northlake 4-SLCHI304</plant_name>
    <generator_id>CH304</generator_id>
    <plant_id>68143</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.92302</lat>
    <lon>-87.91646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68133/CH151</id>
    <plant_name>Elk Grove 51-SLCHI151</plant_name>
    <generator_id>CH151</generator_id>
    <plant_id>68133</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>42.00096</lat>
    <lon>-87.95782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68502/PV1</id>
    <plant_name>Vienna Walbec Customer Hosted</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>68502</plant_id>
    <state>WI</state>
    <county>Dane</county>
    <developer>Wisconsin Power &amp; Light Co</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>43.208435</lat>
    <lon>-89.41019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70029/EWIN1</id>
    <plant_name>East Windsor Solar 1 LLC</plant_name>
    <generator_id>EWIN1</generator_id>
    <plant_id>70029</plant_id>
    <state>NJ</state>
    <county>Mercer</county>
    <developer>Dimension Energy LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <planned_start>2028-03</planned_start>
    <planned_year>2028</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.274397</lat>
    <lon>-74.50169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63622/OES01</id>
    <plant_name>OES Biogas Power</plant_name>
    <generator_id>OES01</generator_id>
    <plant_id>63622</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Organic Energy Solutions, Inc.</developer>
    <sector>IPP CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.17325</lat>
    <lon>-117.3464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63622/OES02</id>
    <plant_name>OES Biogas Power</plant_name>
    <generator_id>OES02</generator_id>
    <plant_id>63622</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>Organic Energy Solutions, Inc.</developer>
    <sector>IPP CHP</sector>
    <technology>Other Waste Biomass</technology>
    <energy_source>OBG</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.17325</lat>
    <lon>-117.3464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68793/LA710</id>
    <plant_name>Bandini - SLLAX710</plant_name>
    <generator_id>LA710</generator_id>
    <plant_id>68793</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.983566</lat>
    <lon>-118.1348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68121/CH414</id>
    <plant_name>Bensenville 14-SLCHI414</plant_name>
    <generator_id>CH414</generator_id>
    <plant_id>68121</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.982829</lat>
    <lon>-87.94589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68137/CH910</id>
    <plant_name>Glendale Heights 10-SLCHI910</plant_name>
    <generator_id>CH910</generator_id>
    <plant_id>68137</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.929422</lat>
    <lon>-88.07008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68236/LA680</id>
    <plant_name>South Bay Dis Ctr 6-SLLAX680</plant_name>
    <generator_id>LA680</generator_id>
    <plant_id>68236</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.8439</lat>
    <lon>-118.2242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68792/LA680</id>
    <plant_name>Fordyce - SLLAX680</plant_name>
    <generator_id>LA680</generator_id>
    <plant_id>68792</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.8439</lat>
    <lon>-118.2242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69860/MURP2</id>
    <plant_name>Murphysboro 2</plant_name>
    <generator_id>MURP2</generator_id>
    <plant_id>69860</plant_id>
    <state>IL</state>
    <county>Jackson</county>
    <developer>Navisun LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <planned_start>2027-10</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.794585</lat>
    <lon>-89.35141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69790/EZMLC</id>
    <plant_name>Elizabeth Metropolitan Logistics Center</plant_name>
    <generator_id>EZMLC</generator_id>
    <plant_id>69790</plant_id>
    <state>NJ</state>
    <county>Union</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.68403</lat>
    <lon>-74.20623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68789/LA104</id>
    <plant_name>South Bay Dis Ctr 12 - SLLAX104</plant_name>
    <generator_id>LA104</generator_id>
    <plant_id>68789</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.842873</lat>
    <lon>-118.2245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68124/CH411</id>
    <plant_name>Bensenville Ind Park 11</plant_name>
    <generator_id>CH411</generator_id>
    <plant_id>68124</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.986194</lat>
    <lon>-87.94525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68135/CH802</id>
    <plant_name>Franklin Park 2-SLCHI802</plant_name>
    <generator_id>CH802</generator_id>
    <plant_id>68135</plant_id>
    <state>IL</state>
    <county>Cook</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.946509</lat>
    <lon>-87.85944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68123/CH410</id>
    <plant_name>Bensenville Ind Park 10-SLCHI410</plant_name>
    <generator_id>CH410</generator_id>
    <plant_id>68123</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.984507</lat>
    <lon>-87.94587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69211/PV1</id>
    <plant_name>San Pedro Public Market (SPPM)</plant_name>
    <generator_id>PV1</generator_id>
    <plant_id>69211</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>SPPM Operating, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>LDWP</balancing_authority>
    <lat>33.731297</lat>
