[{"id":"64550/CVOWC","plant_name":"Coastal Virginia Offshore Wind (CVOW) Commercial Project","generator_id":"CVOWC","plant_id":64550,"state":"VA","county":null,"developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Offshore Wind Turbine","energy_source":"WND","prime_mover":"WS","nameplate_mw":2640,"summer_mw":2640,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.907956,"lon":-75.34907,"as_of":"2026-08"},{"id":"58987/II-A","plant_name":"Chokecherry and Sierra Madre Wind","generator_id":"II-A","plant_id":58987,"state":"WY","county":"Carbon","developer":"Power Company of Wyoming LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":1303.2,"summer_mw":1303.2,"planned_start":"2032-12","planned_year":2032,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":41.683056,"lon":-107.2,"as_of":"2026-08"},{"id":"68396/PGB45","plant_name":"Sunstone Solar","generator_id":"PGB45","plant_id":68396,"state":"OR","county":"Morrow","developer":"Sunstone Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1200,"summer_mw":1200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.605916,"lon":-119.563,"as_of":"2026-08"},{"id":"68396/PGR45","plant_name":"Sunstone Solar","generator_id":"PGR45","plant_id":68396,"state":"OR","county":"Morrow","developer":"Sunstone Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1200,"summer_mw":1200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.605916,"lon":-119.563,"as_of":"2026-08"},{"id":"68367/PEHA1","plant_name":"Pepper Hammock Solar and Storage","generator_id":"PEHA1","plant_id":68367,"state":"GA","county":"Wayne","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1200,"summer_mw":1200,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":31.331,"lon":-81.759,"as_of":"2026-08"},{"id":"65301/SC1","plant_name":"Steward Creek Solar Phase 1","generator_id":"SC1","plant_id":65301,"state":"IL","county":"Lee","developer":"TerraForm Power Operating, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1200,"summer_mw":1200,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.814343,"lon":-88.98988,"as_of":"2026-08"},{"id":"67551/VISTA","plant_name":"Vista Sands Solar","generator_id":"VISTA","plant_id":67551,"state":"WI","county":"Portage","developer":"Vista Sands Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1182,"summer_mw":1182,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.446256,"lon":-89.57631,"as_of":"2026-08"},{"id":"69798/PMN1","plant_name":"Project Matador Nuclear","generator_id":"PMN1","plant_id":69798,"state":"TX","county":"Carson","developer":"Fermi Nuclear","sector":"IPP Non-CHP","technology":"Nuclear","energy_source":"NUC","prime_mover":"ST","nameplate_mw":1117,"summer_mw":1117,"planned_start":"2031-12","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69798/PMN3","plant_name":"Project Matador Nuclear","generator_id":"PMN3","plant_id":69798,"state":"TX","county":"Carson","developer":"Fermi Nuclear","sector":"IPP Non-CHP","technology":"Nuclear","energy_source":"NUC","prime_mover":"ST","nameplate_mw":1117,"summer_mw":1117,"planned_start":"2031-12","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69798/PMN2","plant_name":"Project Matador Nuclear","generator_id":"PMN2","plant_id":69798,"state":"TX","county":"Carson","developer":"Fermi Nuclear","sector":"IPP Non-CHP","technology":"Nuclear","energy_source":"NUC","prime_mover":"ST","nameplate_mw":1117,"summer_mw":1117,"planned_start":"2032-12","planned_year":2032,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69798/PMN4","plant_name":"Project Matador Nuclear","generator_id":"PMN4","plant_id":69798,"state":"TX","county":"Carson","developer":"Fermi Nuclear","sector":"IPP Non-CHP","technology":"Nuclear","energy_source":"NUC","prime_mover":"ST","nameplate_mw":1117,"summer_mw":1117,"planned_start":"2032-12","planned_year":2032,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"68763/DECH1","plant_name":"Deschutes Solar and BESS","generator_id":"DECH1","plant_id":68763,"state":"OR","county":"Wasco","developer":"DECH bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1000,"summer_mw":1000,"planned_start":"2029-11","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.157,"lon":-121.136,"as_of":"2026-08"},{"id":"68763/DECH2","plant_name":"Deschutes Solar and BESS","generator_id":"DECH2","plant_id":68763,"state":"OR","county":"Wasco","developer":"DECH bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1000,"summer_mw":1000,"planned_start":"2029-11","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.157,"lon":-121.136,"as_of":"2026-08"},{"id":"70359/SYRVS","plant_name":"Sycamore Riverside Energy, LLC","generator_id":"SYRVS","plant_id":70359,"state":"IN","county":"Sullivan","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":964,"summer_mw":964,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.213906,"lon":-87.54727,"as_of":"2026-08"},{"id":"67435/SRWND","plant_name":"Sunrise Wind","generator_id":"SRWND","plant_id":67435,"state":"NY","county":"Suffolk","developer":"Orsted Wind Power North America LLC","sector":"IPP Non-CHP","technology":"Offshore Wind Turbine","energy_source":"WND","prime_mover":"WS","nameplate_mw":924,"summer_mw":924,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.977859,"lon":-71.04454,"as_of":"2026-08"},{"id":"68367/PEHA","plant_name":"Pepper Hammock Solar and Storage","generator_id":"PEHA","plant_id":68367,"state":"GA","county":"Wayne","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":900,"summer_mw":900,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":31.331,"lon":-81.759,"as_of":"2026-08"},{"id":"58987/I-B","plant_name":"Chokecherry and Sierra Madre Wind","generator_id":"I-B","plant_id":58987,"state":"WY","county":"Carbon","developer":"Power Company of Wyoming LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":849.6,"summer_mw":849.6,"planned_start":"2031-12","planned_year":2031,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":41.683056,"lon":-107.2,"as_of":"2026-08"},{"id":"58987/I-A","plant_name":"Chokecherry and Sierra Madre Wind","generator_id":"I-A","plant_id":58987,"state":"WY","county":"Carbon","developer":"Power Company of Wyoming LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":844.2,"summer_mw":844.2,"planned_start":"2031-12","planned_year":2031,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":41.683056,"lon":-107.2,"as_of":"2026-08"},{"id":"68443/EMP01","plant_name":"Empire Wind 1","generator_id":"EMP01","plant_id":68443,"state":"NY","county":"Kings","developer":"Empire Offshore Wind LLC","sector":"IPP Non-CHP","technology":"Offshore Wind Turbine","energy_source":"WND","prime_mover":"WS","nameplate_mw":810,"summer_mw":810,"planned_start":"2027-09","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":40.32,"lon":-73.42,"as_of":"2026-08"},{"id":"66011/PV1","plant_name":"Cedar Island Solar LLC","generator_id":"PV1","plant_id":66011,"state":"OR","county":"Sherman","developer":"Cedar Island Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":800,"summer_mw":800,"planned_start":"2031-12","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.233717,"lon":-120.8985,"as_of":"2026-08"},{"id":"68294/VIO1","plant_name":"Viola Generating Station","generator_id":"VIO1","plant_id":68294,"state":"KS","county":"Sumner","developer":"Evergy Kansas Central, Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":765,"summer_mw":693.2,"planned_start":"2029-01","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":37.331481,"lon":-97.67,"as_of":"2026-08"},{"id":"68295/MCN1","plant_name":"McNew Generating Station","generator_id":"MCN1","plant_id":68295,"state":"KS","county":"Reno","developer":"Evergy Kansas Central, Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":765,"summer_mw":690.4,"planned_start":"2030-01","planned_year":2030,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":38.00595,"lon":-97.92166,"as_of":"2026-08"},{"id":"68053/LEG","plant_name":"Legend Power Station","generator_id":"LEG","plant_id":68053,"state":"TX","county":"Jefferson","developer":"Entergy Texas Inc.","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CC","nameplate_mw":754,"summer_mw":723,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.880219,"lon":-93.99573,"as_of":"2026-08"},{"id":"1364/5","plant_name":"Mill Creek (KY)","generator_id":"5","plant_id":1364,"state":"KY","county":"Jefferson","developer":"Louisville Gas & Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":740,"summer_mw":645,"planned_start":"2027-06","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LGEE","lat":38.0525,"lon":-85.9103,"as_of":"2026-08"},{"id":"69566/GEN1","plant_name":"CPV Basin Ranch Energy Center","generator_id":"GEN1","plant_id":69566,"state":"TX","county":"Ward","developer":"CPV Basin Ranch","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":722.5,"summer_mw":672.4,"planned_start":"2029-02","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.506094,"lon":-103.4875,"as_of":"2026-08"},{"id":"69566/GEN2","plant_name":"CPV Basin Ranch Energy Center","generator_id":"GEN2","plant_id":69566,"state":"TX","county":"Ward","developer":"CPV Basin Ranch","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":722.5,"summer_mw":672.4,"planned_start":"2029-02","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.506094,"lon":-103.4875,"as_of":"2026-08"},{"id":"68606/5","plant_name":"Cedar Bayou 5","generator_id":"5","plant_id":68606,"state":"TX","county":"Chambers","developer":"Cedar Bayou 5 LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":721,"summer_mw":674,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.751132,"lon":-94.92114,"as_of":"2026-08"},{"id":"65500/REVWD","plant_name":"Revolution Wind","generator_id":"REVWD","plant_id":65500,"state":"RI","county":"Washington","developer":"Orsted Wind Power North America LLC","sector":"IPP Non-CHP","technology":"Offshore Wind Turbine","energy_source":"WND","prime_mover":"WS","nameplate_mw":715,"summer_mw":715,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":41.15217,"lon":-71.07783,"as_of":"2026-08"},{"id":"69857/LBRBS","plant_name":"Libra Solar","generator_id":"LBRBS","plant_id":69857,"state":"NV","county":"Lyon","developer":"Libra Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":700,"summer_mw":700,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NEVP","lat":38.902103,"lon":-118.9614,"as_of":"2026-08"},{"id":"69857/LBRPV","plant_name":"Libra Solar","generator_id":"LBRPV","plant_id":69857,"state":"NV","county":"Lyon","developer":"Libra Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":700,"summer_mw":700,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NEVP","lat":38.902103,"lon":-118.9614,"as_of":"2026-08"},{"id":"68202/ROMW","plant_name":"IP Roman Wind","generator_id":"ROMW","plant_id":68202,"state":"TX","county":"Deaf Smith","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":670.5,"summer_mw":670.5,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.990891,"lon":-102.6076,"as_of":"2026-08"},{"id":"68504/SLES1","plant_name":"Sandow Lakes Energy Station","generator_id":"SLES1","plant_id":68504,"state":"TX","county":"Lee","developer":"SL Energy Power Plant I, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":645,"summer_mw":590,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.419441,"lon":-97.19124,"as_of":"2026-08"},{"id":"68504/SLES2","plant_name":"Sandow Lakes Energy Station","generator_id":"SLES2","plant_id":68504,"state":"TX","county":"Lee","developer":"SL Energy Power Plant I, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":645,"summer_mw":590,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.419441,"lon":-97.19124,"as_of":"2026-08"},{"id":"65855/TE1PV","plant_name":"Tehuacana Creek Solar","generator_id":"TE1PV","plant_id":65855,"state":"TX","county":"Navarro","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":644.8,"summer_mw":644.8,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":31.914062,"lon":-96.41347,"as_of":"2026-08"},{"id":"62022/GEN1","plant_name":"Lincoln Land Energy Center","generator_id":"GEN1","plant_id":62022,"state":"IL","county":"Sangamon","developer":"Lincoln Land Energy Center LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":638.4,"summer_mw":520,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.5788,"lon":-89.57984,"as_of":"2026-08"},{"id":"62022/GEN2","plant_name":"Lincoln Land Energy Center","generator_id":"GEN2","plant_id":62022,"state":"IL","county":"Sangamon","developer":"Lincoln Land Energy Center LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":638.4,"summer_mw":520,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.5788,"lon":-89.57984,"as_of":"2026-08"},{"id":"63878/HAY","plant_name":"Haymaker Hybrid","generator_id":"HAY","plant_id":63878,"state":"MT","county":"Wheatland","developer":"Haymaker Energy Project LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":630,"summer_mw":630,"planned_start":"2031-10","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NWMT","lat":46.357442,"lon":-110.3958,"as_of":"2026-08"},{"id":"69764/HPW","plant_name":"Illinois Generation LLC","generator_id":"HPW","plant_id":69764,"state":"IL","county":"Livingston","developer":"Pattern Operators LP","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":616.5,"summer_mw":616.5,"planned_start":"2028-04","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.06713,"lon":-88.2497,"as_of":"2026-08"},{"id":"63802/G001","plant_name":"Shady Hills Combined Cycle Facility","generator_id":"G001","plant_id":63802,"state":"FL","county":"Pasco","developer":"Shady Hills Energy Center, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":612,"summer_mw":538.3,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"FPC","lat":28.366667,"lon":-82.55833,"as_of":"2026-08"},{"id":"68479/SHRT","plant_name":"Short Creek Solar","generator_id":"SHRT","plant_id":68479,"state":"TX","county":"Wichita","developer":"Wichita Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":606.4,"summer_mw":605,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.017622,"lon":-98.8013,"as_of":"2026-08"},{"id":"68982/SGG01","plant_name":"Singing Grass Wind","generator_id":"SGG01","plant_id":68982,"state":"CO","county":"Kit Carson","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":603,"summer_mw":600,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":39.201143,"lon":-102.8576,"as_of":"2026-08"},{"id":"66914/DAN","plant_name":"Danish Fields Solar, LLC","generator_id":"DAN","plant_id":66914,"state":"TX","county":"Wharton","developer":"Danish Fields Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":600,"summer_mw":600,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.013637,"lon":-96.22054,"as_of":"2026-08"},{"id":"70135/SWNSN","plant_name":"Swenson Solar","generator_id":"SWNSN","plant_id":70135,"state":"TX","county":"Stonewall","developer":"Swenson Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":600,"summer_mw":600,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.985403,"lon":-100.0292,"as_of":"2026-08"},{"id":"65842/CFCBS","plant_name":"Clear Fork Creek Solar and BESS SLF","generator_id":"CFCBS","plant_id":65842,"state":"TX","county":"Wilson","developer":"Clear Fork","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":600,"summer_mw":600,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.263568,"lon":-97.78055,"as_of":"2026-08"},{"id":"65842/CFCPV","plant_name":"Clear Fork Creek Solar and BESS SLF","generator_id":"CFCPV","plant_id":65842,"state":"TX","county":"Wilson","developer":"Clear Fork","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":600,"summer_mw":600,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.263568,"lon":-97.78055,"as_of":"2026-08"},{"id":"69989/PB1","plant_name":"Arkansas Cypress Solar Station","generator_id":"PB1","plant_id":69989,"state":"AR","county":"Jefferson","developer":"Entergy Arkansas LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":600,"summer_mw":600,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":34.42,"lon":-92.08,"as_of":"2026-08"},{"id":"68071/BELLF","plant_name":"Bellflower Solar (VA)","generator_id":"BELLF","plant_id":68071,"state":"VA","county":"Brunswick","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":600,"summer_mw":600,"planned_start":"2030-01","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37,"lon":-78,"as_of":"2026-08"},{"id":"165/4","plant_name":"GREC","generator_id":"4","plant_id":165,"state":"OK","county":"Mayes","developer":"Grand River Dam Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":594,"summer_mw":416,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":36.190278,"lon":-95.2894,"as_of":"2026-08"},{"id":"64163/11111","plant_name":"Hecate Energy Cider Solar LLC","generator_id":"11111","plant_id":64163,"state":"NY","county":"Genesee","developer":"Greenbacker Renewable Energy Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":557,"summer_mw":557,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.097336,"lon":-78.23041,"as_of":"2026-08"},{"id":"58987/II-B","plant_name":"Chokecherry and Sierra Madre Wind","generator_id":"II-B","plant_id":58987,"state":"WY","county":"Carbon","developer":"Power Company of Wyoming LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":553.5,"summer_mw":553.5,"planned_start":"2033-12","planned_year":2033,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":41.683056,"lon":-107.2,"as_of":"2026-08"},{"id":"69684/70125","plant_name":"Maricopa Solar","generator_id":"70125","plant_id":69684,"state":"AZ","county":"Maricopa","developer":"Maricopa Solar","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":550,"summer_mw":550,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.46303,"lon":-113.1101,"as_of":"2026-08"},{"id":"65310/DAWN1","plant_name":"Renegade Solar Project (Dawn)","generator_id":"DAWN1","plant_id":65310,"state":"TX","county":"Deaf Smith","developer":"Renegade Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":515,"summer_mw":515,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":34.913,"lon":-102.2706,"as_of":"2026-08"},{"id":"64234/19936","plant_name":"Hecate Energy Harley Hand Solar LLC","generator_id":"19936","plant_id":64234,"state":"TX","county":"Nolan","developer":"Hecate Energy Harley Hand Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":514,"summer_mw":514,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.468537,"lon":-100.2164,"as_of":"2026-08"},{"id":"64847/CRTW1","plant_name":"Rail Tie Wind","generator_id":"CRTW1","plant_id":64847,"state":"WY","county":"Albany","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":504,"summer_mw":504,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":41.055833,"lon":-105.4942,"as_of":"2026-08"},{"id":"65028/ROSES","plant_name":"Roseland Solar Project, LLC","generator_id":"ROSES","plant_id":65028,"state":"TX","county":"Falls","developer":"Enel Green Power Roseland Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.461242,"lon":-96.82493,"as_of":"2026-08"},{"id":"64209/26SBA","plant_name":"Bellefield 2 Solar & Energy Storage Farm","generator_id":"26SBA","plant_id":64209,"state":"CA","county":"Kern","developer":"26SB 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.017779,"lon":-118.0687,"as_of":"2026-08"},{"id":"64209/26SBB","plant_name":"Bellefield 2 Solar & Energy Storage Farm","generator_id":"26SBB","plant_id":64209,"state":"CA","county":"Kern","developer":"26SB 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.017779,"lon":-118.0687,"as_of":"2026-08"},{"id":"69820/GRA1","plant_name":"Grace Energy Center","generator_id":"GRA1","plant_id":69820,"state":"CA","county":"Riverside","developer":"Grace Orchard Interconnection, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2027-08","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":33.653564,"lon":-114.696,"as_of":"2026-08"},{"id":"69820/GRA2","plant_name":"Grace Energy Center","generator_id":"GRA2","plant_id":69820,"state":"CA","county":"Riverside","developer":"Grace Orchard Interconnection, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":33.653564,"lon":-114.696,"as_of":"2026-08"},{"id":"66414/RMSY","plant_name":"Hecate Energy Ramsey Storage","generator_id":"RMSY","plant_id":66414,"state":"TX","county":"Wharton","developer":"Hecate Energy Ramsey Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.02939,"lon":-96.2362,"as_of":"2026-08"},{"id":"68204/MEITW","plant_name":"IP Meitner Wind","generator_id":"MEITW","plant_id":68204,"state":"TX","county":"Roberts","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":500,"summer_mw":258,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":35.696972,"lon":-100.8213,"as_of":"2026-08"},{"id":"68203/MEITS","plant_name":"IP Meitner Solar","generator_id":"MEITS","plant_id":68203,"state":"TX","county":"Gray","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":214,"planned_start":"2028-04","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":35.562222,"lon":-100.6941,"as_of":"2026-08"},{"id":"68201/ROMS","plant_name":"IP Roman Solar","generator_id":"ROMS","plant_id":68201,"state":"TX","county":"Deaf Smith","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.990891,"lon":-102.6076,"as_of":"2026-08"},{"id":"70397/SRSP1","plant_name":"Steel River Solar Phase 1","generator_id":"SRSP1","plant_id":70397,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"68354/LSPV1","plant_name":"La Salle Solar","generator_id":"LSPV1","plant_id":68354,"state":"TX","county":"LaSalle","developer":"La Salle Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.092519,"lon":-99.05701,"as_of":"2026-08"},{"id":"68034/SNSCB","plant_name":"Sunscape Renewable Energy","generator_id":"SNSCB","plant_id":68034,"state":"TX","county":"Nueces","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":27.819197,"lon":-97.79994,"as_of":"2026-08"},{"id":"68034/SNSCP","plant_name":"Sunscape Renewable Energy","generator_id":"SNSCP","plant_id":68034,"state":"TX","county":"Nueces","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":27.819197,"lon":-97.79994,"as_of":"2026-08"},{"id":"69584/3572","plant_name":"Rising Star Solar","generator_id":"3572","plant_id":69584,"state":"TX","county":"Starr","developer":"Rising Star Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":26.382105,"lon":-98.61544,"as_of":"2026-08"},{"id":"68353/LSBS1","plant_name":"La Salle ESS","generator_id":"LSBS1","plant_id":68353,"state":"TX","county":"LaSalle","developer":"La Salle ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.094701,"lon":-99.05554,"as_of":"2026-08"},{"id":"70398/SRSP2","plant_name":"Steel River Solar Phase 2","generator_id":"SRSP2","plant_id":70398,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2029-07","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"70399/SRSP3","plant_name":"Steel River Solar Phase 3","generator_id":"SRSP3","plant_id":70399,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2030-07","planned_year":2030,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"68635/KU1","plant_name":"Kemmerer Unit 1","generator_id":"KU1","plant_id":68635,"state":"WY","county":"Lincoln","developer":"US SFR Owner LLC","sector":"IPP Non-CHP","technology":"Nuclear","energy_source":"NUC","prime_mover":"ST","nameplate_mw":500,"summer_mw":342.1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PACE","lat":41.705993,"lon":-110.5603,"as_of":"2026-08"},{"id":"68342/HOHI1","plant_name":"Hop Hill Solar Generation and BESS","generator_id":"HOHI1","plant_id":68342,"state":"WA","county":"Benton","developer":"HOHI bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":500,"summer_mw":500,"planned_start":"2031-09","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":46.324,"lon":-119.822,"as_of":"2026-08"},{"id":"68342/HOHI2","plant_name":"Hop Hill Solar Generation and BESS","generator_id":"HOHI2","plant_id":68342,"state":"WA","county":"Benton","developer":"HOHI bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":500,"summer_mw":500,"planned_start":"2031-09","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":46.324,"lon":-119.822,"as_of":"2026-08"},{"id":"63911/MECN","plant_name":"MEC North","generator_id":"MECN","plant_id":63911,"state":"MI","county":"Calhoun","developer":"MEC North","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":500,"summer_mw":500,"planned_start":"2034-06","planned_year":2034,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":42.233559,"lon":-84.96234,"as_of":"2026-08"},{"id":"63912/MECS","plant_name":"MEC South","generator_id":"MECS","plant_id":63912,"state":"MI","county":"Calhoun","developer":"MEC South","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":500,"summer_mw":500,"planned_start":"2034-06","planned_year":2034,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.237103,"lon":-84.95915,"as_of":"2026-08"},{"id":"68317/DUTC1","plant_name":"Dutchman Solar generation and BESS","generator_id":"DUTC1","plant_id":68317,"state":"WY","county":"Converse","developer":"DUTC bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":499,"summer_mw":499,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":42.871644,"lon":-105.8176,"as_of":"2026-08"},{"id":"68317/DUTC2","plant_name":"Dutchman Solar generation and BESS","generator_id":"DUTC2","plant_id":68317,"state":"WY","county":"Converse","developer":"DUTC bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":499,"summer_mw":499,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":42.871644,"lon":-105.8176,"as_of":"2026-08"},{"id":"69071/CT1","plant_name":"Bison Generation Station","generator_id":"CT1","plant_id":69071,"state":"ND","county":"Williams","developer":"Basin Electric Power Coop","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":496,"summer_mw":409,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":48.327932,"lon":-103.3127,"as_of":"2026-08"},{"id":"69071/CT2","plant_name":"Bison Generation Station","generator_id":"CT2","plant_id":69071,"state":"ND","county":"Williams","developer":"Basin Electric Power Coop","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":496,"summer_mw":409,"planned_start":"2030-03","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":48.327932,"lon":-103.3127,"as_of":"2026-08"},{"id":"68296/MC1","plant_name":"Mullin Creek #1 Generating Station","generator_id":"MC1","plant_id":68296,"state":"MO","county":"Nodaway","developer":"Evergy Missouri West","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":489.7,"summer_mw":425.1,"planned_start":"2030-01","planned_year":2030,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":38.00595,"lon":-97.92166,"as_of":"2026-08"},{"id":"728/8","plant_name":"Yates","generator_id":"8","plant_id":728,"state":"GA","county":"Coweta","developer":"Georgia Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":482.8,"summer_mw":418.4,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":33.4622,"lon":-84.8986,"as_of":"2026-08"},{"id":"728/10","plant_name":"Yates","generator_id":"10","plant_id":728,"state":"GA","county":"Coweta","developer":"Georgia Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":482.8,"summer_mw":418.4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":33.4622,"lon":-84.8986,"as_of":"2026-08"},{"id":"728/9","plant_name":"Yates","generator_id":"9","plant_id":728,"state":"GA","county":"Coweta","developer":"Georgia Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":482.8,"summer_mw":418.4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":33.4622,"lon":-84.8986,"as_of":"2026-08"},{"id":"69184/WF5CT","plant_name":"Waterford 5","generator_id":"WF5CT","plant_id":69184,"state":"LA","county":"St Charles","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":478,"summer_mw":420,"planned_start":"2029-06","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":29.988583,"lon":-90.48565,"as_of":"2026-08"},{"id":"69185/JPSCT","plant_name":"Jefferson Power Station","generator_id":"JPSCT","plant_id":69185,"state":"AR","county":"Jefferson","developer":"Entergy Arkansas LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":478,"summer_mw":420,"planned_start":"2029-11","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.427527,"lon":-92.13996,"as_of":"2026-08"},{"id":"69445/CT1","plant_name":"Waterford 6","generator_id":"CT1","plant_id":69445,"state":"LA","county":"St Charles","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":478,"summer_mw":420,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":29.988583,"lon":-90.48565,"as_of":"2026-08"},{"id":"69223/GT1","plant_name":"Vicksburg Advanced Power Station","generator_id":"GT1","plant_id":69223,"state":"MS","county":"Warren","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":477.7,"summer_mw":422.8,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.28526,"lon":-90.92568,"as_of":"2026-08"},{"id":"70187/CT1","plant_name":"Traceview Advanced Power Station","generator_id":"CT1","plant_id":70187,"state":"MS","county":"Madison","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":477.7,"summer_mw":422.8,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.405646,"lon":-90.22114,"as_of":"2026-08"},{"id":"69426/CT1","plant_name":"Westlake Power Station","generator_id":"CT1","plant_id":69426,"state":"LA","county":"Calcasieu","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":477.7,"summer_mw":390,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.281105,"lon":-93.30189,"as_of":"2026-08"},{"id":"67914/1A","plant_name":"Delta Blues Advanced Power Station","generator_id":"1A","plant_id":67914,"state":"MS","county":"Washington","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":477,"summer_mw":422.2,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":33.330476,"lon":-91.13058,"as_of":"2026-08"},{"id":"69060/SNFA","plant_name":"Snowflake A Solar and BESS","generator_id":"SNFA","plant_id":69060,"state":"AZ","county":"Navajo","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":475,"summer_mw":475,"planned_start":"2027-08","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":34.998055,"lon":-110.1255,"as_of":"2026-08"},{"id":"69060/SNFBA","plant_name":"Snowflake A Solar and BESS","generator_id":"SNFBA","plant_id":69060,"state":"AZ","county":"Navajo","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":475,"summer_mw":475,"planned_start":"2027-08","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":34.998055,"lon":-110.1255,"as_of":"2026-08"},{"id":"69690/PG2","plant_name":"Panther Grove 2","generator_id":"PG2","plant_id":69690,"state":"IL","county":"Livingston","developer":"Panther Grove 2 LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":472.5,"summer_mw":472.5,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.815283,"lon":-88.86191,"as_of":"2026-08"},{"id":"68214/1A","plant_name":"Franklin Farms 1&2","generator_id":"1A","plant_id":68214,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":32.53246,"lon":-91.62767,"as_of":"2026-08"},{"id":"68214/2A","plant_name":"Franklin Farms 1&2","generator_id":"2A","plant_id":68214,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":32.53246,"lon":-91.62767,"as_of":"2026-08"},{"id":"69449/1A","plant_name":"Richland Parish Power Station 1&2","generator_id":"1A","plant_id":69449,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2030-03","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.468339,"lon":-91.68038,"as_of":"2026-08"},{"id":"69449/2A","plant_name":"Richland Parish Power Station 1&2","generator_id":"2A","plant_id":69449,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2030-03","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.468339,"lon":-91.68038,"as_of":"2026-08"},{"id":"69649/3A","plant_name":"Richland Parish Power Station 3","generator_id":"3A","plant_id":69649,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.496716,"lon":-91.69867,"as_of":"2026-08"},{"id":"69650/4A","plant_name":"Richland Parish Power Station 4","generator_id":"4A","plant_id":69650,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.497782,"lon":-91.6997,"as_of":"2026-08"},{"id":"69944/PC1A","plant_name":"Pointe Coupee Power Station","generator_id":"PC1A","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2031-10","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69944/PC2A","plant_name":"Pointe Coupee Power Station","generator_id":"PC2A","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2031-11","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69944/PC3A","plant_name":"Pointe Coupee Power Station","generator_id":"PC3A","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":469.3,"summer_mw":435.4,"planned_start":"2031-12","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69077/1A","plant_name":"Lone Star Power Station","generator_id":"1A","plant_id":69077,"state":"TX","county":"San Jacinto","developer":"Entergy Texas Inc.","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":467.3,"summer_mw":432,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":30.414158,"lon":-95.01671,"as_of":"2026-08"},{"id":"69750/1A","plant_name":"Ironwood Power Station","generator_id":"1A","plant_id":69750,"state":"AR","county":"Hot Spring","developer":"Entergy Arkansas LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":467.3,"summer_mw":432,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.433826,"lon":-92.9042,"as_of":"2026-08"},{"id":"65851/HB2PV","plant_name":"Hollow Branch Creek","generator_id":"HB2PV","plant_id":65851,"state":"TX","county":"Madison","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":460,"summer_mw":460,"planned_start":"2027-08","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.061726,"lon":-96.05606,"as_of":"2026-08"},{"id":"68546/1","plant_name":"Smarr Combined Cycle Energy Facility","generator_id":"1","plant_id":68546,"state":"GA","county":"Monroe","developer":"Oglethorpe Power Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CC","nameplate_mw":459,"summer_mw":407,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":32.975936,"lon":-83.84369,"as_of":"2026-08"},{"id":"65854/RDYPV","plant_name":"Rowdy Creek Solar and BESS","generator_id":"RDYPV","plant_id":65854,"state":"TX","county":"Lamar","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":455,"summer_mw":455,"planned_start":"2028-06","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":33.75694,"lon":-95.6458,"as_of":"2026-08"},{"id":"3407/CTG1","plant_name":"Kingston","generator_id":"CTG1","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":454.8,"summer_mw":372.9,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3399/CTG2","plant_name":"Cumberland (TN)","generator_id":"CTG2","plant_id":3399,"state":"TN","county":"Stewart","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":454.8,"summer_mw":372.9,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":36.3903,"lon":-87.6539,"as_of":"2026-08"},{"id":"3399/CTG1","plant_name":"Cumberland (TN)","generator_id":"CTG1","plant_id":3399,"state":"TN","county":"Stewart","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":454.8,"summer_mw":372.9,"planned_start":"2034-12","planned_year":2034,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":36.3903,"lon":-87.6539,"as_of":"2026-08"},{"id":"66621/1A","plant_name":"Orange County Advanced Power Station","generator_id":"1A","plant_id":66621,"state":"TX","county":"Orange","developer":"Entergy Texas Inc.","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":453,"summer_mw":396.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":30.025251,"lon":-93.87134,"as_of":"2026-08"},{"id":"66621/1B","plant_name":"Orange County Advanced Power Station","generator_id":"1B","plant_id":66621,"state":"TX","county":"Orange","developer":"Entergy Texas Inc.","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":453,"summer_mw":396.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":30.025251,"lon":-93.87134,"as_of":"2026-08"},{"id":"66871/SOLAR","plant_name":"GulfStar Power, LLC","generator_id":"SOLAR","plant_id":66871,"state":"TX","county":"Wharton","developer":"GulfStar Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":451.6,"summer_mw":451.6,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.191296,"lon":-95.96752,"as_of":"2026-08"},{"id":"68772/CHALK","plant_name":"Chalk Bluff Solar","generator_id":"CHALK","plant_id":68772,"state":"AR","county":"St Francis","developer":"Chalk Bluff Solar Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":450,"summer_mw":450,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.051606,"lon":-90.43254,"as_of":"2026-08"},{"id":"70175/ZSPV","plant_name":"ZSS Solar","generator_id":"ZSPV","plant_id":70175,"state":"TX","county":"Knox","developer":"NextEra Energy Resources - ERCOT","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":450,"summer_mw":450,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":33.479935,"lon":-99.67475,"as_of":"2026-08"},{"id":"67664/SOLEI","plant_name":"Soleil","generator_id":"SOLEI","plant_id":67664,"state":"TX","county":"Clay","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":450,"summer_mw":450,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.799253,"lon":-98.04552,"as_of":"2026-08"},{"id":"68273/1","plant_name":"Naples Power Plant","generator_id":"1","plant_id":68273,"state":"TX","county":"Morris","developer":"Arkansas Electric Coop Corp","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":450,"summer_mw":450,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":33.21964,"lon":-94.70564,"as_of":"2026-08"},{"id":"68273/2","plant_name":"Naples Power Plant","generator_id":"2","plant_id":68273,"state":"TX","county":"Morris","developer":"Arkansas Electric Coop Corp","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":450,"summer_mw":450,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":33.21964,"lon":-94.70564,"as_of":"2026-08"},{"id":"69691/06","plant_name":"Greens Bayou 6","generator_id":"06","plant_id":69691,"state":"TX","county":"Harris","developer":"NRG Greens Bayou 6 LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":447,"summer_mw":411,"planned_start":"2028-05","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.821222,"lon":-95.21786,"as_of":"2026-08"},{"id":"68607/PLJW1","plant_name":"Pelicans Jaw Hybrid Solar","generator_id":"PLJW1","plant_id":68607,"state":"CA","county":"Kern","developer":"Pelicans Jaw Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":440,"summer_mw":440,"planned_start":"2027-04","planned_year":2027,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":35.765183,"lon":-119.7436,"as_of":"2026-08"},{"id":"69689/CT11","plant_name":"Vast Sands Power","generator_id":"CT11","plant_id":69689,"state":"TX","county":"Ward","developer":"Permian Power I LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":440,"summer_mw":440,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.584096,"lon":-102.958,"as_of":"2026-08"},{"id":"69689/CT12","plant_name":"Vast Sands Power","generator_id":"CT12","plant_id":69689,"state":"TX","county":"Ward","developer":"Permian Power I LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":440,"summer_mw":440,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.584096,"lon":-102.958,"as_of":"2026-08"},{"id":"69873/CRW02","plant_name":"Cheyenne Ridge II","generator_id":"CRW02","plant_id":69873,"state":"CO","county":"Cheyenne","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":438,"summer_mw":438,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":38.997719,"lon":-102.3593,"as_of":"2026-08"},{"id":"56/LEC3","plant_name":"Lowman Energy Center","generator_id":"LEC3","plant_id":56,"state":"AL","county":"Washington","developer":"PowerSouth Energy Cooperative","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":438,"summer_mw":409,"planned_start":"2029-11","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":31.488019,"lon":-87.91075,"as_of":"2026-08"},{"id":"68305/GWT1","plant_name":"Gigawatt Solar","generator_id":"GWT1","plant_id":68305,"state":"TX","county":"Parker","developer":"Gigawatt Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":429,"summer_mw":429,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.547389,"lon":-97.59792,"as_of":"2026-08"},{"id":"63818/78787","plant_name":"Panther Grove Wind, LLC","generator_id":"78787","plant_id":63818,"state":"IL","county":"Woodford","developer":"Panther Grove Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":423,"summer_mw":423,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.7129,"lon":-89.1706,"as_of":"2026-08"},{"id":"68759/IPQ1B","plant_name":"Quantum BESS","generator_id":"IPQ1B","plant_id":68759,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":422.4,"summer_mw":323.6,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":33.0121,"lon":-99.5604,"as_of":"2026-08"},{"id":"68761/IPQ2B","plant_name":"Quantum II BESS","generator_id":"IPQ2B","plant_id":68761,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":422.4,"summer_mw":323.6,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":33.135,"lon":-99.5719,"as_of":"2026-08"},{"id":"67262/RP1","plant_name":"Ripley Energy Center","generator_id":"RP1","plant_id":67262,"state":"OK","county":"Payne","developer":"Associated Electric Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":419,"summer_mw":411.4,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AECI","lat":36.116,"lon":-96.902,"as_of":"2026-08"},{"id":"67263/TN1","plant_name":"Turney Energy Center","generator_id":"TN1","plant_id":67263,"state":"MO","county":"Clinton","developer":"Associated Electric Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":419,"summer_mw":411.4,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AECI","lat":39.615,"lon":-94.351,"as_of":"2026-08"},{"id":"65855/TE1BS","plant_name":"Tehuacana Creek Solar","generator_id":"TE1BS","plant_id":65855,"state":"TX","county":"Navarro","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":418,"summer_mw":418,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":31.914062,"lon":-96.41347,"as_of":"2026-08"},{"id":"69025/PLSKI","plant_name":"Pulaski Solar","generator_id":"PLSKI","plant_id":69025,"state":"IL","county":"Pulaski","developer":"Joppa BESS LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":417.4,"summer_mw":405,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"GLHB","lat":37.264918,"lon":-88.9524,"as_of":"2026-08"},{"id":"69272/SEQII","plant_name":"Enbridge Solar (Sequoia II)","generator_id":"SEQII","plant_id":69272,"state":"TX","county":"Callahan","developer":"Enbridge Solar (Sequoia II), LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":415,"summer_mw":415,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.341078,"lon":-99.17308,"as_of":"2026-08"},{"id":"68369/STMO","plant_name":"Starfire Mountain Solar","generator_id":"STMO","plant_id":68369,"state":"KY","county":"Perry","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":410,"summer_mw":410,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.4119,"lon":-83.1206,"as_of":"2026-08"},{"id":"8059/2G1","plant_name":"Comanche (OK)","generator_id":"2G1","plant_id":8059,"state":"OK","county":"Comanche","developer":"Public Service Co of Oklahoma","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":408.8,"summer_mw":368.1,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":34.5431,"lon":-98.3244,"as_of":"2026-08"},{"id":"8059/3G1","plant_name":"Comanche (OK)","generator_id":"3G1","plant_id":8059,"state":"OK","county":"Comanche","developer":"Public Service Co of Oklahoma","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":408.8,"summer_mw":368.1,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":34.5431,"lon":-98.3244,"as_of":"2026-08"},{"id":"66912/HS1","plant_name":"Hill Solar 1","generator_id":"HS1","plant_id":66912,"state":"TX","county":"Hill","developer":"Hill Solar 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":405,"summer_mw":405,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.139,"lon":-97.06,"as_of":"2026-08"},{"id":"67984/FFLPA","plant_name":"Firefly Solar PA","generator_id":"FFLPA","plant_id":67984,"state":"PA","county":"Lawrence","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":401.6,"summer_mw":401.6,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.930281,"lon":-80.43244,"as_of":"2026-08"},{"id":"67378/MB","plant_name":"Mineral Basin Solar Power","generator_id":"MB","plant_id":67378,"state":"PA","county":"Clearfield","developer":"Mineral Basin Solar Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":401.6,"summer_mw":401.6,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":41.106469,"lon":-78.29426,"as_of":"2026-08"},{"id":"66621/1C","plant_name":"Orange County Advanced Power Station","generator_id":"1C","plant_id":66621,"state":"TX","county":"Orange","developer":"Entergy Texas Inc.","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":400,"summer_mw":365,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":30.025251,"lon":-93.87134,"as_of":"2026-08"},{"id":"68422/CALII","plant_name":"Callisto II Energy Center","generator_id":"CALII","plant_id":68422,"state":"TX","county":"Harris","developer":"Callisto II Energy Center LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.645345,"lon":-95.45025,"as_of":"2026-08"},{"id":"67978/SSPV1","plant_name":"Sierra Solar Hybrid","generator_id":"SSPV1","plant_id":67978,"state":"NV","county":"Churchill","developer":"Sierra Pacific Power Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NEVP","lat":39.8536,"lon":-119.0394,"as_of":"2026-08"},{"id":"68917/BS","plant_name":"Beavertail Solar","generator_id":"BS","plant_id":68917,"state":"MO","county":"Henry","developer":"Beavertail Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SPA","lat":38.311814,"lon":-93.93546,"as_of":"2026-08"},{"id":"69509/1","plant_name":"Gabriel","generator_id":"1","plant_id":69509,"state":"CA","county":"Los Angeles","developer":"San Gabriel Project LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.11,"lon":-117.97,"as_of":"2026-08"},{"id":"67059/1","plant_name":"Iron Belt","generator_id":"1","plant_id":67059,"state":"TX","county":"Borden","developer":"Iron Belt Energy Storage Project, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.5557,"lon":-101.6601,"as_of":"2026-08"},{"id":"69508/1","plant_name":"Marici","generator_id":"1","plant_id":69508,"state":"CA","county":"Los Angeles","developer":"Marici Project LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.007751,"lon":-117.9462,"as_of":"2026-08"},{"id":"69553/BCS","plant_name":"Blacks Creek Solar","generator_id":"BCS","plant_id":69553,"state":"ID","county":"Ada","developer":"Blacks Creek Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"IPCO","lat":43.499,"lon":-116.1918,"as_of":"2026-08"},{"id":"64670/KOV4A","plant_name":"Big Creek Solar LLC","generator_id":"KOV4A","plant_id":64670,"state":"AR","county":"Lee","developer":"Big Creek Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":34.870404,"lon":-117.9656,"as_of":"2026-08"},{"id":"63782/RH1","plant_name":"Rough Hat","generator_id":"RH1","plant_id":63782,"state":"NV","county":"Clark","developer":"Candela Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":36.09907,"lon":-115.8337,"as_of":"2026-08"},{"id":"66805/LYCAN","plant_name":"Lycan Solar Project","generator_id":"LYCAN","plant_id":66805,"state":"CA","county":"Riverside","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":33.621326,"lon":-115.0959,"as_of":"2026-08"},{"id":"69056/CBBA","plant_name":"CO Bar Solar and BESS","generator_id":"CBBA","plant_id":69056,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"69056/CBPV","plant_name":"CO Bar Solar and BESS","generator_id":"CBPV","plant_id":69056,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"69239/HSS","plant_name":"High Spring Solar Energy","generator_id":"HSS","plant_id":69239,"state":"OK","county":"Muskogee","developer":"High Spring Solar Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":250.4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":35.576674,"lon":-95.65816,"as_of":"2026-08"},{"id":"70219/VALLE","plant_name":"Valley Farms Energy Center","generator_id":"VALLE","plant_id":70219,"state":"AZ","county":"Pinal","developer":"Valley Farms Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.94793,"lon":-111.4576,"as_of":"2026-08"},{"id":"68022/CLP20","plant_name":"Cowboy Solar I","generator_id":"CLP20","plant_id":68022,"state":"WY","county":"Laramie","developer":"Cowboy Solar I","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.032968,"lon":-104.3816,"as_of":"2026-08"},{"id":"64208/30PNA","plant_name":"Red Antelope Solar & Energy Storage Farm","generator_id":"30PNA","plant_id":64208,"state":"AZ","county":"Coconino","developer":"302PN 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":36.7,"lon":-111.28,"as_of":"2026-08"},{"id":"68287/EAGL1","plant_name":"Eagle Eye Solar and Storage","generator_id":"EAGL1","plant_id":68287,"state":"AZ","county":"La Paz","developer":"EAGL bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":33.727,"lon":-112.881,"as_of":"2026-08"},{"id":"68287/EAGL2","plant_name":"Eagle Eye Solar and Storage","generator_id":"EAGL2","plant_id":68287,"state":"AZ","county":"La Paz","developer":"EAGL bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":33.727,"lon":-112.881,"as_of":"2026-08"},{"id":"68209/PSGBS","plant_name":"Purple Sage Energy Center","generator_id":"PSGBS","plant_id":68209,"state":"NV","county":"Clark","developer":"Noble Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.029139,"lon":-115.8062,"as_of":"2026-08"},{"id":"68209/PSGPV","plant_name":"Purple Sage Energy Center","generator_id":"PSGPV","plant_id":68209,"state":"NV","county":"Clark","developer":"Noble Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.029139,"lon":-115.8062,"as_of":"2026-08"},{"id":"63488/OBSLR","plant_name":"Obsidian Solar Center","generator_id":"OBSLR","plant_id":63488,"state":"OR","county":"Lake","developer":"Obsidian Solar Center LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":43.312167,"lon":-120.8218,"as_of":"2026-08"},{"id":"68022/CLPBS","plant_name":"Cowboy Solar I","generator_id":"CLPBS","plant_id":68022,"state":"WY","county":"Laramie","developer":"Cowboy Solar I","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.032968,"lon":-104.3816,"as_of":"2026-08"},{"id":"70331/MRASL","plant_name":"Mirasol Energy Center, LLC.","generator_id":"MRASL","plant_id":70331,"state":"CO","county":"Pueblo","developer":"Mirasol Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":400,"summer_mw":400,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PSCO","lat":38.11439,"lon":-104.2017,"as_of":"2026-08"},{"id":"68367/PEHA2","plant_name":"Pepper Hammock Solar and Storage","generator_id":"PEHA2","plant_id":68367,"state":"GA","county":"Wayne","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":31.331,"lon":-81.759,"as_of":"2026-08"},{"id":"66805/LYCN2","plant_name":"Lycan Solar Project","generator_id":"LYCN2","plant_id":66805,"state":"CA","county":"Riverside","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":400,"summer_mw":400,"planned_start":"2030-04","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":33.621326,"lon":-115.0959,"as_of":"2026-08"},{"id":"67657/HANSO","plant_name":"Hanson","generator_id":"HANSO","plant_id":67657,"state":"TX","county":"Coleman","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":396,"summer_mw":396,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.690367,"lon":-99.51389,"as_of":"2026-08"},{"id":"69877/CHPV1","plant_name":"Charger Solar","generator_id":"CHPV1","plant_id":69877,"state":"TX","county":"Refugio","developer":"AP Solar 4 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":394.4,"summer_mw":394.4,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":28.416661,"lon":-97.03519,"as_of":"2026-08"},{"id":"69057/CBDBA","plant_name":"CO Bar D Solar and BESS","generator_id":"CBDBA","plant_id":69057,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":394,"summer_mw":394,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"69057/CBDPV","plant_name":"CO Bar D Solar and BESS","generator_id":"CBDPV","plant_id":69057,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":394,"summer_mw":394,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"69595/GTGEN","plant_name":"Saddleback Generation Station","generator_id":"GTGEN","plant_id":69595,"state":"AZ","county":"Maricopa","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":375,"summer_mw":345,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":33.410034,"lon":-113.1694,"as_of":"2026-08"},{"id":"69595/GTGN2","plant_name":"Saddleback Generation Station","generator_id":"GTGN2","plant_id":69595,"state":"AZ","county":"Maricopa","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":375,"summer_mw":345,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":33.410034,"lon":-113.1694,"as_of":"2026-08"},{"id":"60206/HCCT1","plant_name":"Wolf Summit Energy","generator_id":"HCCT1","plant_id":60206,"state":"WV","county":"Harrison","developer":"Wolf Summit Energy LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":371.5,"summer_mw":319.1,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.287039,"lon":-80.32287,"as_of":"2026-08"},{"id":"65853/MIDPV","plant_name":"Banita Creek- Spindlepop Solar","generator_id":"MIDPV","plant_id":65853,"state":"TX","county":"Nacogdoches","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":371,"summer_mw":371,"planned_start":"2028-06","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.5552,"lon":-94.7919,"as_of":"2026-08"},{"id":"63841/ARIDA","plant_name":"Arida Solar (Hybrid)","generator_id":"ARIDA","plant_id":63841,"state":"NV","county":"Clark","developer":"326FW 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":370,"summer_mw":370,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.092036,"lon":-114.6888,"as_of":"2026-08"},{"id":"63841/BESS","plant_name":"Arida Solar (Hybrid)","generator_id":"BESS","plant_id":63841,"state":"NV","county":"Clark","developer":"326FW 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":370,"summer_mw":370,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.092036,"lon":-114.6888,"as_of":"2026-08"},{"id":"69189/C2PV","plant_name":"Cowboy Solar II","generator_id":"C2PV","plant_id":69189,"state":"WY","county":"Laramie","developer":"TGE Wyoming 225, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":365,"summer_mw":365,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"WACM","lat":41.032968,"lon":-104.3816,"as_of":"2026-08"},{"id":"68760/IPQ1S","plant_name":"Quantum Solar","generator_id":"IPQ1S","plant_id":68760,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":362.8,"summer_mw":320.6,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":33.0129,"lon":-99.5604,"as_of":"2026-08"},{"id":"68762/IPQ2S","plant_name":"Quantum II Solar","generator_id":"IPQ2S","plant_id":68762,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":362.8,"summer_mw":320.6,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":33.1377,"lon":-99.57,"as_of":"2026-08"},{"id":"68745/SS2","plant_name":"Sunfish Solar 2","generator_id":"SS2","plant_id":68745,"state":"MI","county":"Calhoun","developer":"Consumers Energy Co - (MI)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":360,"summer_mw":360,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.24653,"lon":-85.00559,"as_of":"2026-08"},{"id":"3122/CT5","plant_name":"Homer City Generating Station","generator_id":"CT5","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT6","plant_name":"Homer City Generating Station","generator_id":"CT6","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT2","plant_name":"Homer City Generating Station","generator_id":"CT2","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT3","plant_name":"Homer City Generating Station","generator_id":"CT3","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT7","plant_name":"Homer City Generating Station","generator_id":"CT7","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT4","plant_name":"Homer City Generating Station","generator_id":"CT4","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CT1","plant_name":"Homer City Generating Station","generator_id":"CT1","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":360,"summer_mw":360,"planned_start":"2029-11","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"70200/64205","plant_name":"Lucy Solar","generator_id":"64205","plant_id":70200,"state":"TX","county":"Concho","developer":"Concho County Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":351.3,"summer_mw":351.3,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":31.472348,"lon":-99.99328,"as_of":"2026-08"},{"id":"66915/CTW","plant_name":"Cottonwood Bayou Solar","generator_id":"CTW","plant_id":66915,"state":"TX","county":"Brazoria","developer":"Cottonwood Bayou Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":350,"summer_mw":350,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.263123,"lon":-95.258,"as_of":"2026-08"},{"id":"68065/CHILS","plant_name":"Chillingham Solar","generator_id":"CHILS","plant_id":68065,"state":"TX","county":"Bell","developer":"Chillingham Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":350,"summer_mw":350,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.006,"lon":-97.262,"as_of":"2026-08"},{"id":"67359/4666","plant_name":"Funston Solar","generator_id":"4666","plant_id":67359,"state":"TX","county":"Jones","developer":"Funston Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":350,"summer_mw":350,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.783669,"lon":-99.72019,"as_of":"2026-08"},{"id":"65854/RDYBS","plant_name":"Rowdy Creek Solar and BESS","generator_id":"RDYBS","plant_id":65854,"state":"TX","county":"Lamar","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":350,"summer_mw":350,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.75694,"lon":-95.6458,"as_of":"2026-08"},{"id":"69796/HARVS","plant_name":"Harvey Solar","generator_id":"HARVS","plant_id":69796,"state":"OH","county":"Licking","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":350,"summer_mw":350,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.273115,"lon":-82.71962,"as_of":"2026-08"},{"id":"68039/ELISA","plant_name":"Elisabeth Solar","generator_id":"ELISA","plant_id":68039,"state":"AZ","county":"Yuma","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":350,"summer_mw":350,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":32.95453,"lon":-113.4954,"as_of":"2026-08"},{"id":"69989/PB2","plant_name":"Arkansas Cypress Solar Station","generator_id":"PB2","plant_id":69989,"state":"AR","county":"Jefferson","developer":"Entergy Arkansas LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":350,"summer_mw":350,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":34.42,"lon":-92.08,"as_of":"2026-08"},{"id":"68546/2","plant_name":"Smarr Combined Cycle Energy Facility","generator_id":"2","plant_id":68546,"state":"GA","county":"Monroe","developer":"Oglethorpe Power Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CC","nameplate_mw":345,"summer_mw":304,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":32.975936,"lon":-83.84369,"as_of":"2026-08"},{"id":"68940/CAPV","plant_name":"Country Acres Clean Power LLC","generator_id":"CAPV","plant_id":68940,"state":"CA","county":"Placer","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":344,"summer_mw":344,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BANC","lat":38.751744,"lon":-121.4221,"as_of":"2026-08"},{"id":"68305/GWT2","plant_name":"Gigawatt Solar","generator_id":"GWT2","plant_id":68305,"state":"TX","county":"Parker","developer":"Gigawatt Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":344,"summer_mw":344,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.547389,"lon":-97.59792,"as_of":"2026-08"},{"id":"69661/IPD1S","plant_name":"Darden I Solar","generator_id":"IPD1S","plant_id":69661,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":342.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.504106,"lon":-120.2167,"as_of":"2026-08"},{"id":"69662/IPD2S","plant_name":"Darden II Solar","generator_id":"IPD2S","plant_id":69662,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":342.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.457086,"lon":-120.2248,"as_of":"2026-08"},{"id":"69663/IPD3S","plant_name":"Darden III Solar","generator_id":"IPD3S","plant_id":69663,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":342.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.499703,"lon":-120.1912,"as_of":"2026-08"},{"id":"69664/IPD4S","plant_name":"Darden IV Solar","generator_id":"IPD4S","plant_id":69664,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":342.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.464339,"lon":-120.1862,"as_of":"2026-08"},{"id":"69184/WF5ST","plant_name":"Waterford 5","generator_id":"WF5ST","plant_id":69184,"state":"LA","county":"St Charles","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":342,"summer_mw":310,"planned_start":"2029-06","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":29.988583,"lon":-90.48565,"as_of":"2026-08"},{"id":"69185/JPS1","plant_name":"Jefferson Power Station","generator_id":"JPS1","plant_id":69185,"state":"AR","county":"Jefferson","developer":"Entergy Arkansas LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":342,"summer_mw":310,"planned_start":"2029-11","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.427527,"lon":-92.13996,"as_of":"2026-08"},{"id":"69445/ST1","plant_name":"Waterford 6","generator_id":"ST1","plant_id":69445,"state":"LA","county":"St Charles","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":342,"summer_mw":310,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":29.988583,"lon":-90.48565,"as_of":"2026-08"},{"id":"67914/1C","plant_name":"Delta Blues Advanced Power Station","generator_id":"1C","plant_id":67914,"state":"MS","county":"Washington","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":341.7,"summer_mw":291.5,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":33.330476,"lon":-91.13058,"as_of":"2026-08"},{"id":"69223/ST1","plant_name":"Vicksburg Advanced Power Station","generator_id":"ST1","plant_id":69223,"state":"MS","county":"Warren","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":341.7,"summer_mw":291.9,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.28526,"lon":-90.92568,"as_of":"2026-08"},{"id":"70187/ST1","plant_name":"Traceview Advanced Power Station","generator_id":"ST1","plant_id":70187,"state":"MS","county":"Madison","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":341.7,"summer_mw":291.9,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.405646,"lon":-90.22114,"as_of":"2026-08"},{"id":"69426/CA1","plant_name":"Westlake Power Station","generator_id":"CA1","plant_id":69426,"state":"LA","county":"Calcasieu","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":341.7,"summer_mw":341.7,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.281105,"lon":-93.30189,"as_of":"2026-08"},{"id":"62954/GEN1","plant_name":"Alle-Catt Wind Energy LLC","generator_id":"GEN1","plant_id":62954,"state":"NY","county":"Allegany","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":340,"summer_mw":340,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.262038,"lon":-78.20154,"as_of":"2026-08"},{"id":"69040/ARY1","plant_name":"Arroyo Solar","generator_id":"ARY1","plant_id":69040,"state":"CO","county":"Pueblo","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":335,"summer_mw":335,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":38.161657,"lon":-104.5488,"as_of":"2026-08"},{"id":"64999/CPNS1","plant_name":"Pecan Prairie North Solar","generator_id":"CPNS1","plant_id":64999,"state":"TX","county":"Leon","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":324.1,"summer_mw":324.1,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.13718,"lon":-96.26925,"as_of":"2026-08"},{"id":"64669/KOV4A","plant_name":"Notch Peak Solar LLC","generator_id":"KOV4A","plant_id":64669,"state":"UT","county":"Millard","developer":"Notch Peak Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":324,"summer_mw":324,"planned_start":"2028-09","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"LDWP","lat":39.520131,"lon":-112.6602,"as_of":"2026-08"},{"id":"3407/STG1","plant_name":"Kingston","generator_id":"STG1","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":323,"summer_mw":296.