    <lon>-118.2795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-1</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-1</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-2</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-2</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-3</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-3</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-4</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-4</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-5</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-5</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-6</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-6</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69697/CW-7</id>
    <plant_name>CW Bill Young Hydropower Project</plant_name>
    <generator_id>CW-7</generator_id>
    <plant_id>69697</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>C.W. Bill Young Hydropower Group, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <planned_start>2031-10</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.54028</lat>
    <lon>-79.81556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70207/PS60</id>
    <plant_name>Pivot Solar 60 LLC</plant_name>
    <generator_id>PS60</generator_id>
    <plant_id>70207</plant_id>
    <state>CO</state>
    <county>Weld</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PSCO</balancing_authority>
    <lat>40.474398</lat>
    <lon>-104.623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69533/21938</id>
    <plant_name>CA National City Terminal Ave</plant_name>
    <generator_id>21938</generator_id>
    <plant_id>69533</plant_id>
    <state>CA</state>
    <county>San Diego</county>
    <developer>Catalyze National City Terminal Avenue Microgrid, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>32.654</lat>
    <lon>-117.119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68126/CH402</id>
    <plant_name>Bensenville Ind Park 2-SLCHI402</plant_name>
    <generator_id>CH402</generator_id>
    <plant_id>68126</plant_id>
    <state>IL</state>
    <county>DuPage</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.983957</lat>
    <lon>-87.95383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69895/Gy1a2</id>
    <plant_name>Gateway#1&amp;2 (Newark CA)</plant_name>
    <generator_id>Gy1a2</generator_id>
    <plant_id>69895</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Coast Energy Holdings, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.540903</lat>
    <lon>-122.0617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69706/4149C</id>
    <plant_name>Bishop Ranch - BR 3-GG</plant_name>
    <generator_id>4149C</generator_id>
    <plant_id>69706</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-GG Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.767242</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70128/479</id>
    <plant_name>Roulette - PA 0479</plant_name>
    <generator_id>479</generator_id>
    <plant_id>70128</plant_id>
    <state>PA</state>
    <county>Potter</county>
    <developer>CVE US PA Roulette 479 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.777</lat>
    <lon>-78.1995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-1</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-1</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-2</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-2</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-3</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-3</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-4</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-4</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-5</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-5</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-6</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-6</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-7</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-7</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69698/DAS-8</id>
    <plant_name>Dashields Hydroelectric Project</plant_name>
    <generator_id>DAS-8</generator_id>
    <plant_id>69698</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Dashields Hydropower Corporations</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <planned_start>2030-08</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.549546</lat>
    <lon>-80.20544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65045/VCP14</id>
    <plant_name>Emery Shute Solar One</plant_name>
    <generator_id>VCP14</generator_id>
    <plant_id>65045</plant_id>
    <state>ME</state>
    <county>Waldo</county>
    <developer>VCP Realty, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>44.535591</lat>
    <lon>-68.86433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69983/GRTKN</id>
    <plant_name>Novel Gertken Solar LLC</plant_name>
    <generator_id>GRTKN</generator_id>
    <plant_id>69983</plant_id>
    <state>MN</state>
    <county>Stearns</county>
    <developer>Novel Gertken Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.618191</lat>
    <lon>-94.4891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63506/BCRV3</id>
    <plant_name>Solar Carver 3 Hybrid</plant_name>
    <generator_id>BCRV3</generator_id>
    <plant_id>63506</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Solar Carver 3, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.84206</lat>
    <lon>-70.7699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>63506/SCRV3</id>
    <plant_name>Solar Carver 3 Hybrid</plant_name>
    <generator_id>SCRV3</generator_id>
    <plant_id>63506</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Solar Carver 3, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.84206</lat>
    <lon>-70.7699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68783/NY009</id>
    <plant_name>NY CDG 009</plant_name>
    <generator_id>NY009</generator_id>
    <plant_id>68783</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>NY CDG 009 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.808538</lat>
    <lon>-72.95773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69305/FITZH</id>