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3399/STG2","plant_name":"Cumberland (TN)","generator_id":"STG2","plant_id":3399,"state":"TN","county":"Stewart","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":323,"summer_mw":296.6,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":36.3903,"lon":-87.6539,"as_of":"2026-08"},{"id":"3399/STG1","plant_name":"Cumberland (TN)","generator_id":"STG1","plant_id":3399,"state":"TN","county":"Stewart","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":323,"summer_mw":296.6,"planned_start":"2034-12","planned_year":2034,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":36.3903,"lon":-87.6539,"as_of":"2026-08"},{"id":"66910/MYR","plant_name":"Myrtle Solar, LLC","generator_id":"MYR","plant_id":66910,"state":"TX","county":"Brazoria","developer":"Myrtle Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":313,"summer_mw":313,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.228486,"lon":-95.42744,"as_of":"2026-08"},{"id":"68214/1B","plant_name":"Franklin Farms 1&2","generator_id":"1B","plant_id":68214,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":32.53246,"lon":-91.62767,"as_of":"2026-08"},{"id":"68214/2B","plant_name":"Franklin Farms 1&2","generator_id":"2B","plant_id":68214,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":32.53246,"lon":-91.62767,"as_of":"2026-08"},{"id":"69449/1B","plant_name":"Richland Parish Power Station 1&2","generator_id":"1B","plant_id":69449,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2030-03","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.468339,"lon":-91.68038,"as_of":"2026-08"},{"id":"69449/2B","plant_name":"Richland Parish Power Station 1&2","generator_id":"2B","plant_id":69449,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2030-03","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.468339,"lon":-91.68038,"as_of":"2026-08"},{"id":"69649/3B","plant_name":"Richland Parish Power Station 3","generator_id":"3B","plant_id":69649,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.496716,"lon":-91.69867,"as_of":"2026-08"},{"id":"69650/4B","plant_name":"Richland Parish Power Station 4","generator_id":"4B","plant_id":69650,"state":"LA","county":"Richland","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":32.497782,"lon":-91.6997,"as_of":"2026-08"},{"id":"69944/PC1B","plant_name":"Pointe Coupee Power Station","generator_id":"PC1B","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2031-10","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69944/PC2B","plant_name":"Pointe Coupee Power Station","generator_id":"PC2B","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2031-11","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69944/PC3B","plant_name":"Pointe Coupee Power Station","generator_id":"PC3B","plant_id":69944,"state":"LA","county":"Pointe Coupee","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":311,"summer_mw":302.8,"planned_start":"2031-12","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.739,"lon":-91.377,"as_of":"2026-08"},{"id":"69930/MS2","plant_name":"Milford Solar Phase II","generator_id":"MS2","plant_id":69930,"state":"UT","county":"Beaver","developer":"Milford Solar Phase II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":310,"summer_mw":310,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LDWP","lat":38.522442,"lon":-113.0148,"as_of":"2026-08"},{"id":"67776/GRS2B","plant_name":"Cuchillas PV and BESS","generator_id":"GRS2B","plant_id":67776,"state":"TX","county":"Webb","developer":"Gransolar Texas Two LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":306.9,"summer_mw":306.9,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":27.644178,"lon":-99.18445,"as_of":"2026-08"},{"id":"66391/BESS","plant_name":"Ash Creek BESS","generator_id":"BESS","plant_id":66391,"state":"TX","county":"Hill","developer":"ACTX BESS Project LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":306,"summer_mw":306,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.900218,"lon":-97.01642,"as_of":"2026-08"},{"id":"67776/GRS2P","plant_name":"Cuchillas PV and BESS","generator_id":"GRS2P","plant_id":67776,"state":"TX","county":"Webb","developer":"Gransolar Texas Two LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":305.6,"summer_mw":305.6,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":27.644178,"lon":-99.18445,"as_of":"2026-08"},{"id":"66691/BRIGG","plant_name":"Briggs Solar, LLC","generator_id":"BRIGG","plant_id":66691,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":305,"summer_mw":305,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.144326,"lon":-99.55977,"as_of":"2026-08"},{"id":"69661/IPD1B","plant_name":"Darden I Solar","generator_id":"IPD1B","plant_id":69661,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":303.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.504106,"lon":-120.2167,"as_of":"2026-08"},{"id":"69662/IPD2B","plant_name":"Darden II Solar","generator_id":"IPD2B","plant_id":69662,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":303.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.457086,"lon":-120.2248,"as_of":"2026-08"},{"id":"69663/IPD3B","plant_name":"Darden III Solar","generator_id":"IPD3B","plant_id":69663,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":303.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.499703,"lon":-120.1912,"as_of":"2026-08"},{"id":"69664/IPD4B","plant_name":"Darden IV Solar","generator_id":"IPD4B","plant_id":69664,"state":"CA","county":"Fresno","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":303.7,"summer_mw":287.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.464339,"lon":-120.1862,"as_of":"2026-08"},{"id":"65853/MIDBS","plant_name":"Banita Creek- Spindlepop Solar","generator_id":"MIDBS","plant_id":65853,"state":"TX","county":"Nacogdoches","developer":"Parliament Energy Holdings LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":302.9,"summer_mw":302.9,"planned_start":"2027-04","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.5552,"lon":-94.7919,"as_of":"2026-08"},{"id":"68739/UVAPV","plant_name":"Uva Creek Solar","generator_id":"UVAPV","plant_id":68739,"state":"TX","county":"Borden","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":301,"summer_mw":301,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.679762,"lon":-101.5044,"as_of":"2026-08"},{"id":"63798/ATL01","plant_name":"Atlas","generator_id":"ATL01","plant_id":63798,"state":"AZ","county":"La Paz","developer":"174 Power Global Corp.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-08","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":33.94345,"lon":-113.7917,"as_of":"2026-08"},{"id":"68847/PV1","plant_name":"1000 Mile Solar","generator_id":"PV1","plant_id":68847,"state":"TX","county":"Yoakum","developer":"1000 Mile Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":33.02248,"lon":-102.7089,"as_of":"2026-08"},{"id":"66545/MMTHS","plant_name":"Mammoth South Solar Project","generator_id":"MMTHS","plant_id":66545,"state":"IN","county":"Pulaski","developer":"Mammoth South LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.095334,"lon":-86.69157,"as_of":"2026-08"},{"id":"68514/MC201","plant_name":"Mammoth Central II Solar Facility","generator_id":"MC201","plant_id":68514,"state":"IN","county":"Pulaski","developer":"Mammoth Central II LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.090053,"lon":-86.69398,"as_of":"2026-08"},{"id":"66546/MMTHC","plant_name":"Mammoth Central Solar Project","generator_id":"MMTHC","plant_id":66546,"state":"IN","county":"Pulaski","developer":"Mammoth Central LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.090899,"lon":-86.71283,"as_of":"2026-08"},{"id":"69479/KSHKS","plant_name":"Koshkonong Solar Energy Center LLC","generator_id":"KSHKS","plant_id":69479,"state":"WI","county":"Dane","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.976875,"lon":-89.07209,"as_of":"2026-08"},{"id":"69055/ALTS4","plant_name":"ATLAS SOLAR IV","generator_id":"ALTS4","plant_id":69055,"state":"AZ","county":"La Paz","developer":"ATLAS SOLAR IV, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.582903,"lon":-113.5769,"as_of":"2026-08"},{"id":"69299/4519","plant_name":"Singer Solar","generator_id":"4519","plant_id":69299,"state":"LA","county":"Beauregard","developer":"Singer Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-03","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.694644,"lon":-93.33381,"as_of":"2026-08"},{"id":"68328/ORCH1","plant_name":"Pioneer Clean Energy Center","generator_id":"ORCH1","plant_id":68328,"state":"AZ","county":"Yuma","developer":"Yuma bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":32.549081,"lon":-114.5974,"as_of":"2026-08"},{"id":"68328/ORCH2","plant_name":"Pioneer Clean Energy Center","generator_id":"ORCH2","plant_id":68328,"state":"AZ","county":"Yuma","developer":"Yuma bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":32.549081,"lon":-114.5974,"as_of":"2026-08"},{"id":"68184/COLES","plant_name":"Coles Wind","generator_id":"COLES","plant_id":68184,"state":"IL","county":"Coles","developer":"Coles Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":39.605953,"lon":-88.18026,"as_of":"2026-08"},{"id":"69480/HGHNN","plant_name":"High Noon Solar Energy LLC","generator_id":"HGHNN","plant_id":69480,"state":"WI","county":"Columbia","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.35326,"lon":-89.34738,"as_of":"2026-08"},{"id":"70020/1","plant_name":"Pinopolis BESS","generator_id":"1","plant_id":70020,"state":"SC","county":"Berkeley","developer":"Pinopolis BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SC","lat":33.246764,"lon":-79.98517,"as_of":"2026-08"},{"id":"68030/RDHLW","plant_name":"Red Hollow Renewable Energy","generator_id":"RDHLW","plant_id":68030,"state":"TX","county":"Archer","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.564936,"lon":-98.612,"as_of":"2026-08"},{"id":"68030/RHLWB","plant_name":"Red Hollow Renewable Energy","generator_id":"RHLWB","plant_id":68030,"state":"TX","county":"Archer","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.564936,"lon":-98.612,"as_of":"2026-08"},{"id":"69364/REDEG","plant_name":"Red Egret","generator_id":"REDEG","plant_id":69364,"state":"TX","county":"Galveston","developer":"Red Egret, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.4229,"lon":-95.0049,"as_of":"2026-08"},{"id":"70097/SWB","plant_name":"Sherco BESS","generator_id":"SWB","plant_id":70097,"state":"MN","county":"Sherburne","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.372125,"lon":-93.89978,"as_of":"2026-08"},{"id":"60070/GEN","plant_name":"Nolin Hills","generator_id":"GEN","plant_id":60070,"state":"OR","county":"Umatilla","developer":"Nolin Hills Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"BPAT","lat":45.55455,"lon":-119.1143,"as_of":"2026-08"},{"id":"60070/GEN2","plant_name":"Nolin Hills","generator_id":"GEN2","plant_id":60070,"state":"OR","county":"Umatilla","developer":"Nolin Hills Wind, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"BPAT","lat":45.55455,"lon":-119.1143,"as_of":"2026-08"},{"id":"65850/ELIBS","plant_name":"Elio Energy LLC","generator_id":"ELIBS","plant_id":65850,"state":"TX","county":"Brazoria","developer":"Elio Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.247678,"lon":-95.68546,"as_of":"2026-08"},{"id":"66309/UVPV2","plant_name":"Uvalde Solar 2","generator_id":"UVPV2","plant_id":66309,"state":"TX","county":"Uvalde","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.225768,"lon":-99.69913,"as_of":"2026-08"},{"id":"66426/1EUS","plant_name":"Utah Solar 1","generator_id":"1EUS","plant_id":66426,"state":"UT","county":"Millard","developer":"ECG Utah Solar1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.504761,"lon":-112.5077,"as_of":"2026-08"},{"id":"66908/BZPV","plant_name":"Bonanza Solar and Storage Project","generator_id":"BZPV","plant_id":66908,"state":"NV","county":"Clark","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":36.558,"lon":-115.799,"as_of":"2026-08"},{"id":"68033/SNRSE","plant_name":"Sunrose Renewable Energy","generator_id":"SNRSE","plant_id":68033,"state":"TX","county":"Austin","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.674226,"lon":-96.12137,"as_of":"2026-08"},{"id":"68033/SRSEB","plant_name":"Sunrose Renewable Energy","generator_id":"SRSEB","plant_id":68033,"state":"TX","county":"Austin","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.674226,"lon":-96.12137,"as_of":"2026-08"},{"id":"69963/YLWWD","plant_name":"Yellow Wood Solar Energy LLC","generator_id":"YLWWD","plant_id":69963,"state":"OH","county":"Clinton","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.271465,"lon":-83.7904,"as_of":"2026-08"},{"id":"70097/SSB","plant_name":"Sherco BESS","generator_id":"SSB","plant_id":70097,"state":"MN","county":"Sherburne","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.372125,"lon":-93.89978,"as_of":"2026-08"},{"id":"70204/CANPV","plant_name":"Cantaloupe Solar","generator_id":"CANPV","plant_id":70204,"state":"TX","county":"Reeves","developer":"Cantaloupe Solar - ERCOT","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.05668,"lon":-103.6634,"as_of":"2026-08"},{"id":"70238/RDHS","plant_name":"Roadhouse Energy Center","generator_id":"RDHS","plant_id":70238,"state":"CA","county":"San Bernardino","developer":"Roadhouse Energy Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":34.0065,"lon":-117.5696,"as_of":"2026-08"},{"id":"70330/BRSPV","plant_name":"Bighorn Ridge Solar","generator_id":"BRSPV","plant_id":70330,"state":"TX","county":"Pecos","developer":"NextEra Energy Resources - ERCOT","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":30.956251,"lon":-103.028,"as_of":"2026-08"},{"id":"68076/ROCKY","plant_name":"Rocky Run Solar","generator_id":"ROCKY","plant_id":68076,"state":"VA","county":"Brunswick","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-01","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37,"lon":-78,"as_of":"2026-08"},{"id":"68758/IPEA3","plant_name":"Easley Solar","generator_id":"IPEA3","plant_id":68758,"state":"CA","county":"Riverside","developer":"IP Easley, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":33.722655,"lon":-115.326,"as_of":"2026-08"},{"id":"64208/30PNB","plant_name":"Red Antelope Solar & Energy Storage Farm","generator_id":"30PNB","plant_id":64208,"state":"AZ","county":"Coconino","developer":"302PN 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":36.7,"lon":-111.28,"as_of":"2026-08"},{"id":"68813/VITEX","plant_name":"Vitex Storage","generator_id":"VITEX","plant_id":68813,"state":"NV","county":"Clark","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NEVP","lat":36.382286,"lon":-114.9102,"as_of":"2026-08"},{"id":"63113/BESS","plant_name":"Southern Bighorn Solar Hybrid","generator_id":"BESS","plant_id":63113,"state":"NV","county":"Clark","developer":"300MS 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":36.304793,"lon":-114.4728,"as_of":"2026-08"},{"id":"63113/SBS","plant_name":"Southern Bighorn Solar Hybrid","generator_id":"SBS","plant_id":63113,"state":"NV","county":"Clark","developer":"300MS 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":36.304793,"lon":-114.4728,"as_of":"2026-08"},{"id":"69763/HPS","plant_name":"Heritage Prairie Solar LLC","generator_id":"HPS","plant_id":69763,"state":"IL","county":"Kankakee","developer":"Pattern Operators LP","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-09","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.06713,"lon":-88.2497,"as_of":"2026-08"},{"id":"68283/DESA","plant_name":"Desert Sand BESS","generator_id":"DESA","plant_id":68283,"state":"AZ","county":"Maricopa","developer":"DESA bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":33.497049,"lon":-113.0514,"as_of":"2026-08"},{"id":"68283/DESA1","plant_name":"Desert Sand BESS","generator_id":"DESA1","plant_id":68283,"state":"AZ","county":"Maricopa","developer":"DESA bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":33.497049,"lon":-113.0514,"as_of":"2026-08"},{"id":"70367/OBAES","plant_name":"O'Bannion Energy Storage","generator_id":"OBAES","plant_id":70367,"state":"TX","county":"Jack","developer":"O'Bannion Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":33.041,"lon":-98.339,"as_of":"2026-08"},{"id":"68298/THSI1","plant_name":"THREE SISTERS Solar Generation and BESS","generator_id":"THSI1","plant_id":68298,"state":"AZ","county":"Pinal","developer":"THSI bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":32.053732,"lon":-109.823,"as_of":"2026-08"},{"id":"68298/THSI2","plant_name":"THREE SISTERS Solar Generation and BESS","generator_id":"THSI2","plant_id":68298,"state":"AZ","county":"Pinal","developer":"THSI bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":32.053732,"lon":-109.823,"as_of":"2026-08"},{"id":"68371/REBU","plant_name":"Red Butte Solar and Storage","generator_id":"REBU","plant_id":68371,"state":"UT","county":"Iron","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PACE","lat":37.6134,"lon":-113.644,"as_of":"2026-08"},{"id":"68371/REBU2","plant_name":"Red Butte Solar and Storage","generator_id":"REBU2","plant_id":68371,"state":"UT","county":"Iron","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PACE","lat":37.6134,"lon":-113.644,"as_of":"2026-08"},{"id":"67649/AMERA","plant_name":"Amerada","generator_id":"AMERA","plant_id":67649,"state":"TX","county":"Freestone","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-07","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.861926,"lon":-96.11463,"as_of":"2026-08"},{"id":"65703/HEHUM","plant_name":"Humidor Storage I","generator_id":"HEHUM","plant_id":65703,"state":"CA","county":"Los Angeles","developer":"Hecate Grid Humidor Storage 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.29116,"lon":-118.7518,"as_of":"2026-08"},{"id":"68344/LOSN1","plant_name":"Lower Snake Solar Generation BESS","generator_id":"LOSN1","plant_id":68344,"state":"WA","county":"Garfield","developer":"LOSN, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-10","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":46.502392,"lon":-117.8263,"as_of":"2026-08"},{"id":"68344/LOSN2","plant_name":"Lower Snake Solar Generation BESS","generator_id":"LOSN2","plant_id":68344,"state":"WA","county":"Garfield","developer":"LOSN, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-10","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":46.502392,"lon":-117.8263,"as_of":"2026-08"},{"id":"67819/CRSB1","plant_name":"Robinson Solar","generator_id":"CRSB1","plant_id":67819,"state":"NV","county":"White Pine","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":39.298603,"lon":-115.2192,"as_of":"2026-08"},{"id":"67819/CRSS1","plant_name":"Robinson Solar","generator_id":"CRSS1","plant_id":67819,"state":"NV","county":"White Pine","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":39.298603,"lon":-115.2192,"as_of":"2026-08"},{"id":"69640/73509","plant_name":"Cazadores Solar","generator_id":"73509","plant_id":69640,"state":"TX","county":"Duval","developer":"Cazadores Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":27.392246,"lon":-98.50107,"as_of":"2026-08"},{"id":"61170/33UI8","plant_name":"Gale 1 Solar","generator_id":"33UI8","plant_id":61170,"state":"UT","county":"Millard","developer":"33UI 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2030-08","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.523,"lon":-112.546,"as_of":"2026-08"},{"id":"69643/60215","plant_name":"Deep Space Solar","generator_id":"60215","plant_id":69643,"state":"CO","county":"Kiowa","developer":"Deep Space Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":38.402141,"lon":-103.286,"as_of":"2026-08"},{"id":"69644/58441","plant_name":"Pease River Solar","generator_id":"58441","plant_id":69644,"state":"TX","county":"Foard","developer":"Pease River Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":300,"summer_mw":300,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.991957,"lon":-99.69277,"as_of":"2026-08"},{"id":"68186/FIRE","plant_name":"Firelands Wind","generator_id":"FIRE","plant_id":68186,"state":"OH","county":"Huron","developer":"Firelands Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":297,"summer_mw":297,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.210325,"lon":-82.77908,"as_of":"2026-08"},{"id":"68339/1","plant_name":"Abercrombie Solar","generator_id":"1","plant_id":68339,"state":"ND","county":"Richland","developer":"Otter Tail Power Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":295.1,"summer_mw":295.1,"planned_start":"2028-08","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":46.4277,"lon":-96.8259,"as_of":"2026-08"},{"id":"69150/SYPRT","plant_name":"Sypert Branch Solar","generator_id":"SYPRT","plant_id":69150,"state":"TX","county":"Milam","developer":"Sypert Branch Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":293.9,"summer_mw":260,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":30.877895,"lon":-97.1944,"as_of":"2026-08"},{"id":"68758/IPEA1","plant_name":"Easley Solar","generator_id":"IPEA1","plant_id":68758,"state":"CA","county":"Riverside","developer":"IP Easley, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":290,"summer_mw":290,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":33.722655,"lon":-115.326,"as_of":"2026-08"},{"id":"59243/CHAN1","plant_name":"Changing Winds","generator_id":"CHAN1","plant_id":59243,"state":"TX","county":"Castro","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":288,"summer_mw":288,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.511944,"lon":-102.0519,"as_of":"2026-08"},{"id":"69606/7496","plant_name":"Monarch Creek Wind, LLC","generator_id":"7496","plant_id":69606,"state":"TX","county":"Throckmorton","developer":"Monarch Creek Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":287.6,"summer_mw":287.6,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.183899,"lon":-99.42239,"as_of":"2026-08"},{"id":"68507/EEC","plant_name":"Excelsior Energy Center","generator_id":"EEC","plant_id":68507,"state":"NY","county":"Genesee","developer":"Excelsior Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":280,"summer_mw":280,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.064852,"lon":-78.07681,"as_of":"2026-08"},{"id":"69496/PDRA","plant_name":"Piedra Solar","generator_id":"PDRA","plant_id":69496,"state":"TX","county":"Freestone","developer":"Piedra Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":280,"summer_mw":280,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.648989,"lon":-96.34517,"as_of":"2026-08"},{"id":"8059/2S1","plant_name":"Comanche (OK)","generator_id":"2S1","plant_id":8059,"state":"OK","county":"Comanche","developer":"Public Service Co of Oklahoma","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":277.6,"summer_mw":267,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":34.5431,"lon":-98.3244,"as_of":"2026-08"},{"id":"8059/3S1","plant_name":"Comanche (OK)","generator_id":"3S1","plant_id":8059,"state":"OK","county":"Comanche","developer":"Public Service Co of Oklahoma","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":277.6,"summer_mw":267,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":34.5431,"lon":-98.3244,"as_of":"2026-08"},{"id":"67542/BHWP","plant_name":"Blue Hills Wind Project","generator_id":"BHWP","plant_id":67542,"state":"TX","county":"Val Verde","developer":"Greenalia Wind Power Blue Hills, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":276,"summer_mw":276,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.233597,"lon":-101.3636,"as_of":"2026-08"},{"id":"69778/HK1SO","plant_name":"Hashknife Energy Center LLC","generator_id":"HK1SO","plant_id":69778,"state":"AZ","county":"Navajo","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":275,"summer_mw":275,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":34.574259,"lon":-110.4946,"as_of":"2026-08"},{"id":"69778/HK1ST","plant_name":"Hashknife Energy Center LLC","generator_id":"HK1ST","plant_id":69778,"state":"AZ","county":"Navajo","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":275,"summer_mw":275,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":34.574259,"lon":-110.4946,"as_of":"2026-08"},{"id":"66786/ELVMT","plant_name":"Elevate Middletown","generator_id":"ELVMT","plant_id":66786,"state":"CT","county":"Middlesex","developer":"Lighthouse Middletown, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":275,"summer_mw":275,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":41.554321,"lon":-72.57832,"as_of":"2026-08"},{"id":"69588/YCWT","plant_name":"Yellow Cat Wind, LLC","generator_id":"YCWT","plant_id":69588,"state":"TX","county":"Navarro","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":270,"summer_mw":270,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.07,"lon":-96.83,"as_of":"2026-08"},{"id":"64911/CSRS1","plant_name":"South Ripley Solar","generator_id":"CSRS1","plant_id":64911,"state":"NY","county":"Chautauqua","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":270,"summer_mw":270,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.198116,"lon":-79.75789,"as_of":"2026-08"},{"id":"3122/CA5","plant_name":"Homer City Generating Station","generator_id":"CA5","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA6","plant_name":"Homer City Generating Station","generator_id":"CA6","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA2","plant_name":"Homer City Generating Station","generator_id":"CA2","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA3","plant_name":"Homer City Generating Station","generator_id":"CA3","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA7","plant_name":"Homer City Generating Station","generator_id":"CA7","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA4","plant_name":"Homer City Generating Station","generator_id":"CA4","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"3122/CA1","plant_name":"Homer City Generating Station","generator_id":"CA1","plant_id":3122,"state":"PA","county":"Indiana","developer":"Homer City Generation, L.P.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":268,"summer_mw":268,"planned_start":"2029-11","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.512825,"lon":-79.19611,"as_of":"2026-08"},{"id":"69403/GOOD2","plant_name":"Goodnight Wind II","generator_id":"GOOD2","plant_id":69403,"state":"TX","county":"Armstrong","developer":"FGE Goodnight II, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":265.5,"summer_mw":265.5,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":34.937162,"lon":-101.4339,"as_of":"2026-08"},{"id":"69808/CT1","plant_name":"Princeton Road Station","generator_id":"CT1","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":265.4,"summer_mw":239.6,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/CT2","plant_name":"Princeton Road Station","generator_id":"CT2","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":265.4,"summer_mw":239.6,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"68873/BIGS","plant_name":"Big Sampson Wind","generator_id":"BIGS","plant_id":68873,"state":"TX","county":"Crockett","developer":"Big Sampson Wind Project, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":265,"summer_mw":265,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":30.981883,"lon":-101.8505,"as_of":"2026-08"},{"id":"64547/3","plant_name":"Turtle Creek","generator_id":"3","plant_id":64547,"state":"NE","county":"Sarpy","developer":"Omaha Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":264,"summer_mw":221,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":41.092238,"lon":-96.16831,"as_of":"2026-08"},{"id":"55972/CT-3","plant_name":"Cass County","generator_id":"CT-3","plant_id":55972,"state":"NE","county":"Cass","developer":"Omaha Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":264,"summer_mw":221,"planned_start":"2029-02","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":40.947913,"lon":-95.96403,"as_of":"2026-08"},{"id":"55972/CT-4","plant_name":"Cass County","generator_id":"CT-4","plant_id":55972,"state":"NE","county":"Cass","developer":"Omaha Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":264,"summer_mw":221,"planned_start":"2029-02","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":40.947913,"lon":-95.96403,"as_of":"2026-08"},{"id":"55972/CT-5","plant_name":"Cass County","generator_id":"CT-5","plant_id":55972,"state":"NE","county":"Cass","developer":"Omaha Public Power District","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":264,"summer_mw":221,"planned_start":"2029-02","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":40.947913,"lon":-95.96403,"as_of":"2026-08"},{"id":"69071/CA1","plant_name":"Bison Generation Station","generator_id":"CA1","plant_id":69071,"state":"ND","county":"Williams","developer":"Basin Electric Power Coop","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":263,"summer_mw":320,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":48.327932,"lon":-103.3127,"as_of":"2026-08"},{"id":"69071/CA2","plant_name":"Bison Generation Station","generator_id":"CA2","plant_id":69071,"state":"ND","county":"Williams","developer":"Basin Electric Power Coop","sector":"Electric Utility","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":263,"summer_mw":320,"planned_start":"2030-03","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":48.327932,"lon":-103.3127,"as_of":"2026-08"},{"id":"7916/7","plant_name":"Talbot County Energy","generator_id":"7","plant_id":7916,"state":"GA","county":"Talbot","developer":"Oglethorpe Power Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":262,"summer_mw":241,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":32.5892,"lon":-84.6917,"as_of":"2026-08"},{"id":"69635/74964","plant_name":"Peach Wood Solar","generator_id":"74964","plant_id":69635,"state":"GA","county":"Mitchell","developer":"Peach WoodSolar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":261,"summer_mw":261,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":31.343419,"lon":-84.21269,"as_of":"2026-08"},{"id":"69799/F1G01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1G01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F1G02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1G02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F1G03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1G03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2G01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2G01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2G02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2G02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2G03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2G03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":260,"summer_mw":242.7,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"70419/RSBA","plant_name":"Royal Slope","generator_id":"RSBA","plant_id":70419,"state":"WA","county":"Grant","developer":"Royal Slope Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":260,"summer_mw":260,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"BPAT","lat":46.883147,"lon":-119.9207,"as_of":"2026-08"},{"id":"70419/RSPV","plant_name":"Royal Slope","generator_id":"RSPV","plant_id":70419,"state":"WA","county":"Grant","developer":"Royal Slope Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":260,"summer_mw":260,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"BPAT","lat":46.883147,"lon":-119.9207,"as_of":"2026-08"},{"id":"65893/OCIRO","plant_name":"OCI SunRoper","generator_id":"OCIRO","plant_id":65893,"state":"TX","county":"Wharton","developer":"OCI Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":260,"summer_mw":260,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.240399,"lon":-96.01154,"as_of":"2026-08"},{"id":"70407/RSS","plant_name":"Roy Solar","generator_id":"RSS","plant_id":70407,"state":"OK","county":"Stephens","developer":"Roy Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":258,"summer_mw":258,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SPA","lat":34.309919,"lon":-96.77935,"as_of":"2026-08"},{"id":"67837/RAYRS","plant_name":"Ray Ranch Solar","generator_id":"RAYRS","plant_id":67837,"state":"TX","county":"Goliad","developer":"Ray Ranch Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":255.2,"summer_mw":255.2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":28.628,"lon":-97.724,"as_of":"2026-08"},{"id":"66411/RMSY","plant_name":"Hecate Grid East Valley Storage","generator_id":"RMSY","plant_id":66411,"state":"TX","county":"Cameron","developer":"Hecate Grid East Valley Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":255,"summer_mw":255,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":25.94113,"lon":-97.53276,"as_of":"2026-08"},{"id":"70299/814","plant_name":"Pioneer Creek Wind, LLC","generator_id":"814","plant_id":70299,"state":"KS","county":"Ford","developer":"NextEra Energy Resources, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":252,"summer_mw":252,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":37.735053,"lon":-99.80556,"as_of":"2026-08"},{"id":"64835/NA","plant_name":"Silver Queen Wind Farm","generator_id":"NA","plant_id":64835,"state":"IA","county":"Crawford","developer":"Silver Queen Wind Farm, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":252,"summer_mw":252,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":42.002397,"lon":-95.1316,"as_of":"2026-08"},{"id":"69892/OAK","plant_name":"Oak Valley Solar","generator_id":"OAK","plant_id":69892,"state":"TX","county":"Ellis","developer":"Oak Valley Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":251.3,"summer_mw":251.3,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.012951,"lon":-96.49974,"as_of":"2026-08"},{"id":"65880/ZEYA","plant_name":"Zeya","generator_id":"ZEYA","plant_id":65880,"state":"TX","county":"Galveston","developer":"Engie North America","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.388758,"lon":-94.94793,"as_of":"2026-08"},{"id":"68325/SMS","plant_name":"Show Me State Solar","generator_id":"SMS","plant_id":68325,"state":"MO","county":"Callaway","developer":"Show Me State Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":38.958702,"lon":-91.94479,"as_of":"2026-08"},{"id":"69681/DRAKE","plant_name":"Mallard Energy Storage","generator_id":"DRAKE","plant_id":69681,"state":"TX","county":"Collin","developer":"Mallard Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":33.064274,"lon":-96.45051,"as_of":"2026-08"},{"id":"69968/RUS","plant_name":"Rumble Solar","generator_id":"RUS","plant_id":69968,"state":"OK","county":"Grady","developer":"Rumble Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":35.338721,"lon":-97.98901,"as_of":"2026-08"},{"id":"67357/4666","plant_name":"Tiger Solar","generator_id":"4666","plant_id":67357,"state":"TX","county":"Jones","developer":"Vaca Del Sol, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.796921,"lon":-99.88089,"as_of":"2026-08"},{"id":"70137/DL250","plant_name":"Dry Land Prairie Energy Storage","generator_id":"DL250","plant_id":70137,"state":"CO","county":"Cheyenne","developer":"Dry Land Prairie Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":38.99974,"lon":-102.4943,"as_of":"2026-08"},{"id":"70053/SP250","plant_name":"South Platte Storage","generator_id":"SP250","plant_id":70053,"state":"CO","county":"Morgan","developer":"South Platte Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":40.12,"lon":-103.42,"as_of":"2026-08"},{"id":"70300/USADC","plant_name":"Adams Creek Solar Project","generator_id":"USADC","plant_id":70300,"state":"TX","county":"Wilbarger","developer":"Adams Creek Solar Project, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":34.15382,"lon":-98.96333,"as_of":"2026-08"},{"id":"69887/PRTGS","plant_name":"Portage Solar, LLC","generator_id":"PRTGS","plant_id":69887,"state":"WI","county":"Portage","developer":"Geronimo Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.456358,"lon":-89.54401,"as_of":"2026-08"},{"id":"70178/CBLT","plant_name":"Cobalt","generator_id":"CBLT","plant_id":70178,"state":"CA","county":"Riverside","developer":"RE Cobalt LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.571,"lon":-118.1789,"as_of":"2026-08"},{"id":"66706/11101","plant_name":"Patoka Solar","generator_id":"11101","plant_id":66706,"state":"IN","county":"Posey","developer":"Strata Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.14033,"lon":-87.77567,"as_of":"2026-08"},{"id":"66707/11102","plant_name":"Prairie Oak Solar","generator_id":"11102","plant_id":66707,"state":"IL","county":"Shelby","developer":"Strata Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.542799,"lon":-89.03153,"as_of":"2026-08"},{"id":"69721/BESS1","plant_name":"Energizar BESS","generator_id":"BESS1","plant_id":69721,"state":"MA","county":"Suffolk","developer":"Energizar Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":42.39556,"lon":-71.02218,"as_of":"2026-08"},{"id":"68583/RRB","plant_name":"Rock N' Roll","generator_id":"RRB","plant_id":68583,"state":"TX","county":"Brazoria","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.299371,"lon":-95.42218,"as_of":"2026-08"},{"id":"67226/ROCKH","plant_name":"Rock House Solar","generator_id":"ROCKH","plant_id":67226,"state":"GA","county":"McDuffie","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":33.4481,"lon":-82.4039,"as_of":"2026-08"},{"id":"63202/701","plant_name":"TREX US Red Holly","generator_id":"701","plant_id":63202,"state":"TX","county":"Lynn","developer":"TREX US Red Holly LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.952,"lon":-101.737,"as_of":"2026-08"},{"id":"70047/SSPV","plant_name":"Selenite Springs Solar","generator_id":"SSPV","plant_id":70047,"state":"TX","county":"Pecos","developer":"NextEra Energy Resources - ERCOT","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.992503,"lon":-103.0571,"as_of":"2026-08"},{"id":"70034/ES","plant_name":"Evlou Solar, LLC","generator_id":"ES","plant_id":70034,"state":"TX","county":"El Paso","developer":"Evlou Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-01","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"EPE","lat":31.507744,"lon":-106.0534,"as_of":"2026-08"},{"id":"70034/ESS","plant_name":"Evlou Solar, LLC","generator_id":"ESS","plant_id":70034,"state":"TX","county":"El Paso","developer":"Evlou Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-01","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"EPE","lat":31.507744,"lon":-106.0534,"as_of":"2026-08"},{"id":"67987/MYSPB","plant_name":"Mystic Springs Renewable Energy (Hybrid)","generator_id":"MYSPB","plant_id":67987,"state":"TX","county":"Kaufman","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.821255,"lon":-96.19042,"as_of":"2026-08"},{"id":"67987/MYSPS","plant_name":"Mystic Springs Renewable Energy (Hybrid)","generator_id":"MYSPS","plant_id":67987,"state":"TX","county":"Kaufman","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.821255,"lon":-96.19042,"as_of":"2026-08"},{"id":"70258/H2SLR","plant_name":"Hawkeye Solar II, LLC","generator_id":"H2SLR","plant_id":70258,"state":"IA","county":"Clinton","developer":"Hawkeye Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":41.835204,"lon":-90.69966,"as_of":"2026-08"},{"id":"67982/ATHS1","plant_name":"Athens Solar I (Hybrid)","generator_id":"ATHS1","plant_id":67982,"state":"CA","county":"Placer","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.754889,"lon":-121.4071,"as_of":"2026-08"},{"id":"67982/ATHSB","plant_name":"Athens Solar I (Hybrid)","generator_id":"ATHSB","plant_id":67982,"state":"CA","county":"Placer","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.754889,"lon":-121.4071,"as_of":"2026-08"},{"id":"68883/STBA","plant_name":"Sawtooth Solar","generator_id":"STBA","plant_id":68883,"state":"AZ","county":"Pinal","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":32.728,"lon":-111.629,"as_of":"2026-08"},{"id":"68883/STPV","plant_name":"Sawtooth Solar","generator_id":"STPV","plant_id":68883,"state":"AZ","county":"Pinal","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"AZPS","lat":32.728,"lon":-111.629,"as_of":"2026-08"},{"id":"66684/HL001","plant_name":"Intermountain Pumped Storage Project","generator_id":"HL001","plant_id":66684,"state":"UT","county":"Millard","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.414705,"lon":-112.4404,"as_of":"2026-08"},{"id":"66684/HL002","plant_name":"Intermountain Pumped Storage Project","generator_id":"HL002","plant_id":66684,"state":"UT","county":"Millard","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.414705,"lon":-112.4404,"as_of":"2026-08"},{"id":"66684/HL003","plant_name":"Intermountain Pumped Storage Project","generator_id":"HL003","plant_id":66684,"state":"UT","county":"Millard","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.414705,"lon":-112.4404,"as_of":"2026-08"},{"id":"66684/HL004","plant_name":"Intermountain Pumped Storage Project","generator_id":"HL004","plant_id":66684,"state":"UT","county":"Millard","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.414705,"lon":-112.4404,"as_of":"2026-08"},{"id":"66686/HL001","plant_name":"Haiwee Pumped Storage Project","generator_id":"HL001","plant_id":66686,"state":"CA","county":"Inyo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":36.233105,"lon":-117.9625,"as_of":"2026-08"},{"id":"66686/HL002","plant_name":"Haiwee Pumped Storage Project","generator_id":"HL002","plant_id":66686,"state":"CA","county":"Inyo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":36.233105,"lon":-117.9625,"as_of":"2026-08"},{"id":"66686/HL003","plant_name":"Haiwee Pumped Storage Project","generator_id":"HL003","plant_id":66686,"state":"CA","county":"Inyo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":36.233105,"lon":-117.9625,"as_of":"2026-08"},{"id":"66686/HL004","plant_name":"Haiwee Pumped Storage Project","generator_id":"HL004","plant_id":66686,"state":"CA","county":"Inyo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":36.233105,"lon":-117.9625,"as_of":"2026-08"},{"id":"70397/SRSB1","plant_name":"Steel River Solar Phase 1","generator_id":"SRSB1","plant_id":70397,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"64912/CMPS1","plant_name":"Mill Point Solar","generator_id":"CMPS1","plant_id":64912,"state":"NY","county":"Montgomery","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.919098,"lon":-74.34116,"as_of":"2026-08"},{"id":"68491/FPS","plant_name":"Freedom Pine Solar","generator_id":"FPS","plant_id":68491,"state":"ME","county":"York","developer":"Freedom Pine Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-01","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":43.34779,"lon":-70.8974,"as_of":"2026-08"},{"id":"3797/CERC1","plant_name":"Chesterfield","generator_id":"CERC1","plant_id":3797,"state":"VA","county":"Chesterfield","developer":"Virginia Electric & Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":250,"summer_mw":233.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.3822,"lon":-77.3833,"as_of":"2026-08"},{"id":"3797/CERC2","plant_name":"Chesterfield","generator_id":"CERC2","plant_id":3797,"state":"VA","county":"Chesterfield","developer":"Virginia Electric & Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":250,"summer_mw":233.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.3822,"lon":-77.3833,"as_of":"2026-08"},{"id":"3797/CERC3","plant_name":"Chesterfield","generator_id":"CERC3","plant_id":3797,"state":"VA","county":"Chesterfield","developer":"Virginia Electric & Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":250,"summer_mw":233.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.3822,"lon":-77.3833,"as_of":"2026-08"},{"id":"3797/CERC4","plant_name":"Chesterfield","generator_id":"CERC4","plant_id":3797,"state":"VA","county":"Chesterfield","developer":"Virginia Electric & Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":250,"summer_mw":233.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.3822,"lon":-77.3833,"as_of":"2026-08"},{"id":"68351/CLAPV","plant_name":"Clairemont Solar","generator_id":"CLAPV","plant_id":68351,"state":"TX","county":"Kent","developer":"Clairemont Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.371565,"lon":-100.9758,"as_of":"2026-08"},{"id":"68356/LUBA2","plant_name":"Lazy U ESS 2","generator_id":"LUBA2","plant_id":68356,"state":"TX","county":"Hardeman","developer":"Lazy U ESS 2 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":34.265496,"lon":-99.87214,"as_of":"2026-08"},{"id":"68357/LUPV1","plant_name":"Lazy U Solar 1","generator_id":"LUPV1","plant_id":68357,"state":"TX","county":"Hardeman","developer":"Lazy U Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":34.265496,"lon":-99.87214,"as_of":"2026-08"},{"id":"68358/LUPV2","plant_name":"Lazy U Solar 2","generator_id":"LUPV2","plant_id":68358,"state":"TX","county":"Hardeman","developer":"Lazy U Solar 2 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":34.265496,"lon":-99.87214,"as_of":"2026-08"},{"id":"70398/SRSB2","plant_name":"Steel River Solar Phase 2","generator_id":"SRSB2","plant_id":70398,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2029-07","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"68355/LUBA1","plant_name":"Lazy U ESS 1","generator_id":"LUBA1","plant_id":68355,"state":"TX","county":"Hardeman","developer":"Lazy U ESS 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2030-07","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":34.265496,"lon":-99.87214,"as_of":"2026-08"},{"id":"70399/SRSB3","plant_name":"Steel River Solar Phase 3","generator_id":"SRSB3","plant_id":70399,"state":"AR","county":"Mississippi","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":250,"summer_mw":250,"planned_start":"2030-07","planned_year":2030,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":35.578637,"lon":-90.09763,"as_of":"2026-08"},{"id":"67950/MFS1","plant_name":"Moonlight Flats Solar Power 1","generator_id":"MFS1","plant_id":67950,"state":"PA","county":"Clearfield","developer":"Moonlight Flats Solar Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":250,"summer_mw":250,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":41.092288,"lon":-78.17989,"as_of":"2026-08"},{"id":"69595/STGEN","plant_name":"Saddleback Generation Station","generator_id":"STGEN","plant_id":69595,"state":"AZ","county":"Maricopa","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":250,"summer_mw":230,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":33.410034,"lon":-113.1694,"as_of":"2026-08"},{"id":"69595/STGN2","plant_name":"Saddleback Generation Station","generator_id":"STGN2","plant_id":69595,"state":"AZ","county":"Maricopa","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":250,"summer_mw":230,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":33.410034,"lon":-113.1694,"as_of":"2026-08"},{"id":"63850/CHERY","plant_name":"Cherry","generator_id":"CHERY","plant_id":63850,"state":"CA","county":"Kings","developer":"Westlands Cherry, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":249.7,"summer_mw":249.7,"planned_start":"2027-07","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.122457,"lon":-119.9232,"as_of":"2026-08"},{"id":"67862/SOLAR","plant_name":"Kingstree East 230 Solar Project","generator_id":"SOLAR","plant_id":67862,"state":"SC","county":"Georgetown","developer":"Kingstree East 230 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":249,"summer_mw":249,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SC","lat":33.563633,"lon":-79.46326,"as_of":"2026-08"},{"id":"68370/SALM","plant_name":"Salmonfly Solar and Storage","generator_id":"SALM","plant_id":68370,"state":"OR","county":"Jefferson","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":247,"summer_mw":247,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PGE","lat":44.6157,"lon":-121.3436,"as_of":"2026-08"},{"id":"68370/SALM2","plant_name":"Salmonfly Solar and Storage","generator_id":"SALM2","plant_id":68370,"state":"OR","county":"Jefferson","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":247,"summer_mw":247,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PGE","lat":44.6157,"lon":-121.3436,"as_of":"2026-08"},{"id":"66701/BB1","plant_name":"Buffalo Branch Wind and Solar LLC","generator_id":"BB1","plant_id":66701,"state":"MO","county":"Dade","developer":"Buffalo Branch Wind and Solar LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":247,"summer_mw":247,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AECI","lat":37.38332,"lon":-93.92999,"as_of":"2026-08"},{"id":"63851/GRAPE","plant_name":"Grape","generator_id":"GRAPE","plant_id":63851,"state":"CA","county":"Kings","developer":"Westlands Grape, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":246.4,"summer_mw":246.4,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.145687,"lon":-119.9051,"as_of":"2026-08"},{"id":"68592/OERHA","plant_name":"Rockhound A","generator_id":"OERHA","plant_id":68592,"state":"TX","county":"Ector","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":245,"summer_mw":245,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.723088,"lon":-102.5196,"as_of":"2026-08"},{"id":"68302/LAKET","plant_name":"Lake Trout Solar","generator_id":"LAKET","plant_id":68302,"state":"IN","county":"Blackford","developer":"Lake Trout Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":245,"summer_mw":245,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.524925,"lon":-85.30333,"as_of":"2026-08"},{"id":"69506/GAIPV","plant_name":"Gail Mountain Solar","generator_id":"GAIPV","plant_id":69506,"state":"TX","county":"Borden","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":244.4,"summer_mw":244.4,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.714612,"lon":-101.5274,"as_of":"2026-08"},{"id":"66896/LP2PV","plant_name":"Lupinus Solar 2, LLC","generator_id":"LP2PV","plant_id":66896,"state":"TX","county":"Franklin","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":244,"summer_mw":244,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.303385,"lon":-95.25692,"as_of":"2026-08"},{"id":"66168/GEN01","plant_name":"Cattlemen Solar Park","generator_id":"GEN01","plant_id":66168,"state":"TX","county":"Milam","developer":"Cattlemen Solar Park LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":240,"summer_mw":240,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.045676,"lon":-96.85863,"as_of":"2026-08"},{"id":"68785/DHS1","plant_name":"Dolet Hills Solar","generator_id":"DHS1","plant_id":68785,"state":"LA","county":"DeSoto","developer":"Dolet Hills Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":240,"summer_mw":240,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":31.95595,"lon":-93.62641,"as_of":"2026-08"},{"id":"68264/12345","plant_name":"Rich Road Solar Energy Center","generator_id":"12345","plant_id":68264,"state":"NY","county":"St Lawrence","developer":"Rich Road Solar Energy Center","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":240,"summer_mw":240,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":44.567518,"lon":-75.19654,"as_of":"2026-08"},{"id":"6112/7","plant_name":"Fort St Vrain","generator_id":"7","plant_id":6112,"state":"CO","county":"Weld","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":239,"summer_mw":177.9,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":40.2461,"lon":-104.8742,"as_of":"2026-08"},{"id":"6112/8","plant_name":"Fort St Vrain","generator_id":"8","plant_id":6112,"state":"CO","county":"Weld","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":239,"summer_mw":177.9,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":40.2461,"lon":-104.8742,"as_of":"2026-08"},{"id":"68607/PJBS1","plant_name":"Pelicans Jaw Hybrid Solar","generator_id":"PJBS1","plant_id":68607,"state":"CA","county":"Kern","developer":"Pelicans Jaw Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":238.5,"summer_mw":238.5,"planned_start":"2027-04","planned_year":2027,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":35.765183,"lon":-119.7436,"as_of":"2026-08"},{"id":"4041/11","plant_name":"South Oak Creek","generator_id":"11","plant_id":4041,"state":"WI","county":"Milwaukee","developer":"Wisconsin Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":236.3,"summer_mw":227.6,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.8457,"lon":-87.8294,"as_of":"2026-08"},{"id":"4041/12","plant_name":"South Oak Creek","generator_id":"12","plant_id":4041,"state":"WI","county":"Milwaukee","developer":"Wisconsin Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":236.3,"summer_mw":227.6,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.8457,"lon":-87.8294,"as_of":"2026-08"},{"id":"4041/13","plant_name":"South Oak Creek","generator_id":"13","plant_id":4041,"state":"WI","county":"Milwaukee","developer":"Wisconsin Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":236.3,"summer_mw":227.6,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.8457,"lon":-87.8294,"as_of":"2026-08"},{"id":"4041/14","plant_name":"South Oak Creek","generator_id":"14","plant_id":4041,"state":"WI","county":"Milwaukee","developer":"Wisconsin Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":236.3,"summer_mw":227.6,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.8457,"lon":-87.8294,"as_of":"2026-08"},{"id":"4041/15","plant_name":"South Oak Creek","generator_id":"15","plant_id":4041,"state":"WI","county":"Milwaukee","developer":"Wisconsin Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":236.3,"summer_mw":227.6,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.8457,"lon":-87.8294,"as_of":"2026-08"},{"id":"66421/GRS13","plant_name":"Despain Solar","generator_id":"GRS13","plant_id":66421,"state":"TX","county":"Kinney","developer":"Gransolar Texas Thirteen, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":236.2,"summer_mw":236,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.282259,"lon":-100.2098,"as_of":"2026-08"},{"id":"69295/DFBSS","plant_name":"Duffy BESS","generator_id":"DFBSS","plant_id":69295,"state":"TX","county":"Matagorda","developer":"Duffy Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":235.9,"summer_mw":235.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":28.854592,"lon":-96.08606,"as_of":"2026-08"},{"id":"6085/20","plant_name":"R M Schahfer","generator_id":"20","plant_id":6085,"state":"IN","county":"Jasper","developer":"Northern Indiana Pub Serv Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":233.8,"summer_mw":234.4,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.2164,"lon":-87.0261,"as_of":"2026-08"},{"id":"69004/ADELI","plant_name":"Adelite Storage Project LLC","generator_id":"ADELI","plant_id":69004,"state":"TX","county":"Milam","developer":"Acciona Energy USA Global, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":230,"summer_mw":230,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":30.622383,"lon":-97.2105,"as_of":"2026-08"},{"id":"68579/AC2S","plant_name":"AC Ranch II","generator_id":"AC2S","plant_id":68579,"state":"NM","county":"Lea","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":230,"summer_mw":230,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":32.732263,"lon":-103.2748,"as_of":"2026-08"},{"id":"68079/STAS1","plant_name":"Stagecoach LRE","generator_id":"STAS1","plant_id":68079,"state":"CO","county":"Pueblo","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":230,"summer_mw":230,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PSCO","lat":38.17739,"lon":-104.5012,"as_of":"2026-08"},{"id":"62437/WT","plant_name":"Dodge County Wind","generator_id":"WT","plant_id":62437,"state":"MN","county":"Dodge","developer":"Dodge County Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":228,"summer_mw":228,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":44.005633,"lon":-92.95039,"as_of":"2026-08"},{"id":"67783/GRS12","plant_name":"Ventures BESS","generator_id":"GRS12","plant_id":67783,"state":"TX","county":"Matagorda","developer":"Gransolar Texas Twelve LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":226.8,"summer_mw":226.8,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":28.974482,"lon":-95.99381,"as_of":"2026-08"},{"id":"69658/NS2","plant_name":"New Salem Wind II","generator_id":"NS2","plant_id":69658,"state":"ND","county":"Morton","developer":"New Salem Wind II","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":226,"summer_mw":95.3,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":46.797929,"lon":-101.4344,"as_of":"2026-08"},{"id":"67356/6794","plant_name":"Throckmorton Wind","generator_id":"6794","plant_id":67356,"state":"TX","county":"Haskell","developer":"Throckmorton Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":225.6,"summer_mw":225.6,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.213466,"lon":-99.47612,"as_of":"2026-08"},{"id":"67767/BECBA","plant_name":"Bramble Energy Center","generator_id":"BECBA","plant_id":67767,"state":"TX","county":"Zavala","developer":"Mission Clean Energy Devco LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":225.1,"summer_mw":225.1,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.955627,"lon":-99.72318,"as_of":"2026-08"},{"id":"70193/REC01","plant_name":"Romero Energy Center","generator_id":"REC01","plant_id":70193,"state":"AZ","county":"Maricopa","developer":"Romero Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":225,"summer_mw":225,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.509114,"lon":-113.008,"as_of":"2026-08"},{"id":"68417/1","plant_name":"Hallsville","generator_id":"1","plant_id":68417,"state":"TX","county":"Harrison","developer":"Southwestern Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":225,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":32.4607,"lon":-94.4852,"as_of":"2026-08"},{"id":"68417/2","plant_name":"Hallsville","generator_id":"2","plant_id":68417,"state":"TX","county":"Harrison","developer":"Southwestern Electric Power Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":225,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":32.4607,"lon":-94.4852,"as_of":"2026-08"},{"id":"69198/ATL10","plant_name":"ATLAS Solar X, LLC","generator_id":"ATL10","plant_id":69198,"state":"AZ","county":"La Paz","developer":"ATLAS Solar Manager, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":225,"summer_mw":225,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":33.546706,"lon":-113.5562,"as_of":"2026-08"},{"id":"70194/REC02","plant_name":"Romero Energy Center II, LLC","generator_id":"REC02","plant_id":70194,"state":"AZ","county":"Maricopa","developer":"Romero Energy Center II, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":225,"summer_mw":225,"planned_start":"2028-06","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.509114,"lon":-113.008,"as_of":"2026-08"},{"id":"64634/90FI8","plant_name":"Kingsley Solar Farm","generator_id":"90FI8","plant_id":64634,"state":"CA","county":"Imperial","developer":"90FI 8me, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":225,"summer_mw":225,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":32.742036,"lon":-115.7354,"as_of":"2026-08"},{"id":"69450/GEN01","plant_name":"Emerald Bluffs Solar Park","generator_id":"GEN01","plant_id":69450,"state":"WI","county":"Juneau","developer":"Emerald Bluffs Solar Park LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":225,"summer_mw":225,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":43.764276,"lon":-90.01398,"as_of":"2026-08"},{"id":"2951/11","plant_name":"Horseshoe Lake","generator_id":"11","plant_id":2951,"state":"OK","county":"Oklahoma","developer":"Oklahoma Gas & Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":224,"summer_mw":224,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":35.50866,"lon":-97.17969,"as_of":"2026-08"},{"id":"2951/12","plant_name":"Horseshoe Lake","generator_id":"12","plant_id":2951,"state":"OK","county":"Oklahoma","developer":"Oklahoma Gas & Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":224,"summer_mw":224,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":35.50866,"lon":-97.17969,"as_of":"2026-08"},{"id":"2951/13","plant_name":"Horseshoe Lake","generator_id":"13","plant_id":2951,"state":"OK","county":"Oklahoma","developer":"Oklahoma Gas & Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":224,"summer_mw":224,"planned_start":"2029-02","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":35.50866,"lon":-97.17969,"as_of":"2026-08"},{"id":"2951/14","plant_name":"Horseshoe Lake","generator_id":"14","plant_id":2951,"state":"OK","county":"Oklahoma","developer":"Oklahoma Gas & Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":224,"summer_mw":224,"planned_start":"2029-02","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":35.50866,"lon":-97.17969,"as_of":"2026-08"},{"id":"66138/INMA1","plant_name":"Mayapple Solar 1","generator_id":"INMA1","plant_id":66138,"state":"IN","county":"Pulaski","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":224,"summer_mw":224,"planned_start":"2029-03","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.055223,"lon":-86.71323,"as_of":"2026-08"},{"id":"63193/UNIT1","plant_name":"Alira","generator_id":"UNIT1","plant_id":63193,"state":"TX","county":"Andrews","developer":"Luminant Generation Company LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":222.8,"summer_mw":222.8,"planned_start":"2030-01","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.347392,"lon":-102.9677,"as_of":"2026-08"},{"id":"61331/BA2","plant_name":"NISA Electric Generation Project","generator_id":"BA2","plant_id":61331,"state":"NY","county":"Kings","developer":"NYC Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":220.1,"summer_mw":220.1,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":40.7065,"lon":-73.9702,"as_of":"2026-08"},{"id":"63028/GEN1","plant_name":"Tip Top Solar Energy Center LLC","generator_id":"GEN1","plant_id":63028,"state":"NM","county":"Lea","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":220,"summer_mw":220,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":32.133136,"lon":-103.3235,"as_of":"2026-08"},{"id":"67759/TCHEC","plant_name":"Trenton Channel Energy Center","generator_id":"TCHEC","plant_id":67759,"state":"MI","county":"Wayne","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":220,"summer_mw":220,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.124423,"lon":-83.18571,"as_of":"2026-08"},{"id":"69520/AMDRB","plant_name":"Amador BESS","generator_id":"AMDRB","plant_id":69520,"state":"TX","county":"Van Zandt","developer":"BT Amador Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":220,"summer_mw":220,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.479347,"lon":-96.0321,"as_of":"2026-08"},{"id":"69590/HC1","plant_name":"Hollis Creek Solar","generator_id":"HC1","plant_id":69590,"state":"LA","county":"Sabine","developer":"Hollis Creek PV I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":220,"summer_mw":200,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":31.661627,"lon":-93.47361,"as_of":"2026-08"},{"id":"68744/LSEC","plant_name":"Liberty Solar Energy Center","generator_id":"LSEC","plant_id":68744,"state":"MI","county":"Kalamazoo","developer":"Consumers Energy Co - (MI)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":220,"summer_mw":220,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.3631,"lon":-85.474,"as_of":"2026-08"},{"id":"68668/RIC90","plant_name":"Coke BESS","generator_id":"RIC90","plant_id":68668,"state":"TX","county":"Coke","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":220,"summer_mw":220,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.862499,"lon":-100.7638,"as_of":"2026-08"},{"id":"69108/COT01","plant_name":"Eastern Cottontail Solar","generator_id":"COT01","plant_id":69108,"state":"OH","county":"Fairfield","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":220,"summer_mw":254.5,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.844172,"lon":-82.49453,"as_of":"2026-08"},{"id":"69149/ANSN2","plant_name":"Anson 2 Solar","generator_id":"ANSN2","plant_id":69149,"state":"TX","county":"Jones","developer":"Anson Solar Center 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":218.5,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.805609,"lon":-99.91901,"as_of":"2026-08"},{"id":"67996/SEPAS","plant_name":"Leuven Solar LLC","generator_id":"SEPAS","plant_id":67996,"state":"TX","county":"Nolan","developer":"Belgian Renewable Energy Group (BREG)","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":217,"summer_mw":217,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.49301,"lon":-100.2463,"as_of":"2026-08"},{"id":"67576/1","plant_name":"Castle Bluff Energy Center","generator_id":"1","plant_id":67576,"state":"MO","county":"St Louis","developer":"Union Electric Co - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":216,"summer_mw":175,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.4017,"lon":-90.3358,"as_of":"2026-08"},{"id":"67576/2","plant_name":"Castle Bluff Energy Center","generator_id":"2","plant_id":67576,"state":"MO","county":"St Louis","developer":"Union Electric Co - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":216,"summer_mw":175,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.4017,"lon":-90.3358,"as_of":"2026-08"},{"id":"67576/3","plant_name":"Castle Bluff Energy Center","generator_id":"3","plant_id":67576,"state":"MO","county":"St Louis","developer":"Union Electric Co - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":216,"summer_mw":175,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.4017,"lon":-90.3358,"as_of":"2026-08"},{"id":"66559/TXJC1","plant_name":"Jones City 1 Solar","generator_id":"TXJC1","plant_id":66559,"state":"TX","county":"Jones","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":215,"summer_mw":215,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.781168,"lon":-100.0065,"as_of":"2026-08"},{"id":"69654/ZEUB","plant_name":"Zeus BESS","generator_id":"ZEUB","plant_id":69654,"state":"CA","county":"San Joaquin","developer":"Zeus BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":213.6,"summer_mw":200,"planned_start":"2031-09","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":37.711754,"lon":-121.4884,"as_of":"2026-08"},{"id":"64672/BLUJS","plant_name":"Blue Jay Solar I, LLC","generator_id":"BLUJS","plant_id":64672,"state":"TX","county":"Grimes","developer":"Blue Jay Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":210,"summer_mw":210,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":30.705329,"lon":-96.06983,"as_of":"2026-08"},{"id":"68323/ALT8A","plant_name":"Atlas VIII","generator_id":"ALT8A","plant_id":68323,"state":"AZ","county":"La Paz","developer":"Atlas VIII LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":210,"summer_mw":210,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.582903,"lon":-113.5769,"as_of":"2026-08"},{"id":"69956/S10BS","plant_name":"Sanborn Hybrid 3","generator_id":"S10BS","plant_id":69956,"state":"CA","county":"Kern","developer":"Terra-Gen Operating Co-Hybrid","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":210,"summer_mw":210,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.996,"lon":-118.114,"as_of":"2026-08"},{"id":"69956/S10PV","plant_name":"Sanborn Hybrid 3","generator_id":"S10PV","plant_id":69956,"state":"CA","county":"Kern","developer":"Terra-Gen Operating Co-Hybrid","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":210,"summer_mw":210,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.996,"lon":-118.114,"as_of":"2026-08"},{"id":"69537/1","plant_name":"Lyon County Generating Station","generator_id":"1","plant_id":69537,"state":"MN","county":"Lyon","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":210,"summer_mw":193.3,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.226167,"lon":-95.75362,"as_of":"2026-08"},{"id":"69537/2","plant_name":"Lyon County Generating