    <plant_name>Enterprise MN - Fitzthum</plant_name>
    <generator_id>FITZH</generator_id>
    <plant_id>69305</plant_id>
    <state>MN</state>
    <county>Stearns</county>
    <developer>Standard Solar</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.644581</lat>
    <lon>-94.22744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69616/USLYN</id>
    <plant_name>USS Lyndon Solar LLC</plant_name>
    <generator_id>USLYN</generator_id>
    <plant_id>69616</plant_id>
    <state>IL</state>
    <county>Whiteside</county>
    <developer>United States Solar Corporation</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.659472</lat>
    <lon>-89.92079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69886/USSWA</id>
    <plant_name>USS Swank Solar</plant_name>
    <generator_id>USSWA</generator_id>
    <plant_id>69886</plant_id>
    <state>IL</state>
    <county>Henry</county>
    <developer>USS Swank Solar LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.1615</lat>
    <lon>-90.0285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68542/7170G</id>
    <plant_name>Palmdale Water District 6MG Tank</plant_name>
    <generator_id>7170G</generator_id>
    <plant_id>68542</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>East Avenue South Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.558047</lat>
    <lon>-118.1187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64098/3</id>
    <plant_name>Tesla Reno GigaFactory</plant_name>
    <generator_id>3</generator_id>
    <plant_id>64098</plant_id>
    <state>NV</state>
    <county>Storey</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>NEVP</balancing_authority>
    <lat>39.539511</lat>
    <lon>-119.4392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64291/B4</id>
    <plant_name>Lincoln Medical and Mental Health Center</plant_name>
    <generator_id>B4</generator_id>
    <plant_id>64291</plant_id>
    <state>NY</state>
    <county>Bronx</county>
    <developer>Lincoln Medical and Mental Health Center</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Petroleum Liquids</technology>
    <energy_source>DFO</energy_source>
    <prime_mover>IC</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.816971</lat>
    <lon>-73.92411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70505/1055</id>
    <plant_name>VS HR Warner NEM, LLC</plant_name>
    <generator_id>1055</generator_id>
    <plant_id>70505</plant_id>
    <state>CA</state>
    <county>Orange</county>
    <developer>Valta Energy</developer>
    <sector>Commercial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>33.7162</lat>
    <lon>-117.9345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64865/BLILE</id>
    <plant_name>Novel Blilie Solar LLC</plant_name>
    <generator_id>BLILE</generator_id>
    <plant_id>64865</plant_id>
    <state>MN</state>
    <county>Wilkin</county>
    <developer>Novel Blilie Solar, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>46.630077</lat>
    <lon>-96.75811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69812/BROWN</id>
    <plant_name>SV CSG Brownstown 1</plant_name>
    <generator_id>BROWN</generator_id>
    <plant_id>69812</plant_id>
    <state>IL</state>
    <county>Fayette</county>
    <developer>SV CSG Brownstown 1, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>38.971573</lat>
    <lon>-89.01849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70381/GEN1</id>
    <plant_name>Carver Garden</plant_name>
    <generator_id>GEN1</generator_id>
    <plant_id>70381</plant_id>
    <state>MN</state>
    <county>Rice</county>
    <developer>Bullrock-NxtGenREA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-02</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.29848</lat>
    <lon>-93.2408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68217/FEAES</id>
    <plant_name>Featherbed Lane South Solar</plant_name>
    <generator_id>FEAES</generator_id>
    <plant_id>68217</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.761</lat>
    <lon>-70.896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68217/FEAPV</id>
    <plant_name>Featherbed Lane South Solar</plant_name>
    <generator_id>FEAPV</generator_id>
    <plant_id>68217</plant_id>
    <state>MA</state>
    <county>Plymouth</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>ISNE</balancing_authority>
    <lat>41.761</lat>
    <lon>-70.896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70301/BOHRE</id>
    <plant_name>MN CSG 2019-57</plant_name>
    <generator_id>BOHRE</generator_id>
    <plant_id>70301</plant_id>
    <state>MN</state>
    <county>Blue Earth</county>
    <developer>MN CSG 2019-57 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.224001</lat>
    <lon>-93.9787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70379/GEN2</id>
    <plant_name>Fuller Garden</plant_name>
    <generator_id>GEN2</generator_id>
    <plant_id>70379</plant_id>
    <state>MN</state>
    <county>Sherburne</county>
    <developer>Bullrock-NxtGenREA</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-03</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.45357</lat>
    <lon>-94.00707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69034/PMI2</id>
    <plant_name>Pivot Energy Minnesota Solar 2</plant_name>
    <generator_id>PMI2</generator_id>
    <plant_id>69034</plant_id>
    <state>MN</state>
    <county>Kandiyohi</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>44.935059</lat>
    <lon>-95.19906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69724/PIKE</id>
    <plant_name>Pike County Solar</plant_name>
    <generator_id>PIKE</generator_id>
    <plant_id>69724</plant_id>
    <state>IL</state>
    <county>Pike</county>
    <developer>Illinois Rural Electric Coop</developer>
    <sector>Electric Utility</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>39.6189</lat>
    <lon>-90.8461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69786/CV209</id>