Station","generator_id":"2","plant_id":69537,"state":"MN","county":"Lyon","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":210,"summer_mw":193.3,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.226167,"lon":-95.75362,"as_of":"2026-08"},{"id":"68040/SYCAM","plant_name":"Sycamore Cross Solar","generator_id":"SYCAM","plant_id":68040,"state":"VA","county":"Isle of Wight","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":208.2,"summer_mw":208.2,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.017425,"lon":-76.74399,"as_of":"2026-08"},{"id":"60206/HCCA1","plant_name":"Wolf Summit Energy","generator_id":"HCCA1","plant_id":60206,"state":"WV","county":"Harrison","developer":"Wolf Summit Energy LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":207.4,"summer_mw":205.4,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.287039,"lon":-80.32287,"as_of":"2026-08"},{"id":"70237/MULE1","plant_name":"Mule Shoe Energy Storage","generator_id":"MULE1","plant_id":70237,"state":"TX","county":"Yoakum","developer":"Mule Shoe Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":207,"summer_mw":207,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":33.125909,"lon":-102.76,"as_of":"2026-08"},{"id":"69589/BEEK1","plant_name":"Beekman Solar","generator_id":"BEEK1","plant_id":69589,"state":"LA","county":"Morehouse","developer":"Beekman PV I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":206.8,"summer_mw":185,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":32.989386,"lon":-91.94288,"as_of":"2026-08"},{"id":"69468/PSVSP","plant_name":"Poseyville Solar Park","generator_id":"PSVSP","plant_id":69468,"state":"MI","county":"Midland","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":206.4,"summer_mw":117,"planned_start":"2028-04","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.5178,"lon":-84.2254,"as_of":"2026-08"},{"id":"69507/NHKRY","plant_name":"New Hickory Solar","generator_id":"NHKRY","plant_id":69507,"state":"TX","county":"Jackson","developer":"New Hickory Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":206,"summer_mw":206,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.069747,"lon":-96.8782,"as_of":"2026-08"},{"id":"69058/CBCBA","plant_name":"CO Bar C Solar and BESS","generator_id":"CBCBA","plant_id":69058,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":206,"summer_mw":206,"planned_start":"2027-08","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"69058/CBCPV","plant_name":"CO Bar C Solar and BESS","generator_id":"CBCPV","plant_id":69058,"state":"AZ","county":"Coconino","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":206,"summer_mw":206,"planned_start":"2027-08","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AZPS","lat":35.636594,"lon":-111.8835,"as_of":"2026-08"},{"id":"66651/C2-92","plant_name":"Arco Wind and Solar Project","generator_id":"C2-92","plant_id":66651,"state":"ID","county":"Bonneville","developer":"PacifiCorp","sector":"Electric Utility","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":206,"summer_mw":206,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PACE","lat":43.557,"lon":-112.4415,"as_of":"2026-08"},{"id":"68511/CHC1","plant_name":"Henry Solar","generator_id":"CHC1","plant_id":68511,"state":"OH","county":"Henry","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":206,"summer_mw":206,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.474421,"lon":-84.11271,"as_of":"2026-08"},{"id":"67543/DOGSP","plant_name":"Donegal Solar Project","generator_id":"DOGSP","plant_id":67543,"state":"TX","county":"Dickens","developer":"HE-Cottonwood Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":204.2,"summer_mw":204.2,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":33.796247,"lon":-100.8728,"as_of":"2026-08"},{"id":"67341/NOSPV","plant_name":"SGT Hoskins Solar Project Hybrid","generator_id":"NOSPV","plant_id":67341,"state":"TX","county":"Lamar","developer":"SGT Hoskins Solar Project, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":204.1,"summer_mw":204.1,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.63124,"lon":-95.33785,"as_of":"2026-08"},{"id":"68853/LMWOD","plant_name":"Limewood Bell Renewables Solar","generator_id":"LMWOD","plant_id":68853,"state":"TX","county":"Bell","developer":"Limewood Bell Renewables LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":204,"summer_mw":204,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.129365,"lon":-97.26139,"as_of":"2026-08"},{"id":"67353/4666","plant_name":"Erath County Solar","generator_id":"4666","plant_id":67353,"state":"TX","county":"Erath","developer":"Erath County Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":204,"summer_mw":204,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.089488,"lon":-98.17853,"as_of":"2026-08"},{"id":"67917/CHMPN","plant_name":"Champaign BESS, LLC","generator_id":"CHMPN","plant_id":67917,"state":"TX","county":"Glasscock","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":202.7,"summer_mw":202.7,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.871567,"lon":-101.7384,"as_of":"2026-08"},{"id":"65049/CPCW1","plant_name":"Pike Creek Wind","generator_id":"CPCW1","plant_id":65049,"state":"IL","county":"Logan","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":202.5,"summer_mw":202.5,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":40.059,"lon":-89.537,"as_of":"2026-08"},{"id":"69659/RBW","plant_name":"Red Butte Wind","generator_id":"RBW","plant_id":69659,"state":"ND","county":"Morton","developer":"Red Butte Wind","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":202,"summer_mw":84,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":47.063928,"lon":-101.4753,"as_of":"2026-08"},{"id":"68275/1","plant_name":"Erin","generator_id":"1","plant_id":68275,"state":"TX","county":"Wharton","developer":"Erin Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":202,"summer_mw":202,"planned_start":"2029-10","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.163,"lon":-96.013,"as_of":"2026-08"},{"id":"69879/N3884","plant_name":"Ninnescah Flats Solar","generator_id":"N3884","plant_id":69879,"state":"KS","county":"Pratt","developer":"Nextera Energy Resources","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":201.6,"summer_mw":201.6,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":37.628817,"lon":-98.59311,"as_of":"2026-08"},{"id":"67918/DIOS","plant_name":"Dios BESS, LLC","generator_id":"DIOS","plant_id":67918,"state":"TX","county":"Jackson","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":201.6,"summer_mw":201.6,"planned_start":"2027-03","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.012998,"lon":-96.5051,"as_of":"2026-08"},{"id":"65948/PNW01","plant_name":"Plum Nellie Wind Farm LLC","generator_id":"PNW01","plant_id":65948,"state":"KS","county":"Cloud","developer":"Plum Nellie Wind Farm LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":201.6,"summer_mw":201.6,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":39.376786,"lon":-97.55649,"as_of":"2026-08"},{"id":"65462/AXTON","plant_name":"Axton Solar","generator_id":"AXTON","plant_id":65462,"state":"VA","county":"Henry","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":201.1,"summer_mw":201.1,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":36.671684,"lon":-79.68606,"as_of":"2026-08"},{"id":"62892/SONRI","plant_name":"EDPR CA Solar Park VI LLC (CA) Hybrid","generator_id":"SONRI","plant_id":62892,"state":"CA","county":"Fresno","developer":"EDPR CA Solar Park VI LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":201,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.62543,"lon":-120.3789,"as_of":"2026-08"},{"id":"67575/NZRTH","plant_name":"TX Nazareth Solar","generator_id":"NZRTH","plant_id":67575,"state":"TX","county":"Swisher","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":201,"summer_mw":201,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":34.49,"lon":-101.97,"as_of":"2026-08"},{"id":"68902/ECHPV","plant_name":"Echols Grove Solar","generator_id":"ECHPV","plant_id":68902,"state":"TX","county":"Lamar","developer":"Echols Grove LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":201,"summer_mw":201,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.616471,"lon":-95.45837,"as_of":"2026-08"},{"id":"67535/ASHU1","plant_name":"Bell Creek BESS LLC","generator_id":"ASHU1","plant_id":67535,"state":"TX","county":"Brazoria","developer":"Nexus Renewables U.S. Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200.9,"summer_mw":200.9,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.137519,"lon":-95.66797,"as_of":"2026-08"},{"id":"68168/KAHBA","plant_name":"Kahla Storage","generator_id":"KAHBA","plant_id":68168,"state":"TX","county":"Leon","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200.9,"summer_mw":200.9,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.325705,"lon":-96.26071,"as_of":"2026-08"},{"id":"69120/RESBS","plant_name":"Resaca Oasis Storage","generator_id":"RESBS","plant_id":69120,"state":"TX","county":"Cameron","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200.7,"summer_mw":200.7,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":25.978783,"lon":-97.37263,"as_of":"2026-08"},{"id":"67558/RIC96","plant_name":"Blackcat BESS","generator_id":"RIC96","plant_id":67558,"state":"TX","county":"Matagorda","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200.6,"summer_mw":200.6,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.974879,"lon":-95.99499,"as_of":"2026-08"},{"id":"70021/STACB","plant_name":"Staccato BESS","generator_id":"STACB","plant_id":70021,"state":"TX","county":"Fayette","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200.5,"summer_mw":200.5,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":30.053062,"lon":-96.92122,"as_of":"2026-08"},{"id":"68179/TEMPW","plant_name":"Templeton Wind","generator_id":"TEMPW","plant_id":68179,"state":"IN","county":"Benton","developer":"Templeton Wind Energy Center, LLC","sector":"Electric Utility","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200.2,"summer_mw":200.2,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":40.519676,"lon":-87.15039,"as_of":"2026-08"},{"id":"65870/CASTR","plant_name":"Castor","generator_id":"CASTR","plant_id":65870,"state":"TX","county":"Brazoria","developer":"Engie North America","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.150279,"lon":-95.65118,"as_of":"2026-08"},{"id":"66216/SOL","plant_name":"Yaupon Solar Project (Hybrid)","generator_id":"SOL","plant_id":66216,"state":"TX","county":"Milam","developer":"Yaupon Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.0444,"lon":-96.8514,"as_of":"2026-08"},{"id":"68581/MTB","plant_name":"Mendoza Trail BESS","generator_id":"MTB","plant_id":68581,"state":"TX","county":"Crane","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.19371,"lon":-102.3159,"as_of":"2026-08"},{"id":"68582/PPB","plant_name":"Pintail BESS","generator_id":"PPB","plant_id":68582,"state":"TX","county":"San Patricio","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":28.04268,"lon":-97.44014,"as_of":"2026-08"},{"id":"69255/VESP1","plant_name":"Vertus Energy Storage Plant","generator_id":"VESP1","plant_id":69255,"state":"TX","county":"Galveston","developer":"Vertus Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.392994,"lon":-95.03924,"as_of":"2026-08"},{"id":"69585/5568","plant_name":"Kaufman Solar","generator_id":"5568","plant_id":69585,"state":"TX","county":"Kaufman","developer":"Kaufman Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.536696,"lon":-96.22112,"as_of":"2026-08"},{"id":"67976/GEN01","plant_name":"Cattlemen Solar II","generator_id":"GEN01","plant_id":67976,"state":"TX","county":"Milam","developer":"Cattlemen Solar Park II LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.083559,"lon":-96.85732,"as_of":"2026-08"},{"id":"68425/TWPII","plant_name":"Tidwell Prairie II","generator_id":"TWPII","plant_id":68425,"state":"TX","county":"Robertson","developer":"Tidwell Prairie IIA LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":31.103064,"lon":-96.66494,"as_of":"2026-08"},{"id":"68481/HS2","plant_name":"Hill Solar II","generator_id":"HS2","plant_id":68481,"state":"TX","county":"Hill","developer":"Hill Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.115203,"lon":-97.06783,"as_of":"2026-08"},{"id":"68914/12343","plant_name":"Padua 3","generator_id":"12343","plant_id":68914,"state":"TX","county":"Bexar","developer":"Padua 3","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.325064,"lon":-98.32562,"as_of":"2026-08"},{"id":"70344/RSPV","plant_name":"Rush Springs Solar","generator_id":"RSPV","plant_id":70344,"state":"OK","county":"Stephens","developer":"Rush Springs Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":34.469189,"lon":-97.89441,"as_of":"2026-08"},{"id":"69155/AHBA1","plant_name":"Apache Hill Energy Center","generator_id":"AHBA1","plant_id":69155,"state":"TX","county":"Hood","developer":"Apache Hill Energy Center","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.380005,"lon":-97.72782,"as_of":"2026-08"},{"id":"69392/BBIA","plant_name":"Barton Branch IA","generator_id":"BBIA","plant_id":69392,"state":"TX","county":"Robertson","developer":"Barton Branch IA LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.103064,"lon":-96.66494,"as_of":"2026-08"},{"id":"66968/BFW00","plant_name":"Blackford Wind","generator_id":"BFW00","plant_id":66968,"state":"IN","county":"Blackford","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.402078,"lon":-85.30058,"as_of":"2026-08"},{"id":"68089/TS03","plant_name":"Twelvemile Solar 3","generator_id":"TS03","plant_id":68089,"state":"OK","county":"Mayes","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":36.331569,"lon":-95.22931,"as_of":"2026-08"},{"id":"68341/GREE","plant_name":"Greenwater BESS","generator_id":"GREE","plant_id":68341,"state":"WA","county":"Pierce","developer":"GREE bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSEI","lat":47.236485,"lon":-122.2271,"as_of":"2026-08"},{"id":"68515/GREER","plant_name":"Greer Solar Plant","generator_id":"GREER","plant_id":68515,"state":"MS","county":"Washington","developer":"Greer Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":33.115544,"lon":-90.83077,"as_of":"2026-08"},{"id":"69477/PLSNT","plant_name":"Pleasant Prairie Solar Energy LLC","generator_id":"PLSNT","plant_id":69477,"state":"OH","county":"Franklin","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":39.944801,"lon":-83.20397,"as_of":"2026-08"},{"id":"69549/DLE1","plant_name":"Dry Lake East Energy Center","generator_id":"DLE1","plant_id":69549,"state":"NV","county":"Clark","developer":"Dry Lake East Energy Center","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NEVP","lat":36.401094,"lon":-114.8652,"as_of":"2026-08"},{"id":"70408/WCB","plant_name":"Willow Creek Energy Storage","generator_id":"WCB","plant_id":70408,"state":"OK","county":"Pawnee","developer":"Willow Creek Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SPA","lat":36.389624,"lon":-97.02781,"as_of":"2026-08"},{"id":"64290/ATHB2","plant_name":"SE Athos II, LLC","generator_id":"ATHB2","plant_id":64290,"state":"CA","county":"Riverside","developer":"SE Athos II, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.751283,"lon":-115.355,"as_of":"2026-08"},{"id":"64744/TC001","plant_name":"Turkey Creek Solar Project","generator_id":"TC001","plant_id":64744,"state":"CO","county":"Pueblo","developer":"174 Power Global Corp.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-02","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.382137,"lon":-104.9141,"as_of":"2026-08"},{"id":"69723/BESS1","plant_name":"Taft BESS","generator_id":"BESS1","plant_id":69723,"state":"MA","county":"Worcester","developer":"FE Taft LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":42.03383,"lon":-71.60374,"as_of":"2026-08"},{"id":"66893/TXJS2","plant_name":"Jones City 2 Solar","generator_id":"TXJS2","plant_id":66893,"state":"TX","county":"Jones","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.794928,"lon":-99.99293,"as_of":"2026-08"},{"id":"67249/RRES","plant_name":"Rock Rose Energy Storage","generator_id":"RRES","plant_id":67249,"state":"TX","county":"Fort Bend","developer":"Rock Rose Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.395241,"lon":-95.73535,"as_of":"2026-08"},{"id":"69779/HK2SO","plant_name":"Hashknife Energy Center II LLC","generator_id":"HK2SO","plant_id":69779,"state":"AZ","county":"Navajo","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":34.574259,"lon":-110.4946,"as_of":"2026-08"},{"id":"69779/HK2ST","plant_name":"Hashknife Energy Center II LLC","generator_id":"HK2ST","plant_id":69779,"state":"AZ","county":"Navajo","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":34.574259,"lon":-110.4946,"as_of":"2026-08"},{"id":"68568/TULLA","plant_name":"SR Tullahoma","generator_id":"TULLA","plant_id":68568,"state":"TN","county":"Moore","developer":"SR Tullahoma, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TVA","lat":35.360002,"lon":-86.27532,"as_of":"2026-08"},{"id":"66852/HILL3","plant_name":"Hillsboro Solar 3","generator_id":"HILL3","plant_id":66852,"state":"AL","county":"Lawrence","developer":"Urban Grid Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"TVA","lat":34.669883,"lon":-87.2332,"as_of":"2026-08"},{"id":"65964/URSA","plant_name":"Ursa Solar, LLC","generator_id":"URSA","plant_id":65964,"state":"WI","county":"Columbia","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":43.504285,"lon":-89.11314,"as_of":"2026-08"},{"id":"69169/FWS","plant_name":"Freshwater Solar, LLC","generator_id":"FWS","plant_id":69169,"state":"MI","county":"Montcalm","developer":"Freshwater Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.338197,"lon":-85.04013,"as_of":"2026-08"},{"id":"70400/BEE1A","plant_name":"Bee Branch IA","generator_id":"BEE1A","plant_id":70400,"state":"TX","county":"Robertson","developer":"Bee Branch IA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.104838,"lon":-96.66477,"as_of":"2026-08"},{"id":"63784/PLMNO","plant_name":"Palomino Solar","generator_id":"PLMNO","plant_id":63784,"state":"OH","county":"Highland","developer":"Palomino Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.2158,"lon":-83.7771,"as_of":"2026-08"},{"id":"66685/WH001","plant_name":"Whale Rock Pumped Storage Hydro Project","generator_id":"WH001","plant_id":66685,"state":"CA","county":"San Luis Obispo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.454196,"lon":-120.8671,"as_of":"2026-08"},{"id":"66685/WH002","plant_name":"Whale Rock Pumped Storage Hydro Project","generator_id":"WH002","plant_id":66685,"state":"CA","county":"San Luis Obispo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.454196,"lon":-120.8671,"as_of":"2026-08"},{"id":"66685/WH003","plant_name":"Whale Rock Pumped Storage Hydro Project","generator_id":"WH003","plant_id":66685,"state":"CA","county":"San Luis Obispo","developer":"Premium Energy Holdings","sector":"IPP Non-CHP","technology":"Hydroelectric Pumped Storage","energy_source":"WAT","prime_mover":"PS","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.454196,"lon":-120.8671,"as_of":"2026-08"},{"id":"68348/ACESS","plant_name":"Alamo City ESS","generator_id":"ACESS","plant_id":68348,"state":"TX","county":"Bexar","developer":"Alamo City ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.345305,"lon":-98.31948,"as_of":"2026-08"},{"id":"68911/27288","plant_name":"Flint","generator_id":"27288","plant_id":68911,"state":"OH","county":"Franklin","developer":"Flint","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.09639,"lon":-82.73361,"as_of":"2026-08"},{"id":"68906/PFBA2","plant_name":"Pine Forest Solar I","generator_id":"PFBA2","plant_id":68906,"state":"TX","county":"Hopkins","developer":"Pine Forest Solar I, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DOPD","lat":33.100779,"lon":-95.39229,"as_of":"2026-08"},{"id":"67768/CECBA","plant_name":"Cumbia Energy Center","generator_id":"CECBA","plant_id":67768,"state":"TX","county":"Nueces","developer":"Mission Clean Energy Devco LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":27.739083,"lon":-97.44955,"as_of":"2026-08"},{"id":"66401/OHLPV","plant_name":"OCI Hillsboro","generator_id":"OHLPV","plant_id":66401,"state":"TX","county":"Hill","developer":"HEC Renewable Energy America LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.941,"lon":-97.021,"as_of":"2026-08"},{"id":"65821/HNYSR","plant_name":"Honey Creek Solar","generator_id":"HNYSR","plant_id":65821,"state":"IN","county":"White","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.7971,"lon":-86.8572,"as_of":"2026-08"},{"id":"66401/OHLBS","plant_name":"OCI Hillsboro","generator_id":"OHLBS","plant_id":66401,"state":"TX","county":"Hill","developer":"HEC Renewable Energy America LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.941,"lon":-97.021,"as_of":"2026-08"},{"id":"66904/LBTN","plant_name":"Lumberton PV I, LLC","generator_id":"LBTN","plant_id":66904,"state":"TX","county":"Hardin","developer":"Lumberton PV I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.298323,"lon":-94.27631,"as_of":"2026-08"},{"id":"67354/5698","plant_name":"Waco Solar II","generator_id":"5698","plant_id":67354,"state":"TX","county":"Limestone","developer":"Waco Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.71062,"lon":-96.7914,"as_of":"2026-08"},{"id":"67652/BHALU","plant_name":"Bhalu","generator_id":"BHALU","plant_id":67652,"state":"TX","county":"Howard","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.31219,"lon":-101.3378,"as_of":"2026-08"},{"id":"68031/SCPSB","plant_name":"Scopus Solar","generator_id":"SCPSB","plant_id":68031,"state":"MO","county":"Bollinger","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":37.392178,"lon":-89.89929,"as_of":"2026-08"},{"id":"68031/SCPSR","plant_name":"Scopus Solar","generator_id":"SCPSR","plant_id":68031,"state":"MO","county":"Bollinger","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":37.392178,"lon":-89.89929,"as_of":"2026-08"},{"id":"68036/VCHSB","plant_name":"Vichy Solar","generator_id":"VCHSB","plant_id":68036,"state":"MO","county":"Maries","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.167934,"lon":-91.82552,"as_of":"2026-08"},{"id":"68036/VCHSR","plant_name":"Vichy Solar","generator_id":"VCHSR","plant_id":68036,"state":"MO","county":"Maries","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.167934,"lon":-91.82552,"as_of":"2026-08"},{"id":"68299/TUAL","plant_name":"Tualatin Battery Energy Storage System","generator_id":"TUAL","plant_id":68299,"state":"OR","county":"Washington","developer":"TUAL bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PGE","lat":45,"lon":-122,"as_of":"2026-08"},{"id":"68315/ARFL1","plant_name":"Anthelope Hills Solar Generation BESS","generator_id":"ARFL1","plant_id":68315,"state":"MT","county":"Beaverhead","developer":"ARFL bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NWMT","lat":45.05029,"lon":-113.0588,"as_of":"2026-08"},{"id":"68315/ARFL2","plant_name":"Anthelope Hills Solar Generation BESS","generator_id":"ARFL2","plant_id":68315,"state":"MT","county":"Beaverhead","developer":"ARFL bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NWMT","lat":45.05029,"lon":-113.0588,"as_of":"2026-08"},{"id":"69189/C2BS","plant_name":"Cowboy Solar II","generator_id":"C2BS","plant_id":69189,"state":"WY","county":"Laramie","developer":"TGE Wyoming 225, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.032968,"lon":-104.3816,"as_of":"2026-08"},{"id":"69199/ATL11","plant_name":"ATLAS Solar XI, LLC","generator_id":"ATL11","plant_id":69199,"state":"AZ","county":"La Paz","developer":"ATLAS Solar Manager, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":33.553361,"lon":-113.5803,"as_of":"2026-08"},{"id":"69982/3569","plant_name":"Diamondback Solar","generator_id":"3569","plant_id":69982,"state":"TX","county":"Starr","developer":"Diamondback Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":26.426684,"lon":-98.70102,"as_of":"2026-08"},{"id":"70297/BWTS","plant_name":"Blackwater Solar Center - NM","generator_id":"BWTS","plant_id":70297,"state":"NM","county":"Roosevelt","developer":"Blackwater Solar Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":34.292324,"lon":-103.1657,"as_of":"2026-08"},{"id":"70341/TW200","plant_name":"Thunder Wolf II, LLC","generator_id":"TW200","plant_id":70341,"state":"CO","county":"Pueblo","developer":"Thunder Wolf II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"WACM","lat":38.94808,"lon":-104.2357,"as_of":"2026-08"},{"id":"66858/SPRV2","plant_name":"Spring Valley Solar 2","generator_id":"SPRV2","plant_id":66858,"state":"AL","county":"Colbert","developer":"Urban Grid Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"TVA","lat":34.674983,"lon":-87.66373,"as_of":"2026-08"},{"id":"67945/JCSIB","plant_name":"Juniper Creek Storage","generator_id":"JCSIB","plant_id":67945,"state":"CA","county":"Sacramento","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":38.554073,"lon":-121.2066,"as_of":"2026-08"},{"id":"67985/HRNT2","plant_name":"Hornet Solar II (TX) (Hybrid)","generator_id":"HRNT2","plant_id":67985,"state":"TX","county":"Swisher","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.483406,"lon":-101.9699,"as_of":"2026-08"},{"id":"67985/HRT2B","plant_name":"Hornet Solar II (TX) (Hybrid)","generator_id":"HRT2B","plant_id":67985,"state":"TX","county":"Swisher","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":34.483406,"lon":-101.9699,"as_of":"2026-08"},{"id":"70257/H1SLR","plant_name":"Hawkeye Solar, LLC","generator_id":"H1SLR","plant_id":70257,"state":"IA","county":"Clinton","developer":"Hawkeye Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":41.835204,"lon":-90.69966,"as_of":"2026-08"},{"id":"68490/BLS","plant_name":"Broadleaf Solar","generator_id":"BLS","plant_id":68490,"state":"CT","county":"Hartford","developer":"Broadleaf Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-04","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.9241,"lon":-72.7824,"as_of":"2026-08"},{"id":"67250/ALIBS","plant_name":"Alina Energy LLC","generator_id":"ALIBS","plant_id":67250,"state":"TX","county":"Wilson","developer":"Alina Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.161128,"lon":-98.08988,"as_of":"2026-08"},{"id":"67250/ALIPV","plant_name":"Alina Energy LLC","generator_id":"ALIPV","plant_id":67250,"state":"TX","county":"Wilson","developer":"Alina Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.161128,"lon":-98.08988,"as_of":"2026-08"},{"id":"68604/DALPV","plant_name":"Dahlia Energy","generator_id":"DALPV","plant_id":68604,"state":"TX","county":"La Salle","developer":"Dahlia Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.369598,"lon":-98.96762,"as_of":"2026-08"},{"id":"65847/ELDBS","plant_name":"Eldora Energy LLC","generator_id":"ELDBS","plant_id":65847,"state":"TX","county":"Matagorda","developer":"Eldora Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.865989,"lon":-96.12169,"as_of":"2026-08"},{"id":"65847/ELDPV","plant_name":"Eldora Energy LLC","generator_id":"ELDPV","plant_id":65847,"state":"TX","county":"Matagorda","developer":"Eldora Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.865989,"lon":-96.12169,"as_of":"2026-08"},{"id":"68347/ABPV1","plant_name":"Abeja Solar Farm","generator_id":"ABPV1","plant_id":68347,"state":"TX","county":"Bee","developer":"Abeja Solar Farm LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.288244,"lon":-97.84019,"as_of":"2026-08"},{"id":"68362/SABS1","plant_name":"Sun Angel ESS","generator_id":"SABS1","plant_id":68362,"state":"TX","county":"Angelina","developer":"Sun Angel ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.345947,"lon":-94.66785,"as_of":"2026-08"},{"id":"69470/SVCSP","plant_name":"Silver Creek Solar Park","generator_id":"SVCSP","plant_id":69470,"state":"MI","county":"Huron","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.837206,"lon":-83.05481,"as_of":"2026-08"},{"id":"69952/CH1","plant_name":"Cypress Harvest Solar Station","generator_id":"CH1","plant_id":69952,"state":"LA","county":"Iberville","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.237835,"lon":-91.26486,"as_of":"2026-08"},{"id":"69776/DKVSP","plant_name":"Deckerville Solar Park","generator_id":"DKVSP","plant_id":69776,"state":"MI","county":"Sanilac","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-11","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.5521,"lon":-82.7649,"as_of":"2026-08"},{"id":"61687/PLMCK","plant_name":"Plum Creek","generator_id":"PLMCK","plant_id":61687,"state":"MN","county":"Cottonwood","developer":"Geronimo Power","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.14504,"lon":-95.38272,"as_of":"2026-08"},{"id":"64632/99MT8","plant_name":"Sienna Solar Farm","generator_id":"99MT8","plant_id":64632,"state":"CA","county":"San Bernardino","developer":"99MT 8me, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.493659,"lon":-116.915,"as_of":"2026-08"},{"id":"64632/99MTB","plant_name":"Sienna Solar Farm","generator_id":"99MTB","plant_id":64632,"state":"CA","county":"San Bernardino","developer":"99MT 8me, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.493659,"lon":-116.915,"as_of":"2026-08"},{"id":"68282/CENT","plant_name":"Centralia Battery Energy Storage System","generator_id":"CENT","plant_id":68282,"state":"WA","county":"Thurston","developer":"CENT bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSEI","lat":46.779823,"lon":-122.8848,"as_of":"2026-08"},{"id":"68485/22SVA","plant_name":"Rexford 2 Solar Farm","generator_id":"22SVA","plant_id":68485,"state":"CA","county":"Tulare","developer":"22SV 8ME LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.893525,"lon":-119.0805,"as_of":"2026-08"},{"id":"68485/22SVB","plant_name":"Rexford 2 Solar Farm","generator_id":"22SVB","plant_id":68485,"state":"CA","county":"Tulare","developer":"22SV 8ME LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.893525,"lon":-119.0805,"as_of":"2026-08"},{"id":"69657/NS1","plant_name":"New Salem Wind I","generator_id":"NS1","plant_id":69657,"state":"ND","county":"Morton","developer":"New Salem Wind I","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":83.1,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":46.730181,"lon":-101.3054,"as_of":"2026-08"},{"id":"69990/BW1","plant_name":"Bogalusa West Solar Station","generator_id":"BW1","plant_id":69990,"state":"LA","county":"Washington","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.84,"lon":-89.86,"as_of":"2026-08"},{"id":"68090/WILLO","plant_name":"Willow Beach Wind","generator_id":"WILLO","plant_id":68090,"state":"TX","county":"Brazoria","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.249522,"lon":-95.13416,"as_of":"2026-08"},{"id":"67655/ELKRN","plant_name":"Elk Run","generator_id":"ELKRN","plant_id":67655,"state":"CO","county":"Las Animas","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":37.454588,"lon":-104.4887,"as_of":"2026-08"},{"id":"68292/GGSO","plant_name":"Gage Solar","generator_id":"GGSO","plant_id":68292,"state":"KY","county":"McCracken","developer":"GGSO, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"LGEE","lat":37.0967,"lon":-88.7791,"as_of":"2026-08"},{"id":"70138/CRAW1","plant_name":"Crawfish Creek Energy Storage","generator_id":"CRAW1","plant_id":70138,"state":"AL","county":"Jackson","developer":"Crawfish Creek Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-06","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":34.83057,"lon":-85.66845,"as_of":"2026-08"},{"id":"68349/AVBS1","plant_name":"Avant Prairie ESS","generator_id":"AVBS1","plant_id":68349,"state":"TX","county":"Freestone","developer":"Avant Prairie ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.625891,"lon":-96.12222,"as_of":"2026-08"},{"id":"68350/BESS1","plant_name":"Bravo ESS","generator_id":"BESS1","plant_id":68350,"state":"TX","county":"Zapata","developer":"Bravo ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":27.285037,"lon":-99.41187,"as_of":"2026-08"},{"id":"68360/PRESS","plant_name":"Prost ESS","generator_id":"PRESS","plant_id":68360,"state":"TX","county":"Austin","developer":"Prost ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.957853,"lon":-96.53331,"as_of":"2026-08"},{"id":"68363/SSESS","plant_name":"SunShiner ESS","generator_id":"SSESS","plant_id":68363,"state":"TX","county":"Zavala","developer":"SunShiner ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.937123,"lon":-99.83407,"as_of":"2026-08"},{"id":"68364/TBESS","plant_name":"Tex-Bar ESS","generator_id":"TBESS","plant_id":68364,"state":"TX","county":"Madison","developer":"Tex-Bar ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.930573,"lon":-96.03037,"as_of":"2026-08"},{"id":"69952/CH2","plant_name":"Cypress Harvest Solar Station","generator_id":"CH2","plant_id":69952,"state":"LA","county":"Iberville","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.237835,"lon":-91.26486,"as_of":"2026-08"},{"id":"68368/MYSO","plant_name":"Mayfield Solar and Storage","generator_id":"MYSO","plant_id":68368,"state":"KY","county":"McCracken","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-10","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":36.8864,"lon":-88.659,"as_of":"2026-08"},{"id":"64904/1","plant_name":"Elliot Solar LLC","generator_id":"1","plant_id":64904,"state":"IN","county":"Gibson","developer":"Elliot Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.316297,"lon":-87.42793,"as_of":"2026-08"},{"id":"65808/SVEC","plant_name":"Sacramento Valley Energy Center, LLC","generator_id":"SVEC","plant_id":65808,"state":"CA","county":"Sacramento","developer":"Sacramento Valley Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BANC","lat":38.57147,"lon":-121.1845,"as_of":"2026-08"},{"id":"68084/MLB","plant_name":"Morrow Lake BESS","generator_id":"MLB","plant_id":68084,"state":"TX","county":"Frio","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.936239,"lon":-99.08318,"as_of":"2026-08"},{"id":"68288/MAHI","plant_name":"Flag Run Solar","generator_id":"MAHI","plant_id":68288,"state":"IN","county":"Clark","developer":"MAHI bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":38.556,"lon":-85.201,"as_of":"2026-08"},{"id":"68290/DYSP","plant_name":"Dyers Spring Solar","generator_id":"DYSP","plant_id":68290,"state":"KY","county":"Breckinridge","developer":"DYSP, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"LGEE","lat":37.688411,"lon":-86.26927,"as_of":"2026-08"},{"id":"68332/DEGA1","plant_name":"Dega Solar and Storage","generator_id":"DEGA1","plant_id":68332,"state":"AL","county":"Talladega","developer":"DEGA bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":33.537201,"lon":-86.0855,"as_of":"2026-08"},{"id":"68332/DEGA2","plant_name":"Dega Solar and Storage","generator_id":"DEGA2","plant_id":68332,"state":"AL","county":"Talladega","developer":"DEGA bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":33.537201,"lon":-86.0855,"as_of":"2026-08"},{"id":"68843/TLCP","plant_name":"Tupper Lake Wind","generator_id":"TLCP","plant_id":68843,"state":"MI","county":"Ionia","developer":"Tupper Lake","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":198,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.829,"lon":-85.138,"as_of":"2026-08"},{"id":"69633/99757","plant_name":"Lion Solar","generator_id":"99757","plant_id":69633,"state":"AR","county":"Jefferson","developer":"Lion Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":34.324581,"lon":-91.9253,"as_of":"2026-08"},{"id":"70186/SOLBS","plant_name":"Solstice Solar LLC","generator_id":"SOLBS","plant_id":70186,"state":"OK","county":"Le Flore","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":35.291043,"lon":-94.77891,"as_of":"2026-08"},{"id":"70186/SOLPV","plant_name":"Solstice Solar LLC","generator_id":"SOLPV","plant_id":70186,"state":"OK","county":"Le Flore","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":200,"summer_mw":200,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":35.291043,"lon":-94.77891,"as_of":"2026-08"},{"id":"58652/1","plant_name":"La Paz Solar Tower","generator_id":"1","plant_id":58652,"state":"AZ","county":"La Paz","developer":"Enviromission, Inc","sector":"IPP Non-CHP","technology":"Solar Thermal without Energy Storage","energy_source":"SUN","prime_mover":"OT","nameplate_mw":200,"summer_mw":200,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WALC","lat":33.917222,"lon":-114.2675,"as_of":"2026-08"},{"id":"69637/28152","plant_name":"Oakley BESS","generator_id":"28152","plant_id":69637,"state":"TX","county":"Denton","developer":"Oakley BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.41854,"lon":-97.18809,"as_of":"2026-08"},{"id":"69641/49453","plant_name":"Metro BESS","generator_id":"49453","plant_id":69641,"state":"TX","county":"Caldwell","developer":"Metro BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.003245,"lon":-97.67794,"as_of":"2026-08"},{"id":"70136/MORL1","plant_name":"Morel Energy Storage","generator_id":"MORL1","plant_id":70136,"state":"CO","county":"Moffat","developer":"Morel Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2030-12","planned_year":2030,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":40.469217,"lon":-107.6032,"as_of":"2026-08"},{"id":"68342/HOHI","plant_name":"Hop Hill Solar Generation and BESS","generator_id":"HOHI","plant_id":68342,"state":"WA","county":"Benton","developer":"HOHI bn, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":200,"summer_mw":200,"planned_start":"2031-09","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":46.324,"lon":-119.822,"as_of":"2026-08"},{"id":"68361/RUESS","plant_name":"Rush ESS","generator_id":"RUESS","plant_id":68361,"state":"TX","county":"Bexar","developer":"Rush ESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":200,"summer_mw":200,"planned_start":"2031-12","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.307639,"lon":-98.29673,"as_of":"2026-08"},{"id":"58835/ELK4","plant_name":"Elk Station","generator_id":"ELK4","plant_id":58835,"state":"TX","county":"Hale","developer":"Golden Spread Electric Cooperative, Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":199.8,"summer_mw":201,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":33.865,"lon":-101.8433,"as_of":"2026-08"},{"id":"68767/BRGSP","plant_name":"Greenalia Solar Power Blackwelder Ranch","generator_id":"BRGSP","plant_id":68767,"state":"TX","county":"Pecos","developer":"Greenalia Solar Power Blackwelder Ranch, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":199.7,"summer_mw":199.7,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.81256,"lon":-102.1865,"as_of":"2026-08"},{"id":"69946/SBA","plant_name":"Spindle BESS","generator_id":"SBA","plant_id":69946,"state":"CO","county":"Weld","developer":"Spindle Battery LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":199,"summer_mw":199,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.092401,"lon":-104.9012,"as_of":"2026-08"},{"id":"68510/CFC1","plant_name":"Ritter Solar","generator_id":"CFC1","plant_id":68510,"state":"OH","county":"Fulton","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":199,"summer_mw":199,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.694902,"lon":-84.31682,"as_of":"2026-08"},{"id":"69278/1","plant_name":"Fortress 1","generator_id":"1","plant_id":69278,"state":"CO","county":"Morgan","developer":"Fortress Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":199,"summer_mw":199,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":40.26,"lon":-103.57,"as_of":"2026-08"},{"id":"68153/BA1","plant_name":"Fremont Solar","generator_id":"BA1","plant_id":68153,"state":"UT","county":"Iron","developer":"Fremont Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":198,"summer_mw":198,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":37.9789,"lon":-112.7761,"as_of":"2026-08"},{"id":"69780/OCPV1","plant_name":"Oystercatcher Solar","generator_id":"OCPV1","plant_id":69780,"state":"TX","county":"Ellis","developer":"Cardinal Investment Company, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":197,"summer_mw":197,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.192556,"lon":-96.91867,"as_of":"2026-08"},{"id":"70259/CHCS2","plant_name":"Cunningham Solar II","generator_id":"CHCS2","plant_id":70259,"state":"NM","county":"Lea","developer":"Southwestern Public Service Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":196,"summer_mw":196,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":32.786412,"lon":-103.3507,"as_of":"2026-08"},{"id":"66908/BZES","plant_name":"Bonanza Solar and Storage Project","generator_id":"BZES","plant_id":66908,"state":"NV","county":"Clark","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":195,"summer_mw":195,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":36.558,"lon":-115.799,"as_of":"2026-08"},{"id":"67798/GRS7","plant_name":"Steelhead Energy Storage","generator_id":"GRS7","plant_id":67798,"state":"TX","county":"Fannin","developer":"GRS BESS Texas Seven, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":193.7,"summer_mw":190.1,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.633102,"lon":-96.15789,"as_of":"2026-08"},{"id":"67233/SOL1","plant_name":"Lawrence County Solar","generator_id":"SOL1","plant_id":67233,"state":"AL","county":"Lawrence","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":193,"summer_mw":193,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.63928,"lon":-87.25098,"as_of":"2026-08"},{"id":"66673/66666","plant_name":"Accalia Point Solar, LLC","generator_id":"66666","plant_id":66673,"state":"TX","county":"Cameron","developer":"Accalia Point Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":190.5,"summer_mw":190.5,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":26.098075,"lon":-97.83752,"as_of":"2026-08"},{"id":"68461/KEYBB","plant_name":"Key Energy Storage","generator_id":"KEYBB","plant_id":68461,"state":"CA","county":"Fresno","developer":"Key Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":190,"summer_mw":190,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.13681,"lon":-120.1312,"as_of":"2026-08"},{"id":"68029/PSP","plant_name":"Penton Solar Plant","generator_id":"PSP","plant_id":68029,"state":"MS","county":"DeSoto","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":190,"summer_mw":190,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":34.861567,"lon":-90.263,"as_of":"2026-08"},{"id":"67777/GRS4B","plant_name":"Harryoung PV and BESS","generator_id":"GRS4B","plant_id":67777,"state":"TX","county":"Cameron","developer":"Gransolar Texas Four LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":190,"summer_mw":190,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":26.276027,"lon":-97.63249,"as_of":"2026-08"},{"id":"67777/GRS4P","plant_name":"Harryoung PV and BESS","generator_id":"GRS4P","plant_id":67777,"state":"TX","county":"Cameron","developer":"Gransolar Texas Four LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":190,"summer_mw":190,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":26.276027,"lon":-97.63249,"as_of":"2026-08"},{"id":"59047/GEN 1","plant_name":"Gallegos Wind Farm, Phase 1","generator_id":"GEN 1","plant_id":59047,"state":"NM","county":"Union","developer":"Gallegos Wind Farm LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":190,"summer_mw":190,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PNM","lat":36.580281,"lon":-103.849,"as_of":"2026-08"},{"id":"64658/AFS","plant_name":"AEUG Fleming Solar, LLC","generator_id":"AFS","plant_id":64658,"state":"KY","county":"Fleming","developer":"Acciona Energy USA Global, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":188.5,"summer_mw":188.5,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.429925,"lon":-83.77156,"as_of":"2026-08"},{"id":"68411/NORPV","plant_name":"Noor Solar","generator_id":"NORPV","plant_id":68411,"state":"TX","county":"Chambers","developer":"Industrial Kilo Project, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":188.2,"summer_mw":185,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.909115,"lon":-94.96756,"as_of":"2026-08"},{"id":"67555/RIC98","plant_name":"Zephyr Storage","generator_id":"RIC98","plant_id":67555,"state":"TX","county":"Brown","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":185.6,"summer_mw":185.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.707049,"lon":-98.85746,"as_of":"2026-08"},{"id":"67556/RIC97","plant_name":"Serrano BESS","generator_id":"RIC97","plant_id":67556,"state":"TX","county":"Maverick","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":185.6,"summer_mw":185.6,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.837905,"lon":-100.5487,"as_of":"2026-08"},{"id":"66893/TXJC2","plant_name":"Jones City 2 Solar","generator_id":"TXJC2","plant_id":66893,"state":"TX","county":"Jones","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":185,"summer_mw":185,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.794928,"lon":-99.99293,"as_of":"2026-08"},{"id":"65935/14","plant_name":"Vermillion Rise Solar","generator_id":"14","plant_id":65935,"state":"IN","county":"Vermillion","developer":"Vermillion Rise Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":185,"summer_mw":185,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.83182,"lon":-87.42895,"as_of":"2026-08"},{"id":"69467/PETSP","plant_name":"Peatville Solar Park","generator_id":"PETSP","plant_id":69467,"state":"MI","county":"Sanilac","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":185,"summer_mw":185,"planned_start":"2028-07","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.64,"lon":-82.8,"as_of":"2026-08"},{"id":"68319/NIM","plant_name":"Nimbus Wind Farm","generator_id":"NIM","plant_id":68319,"state":"AR","county":"Carroll","developer":"Nimbus Wind Farm LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":183,"summer_mw":183,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":36.27118,"lon":-93.40682,"as_of":"2026-08"},{"id":"69579/HMWT","plant_name":"Honey Mesquite Wind, LLC","generator_id":"HMWT","plant_id":69579,"state":"TX","county":"Sterling","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":180.5,"summer_mw":180.5,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.030383,"lon":-101.1672,"as_of":"2026-08"},{"id":"67559/RIC95","plant_name":"Dunlay Solar","generator_id":"RIC95","plant_id":67559,"state":"TX","county":"Medina","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180.4,"summer_mw":150.5,"planned_start":"2030-05","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.314674,"lon":-99.09725,"as_of":"2026-08"},{"id":"69151/ARY_B","plant_name":"Arroyo Storage","generator_id":"ARY_B","plant_id":69151,"state":"TX","county":"Cameron","developer":"BT Cantwell Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":180,"summer_mw":180,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":26.264311,"lon":-97.61156,"as_of":"2026-08"},{"id":"69245/NTFL","plant_name":"Nightfall Solar","generator_id":"NTFL","plant_id":69245,"state":"TX","county":"Uvalde","developer":"Sol Systems","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.259299,"lon":-99.72513,"as_of":"2026-08"},{"id":"66891/245BS","plant_name":"Indigo Solar & Storage","generator_id":"245BS","plant_id":66891,"state":"TX","county":"Fisher","developer":"Innovative Solar 245 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":180,"summer_mw":180,"planned_start":"2027-05","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.628061,"lon":-100.236,"as_of":"2026-08"},{"id":"67173/HLW00","plant_name":"Hoosier Line Solar","generator_id":"HLW00","plant_id":67173,"state":"IN","county":"White","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.851153,"lon":-86.94475,"as_of":"2026-08"},{"id":"70183/FSPV","plant_name":"Flatland Solar","generator_id":"FSPV","plant_id":70183,"state":"TX","county":"Scurry","developer":"Flatland Solar Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.618367,"lon":-100.9789,"as_of":"2026-08"},{"id":"62846/WWE1","plant_name":"Water Valley Wind Energy","generator_id":"WWE1","plant_id":62846,"state":"TX","county":"Tom Green","developer":"Tri Global Energy, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":180,"summer_mw":180,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.611223,"lon":-100.8133,"as_of":"2026-08"},{"id":"63096/GEN1","plant_name":"Horseshoe Solar Energy","generator_id":"GEN1","plant_id":63096,"state":"NY","county":"Livingston","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2028-11","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.570762,"lon":-77.45296,"as_of":"2026-08"},{"id":"68814/ASHU2","plant_name":"Brazos River BESS LLC","generator_id":"ASHU2","plant_id":68814,"state":"TX","county":"Brazoria","developer":"Nexus Renewables U.S. Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":180,"summer_mw":180,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.150409,"lon":-95.62124,"as_of":"2026-08"},{"id":"66238/1SPS","plant_name":"Sculpin Solar","generator_id":"1SPS","plant_id":66238,"state":"IN","county":"DeKalb","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.364556,"lon":-84.84381,"as_of":"2026-08"},{"id":"69761/DBBES","plant_name":"Dawn Break Solar","generator_id":"DBBES","plant_id":69761,"state":"WI","county":"Waushara","developer":"Dawn Break Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":180,"summer_mw":180,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.140833,"lon":-89.46472,"as_of":"2026-08"},{"id":"69761/DBSOL","plant_name":"Dawn Break Solar","generator_id":"DBSOL","plant_id":69761,"state":"WI","county":"Waushara","developer":"Dawn Break Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":180,"summer_mw":180,"planned_start":"2029-09","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.140833,"lon":-89.46472,"as_of":"2026-08"},{"id":"65975/TXSD2","plant_name":"Starr Solar Ranch","generator_id":"TXSD2","plant_id":65975,"state":"TX","county":"Starr","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":180,"summer_mw":180,"planned_start":"2031-12","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":26.523359,"lon":-99.01711,"as_of":"2026-08"},{"id":"68413/OT","plant_name":"Old Town Wind","generator_id":"OT","plant_id":68413,"state":"IL","county":"Marshall","developer":"Old Town Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":178,"summer_mw":178,"planned_start":"2029-10","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":40.988976,"lon":-89.17326,"as_of":"2026-08"},{"id":"68176/WILBA","plant_name":"Willis Storage","generator_id":"WILBA","plant_id":68176,"state":"TX","county":"Rains","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":176.1,"summer_mw":176.1,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.870406,"lon":-95.74785,"as_of":"2026-08"},{"id":"68165/BROBA","plant_name":"Brotherton Storage","generator_id":"BROBA","plant_id":68165,"state":"TX","county":"Anderson","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":176.1,"summer_mw":176.1,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.687913,"lon":-95.73988,"as_of":"2026-08"},{"id":"68171/MCMBA","plant_name":"Mcmurtre Storage","generator_id":"MCMBA","plant_id":68171,"state":"TX","county":"Hunt","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":176.1,"summer_mw":176.1,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.179664,"lon":-95.80922,"as_of":"2026-08"},{"id":"68178/YOOBA","plant_name":"Yooperlite Storage","generator_id":"YOOBA","plant_id":68178,"state":"TX","county":"Wise","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":175.7,"summer_mw":175.7,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.033186,"lon":-97.88031,"as_of":"2026-08"},{"id":"69755/5568","plant_name":"King Mountain Solar","generator_id":"5568","plant_id":69755,"state":"TX","county":"Upton","developer":"King Mountain Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":175,"summer_mw":175,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.235934,"lon":-102.1229,"as_of":"2026-08"},{"id":"64349/6666","plant_name":"Armadillo Solar Center","generator_id":"6666","plant_id":64349,"state":"TX","county":"Navarro","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":175,"summer_mw":175,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.00014,"lon":-96.2027,"as_of":"2026-08"},{"id":"65425/KWOOD","plant_name":"Kingwood Solar","generator_id":"KWOOD","plant_id":65425,"state":"OH","county":"Greene","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":175,"summer_mw":175,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.782,"lon":-83.83,"as_of":"2026-08"},{"id":"69984/6059","plant_name":"Hackberry Creek Solar","generator_id":"6059","plant_id":69984,"state":"TX","county":"Mitchell","developer":"Hackberry Creek Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":175,"summer_mw":175,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.393074,"lon":-100.8702,"as_of":"2026-08"},{"id":"68459/5961","plant_name":"Bob Creek Wind, LLC","generator_id":"5961","plant_id":68459,"state":"TX","county":"Sterling","developer":"Bob Creek Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":175,"summer_mw":175,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.868813,"lon":-101.2275,"as_of":"2026-08"},{"id":"69462/AUGSP","plant_name":"Au Gres Solar Park","generator_id":"AUGSP","plant_id":69462,"state":"MI","county":"Arenac","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":175,"summer_mw":175,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.118,"lon":-83.794,"as_of":"2026-08"},{"id":"68323/ALT8B","plant_name":"Atlas VIII","generator_id":"ALT8B","plant_id":68323,"state":"AZ","county":"La Paz","developer":"Atlas VIII LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":172.4,"summer_mw":172.4,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.582903,"lon":-113.5769,"as_of":"2026-08"},{"id":"68940/CABS","plant_name":"Country Acres Clean Power LLC","generator_id":"CABS","plant_id":68940,"state":"CA","county":"Placer","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":172,"summer_mw":172,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"BANC","lat":38.751744,"lon":-121.4221,"as_of":"2026-08"},{"id":"67956/CONPV","plant_name":"Concho Pearl Solar and Storage","generator_id":"CONPV","plant_id":67956,"state":"TX","county":"Concho","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":171.9,"summer_mw":171.9,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":31.465492,"lon":-99.93435,"as_of":"2026-08"},{"id":"69110/CONEF","plant_name":"Coneflower Storage Project LLC","generator_id":"CONEF","plant_id":69110,"state":"TX","county":"Chambers","developer":"Acciona Energy USA Global, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":170.9,"summer_mw":170.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.8547,"lon":-94.9254,"as_of":"2026-08"},{"id":"66390/GDYPV","plant_name":"MRG Goody Solar Project Hybrid","generator_id":"GDYPV","plant_id":66390,"state":"TX","county":"Lamar","developer":"Nexus Renewable Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":170.8,"summer_mw":170.8,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.639193,"lon":-95.62905,"as_of":"2026-08"},{"id":"66397/TOKIO","plant_name":"Tokio Solar","generator_id":"TOKIO","plant_id":66397,"state":"TX","county":"McLennan","developer":"Gransolar Texas Eight, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":170.4,"summer_mw":168,"planned_start":"2027-08","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.427419,"lon":-97.31086,"as_of":"2026-08"},{"id":"69967/FTS","plant_name":"Foxtail Flats Solar, LLC","generator_id":"FTS","plant_id":69967,"state":"NM","county":"San Juan","developer":"Foxtail Flats Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":170,"summer_mw":170,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":36.8685,"lon":-108.277,"as_of":"2026-08"},{"id":"67222/1","plant_name":"Yellow Viking Solar","generator_id":"1","plant_id":67222,"state":"TX","county":"Somervell","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":170,"summer_mw":170,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.31664,"lon":-97.62889,"as_of":"2026-08"},{"id":"68082/BBP","plant_name":"Bluebonnet Prairie Wind","generator_id":"BBP","plant_id":68082,"state":"TX","county":"Navarro","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":170,"summer_mw":170,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.143863,"lon":-96.30097,"as_of":"2026-08"},{"id":"68366/AGAT","plant_name":"AGATE BESS","generator_id":"AGAT","plant_id":68366,"state":"WA","county":"Kitsap","developer":"BrightNight Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":170,"summer_mw":170,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSEI","lat":47.76879,"lon":-122.6078,"as_of":"2026-08"},{"id":"69991/SN1","plant_name":"Segno Solar Station","generator_id":"SN1","plant_id":69991,"state":"TX","county":"Polk","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":170,"summer_mw":170,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.577,"lon":-94.686,"as_of":"2026-08"},{"id":"68769/M3GSP","plant_name":"Greenalia Solar Power Misae III","generator_id":"M3GSP","plant_id":68769,"state":"TX","county":"Childress","developer":"Greenlia Solar Power Misae III, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":169.6,"summer_mw":169.6,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":34.343755,"lon":-100.0668,"as_of":"2026-08"},{"id":"68397/I168M","plant_name":"Ironwood Solar","generator_id":"I168M","plant_id":68397,"state":"AZ","county":"Yuma","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":168,"summer_mw":168,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"AZPS","lat":32.915556,"lon":-113.5778,"as_of":"2026-08"},{"id":"69722/BESS1","plant_name":"Salt Cod BESS","generator_id":"BESS1","plant_id":69722,"state":"MA","county":"Bristol","developer":"Somerset Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":168,"summer_mw":168,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.73722,"lon":-71.1489,"as_of":"2026-08"},{"id":"66976/WAPPA","plant_name":"Carol Wind, LLC","generator_id":"WAPPA","plant_id":66976,"state":"TX","county":"Potter","developer":"Carol Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":167.8,"summer_mw":167.8,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":35.259819,"lon":-102.0643,"as_of":"2026-08"},{"id":"69148/BESS1","plant_name":"Allen 2 BESS","generator_id":"BESS1","plant_id":69148,"state":"NC","county":"Gaston","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":167,"summer_mw":167,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"DUK","lat":35.192096,"lon":-81.01013,"as_of":"2026-08"},{"id":"66312/CHSL","plant_name":"Courthouse Solar","generator_id":"CHSL","plant_id":66312,"state":"VA","county":"Charlotte","developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":167,"summer_mw":167,"planned_start":"2030-10","planned_year":2030,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":37.04,"lon":-78.58,"as_of":"2026-08"},{"id":"68466/CFPV3","plant_name":"Centennial Flats","generator_id":"CFPV3","plant_id":68466,"state":"AZ","county":"La Paz","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":166.7,"summer_mw":166.7,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.588334,"lon":-113.5283,"as_of":"2026-08"},{"id":"70441/PALO2","plant_name":"Palo Duro Energy Storage II","generator_id":"PALO2","plant_id":70441,"state":"TX","county":"Ochiltree","developer":"Palo Duro Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":165.7,"summer_mw":165.7,"planned_start":"2029-05","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":36.410697,"lon":-101.0149,"as_of":"2026-08"},{"id":"66895/LP1PV","plant_name":"Lupinus Solar 1, LLC","generator_id":"LP1PV","plant_id":66895,"state":"TX","county":"Franklin","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":165,"summer_mw":165,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.303385,"lon":-95.25692,"as_of":"2026-08"},{"id":"67936/GS1","plant_name":"Goshen Solar","generator_id":"GS1","plant_id":67936,"state":"WY","county":"Goshen","developer":"Goshen Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":163,"summer_mw":163,"planned_start":"2030-12","planned_year":2030,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"WACM","lat":41.853445,"lon":-104.5032,"as_of":"2026-08"},{"id":"67956/CONBS","plant_name":"Concho Pearl Solar and Storage","generator_id":"CONBS","plant_id":67956,"state":"TX","county":"Concho","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":162.4,"summer_mw":162.4,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":31.465492,"lon":-99.93435,"as_of":"2026-08"},{"id":"63342/BKII","plant_name":"McCrae Wind Energy II","generator_id":"BKII","plant_id":63342,"state":"TX","county":"Glasscock","developer":"McCrae Wind Energy II, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":162.1,"summer_mw":162.1,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.754037,"lon":-101.6752,"as_of":"2026-08"},{"id":"68993/ENX40","plant_name":"MPG Solar","generator_id":"ENX40","plant_id":68993,"state":"PA","county":"Centre","developer":"MPG Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":162,"summer_mw":162,"planned_start":"2028-07","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.060649,"lon":-78.04193,"as_of":"2026-08"},{"id":"68907/1","plant_name":"Vidal Energy Center","generator_id":"1","plant_id":68907,"state":"CA","county":"San Bernardino","developer":"CDH Vidal LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":160,"summer_mw":160,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.084796,"lon":-114.4707,"as_of":"2026-08"},{"id":"68907/2","plant_name":"Vidal Energy Center","generator_id":"2","plant_id":68907,"state":"CA","county":"San Bernardino","developer":"CDH Vidal LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.084796,"lon":-114.4707,"as_of":"2026-08"},{"id":"68559/MAGNA","plant_name":"SR Magnolia","generator_id":"MAGNA","plant_id":68559,"state":"MS","county":"Monroe","developer":"SR Magnolia, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2027-06","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TVA","lat":33.856467,"lon":-88.67488,"as_of":"2026-08"},{"id":"69582/CSTP","plant_name":"Chester Solar Technology Park, LLC","generator_id":"CSTP","plant_id":69582,"state":"VA","county":"Chesterfield","developer":"Chester Solar Technology Park, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.317,"lon":-77.466,"as_of":"2026-08"},{"id":"70256/DCES","plant_name":"Dry Creek Energy Storage, LLC","generator_id":"DCES","plant_id":70256,"state":"CA","county":"Sacramento","developer":"Dry Creek Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":160,"summer_mw":160,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"BANC","lat":38.347139,"lon":-121.1209,"as_of":"2026-08"},{"id":"68584/YBS","plant_name":"Yellow Barn Solar","generator_id":"YBS","plant_id":68584,"state":"NY","county":"Tompkins","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.56495,"lon":-76.43907,"as_of":"2026-08"},{"id":"67653/CARRI","plant_name":"Carriger","generator_id":"CARRI","plant_id":67653,"state":"WA","county":"Klickitat","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2028-11","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"BPAT","lat":45.8777,"lon":-120.8865,"as_of":"2026-08"},{"id":"69638/11767","plant_name":"Landshark Energy Generation Facility","generator_id":"11767","plant_id":69638,"state":"MS","county":"Calhoun","developer":"Landshark Energy Generation Facility LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":160,"summer_mw":160,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":33.898797,"lon":-89.14577,"as_of":"2026-08"},{"id":"67774/GRS3","plant_name":"Pecan BESS","generator_id":"GRS3","plant_id":67774,"state":"TX","county":"Leon","developer":"Gransolar Texas Three, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":157.1,"summer_mw":157.1,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.078667,"lon":-96.22328,"as_of":"2026-08"},{"id":"68667/RIC89","plant_name":"Chimney Rock BESS","generator_id":"RIC89","plant_id":68667,"state":"TX","county":"Taylor","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":156,"summer_mw":156,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.387494,"lon":-99.84846,"as_of":"2026-08"},{"id":"65900/SPRIN","plant_name":"Springwater Solar, LLC","generator_id":"SPRIN","plant_id":65900,"state":"OH","county":"Madison","developer":"Springwater Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":155,"summer_mw":155,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.82972,"lon":-83.2498,"as_of":"2026-08"},{"id":"70022/DCYSO","plant_name":"Decoy Solar Energy LLC","generator_id":"DCYSO","plant_id":70022,"state":"AR","county":"Arkansas","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":155,"summer_mw":155,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":34.463496,"lon":-91.52053,"as_of":"2026-08"},{"id":"67078/GRS3","plant_name":"Quarter Ranch Solar","generator_id":"GRS3","plant_id":67078,"state":"TX","county":"Webb","developer":"Gransolar Texas Three, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":154.1,"summer_mw":154,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":27.301064,"lon":-99.43041,"as_of":"2026-08"},{"id":"69945/WTRTN","plant_name":"Watertown Solar","generator_id":"WTRTN","plant_id":69945,"state":"MI","county":"Sanilac","developer":"Watertown Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":154,"summer_mw":154,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.399794,"lon":-82.81425,"as_of":"2026-08"},{"id":"67581/CIRSA","plant_name":"Cairos Solar and Storage","generator_id":"CIRSA","plant_id":67581,"state":"TX","county":"Kinney","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":153.3,"summer_mw":153.3,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.269974,"lon":-100.1975,"as_of":"2026-08"},{"id":"66651/37565","plant_name":"Arco Wind and Solar Project","generator_id":"37565","plant_id":66651,"state":"ID","county":"Bonneville","developer":"PacifiCorp","sector":"Electric