    <plant_name>Stockton 9 - slcva209</plant_name>
    <generator_id>CV209</generator_id>
    <plant_id>69786</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-04</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.89233</lat>
    <lon>-121.2667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69609/EB702</id>
    <plant_name>San Leandro 10 - sleba702</plant_name>
    <generator_id>EB702</generator_id>
    <plant_id>69609</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.71422</lat>
    <lon>-122.182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>67565/CEC01</id>
    <plant_name>East Road Storage Project</plant_name>
    <generator_id>CEC01</generator_id>
    <plant_id>67565</plant_id>
    <state>CA</state>
    <county>Mendocino</county>
    <developer>Form Energy Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-06</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>39.25</lat>
    <lon>-123.196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69785/CV801</id>
    <plant_name>Stockton 1 - slcva801</plant_name>
    <generator_id>CV801</generator_id>
    <plant_id>69785</plant_id>
    <state>CA</state>
    <county>San Joaquin</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.93997</lat>
    <lon>-121.2265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>2038/BA1</id>
    <plant_name>Cambridge CT Hybrid</plant_name>
    <generator_id>BA1</generator_id>
    <plant_id>2038</plant_id>
    <state>MN</state>
    <county>Isanti</county>
    <developer>Great River Energy</developer>
    <sector>Electric Utility</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>MISO</balancing_authority>
    <lat>45.601</lat>
    <lon>-93.2081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70167/408</id>
    <plant_name>Latrobe - PA 0408 (Soccerhound B)</plant_name>
    <generator_id>408</generator_id>
    <plant_id>70167</plant_id>
    <state>PA</state>
    <county>Clearfield</county>
    <developer>CVE US PA Latrobe 408 LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.25174</lat>
    <lon>-79.35354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-1</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-1</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-10</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-10</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-2</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-2</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-3</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-3</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-4</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-4</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-5</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-5</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-6</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-6</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-7</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-7</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-8</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-8</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69699/DI-9</id>
    <plant_name>Dresden Island Hydroelectric Project</plant_name>
    <generator_id>DI-9</generator_id>
    <plant_id>69699</plant_id>
    <state>IL</state>
    <county>Grundy</county>
    <developer>Northern Illinois Hydropower, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.401926</lat>
    <lon>-88.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68600/7236G</id>
    <plant_name>Las Virgenes MWD - Composting Plant</plant_name>
    <generator_id>7236G</generator_id>
    <plant_id>68600</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Las Virgenes Road Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.126481</lat>
    <lon>-118.6981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69713/9985C</id>
    <plant_name>Sanger USD - Sanger West HS</plant_name>
    <generator_id>9985C</generator_id>
    <plant_id>69713</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>South Fowler Avenue Solar Project 2023, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.709291</lat>
    <lon>-119.6814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64758/MANB</id>
    <plant_name>Manorville II</plant_name>
    <generator_id>MANB</generator_id>
    <plant_id>64758</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.834</lat>
    <lon>-72.7819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-1</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-1</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-2</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-2</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-3</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-3</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-4</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-4</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-5</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-5</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-6</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-6</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-7</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-7</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69694/AL4-8</id>
    <plant_name>Allegheny Lock and Dam 4</plant_name>
    <generator_id>AL4-8</generator_id>
    <plant_id>69694</plant_id>
    <state>PA</state>
    <county>Allegheny</county>
    <developer>Allegheny Hydro Group Lock and Dam 4, Inc</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <planned_start>2031-02</planned_start>
    <planned_year>2031</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>40.613718</lat>