Utility","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":153,"summer_mw":153,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PACE","lat":43.557,"lon":-112.4415,"as_of":"2026-08"},{"id":"59971/ESTR1","plant_name":"Easter","generator_id":"ESTR1","plant_id":59971,"state":"TX","county":"Castro","developer":"Enbridge Wind (Easter), LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":152,"summer_mw":152,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":34.668882,"lon":-102.3517,"as_of":"2026-08"},{"id":"63584/NY2","plant_name":"NY2 Battery","generator_id":"NY2","plant_id":63584,"state":"NY","county":"Orange","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":151.5,"summer_mw":151.5,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":41.52667,"lon":-74.14226,"as_of":"2026-08"},{"id":"66905/SOLAR","plant_name":"Ables Springs Solar & Storage","generator_id":"SOLAR","plant_id":66905,"state":"TX","county":"Kaufman","developer":"Ables Springs Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":151,"summer_mw":151,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.819566,"lon":-96.18484,"as_of":"2026-08"},{"id":"68478/DRK","plant_name":"Darkwood Solar","generator_id":"DRK","plant_id":68478,"state":"TX","county":"Comanche","developer":"Mustang Creek Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150.7,"summer_mw":150.7,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.928528,"lon":-98.4241,"as_of":"2026-08"},{"id":"68866/SAN","plant_name":"Santa Teresa Solar","generator_id":"SAN","plant_id":68866,"state":"NM","county":"Dona Ana","developer":"Santa Teresa Solar","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"EPE","lat":31.805525,"lon":-106.6989,"as_of":"2026-08"},{"id":"69290/DSBLM","plant_name":"Desert Bloom","generator_id":"DSBLM","plant_id":69290,"state":"AZ","county":"Maricopa","developer":"RE Desert Bloom LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"DOPD","lat":33.70299,"lon":-112.3219,"as_of":"2026-08"},{"id":"69423/BCNV2","plant_name":"Bocanova Energy Storage II","generator_id":"BCNV2","plant_id":69423,"state":"TX","county":"Brazoria","developer":"Bocanova Power II LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.435422,"lon":-95.2511,"as_of":"2026-08"},{"id":"69424/FBS1","plant_name":"Faraday Energy Storage","generator_id":"FBS1","plant_id":69424,"state":"UT","county":"Utah","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":40.082,"lon":-112.069,"as_of":"2026-08"},{"id":"66960/BLKSL","plant_name":"Blackford Solar","generator_id":"BLKSL","plant_id":66960,"state":"IN","county":"Blackford","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.41608,"lon":-85.25979,"as_of":"2026-08"},{"id":"67964/A400M","plant_name":"Agave","generator_id":"A400M","plant_id":67964,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"AZPS","lat":33.32389,"lon":-112.8397,"as_of":"2026-08"},{"id":"68500/CWH2","plant_name":"Crowned Heron 2 - Storage, LLC","generator_id":"CWH2","plant_id":68500,"state":"TX","county":"Fort Bend","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.482673,"lon":-95.61996,"as_of":"2026-08"},{"id":"69540/RCS01","plant_name":"Rock Creek Solar","generator_id":"RCS01","plant_id":69540,"state":"IA","county":"Clinton","developer":"Rock Creek Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":41.771603,"lon":-90.35751,"as_of":"2026-08"},{"id":"69578/CFSPV","plant_name":"Casey Fork Solar, LLC","generator_id":"CFSPV","plant_id":69578,"state":"IL","county":"Jefferson","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":38.452,"lon":-88.876,"as_of":"2026-08"},{"id":"69874/BHSF","plant_name":"Bee Hollow Solar, LLC","generator_id":"BHSF","plant_id":69874,"state":"IL","county":"St Clair","developer":"Geronimo Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.323,"lon":-89.75,"as_of":"2026-08"},{"id":"64215/45MGA","plant_name":"Aratina Solar Center 2","generator_id":"45MGA","plant_id":64215,"state":"CA","county":"Kern","developer":"45MG 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.062965,"lon":-118.0878,"as_of":"2026-08"},{"id":"67347/OF1","plant_name":"Osagrove Flats Wind","generator_id":"OF1","plant_id":67347,"state":"IL","county":"LaSalle","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":40.941383,"lon":-88.97152,"as_of":"2026-08"},{"id":"67755/LTRSP","plant_name":"Little Trout Solar","generator_id":"LTRSP","plant_id":67755,"state":"MI","county":"Presque Isle","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.334045,"lon":-83.75117,"as_of":"2026-08"},{"id":"69277/GR001","plant_name":"Gunnar Reliability Project","generator_id":"GR001","plant_id":69277,"state":"TX","county":"Hidalgo","developer":"Gunnar Reliability Project LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":26.315571,"lon":-98.14851,"as_of":"2026-08"},{"id":"69605/TENN","plant_name":"Tennyson Solar","generator_id":"TENN","plant_id":69605,"state":"TX","county":"Coke","developer":"BNB Tennyson Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.726229,"lon":-100.2771,"as_of":"2026-08"},{"id":"68932/OSBA","plant_name":"Overnight Solar","generator_id":"OSBA","plant_id":68932,"state":"CA","county":"San Bernardino","developer":"Overnight Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.016197,"lon":-117.357,"as_of":"2026-08"},{"id":"68932/OSPV","plant_name":"Overnight Solar","generator_id":"OSPV","plant_id":68932,"state":"CA","county":"San Bernardino","developer":"Overnight Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":35.016197,"lon":-117.357,"as_of":"2026-08"},{"id":"67995/PWS","plant_name":"Piney Woods Solar","generator_id":"PWS","plant_id":67995,"state":"TX","county":"Walker","developer":"Piney Woods Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":30.718683,"lon":-95.66965,"as_of":"2026-08"},{"id":"66672/AG239","plant_name":"Stark Solar, LLC","generator_id":"AG239","plant_id":66672,"state":"OH","county":"Stark","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-03","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.852661,"lon":-81.15701,"as_of":"2026-08"},{"id":"68321/ALT4","plant_name":"Atlas BESS IV LLC","generator_id":"ALT4","plant_id":68321,"state":"AZ","county":"La Paz","developer":"ATLAS BESS IV, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.582903,"lon":-113.5769,"as_of":"2026-08"},{"id":"66891/IS245","plant_name":"Indigo Solar & Storage","generator_id":"IS245","plant_id":66891,"state":"TX","county":"Fisher","developer":"Innovative Solar 245 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-05","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.628061,"lon":-100.236,"as_of":"2026-08"},{"id":"69929/WC001","plant_name":"Weirs Creek","generator_id":"WC001","plant_id":69929,"state":"KY","county":"Hopkins","developer":"Weirs Creek Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":37.423648,"lon":-87.69048,"as_of":"2026-08"},{"id":"70377/BES","plant_name":"Boxcar Energy Storage","generator_id":"BES","plant_id":70377,"state":"TX","county":"Collin","developer":"Boxcar Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.018516,"lon":-96.52003,"as_of":"2026-08"},{"id":"66671/CONEZ","plant_name":"Conez Solar, LLC","generator_id":"CONEZ","plant_id":66671,"state":"GA","county":"Emanuel","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":32.458353,"lon":-82.39457,"as_of":"2026-08"},{"id":"67231/HS","plant_name":"Hinds Solar, LLC","generator_id":"HS","plant_id":67231,"state":"MS","county":"Hinds","developer":"Hinds Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.416186,"lon":-90.38886,"as_of":"2026-08"},{"id":"68901/PVCLA","plant_name":"Cedar Range Solar","generator_id":"PVCLA","plant_id":68901,"state":"TX","county":"Hopkins","developer":"Cedar Range LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.057483,"lon":-95.82701,"as_of":"2026-08"},{"id":"69660/HS","plant_name":"El Patrimonio","generator_id":"HS","plant_id":69660,"state":"TX","county":"Bexar","developer":"Heritage Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.240499,"lon":-98.51006,"as_of":"2026-08"},{"id":"69974/CRZN1","plant_name":"Corazon Energy Storage","generator_id":"CRZN1","plant_id":69974,"state":"NM","county":"Bernalillo","developer":"Corazon Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PNM","lat":35.003482,"lon":-106.742,"as_of":"2026-08"},{"id":"60272/WT1","plant_name":"Cone Renewable Energy Project, LLC","generator_id":"WT1","plant_id":60272,"state":"TX","county":"Crosby","developer":"Cone Renewable Energy Project, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.8093,"lon":-101.3424,"as_of":"2026-08"},{"id":"70195/MAMM1","plant_name":"Mammoth Plains Energy Storage","generator_id":"MAMM1","plant_id":70195,"state":"OK","county":"Dewey","developer":"Mammoth Plains Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SPA","lat":35.981842,"lon":-98.70672,"as_of":"2026-08"},{"id":"70199/PALO1","plant_name":"Palo Duro Energy Storage","generator_id":"PALO1","plant_id":70199,"state":"TX","county":"Ochiltree","developer":"Palo Duro Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":36.4106,"lon":-101.0102,"as_of":"2026-08"},{"id":"66558/LAMO1","plant_name":"Mowata Solar","generator_id":"LAMO1","plant_id":66558,"state":"LA","county":"Acadia","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":30.3918,"lon":-92.4044,"as_of":"2026-08"},{"id":"67358/4670","plant_name":"Lake Whitney Solar","generator_id":"4670","plant_id":67358,"state":"TX","county":"Bosque","developer":"Lake Whitney Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.837644,"lon":-97.39844,"as_of":"2026-08"},{"id":"67874/ENX32","plant_name":"Parks Valley Energy LLC","generator_id":"ENX32","plant_id":67874,"state":"WV","county":"Hampshire","developer":"Parks Valley Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.288816,"lon":-78.47481,"as_of":"2026-08"},{"id":"69972/SP150","plant_name":"South Platte Solar","generator_id":"SP150","plant_id":69972,"state":"CO","county":"Morgan","developer":"South Platte Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":40.194947,"lon":-103.7088,"as_of":"2026-08"},{"id":"70218/SEL1B","plant_name":"Selma Energy Center","generator_id":"SEL1B","plant_id":70218,"state":"AZ","county":"Pinal","developer":"Selma Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DOPD","lat":32.849821,"lon":-111.5251,"as_of":"2026-08"},{"id":"69278/2","plant_name":"Fortress 1","generator_id":"2","plant_id":69278,"state":"CO","county":"Morgan","developer":"Fortress Solar 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":40.26,"lon":-103.57,"as_of":"2026-08"},{"id":"65665/HEPU1","plant_name":"Hecate Energy Pulaski 1","generator_id":"HEPU1","plant_id":65665,"state":"VA","county":"Pulaski","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-04","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.139595,"lon":-80.68741,"as_of":"2026-08"},{"id":"67986/MSPRB","plant_name":"Meadow Springs Renewable Energy (Hybrid)","generator_id":"MSPRB","plant_id":67986,"state":"IL","county":"White","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.029,"lon":-88.284,"as_of":"2026-08"},{"id":"67986/MSPRE","plant_name":"Meadow Springs Renewable Energy (Hybrid)","generator_id":"MSPRE","plant_id":67986,"state":"IL","county":"White","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.029,"lon":-88.284,"as_of":"2026-08"},{"id":"68480/LS1","plant_name":"Laurens Solar","generator_id":"LS1","plant_id":68480,"state":"GA","county":"Laurens","developer":"Laurens Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":32.577504,"lon":-83.11216,"as_of":"2026-08"},{"id":"66132/TXTR1","plant_name":"Trinity River Solar 1","generator_id":"TXTR1","plant_id":66132,"state":"TX","county":"Liberty","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.010255,"lon":-94.48631,"as_of":"2026-08"},{"id":"68061/GEMPV","plant_name":"Gemstone Solar LLC","generator_id":"GEMPV","plant_id":68061,"state":"MI","county":"Cass","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.896754,"lon":-86.0488,"as_of":"2026-08"},{"id":"69577/SPROR","plant_name":"Superior Solar Project, LLC","generator_id":"SPROR","plant_id":69577,"state":"MI","county":"Marquette","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":100,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":46.455,"lon":-87.466,"as_of":"2026-08"},{"id":"70055/AA1","plant_name":"Allen Acres Solar","generator_id":"AA1","plant_id":70055,"state":"IL","county":"LaSalle","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2029-05","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.11792,"lon":-88.64038,"as_of":"2026-08"},{"id":"68333/CROS","plant_name":"Crossroads Solar - GA","generator_id":"CROS","plant_id":68333,"state":"GA","county":"Liberty","developer":"Crossroads bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2029-07","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":31.71,"lon":-81.66,"as_of":"2026-08"},{"id":"68105/JASP","plant_name":"SR Jasper","generator_id":"JASP","plant_id":68105,"state":"MS","county":"Jasper","developer":"SR Jasper, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":32.048427,"lon":-88.94419,"as_of":"2026-08"},{"id":"67894/51LVA","plant_name":"Bellefield 3 Solar and Battery Storage","generator_id":"51LVA","plant_id":67894,"state":"CA","county":"Kern","developer":"51LV 8me, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2030-05","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.029153,"lon":-117.9926,"as_of":"2026-08"},{"id":"67894/51LVB","plant_name":"Bellefield 3 Solar and Battery Storage","generator_id":"51LVB","plant_id":67894,"state":"CA","county":"Kern","developer":"51LV 8me, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2030-05","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.029153,"lon":-117.9926,"as_of":"2026-08"},{"id":"61170/33UI9","plant_name":"Gale 1 Solar","generator_id":"33UI9","plant_id":61170,"state":"UT","county":"Millard","developer":"33UI 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2030-08","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":39.523,"lon":-112.546,"as_of":"2026-08"},{"id":"67352/CPVCL","plant_name":"CPV County Line Solar, LLC","generator_id":"CPVCL","plant_id":67352,"state":"VA","county":"Charlotte","developer":"CPV County Line Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":150,"summer_mw":150,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.190161,"lon":-78.68228,"as_of":"2026-08"},{"id":"70236/SLRN1","plant_name":"Sierra Luna Energy Storage","generator_id":"SLRN1","plant_id":70236,"state":"AZ","county":"Maricopa","developer":"Sierra Luna Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":150,"summer_mw":150,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SRP","lat":33.408834,"lon":-112.3042,"as_of":"2026-08"},{"id":"70340/CAR15","plant_name":"Carousel Energy Storage, LLC","generator_id":"CAR15","plant_id":70340,"state":"CO","county":"Kit Carson","developer":"Carousel Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":149.6,"summer_mw":149.6,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":39.213298,"lon":-102.1036,"as_of":"2026-08"},{"id":"68194/RIVER","plant_name":"Riverstone Solar","generator_id":"RIVER","plant_id":68194,"state":"VA","county":"Buckingham","developer":"Riverstone Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":149.5,"summer_mw":149.5,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.72839,"lon":-78.45188,"as_of":"2026-08"},{"id":"68738/CANPV","plant_name":"Cannibal Draw Solar and Storage","generator_id":"CANPV","plant_id":68738,"state":"TX","county":"Glasscock","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":149.5,"summer_mw":149.5,"planned_start":"2028-04","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.023861,"lon":-101.284,"as_of":"2026-08"},{"id":"68900/BSS","plant_name":"Badger State Solar LLC","generator_id":"BSS","plant_id":68900,"state":"WI","county":"Jefferson","developer":"Badger State Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":149,"summer_mw":149,"planned_start":"2027-10","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":43.012287,"lon":-88.86356,"as_of":"2026-08"},{"id":"67773/GRS20","plant_name":"Cosper Solar","generator_id":"GRS20","plant_id":67773,"state":"TX","county":"Bell","developer":"Gransolar Texas Twenty LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":148.2,"summer_mw":148,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.994225,"lon":-97.79588,"as_of":"2026-08"},{"id":"68078/CHIPV","plant_name":"Chisme Solar and Storage","generator_id":"CHIPV","plant_id":68078,"state":"TX","county":"Brown","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":147,"summer_mw":147,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.568929,"lon":-98.82195,"as_of":"2026-08"},{"id":"68078/CHIBS","plant_name":"Chisme Solar and Storage","generator_id":"CHIBS","plant_id":68078,"state":"TX","county":"Brown","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":146,"summer_mw":146,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.568929,"lon":-98.82195,"as_of":"2026-08"},{"id":"67567/WEGSP","plant_name":"Wensowitch Solar Park","generator_id":"WEGSP","plant_id":67567,"state":"TX","county":"Navarro","developer":"Greenalia Solar Power Wensowitch, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":145.6,"summer_mw":145.6,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.300261,"lon":-96.37123,"as_of":"2026-08"},{"id":"69464/CDFSP","plant_name":"Cedar Field Solar Park","generator_id":"CDFSP","plant_id":69464,"state":"MI","county":"Gladwin","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":145,"summer_mw":145,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":43.95,"lon":-84.55,"as_of":"2026-08"},{"id":"65344/66148","plant_name":"Noria Hondo Solar (Hybrid)","generator_id":"66148","plant_id":65344,"state":"TX","county":"Kleberg","developer":"Nexus Renewable Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":145,"summer_mw":145,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":27.553355,"lon":-97.67528,"as_of":"2026-08"},{"id":"68876/6339","plant_name":"Okolona Solar","generator_id":"6339","plant_id":68876,"state":"MS","county":"Henderson","developer":"Okolona Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":145,"summer_mw":145,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":37.693,"lon":-87.549,"as_of":"2026-08"},{"id":"68876/6340","plant_name":"Okolona Solar","generator_id":"6340","plant_id":68876,"state":"MS","county":"Henderson","developer":"Okolona Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":145,"summer_mw":145,"planned_start":"2028-08","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":37.693,"lon":-87.549,"as_of":"2026-08"},{"id":"68665/RIC87","plant_name":"Summerhill BESS","generator_id":"RIC87","plant_id":68665,"state":"TX","county":"Taylor","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":143,"summer_mw":143,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.51289,"lon":-99.79563,"as_of":"2026-08"},{"id":"67784/GRS11","plant_name":"Vial BESS","generator_id":"GRS11","plant_id":67784,"state":"TX","county":"Hill","developer":"Gransolar Texas Eleven LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":141.4,"summer_mw":141.4,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.953772,"lon":-97.06248,"as_of":"2026-08"},{"id":"69993/VT1","plant_name":"Votaw Solar Station","generator_id":"VT1","plant_id":69993,"state":"TX","county":"Hardin","developer":"Entergy Louisiana LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":141,"summer_mw":141,"planned_start":"2029-05","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.4355,"lon":-94.673,"as_of":"2026-08"},{"id":"67999/SCAEC","plant_name":"Spring Creek Agri-Energy Center","generator_id":"SCAEC","plant_id":67999,"state":"MI","county":"Calhoun","developer":"Consumers Energy Co - (MI)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":140,"summer_mw":140,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.2024,"lon":-85.23803,"as_of":"2026-08"},{"id":"69878/5869","plant_name":"Emmons-Logan Energy Storage","generator_id":"5869","plant_id":69878,"state":"ND","county":"Emmons","developer":"Emmons-Logan Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":140,"summer_mw":140,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":46.372883,"lon":-99.9784,"as_of":"2026-08"},{"id":"66703/11103","plant_name":"Austin Creek Solar","generator_id":"11103","plant_id":66703,"state":"IL","county":"Adams","developer":"Strata Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":140,"summer_mw":140,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.790103,"lon":-91.31508,"as_of":"2026-08"},{"id":"64857/C0513","plant_name":"Canyonland Solar","generator_id":"C0513","plant_id":64857,"state":"CO","county":"Montezuma","developer":"Canyonland Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":140,"summer_mw":140,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":37.431,"lon":-108.724,"as_of":"2026-08"},{"id":"69482/BBS1","plant_name":"Bluebird Solar","generator_id":"BBS1","plant_id":69482,"state":"WA","county":"Klickitat","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":140,"summer_mw":140,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"BPAT","lat":45.896375,"lon":-120.3031,"as_of":"2026-08"},{"id":"67661/OXHIL","plant_name":"Oxbow Hill","generator_id":"OXHIL","plant_id":67661,"state":"NY","county":"Niagara","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":140,"summer_mw":140,"planned_start":"2029-05","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.9711,"lon":-75.73553,"as_of":"2026-08"},{"id":"68766/PFGWP","plant_name":"Pioneer Field Wind Power","generator_id":"PFGWP","plant_id":68766,"state":"TX","county":"Tom Green","developer":"Greenalia Wind Power Pioneer Field, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":136.2,"summer_mw":163.2,"planned_start":"2030-11","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.19494,"lon":-100.2118,"as_of":"2026-08"},{"id":"70098/BEB","plant_name":"Blue Lake BESS","generator_id":"BEB","plant_id":70098,"state":"MN","county":"Scott","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":135.5,"summer_mw":135.5,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.786793,"lon":-93.4269,"as_of":"2026-08"},{"id":"66409/GWNT","plant_name":"Hecate Grid Gwent Storage 1","generator_id":"GWNT","plant_id":66409,"state":"CA","county":"Ventura","developer":"Hecate Grid Gwent Storage 1, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":135,"summer_mw":135,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.28093,"lon":-118.903,"as_of":"2026-08"},{"id":"68666/RIC88","plant_name":"Stonewall BESS","generator_id":"RIC88","plant_id":68666,"state":"TX","county":"Stonewall","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":135,"summer_mw":135,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.2466,"lon":-100.3982,"as_of":"2026-08"},{"id":"64981/CPSS1","plant_name":"Pecan Prairie South Solar","generator_id":"CPSS1","plant_id":64981,"state":"TX","county":"Leon","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":132.9,"summer_mw":132.9,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.05001,"lon":-96.221,"as_of":"2026-08"},{"id":"69101/MLB03","plant_name":"Millers Branch Solar","generator_id":"MLB03","plant_id":69101,"state":"TX","county":"Haskell","developer":"Southern Power Co","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":132,"summer_mw":132,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":33.22132,"lon":-99.58652,"as_of":"2026-08"},{"id":"68252/QUVAL","plant_name":"SR Quincy Valley","generator_id":"QUVAL","plant_id":68252,"state":"WA","county":"Grant","developer":"SR Quincy Valley, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":130,"summer_mw":130,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"GCPD","lat":47.27998,"lon":-119.7046,"as_of":"2026-08"},{"id":"70450/PV1","plant_name":"Wheatridge Optimization II","generator_id":"PV1","plant_id":70450,"state":"OR","county":"Morrow","developer":"Wheatridge Optimization II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":130,"summer_mw":130,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":45.559975,"lon":-119.6292,"as_of":"2026-08"},{"id":"65141/BS301","plant_name":"Boulder Solar III LLC","generator_id":"BS301","plant_id":65141,"state":"NV","county":"Clark","developer":"174 Power Global Corp.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":128,"summer_mw":128,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":35.838769,"lon":-114.9642,"as_of":"2026-08"},{"id":"65141/BS3ES","plant_name":"Boulder Solar III LLC","generator_id":"BS3ES","plant_id":65141,"state":"NV","county":"Clark","developer":"174 Power Global Corp.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":128,"summer_mw":128,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":35.838769,"lon":-114.9642,"as_of":"2026-08"},{"id":"69965/RS","plant_name":"Roccasecca BESS LLC","generator_id":"RS","plant_id":69965,"state":"NV","county":"Clark","developer":"Roccasecca BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":126.5,"summer_mw":126.5,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.83,"lon":-115.0128,"as_of":"2026-08"},{"id":"68173/SANPV","plant_name":"Sandford Solar and Storage","generator_id":"SANPV","plant_id":68173,"state":"TX","county":"Wise","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":126.2,"summer_mw":126.2,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.30726,"lon":-97.52777,"as_of":"2026-08"},{"id":"68191/HRTG","plant_name":"Heritage Wind","generator_id":"HRTG","plant_id":68191,"state":"NY","county":"Orleans","developer":"Heritage Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":126,"summer_mw":126,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":43.170976,"lon":-78.17454,"as_of":"2026-08"},{"id":"62263/GEN1","plant_name":"Saddle Mountain East Wind Farm","generator_id":"GEN1","plant_id":62263,"state":"WA","county":"Adams","developer":"EDP Renewables North America LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":126,"summer_mw":126,"planned_start":"2029-10","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"AVA","lat":46.789,"lon":-119.346,"as_of":"2026-08"},{"id":"68166/DOLBA","plant_name":"Dolomite Storage","generator_id":"DOLBA","plant_id":68166,"state":"TX","county":"Ellis","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":125.7,"summer_mw":125.7,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.456144,"lon":-96.73774,"as_of":"2026-08"},{"id":"67552/ELMFL","plant_name":"Elm Flats Solar","generator_id":"ELMFL","plant_id":67552,"state":"TX","county":"Navarro","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.113579,"lon":-96.30476,"as_of":"2026-08"},{"id":"68410/BRAZ","plant_name":"Brazoria Solar I","generator_id":"BRAZ","plant_id":68410,"state":"TX","county":"Brazoria","developer":"Brazoria Solar i, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.138777,"lon":-95.37108,"as_of":"2026-08"},{"id":"68410/BRAZ2","plant_name":"Brazoria Solar I","generator_id":"BRAZ2","plant_id":68410,"state":"TX","county":"Brazoria","developer":"Brazoria Solar i, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.138777,"lon":-95.37108,"as_of":"2026-08"},{"id":"69647/JCKSN","plant_name":"Jackson County Solar, LLC","generator_id":"JCKSN","plant_id":69647,"state":"MI","county":"Jackson","developer":"Geronimo Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":42.281921,"lon":-84.65668,"as_of":"2026-08"},{"id":"1355/BESS","plant_name":"E W Brown","generator_id":"BESS","plant_id":1355,"state":"KY","county":"Mercer","developer":"Kentucky Utilities Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LGEE","lat":37.78831,"lon":-84.71257,"as_of":"2026-08"},{"id":"66663/EMPIR","plant_name":"Empire Solar (NY)","generator_id":"EMPIR","plant_id":66663,"state":"NY","county":"Chautauqua","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.2596,"lon":-79.6142,"as_of":"2026-08"},{"id":"67937/FLOSO","plant_name":"Flora Solar","generator_id":"FLOSO","plant_id":67937,"state":"IL","county":"Clay","developer":"Flora Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":38.648852,"lon":-88.51444,"as_of":"2026-08"},{"id":"68316/BIGL1","plant_name":"Biglow Solar Generation and BESS","generator_id":"BIGL1","plant_id":68316,"state":"OR","county":"Sherman","developer":"BIGL bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PGE","lat":45.606,"lon":-120.625,"as_of":"2026-08"},{"id":"68316/BIGL2","plant_name":"Biglow Solar Generation and BESS","generator_id":"BIGL2","plant_id":68316,"state":"OR","county":"Sherman","developer":"BIGL bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PGE","lat":45.606,"lon":-120.625,"as_of":"2026-08"},{"id":"70218/SEL1S","plant_name":"Selma Energy Center","generator_id":"SEL1S","plant_id":70218,"state":"AZ","county":"Pinal","developer":"Selma Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DOPD","lat":32.849821,"lon":-111.5251,"as_of":"2026-08"},{"id":"68673/OESLW","plant_name":"Sand Luis West","generator_id":"OESLW","plant_id":68673,"state":"CA","county":"Fresno","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":125,"summer_mw":125,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.1676,"lon":-120.054,"as_of":"2026-08"},{"id":"65590/OCTNS","plant_name":"Octans","generator_id":"OCTNS","plant_id":65590,"state":"TX","county":"Pecos","developer":"Engie North America","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":125,"summer_mw":125,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.000575,"lon":-102.6799,"as_of":"2026-08"},{"id":"68671/RIC91","plant_name":"Houston County BESS","generator_id":"RIC91","plant_id":68671,"state":"TX","county":"Houston","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":125,"summer_mw":125,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.239009,"lon":-95.57699,"as_of":"2026-08"},{"id":"68925/MIDB","plant_name":"Midway BESS","generator_id":"MIDB","plant_id":68925,"state":"CA","county":"Fresno","developer":"Midway BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":124.6,"summer_mw":119.9,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":36.652653,"lon":-120.5783,"as_of":"2026-08"},{"id":"68765/HUGSP","plant_name":"Hutcherson Solar","generator_id":"HUGSP","plant_id":68765,"state":"TX","county":"Wilbarger","developer":"Greenalia Solar Power Hutcherson, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":123.3,"summer_mw":123.3,"planned_start":"2030-01","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":34.02533,"lon":-99.26568,"as_of":"2026-08"},{"id":"68155/RIOLA","plant_name":"Rio Lago Solar","generator_id":"RIOLA","plant_id":68155,"state":"TX","county":"Bandera","developer":"Rio Lago Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":123,"summer_mw":123,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.756134,"lon":-99.09524,"as_of":"2026-08"},{"id":"66896/LP2BA","plant_name":"Lupinus Solar 2, LLC","generator_id":"LP2BA","plant_id":66896,"state":"TX","county":"Franklin","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":122.9,"summer_mw":122.9,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.303385,"lon":-95.25692,"as_of":"2026-08"},{"id":"69167/BCKBN","plant_name":"Backbone Creek BESS","generator_id":"BCKBN","plant_id":69167,"state":"TX","county":"Burnet","developer":"Backbone BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":121,"summer_mw":121,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":30.550207,"lon":-98.25687,"as_of":"2026-08"},{"id":"66778/HS1","plant_name":"Hart Solar Project","generator_id":"HS1","plant_id":66778,"state":"MI","county":"Oceana","developer":"Hart Solar Partners, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.692866,"lon":-86.32097,"as_of":"2026-08"},{"id":"68968/ENX37","plant_name":"Border Basin Solar","generator_id":"ENX37","plant_id":68968,"state":"OH","county":"Hancock","developer":"Border Basin, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.107431,"lon":-83.5722,"as_of":"2026-08"},{"id":"67870/ENX34","plant_name":"Clermont Solar","generator_id":"ENX34","plant_id":67870,"state":"PA","county":"McKean","developer":"Clermont Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.656025,"lon":-78.56731,"as_of":"2026-08"},{"id":"68898/ECS1","plant_name":"Eagle Creek Solar Park LLC","generator_id":"ECS1","plant_id":68898,"state":"MI","county":"Saginaw","developer":"Eagle Creek Solar Park LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":43.308523,"lon":-84.21895,"as_of":"2026-08"},{"id":"68359/OCPSF","plant_name":"Pepper Solar Farm","generator_id":"OCPSF","plant_id":68359,"state":"TX","county":"McLennan","developer":"Pepper Solar Farm, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2027-08","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.678359,"lon":-97.04595,"as_of":"2026-08"},{"id":"68293/FRON","plant_name":"Frontier Solar","generator_id":"FRON","plant_id":68293,"state":"KY","county":"Washington","developer":"FRON bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":120,"summer_mw":120,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"LGEE","lat":37.605063,"lon":-85.24822,"as_of":"2026-08"},{"id":"68877/WLDC1","plant_name":"Wildcat Ranch Energy