    <lon>-79.71829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/1</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>1</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/2</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>2</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/5</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>5</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/6</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>6</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69706/4149B</id>
    <plant_name>Bishop Ranch - BR 3-GG</plant_name>
    <generator_id>4149B</generator_id>
    <plant_id>69706</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-GG Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.767242</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69708/4150B</id>
    <plant_name>Bishop Ranch - BR 3-HH</plant_name>
    <generator_id>4150B</generator_id>
    <plant_id>69708</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-HH Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.766297</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69708/4150C</id>
    <plant_name>Bishop Ranch - BR 3-HH</plant_name>
    <generator_id>4150C</generator_id>
    <plant_id>69708</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-HH Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.766297</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69710/4148B</id>
    <plant_name>Bishop Ranch - BR 3-FF</plant_name>
    <generator_id>4148B</generator_id>
    <plant_id>69710</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-FF Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.768388</lat>
    <lon>-121.959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69710/4148C</id>
    <plant_name>Bishop Ranch - BR 3-FF</plant_name>
    <generator_id>4148C</generator_id>
    <plant_id>69710</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-FF Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.768388</lat>
    <lon>-121.959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/6</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>6</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/NA1</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA1</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/NA2</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA2</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/NA5</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA5</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>64758/MAN</id>
    <plant_name>Manorville II</plant_name>
    <generator_id>MAN</generator_id>
    <plant_id>64758</plant_id>
    <state>NY</state>
    <county>Suffolk</county>
    <developer>Agilitas Energy, Inc.</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2027-12</planned_start>
    <planned_year>2027</planned_year>
    <status>(L) Regulatory approvals pending. Not under construction</status>
    <balancing_authority>NYIS</balancing_authority>
    <lat>40.834</lat>
    <lon>-72.7819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/1</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>1</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/2</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>2</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/5</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>5</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/6</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>6</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68600/7236B</id>
    <plant_name>Las Virgenes MWD - Composting Plant</plant_name>
    <generator_id>7236B</generator_id>
    <plant_id>68600</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>Las Virgenes Road Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.126481</lat>
    <lon>-118.6981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69713/9985B</id>
    <plant_name>Sanger USD - Sanger West HS</plant_name>
    <generator_id>9985B</generator_id>
    <plant_id>69713</plant_id>
    <state>CA</state>
    <county>Fresno</county>
    <developer>South Fowler Avenue Solar Project 2023, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>36.709291</lat>
    <lon>-119.6814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65072/GVSRS</id>
    <plant_name>Fremont CA AutoFactory</plant_name>
    <generator_id>GVSRS</generator_id>
    <plant_id>65072</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.49254</lat>
    <lon>-121.9446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68235/C34BB</id>
    <plant_name>Romeoville 34 - SLCHI234 - BSCHI234</plant_name>
    <generator_id>C34BB</generator_id>
    <plant_id>68235</plant_id>
    <state>IL</state>
    <county>Will</county>
    <developer>Prologis Logistics Services Incorporated</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <planned_start>2027-05</planned_start>
    <planned_year>2027</planned_year>
    <status>(U) Under construction, less than or equal to 50 percent complete</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>41.597</lat>
    <lon>-88.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>65072/VSRS</id>
    <plant_name>Fremont CA AutoFactory</plant_name>
    <generator_id>VSRS</generator_id>
    <plant_id>65072</plant_id>
    <state>CA</state>
    <county>Alameda</county>
    <developer>Tesla Inc.</developer>
    <sector>Industrial Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.4</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <planned_start>2026-12</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.49254</lat>
    <lon>-121.9446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70428/DRIVB</id>
    <plant_name>Bakersfield Driver</plant_name>
    <generator_id>DRIVB</generator_id>
    <plant_id>70428</plant_id>
    <state>CA</state>
    <county>Kern</county>
    <developer>Pacifico Bakersfield Driver LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <planned_start>2026-09</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>35.562181</lat>
    <lon>-119.202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>68542/7170B</id>
    <plant_name>Palmdale Water District 6MG Tank</plant_name>
    <generator_id>7170B</generator_id>
    <plant_id>68542</plant_id>
    <state>CA</state>
    <county>Los Angeles</county>
    <developer>East Avenue South Solar Project 2022, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <planned_start>2026-11</planned_start>
    <planned_year>2026</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.558047</lat>
    <lon>-118.1187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58168/TURB4</id>
    <plant_name>Energy Center</plant_name>
    <generator_id>TURB4</generator_id>
    <plant_id>58168</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>University of Redlands</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.063056</lat>
    <lon>-117.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58168/TURB5</id>
    <plant_name>Energy Center</plant_name>
    <generator_id>TURB5</generator_id>
    <plant_id>58168</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>University of Redlands</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.063056</lat>
    <lon>-117.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>58168/TURB6</id>
    <plant_name>Energy Center</plant_name>
    <generator_id>TURB6</generator_id>
    <plant_id>58168</plant_id>
    <state>CA</state>
    <county>San Bernardino</county>
    <developer>University of Redlands</developer>
    <sector>Commercial CHP</sector>
    <technology>Natural Gas Fired Combustion Turbine</technology>
    <energy_source>NG</energy_source>
    <prime_mover>GT</prime_mover>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <planned_start>2030-12</planned_start>
    <planned_year>2030</planned_year>
    <status>(P) Planned for installation, but regulatory approvals not initiated</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>34.063056</lat>
    <lon>-117.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/3</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>3</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62749/4</id>
    <plant_name>Heidelberg Hydroelectric Project</plant_name>
    <generator_id>4</generator_id>
    <plant_id>62749</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 14 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2026-10</planned_start>
    <planned_year>2026</planned_year>
    <status>(TS) Construction complete, but not yet in commercial operation</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.552399</lat>
    <lon>-83.77001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69706/4149R</id>
    <plant_name>Bishop Ranch - BR 3-GG</plant_name>
    <generator_id>4149R</generator_id>
    <plant_id>69706</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-GG Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.767242</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69708/4150R</id>
    <plant_name>Bishop Ranch - BR 3-HH</plant_name>
    <generator_id>4150R</generator_id>
    <plant_id>69708</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-HH Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.766297</lat>
    <lon>-121.9582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>69710/4148R</id>
    <plant_name>Bishop Ranch - BR 3-FF</plant_name>
    <generator_id>4148R</generator_id>
    <plant_id>69710</plant_id>
    <state>CA</state>
    <county>Contra Costa</county>
    <developer>Camino Ramon BR 3-FF Solar Project 2020, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Solar Photovoltaic</technology>
    <energy_source>SUN</energy_source>
    <prime_mover>PV</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2027-07</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>37.768388</lat>
    <lon>-121.959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/NA3</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA3</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62390/NA4</id>
    <plant_name>KY No. 11 L&amp;D Hydroelectric Project</plant_name>
    <generator_id>NA4</generator_id>
    <plant_id>62390</plant_id>
    <state>KY</state>
    <county>Estill</county>
    <developer>Lock 11 Hydro Partners, LLC</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2027-11</planned_start>
    <planned_year>2027</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.78401</lat>
    <lon>-84.10329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/3</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>3</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>62748/4</id>
    <plant_name>Evelyn Hydroelectric Project</plant_name>
    <generator_id>4</generator_id>
    <plant_id>62748</plant_id>
    <state>KY</state>
    <county>Lee</county>
    <developer>Lock 13 Hydro Partners</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Conventional Hydroelectric</technology>
    <energy_source>WAT</energy_source>
    <prime_mover>HY</prime_mover>
    <nameplate_mw>0.2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <planned_start>2029-12</planned_start>
    <planned_year>2029</planned_year>
    <status>(T) Regulatory approvals received. Not under construction</status>
    <balancing_authority>PJM</balancing_authority>
    <lat>37.601982</lat>
    <lon>-83.83297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <id>70101/PA29B</id>
    <plant_name>Pivot Energy PPA 29 LLC</plant_name>
    <generator_id>PA29B</generator_id>
    <plant_id>70101</plant_id>
    <state>CA</state>
    <county>Placer</county>
    <developer>Pivot Energy</developer>
    <sector>IPP Non-CHP</sector>
    <technology>Batteries</technology>
    <energy_source>MWH</energy_source>
    <prime_mover>BA</prime_mover>
    <nameplate_mw>0.1</nameplate_mw>
    <summer_mw>0.1</summer_mw>
    <planned_start>2027-01</planned_start>
    <planned_year>2027</planned_year>
    <status>(V) Under construction, more than 50 percent complete</status>
    <balancing_authority>CISO</balancing_authority>
    <lat>38.828466</lat>
    <lon>-121.3049</lon>
    <as_of>2026-09</as_of>
  </row>