Storage","generator_id":"WLDC1","plant_id":68877,"state":"TX","county":"Cochran","developer":"Wildcat Ranch Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":120,"summer_mw":107.5,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PNM","lat":33.524176,"lon":-102.8773,"as_of":"2026-08"},{"id":"65051/TSEC","plant_name":"Tracy Solar Energy Center","generator_id":"TSEC","plant_id":65051,"state":"NY","county":"Jefferson","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":119,"summer_mw":119,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":44.175939,"lon":-75.98513,"as_of":"2026-08"},{"id":"67884/ENX27","plant_name":"Two Oaks Solar and Storage LLC","generator_id":"ENX27","plant_id":67884,"state":"VA","county":"Louisa","developer":"Two Oaks Solar and Storage","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":118,"summer_mw":118,"planned_start":"2029-11","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":38.013053,"lon":-77.93117,"as_of":"2026-08"},{"id":"68080/GRS8B","plant_name":"Marcos PV and BESS","generator_id":"GRS8B","plant_id":68080,"state":"TX","county":"Victoria","developer":"GRS BESS Texas Eight LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":115.9,"summer_mw":115,"planned_start":"2029-08","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":28.904979,"lon":-97.71017,"as_of":"2026-08"},{"id":"68080/GRS8P","plant_name":"Marcos PV and BESS","generator_id":"GRS8P","plant_id":68080,"state":"TX","county":"Victoria","developer":"GRS BESS Texas Eight LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":115.9,"summer_mw":115,"planned_start":"2029-08","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":28.904979,"lon":-97.71017,"as_of":"2026-08"},{"id":"66675/ALOAK","plant_name":"Alfred Oaks Solar, LLC","generator_id":"ALOAK","plant_id":66675,"state":"NY","county":"Allegany","developer":"Alfred Oaks Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":115.2,"summer_mw":115.2,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.21,"lon":-77.82,"as_of":"2026-08"},{"id":"68086/SBS","plant_name":"South Branch Solar","generator_id":"SBS","plant_id":68086,"state":"OH","county":"Hancock","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":115,"summer_mw":115,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.128477,"lon":-83.51517,"as_of":"2026-08"},{"id":"68553/BACN2","plant_name":"SR Bacon II","generator_id":"BACN2","plant_id":68553,"state":"GA","county":"Bacon","developer":"SR Bacon II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":115,"summer_mw":115,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":31.511392,"lon":-82.33683,"as_of":"2026-08"},{"id":"64543/1","plant_name":"Cedar Creek Solar","generator_id":"1","plant_id":64543,"state":"DE","county":"New Castle","developer":"FPS Cedar Creek Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":114,"summer_mw":114,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.37259,"lon":-75.56455,"as_of":"2026-08"},{"id":"67779/GRS5","plant_name":"Hayrick BESS","generator_id":"GRS5","plant_id":67779,"state":"TX","county":"Coke","developer":"Gransolar Texas Five LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":113.9,"summer_mw":113.9,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.022914,"lon":-100.2926,"as_of":"2026-08"},{"id":"64215/45MGB","plant_name":"Aratina Solar Center 2","generator_id":"45MGB","plant_id":64215,"state":"CA","county":"Kern","developer":"45MG 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":113,"summer_mw":113,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.062965,"lon":-118.0878,"as_of":"2026-08"},{"id":"65977/BF1PV","plant_name":"Boulder Flats Solar","generator_id":"BF1PV","plant_id":65977,"state":"NV","county":"Clark","developer":"Boulder Flats Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":113,"summer_mw":113,"planned_start":"2028-12","planned_year":2028,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NEVP","lat":35.878865,"lon":-114.9833,"as_of":"2026-08"},{"id":"65458/ANOD1","plant_name":"Anode (Springville) BESS","generator_id":"ANOD1","plant_id":65458,"state":"CA","county":"Tulare","developer":"Southern California Edison Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":112.5,"summer_mw":112.5,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.107903,"lon":-118.9409,"as_of":"2026-08"},{"id":"65458/ANOD2","plant_name":"Anode (Springville) BESS","generator_id":"ANOD2","plant_id":65458,"state":"CA","county":"Tulare","developer":"Southern California Edison Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":112.5,"summer_mw":112.5,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.107903,"lon":-118.9409,"as_of":"2026-08"},{"id":"69283/TWPV1","plant_name":"Three W Solar","generator_id":"TWPV1","plant_id":69283,"state":"TX","county":"Hill","developer":"Three W Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":110.9,"summer_mw":110.9,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.032404,"lon":-97.21424,"as_of":"2026-08"},{"id":"68768/BRGWP","plant_name":"Blackwelder Ranch Wind","generator_id":"BRGWP","plant_id":68768,"state":"TX","county":"Pecos","developer":"Greenalia Wind Power Blackwelder Ranch, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":110.4,"summer_mw":110.4,"planned_start":"2030-06","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.81256,"lon":-102.1865,"as_of":"2026-08"},{"id":"66341/EGSS","plant_name":"Eagle Springs Hybrid","generator_id":"EGSS","plant_id":66341,"state":"TX","county":"Delta","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":110.1,"summer_mw":110.1,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.433264,"lon":-95.57444,"as_of":"2026-08"},{"id":"63850/BESS2","plant_name":"Cherry","generator_id":"BESS2","plant_id":63850,"state":"CA","county":"Kings","developer":"Westlands Cherry, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":110,"summer_mw":110,"planned_start":"2027-07","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.122457,"lon":-119.9232,"as_of":"2026-08"},{"id":"68099/COPE","plant_name":"SR Copeland","generator_id":"COPE","plant_id":68099,"state":"TN","county":"Cumberland","developer":"SR Copeland, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":110,"summer_mw":110,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":36.035453,"lon":-85.10991,"as_of":"2026-08"},{"id":"70420/PV1","plant_name":"Wheatridge Optimization I","generator_id":"PV1","plant_id":70420,"state":"OR","county":"Morrow","developer":"Wheatridge Optimization I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":110,"summer_mw":110,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":45.560054,"lon":-119.6224,"as_of":"2026-08"},{"id":"69481/FXTRT","plant_name":"Foxtrot Solar Energy LLC","generator_id":"FXTRT","plant_id":69481,"state":"MO","county":"Jasper","developer":"Evergy Missouri West","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":108.9,"summer_mw":108.9,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.352,"lon":-94.606,"as_of":"2026-08"},{"id":"65338/UNIS1","plant_name":"Union Ridge Solar","generator_id":"UNIS1","plant_id":65338,"state":"OH","county":"Montgomery","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":108,"summer_mw":108,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":39.984126,"lon":-82.6413,"as_of":"2026-08"},{"id":"70360/FNDRD","plant_name":"Foundry Ridge Energy Center LLC","generator_id":"FNDRD","plant_id":70360,"state":"WI","county":"Walworth","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":108,"summer_mw":108,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":42.583072,"lon":-88.72461,"as_of":"2026-08"},{"id":"70360/FNRD2","plant_name":"Foundry Ridge Energy Center LLC","generator_id":"FNRD2","plant_id":70360,"state":"WI","county":"Walworth","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":108,"summer_mw":108,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":42.583072,"lon":-88.72461,"as_of":"2026-08"},{"id":"70360/FNRD3","plant_name":"Foundry Ridge Energy Center LLC","generator_id":"FNRD3","plant_id":70360,"state":"WI","county":"Walworth","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":108,"summer_mw":108,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":42.583072,"lon":-88.72461,"as_of":"2026-08"},{"id":"64745/BHS02","plant_name":"Black Hollow Sun","generator_id":"BHS02","plant_id":64745,"state":"CO","county":"Weld","developer":"Contour Global","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":107,"summer_mw":107,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.616742,"lon":-104.8489,"as_of":"2026-08"},{"id":"68563/NORWD","plant_name":"SR Norwood","generator_id":"NORWD","plant_id":68563,"state":"GA","county":"Warren","developer":"SR Norwood, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":107,"summer_mw":107,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":33.435993,"lon":-82.76361,"as_of":"2026-08"},{"id":"67564/REGSP","plant_name":"Reis Solar Park","generator_id":"REGSP","plant_id":67564,"state":"TX","county":"Atascosa","developer":"Greenalia Solar Power Reis, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":105.5,"summer_mw":105.5,"planned_start":"2029-05","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":28.652762,"lon":-98.45369,"as_of":"2026-08"},{"id":"69799/F1S01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1S01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F1S02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1S02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F1S03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F1S03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2S01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2S01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2S02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2S02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/F2S03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"F2S03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":104.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBS01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBS01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":101.8,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES001","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES001","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES002","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES002","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES003","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES003","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES004","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES004","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES005","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES005","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES006","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES006","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES007","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES007","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES008","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES008","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES009","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES009","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES010","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES010","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES011","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES011","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES012","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES012","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES013","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES013","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES014","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES014","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES015","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES015","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/ES016","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"ES016","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS001","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS001","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS002","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS002","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS003","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS003","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS004","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS004","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS005","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS005","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS006","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS006","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS007","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS007","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS008","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS008","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS009","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS009","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS010","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS010","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS011","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS011","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS012","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS012","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS013","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS013","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS014","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS014","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS015","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS015","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MS016","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MS016","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":105,"summer_mw":105,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"67346/Q1335","plant_name":"Hoffman Falls Wind 2","generator_id":"Q1335","plant_id":67346,"state":"NY","county":"Madison","developer":"Liberty Renewables Incorporated","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":103.5,"summer_mw":102.5,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.964628,"lon":-75.75371,"as_of":"2026-08"},{"id":"68428/GTSBY","plant_name":"Gatsby Energy Storage Project","generator_id":"GTSBY","plant_id":68428,"state":"TX","county":"Pecos","developer":"Gatsby Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":103.4,"summer_mw":103.4,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":30.664176,"lon":-101.7801,"as_of":"2026-08"},{"id":"62894/WT","plant_name":"High Bridge Wind Project","generator_id":"WT","plant_id":62894,"state":"NY","county":"Chenango","developer":"High Bridge Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":103.2,"summer_mw":103.2,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.437923,"lon":-75.48056,"as_of":"2026-08"},{"id":"69956/S9","plant_name":"Sanborn Hybrid 3","generator_id":"S9","plant_id":69956,"state":"CA","county":"Kern","developer":"Terra-Gen Operating Co-Hybrid","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":103,"summer_mw":103,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.996,"lon":-118.114,"as_of":"2026-08"},{"id":"65326/SS1","plant_name":"Sunset Solar","generator_id":"SS1","plant_id":65326,"state":"OR","county":"Wasco","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":103,"summer_mw":103,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"BPAT","lat":45.165062,"lon":-120.8804,"as_of":"2026-08"},{"id":"64290/ATH1S","plant_name":"SE Athos II, LLC","generator_id":"ATH1S","plant_id":64290,"state":"CA","county":"Riverside","developer":"SE Athos II, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":102.3,"summer_mw":102.3,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.751283,"lon":-115.355,"as_of":"2026-08"},{"id":"66396/NDUAH","plant_name":"Naduah Solar","generator_id":"NDUAH","plant_id":66396,"state":"TX","county":"Limestone","developer":"Gransolar Texas Fifteen, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":102.3,"summer_mw":77.6,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.521467,"lon":-96.67385,"as_of":"2026-08"},{"id":"67341/NOSES","plant_name":"SGT Hoskins Solar Project Hybrid","generator_id":"NOSES","plant_id":67341,"state":"TX","county":"Lamar","developer":"SGT Hoskins Solar Project, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":102.1,"summer_mw":102.1,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.63124,"lon":-95.33785,"as_of":"2026-08"},{"id":"69969/PAS","plant_name":"Panhandle Solar","generator_id":"PAS","plant_id":69969,"state":"OK","county":"Texas","developer":"Panhandle Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":102,"summer_mw":102,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":36.609029,"lon":-101.4743,"as_of":"2026-08"},{"id":"67919/DOLCE","plant_name":"Dolce BESS, LLC","generator_id":"DOLCE","plant_id":67919,"state":"TX","county":"Mitchell","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":101.4,"summer_mw":101.4,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.484063,"lon":-100.9018,"as_of":"2026-08"},{"id":"70443/MAMM2","plant_name":"Mammoth Plains Energy Storage II","generator_id":"MAMM2","plant_id":70443,"state":"OK","county":"Dewey","developer":"Mammoth Plains Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":101.2,"summer_mw":101.2,"planned_start":"2029-05","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":35.97972,"lon":-98.70606,"as_of":"2026-08"},{"id":"66894/ALBPV","plant_name":"Albatross Solar, LLC","generator_id":"ALBPV","plant_id":66894,"state":"TX","county":"McLennan","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":101,"summer_mw":101,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.484342,"lon":-97.42239,"as_of":"2026-08"},{"id":"66958/NOPR1","plant_name":"Northern Prairie 1","generator_id":"NOPR1","plant_id":66958,"state":"WI","county":"St Croix","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":101,"summer_mw":101,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":45.131813,"lon":-92.31686,"as_of":"2026-08"},{"id":"68172/MYEPV","plant_name":"Myers Solar and Storage","generator_id":"MYEPV","plant_id":68172,"state":"TX","county":"Goliad","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100.9,"summer_mw":100.9,"planned_start":"2028-08","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":28.420043,"lon":-97.70934,"as_of":"2026-08"},{"id":"68173/SANBT","plant_name":"Sandford Solar and Storage","generator_id":"SANBT","plant_id":68173,"state":"TX","county":"Wise","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100.9,"summer_mw":100.9,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.30726,"lon":-97.52777,"as_of":"2026-08"},{"id":"68014/BRDFS","plant_name":"Bradford Solar PA","generator_id":"BRDFS","plant_id":68014,"state":"PA","county":"Bradford","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100.5,"summer_mw":100.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.721657,"lon":-76.53663,"as_of":"2026-08"},{"id":"68851/HSPV1","plant_name":"Hermes Solar PV","generator_id":"HSPV1","plant_id":68851,"state":"TX","county":"Bell","developer":"Bell 1 Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100.4,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":30.989842,"lon":-97.14982,"as_of":"2026-08"},{"id":"68852/HSBE1","plant_name":"Hermes Storage BESS","generator_id":"HSBE1","plant_id":68852,"state":"TX","county":"Bell","developer":"Bell 1 Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100.4,"summer_mw":100,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":30.981595,"lon":-97.1429,"as_of":"2026-08"},{"id":"65043/DUSO","plant_name":"Dulles Solar and Storage","generator_id":"DUSO","plant_id":65043,"state":"VA","county":"Loudoun","developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.95,"lon":-77.5,"as_of":"2026-08"},{"id":"66678/IPAR1","plant_name":"Aramis I Solar Project","generator_id":"IPAR1","plant_id":66678,"state":"CA","county":"Alameda","developer":"IP Aramis, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.749678,"lon":-121.7661,"as_of":"2026-08"},{"id":"66678/IPARB","plant_name":"Aramis I Solar Project","generator_id":"IPARB","plant_id":66678,"state":"CA","county":"Alameda","developer":"IP Aramis, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.749678,"lon":-121.7661,"as_of":"2026-08"},{"id":"69238/ATL6","plant_name":"ATLAS Solar VI, LLC","generator_id":"ATL6","plant_id":69238,"state":"AZ","county":"La Paz","developer":"ATLAS Solar VI, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.579227,"lon":-113.5742,"as_of":"2026-08"},{"id":"69471/CLCSP","plant_name":"Cold Creek Solar Park","generator_id":"CLCSP","plant_id":69471,"state":"MI","county":"Branch","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":41.938,"lon":-85.003,"as_of":"2026-08"},{"id":"69156/GEN01","plant_name":"Duff Solar Park","generator_id":"GEN01","plant_id":69156,"state":"IN","county":"Dubois","developer":"Duff Solar Park LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.31341,"lon":-87.02063,"as_of":"2026-08"},{"id":"68149/RAVEB","plant_name":"Raven Storage","generator_id":"RAVEB","plant_id":68149,"state":"TX","county":"Wharton","developer":"Raven Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.575617,"lon":-96.08872,"as_of":"2026-08"},{"id":"69054/ALT2","plant_name":"ATLAS II","generator_id":"ALT2","plant_id":69054,"state":"AZ","county":"La Paz","developer":"ATLAS Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":33.582903,"lon":-113.5769,"as_of":"2026-08"},{"id":"63386/3RIVS","plant_name":"Three Rivers Solar Power, LLC","generator_id":"3RIVS","plant_id":63386,"state":"ME","county":"Hancock","developer":"Three Rivers Solar Power, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":44.711644,"lon":-68.11,"as_of":"2026-08"},{"id":"66658/NOTT","plant_name":"Nottingham Solar","generator_id":"NOTT","plant_id":66658,"state":"OH","county":"Harrison","developer":"BQ Energy Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.189455,"lon":-81.04111,"as_of":"2026-08"},{"id":"68452/KITTB","plant_name":"Kitt Solar","generator_id":"KITTB","plant_id":68452,"state":"AZ","county":"Pinal","developer":"301AK 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":32.73353,"lon":-111.5691,"as_of":"2026-08"},{"id":"68452/KITTS","plant_name":"Kitt Solar","generator_id":"KITTS","plant_id":68452,"state":"AZ","county":"Pinal","developer":"301AK 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"AZPS","lat":32.73353,"lon":-111.5691,"as_of":"2026-08"},{"id":"69027/SSBA","plant_name":"Stoneridge Solar, LLC","generator_id":"SSBA","plant_id":69027,"state":"TX","county":"Milam","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":30.569447,"lon":-97.11043,"as_of":"2026-08"},{"id":"69497/SLB","plant_name":"Star Light Energy Center","generator_id":"SLB","plant_id":69497,"state":"NM","county":"Valencia","developer":"Star Light Energy Center","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":34.739572,"lon":-106.7928,"as_of":"2026-08"},{"id":"69497/SLS","plant_name":"Star Light Energy Center","generator_id":"SLS","plant_id":69497,"state":"NM","county":"Valencia","developer":"Star Light Energy Center","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":34.739572,"lon":-106.7928,"as_of":"2026-08"},{"id":"69517/BV3BA","plant_name":"Buena Vista Energy Center III","generator_id":"BV3BA","plant_id":69517,"state":"NM","county":"Otero","developer":"Buena Vista Energy Center III, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"EPE","lat":32.06659,"lon":-106.2853,"as_of":"2026-08"},{"id":"69517/BV3SO","plant_name":"Buena Vista Energy Center III","generator_id":"BV3SO","plant_id":69517,"state":"NM","county":"Otero","developer":"Buena Vista Energy Center III, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"EPE","lat":32.06659,"lon":-106.2853,"as_of":"2026-08"},{"id":"69586/GPS","plant_name":"Great Plains Solar, LLC","generator_id":"GPS","plant_id":69586,"state":"IL","county":"Perry","developer":"Great Plains Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.177944,"lon":-89.55289,"as_of":"2026-08"},{"id":"69594/SPS","plant_name":"Switchgrass Plains Solar, LLC","generator_id":"SPS","plant_id":69594,"state":"IL","county":"Fayette","developer":"Switchgrass Plains Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":39.172414,"lon":-89.05787,"as_of":"2026-08"},{"id":"69809/5756","plant_name":"Northern Divide Energy Storage","generator_id":"5756","plant_id":69809,"state":"ND","county":"Burke","developer":"Northern Divide Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":48.769875,"lon":-102.7678,"as_of":"2026-08"},{"id":"70188/WES01","plant_name":"Weld Energy Storage","generator_id":"WES01","plant_id":70188,"state":"CO","county":"Weld","developer":"Weld Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":40.613467,"lon":-104.8467,"as_of":"2026-08"},{"id":"64290/ATH1N","plant_name":"SE Athos II, LLC","generator_id":"ATH1N","plant_id":64290,"state":"CA","county":"Riverside","developer":"SE Athos II, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.751283,"lon":-115.355,"as_of":"2026-08"},{"id":"68426/VOYGR","plant_name":"Voyager Energy Storage","generator_id":"VOYGR","plant_id":68426,"state":"MI","county":"Washtenaw","developer":"Voyager Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.153167,"lon":-83.8333,"as_of":"2026-08"},{"id":"69393/PHIEC","plant_name":"Pamela Heights I Energy Center","generator_id":"PHIEC","plant_id":69393,"state":"TX","county":"Harris","developer":"Pamela Heights I Energy Center LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.645345,"lon":-95.45021,"as_of":"2026-08"},{"id":"66441/INCV1","plant_name":"Crossvine Solar","generator_id":"INCV1","plant_id":66441,"state":"IN","county":"Dubois","developer":"Crossvine Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.264271,"lon":-87.00189,"as_of":"2026-08"},{"id":"69356/PWLNB","plant_name":"Powerline Energy Storage","generator_id":"PWLNB","plant_id":69356,"state":"FL","county":"Citrus","developer":"Duke Energy Florida, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPC","lat":28.96684,"lon":-82.61751,"as_of":"2026-08"},{"id":"70033/WT001","plant_name":"White Tank Energy Storage","generator_id":"WT001","plant_id":70033,"state":"AZ","county":"Maricopa","developer":"White Tank Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.498,"lon":-112.3176,"as_of":"2026-08"},{"id":"70403/GRBS1","plant_name":"Grand Basin Energy Storage","generator_id":"GRBS1","plant_id":70403,"state":"MI","county":"Jackson","developer":"Grand Basin Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-03","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":42.420211,"lon":-84.48752,"as_of":"2026-08"},{"id":"69059/COBA","plant_name":"Crimson Orchard Solar and BESS","generator_id":"COBA","plant_id":69059,"state":"ID","county":"Elmore","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-04","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"IPCO","lat":43.181239,"lon":-115.7465,"as_of":"2026-08"},{"id":"69059/COPV","plant_name":"Crimson Orchard Solar and BESS","generator_id":"COPV","plant_id":69059,"state":"ID","county":"Elmore","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-04","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"IPCO","lat":43.181239,"lon":-115.7465,"as_of":"2026-08"},{"id":"68897/PVSI","plant_name":"New Frontiers Solar","generator_id":"PVSI","plant_id":68897,"state":"KY","county":"Breckinridge","developer":"Clover Creek Solar Project LLC d/b/a New Frontiers Solar Park","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":37.79502,"lon":-86.5068,"as_of":"2026-08"},{"id":"68909/ISSBA","plant_name":"Imperial Sun Solar","generator_id":"ISSBA","plant_id":68909,"state":"CA","county":"Imperial","developer":"Imperial Sun Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"IID","lat":32.6851,"lon":-115.2977,"as_of":"2026-08"},{"id":"68909/ISSPV","plant_name":"Imperial Sun Solar","generator_id":"ISSPV","plant_id":68909,"state":"CA","county":"Imperial","developer":"Imperial Sun Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"IID","lat":32.6851,"lon":-115.2977,"as_of":"2026-08"},{"id":"69966/FMM","plant_name":"Four Mile Mesa Solar, LLC","generator_id":"FMM","plant_id":69966,"state":"NM","county":"San Juan","developer":"Four Mile Mesa Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":36.8685,"lon":-108.277,"as_of":"2026-08"},{"id":"69966/FMMS","plant_name":"Four Mile Mesa Solar, LLC","generator_id":"FMMS","plant_id":69966,"state":"NM","county":"San Juan","developer":"Four Mile Mesa Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":36.8685,"lon":-108.277,"as_of":"2026-08"},{"id":"68473/BROOK","plant_name":"Brookside Solar","generator_id":"BROOK","plant_id":68473,"state":"NY","county":"Franklin","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":44.932,"lon":-74.1302,"as_of":"2026-08"},{"id":"69687/L7SF","plant_name":"Lucky 7 Solar Farm LLC","generator_id":"L7SF","plant_id":69687,"state":"TX","county":"Hopkins","developer":"Lucky 7 Solar Farm LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":33.082,"lon":-95.721,"as_of":"2026-08"},{"id":"67667/3COAS","plant_name":"Third Coast BESS, LLC","generator_id":"3COAS","plant_id":67667,"state":"TX","county":"Jackson","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":28.852327,"lon":-96.55642,"as_of":"2026-08"},{"id":"64216/201LC","plant_name":"Rockmont Solar and Storage Project","generator_id":"201LC","plant_id":64216,"state":"NM","county":"San Juan","developer":"201LC 8me LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.776579,"lon":-108.3751,"as_of":"2026-08"},{"id":"65471/RGS23","plant_name":"Rose Gold Solar","generator_id":"RGS23","plant_id":65471,"state":"IN","county":"Jay","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.404357,"lon":-85.19716,"as_of":"2026-08"},{"id":"66113/NEBE1","plant_name":"Big Elk Solar","generator_id":"NEBE1","plant_id":66113,"state":"NE","county":"Washington","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":41.475678,"lon":-96.29309,"as_of":"2026-08"},{"id":"66216/BESS","plant_name":"Yaupon Solar Project (Hybrid)","generator_id":"BESS","plant_id":66216,"state":"TX","county":"Milam","developer":"Yaupon Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.0444,"lon":-96.8514,"as_of":"2026-08"},{"id":"68554/BACN3","plant_name":"SR Bacon III","generator_id":"BACN3","plant_id":68554,"state":"GA","county":"Bacon","developer":"SR Bacon III, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":31.511392,"lon":-82.33683,"as_of":"2026-08"},{"id":"68555/CORDV","plant_name":"SR Cordova","generator_id":"CORDV","plant_id":68555,"state":"SC","county":"Orangeburg","developer":"SR Cordova, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":33.45963,"lon":-80.88897,"as_of":"2026-08"},{"id":"68903/MUSPV","plant_name":"Solex Ridge Solar","generator_id":"MUSPV","plant_id":68903,"state":"TX","county":"Henderson","developer":"Solex Ridge, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.169946,"lon":-95.5803,"as_of":"2026-08"},{"id":"68939/COGPV","plant_name":"Coggon Solar LLC","generator_id":"COGPV","plant_id":68939,"state":"IA","county":"Linn","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.290594,"lon":-91.57266,"as_of":"2026-08"},{"id":"69170/FW2","plant_name":"Freshwater Solar II, LLC","generator_id":"FW2","plant_id":69170,"state":"MI","county":"Montcalm","developer":"Freshwater Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.310581,"lon":-85.05159,"as_of":"2026-08"},{"id":"67090/FMS","plant_name":"Flint Mine Solar","generator_id":"FMS","plant_id":67090,"state":"NY","county":"Greene","developer":"Flint Mine Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":42.313611,"lon":-73.84556,"as_of":"2026-08"},{"id":"70050/DRENN","plant_name":"Drennan Energy Storage","generator_id":"DRENN","plant_id":70050,"state":"CO","county":"El Paso","developer":"Drennan Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":38.772896,"lon":-104.6671,"as_of":"2026-08"},{"id":"66922/59957","plant_name":"Timber Cove Solar","generator_id":"59957","plant_id":66922,"state":"TX","county":"Freestone","developer":"Freestone Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.870589,"lon":-96.15247,"as_of":"2026-08"},{"id":"69973/OSON1","plant_name":"Oso Negro","generator_id":"OSON1","plant_id":69973,"state":"NM","county":"Bernalillo","developer":"Oso Negro, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-05","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PNM","lat":35.111657,"lon":-106.7205,"as_of":"2026-08"},{"id":"68032/SKLRE","plant_name":"Skylight Renewable Energy","generator_id":"SKLRE","plant_id":68032,"state":"CA","county":"Sutter","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WALC","lat":38.947494,"lon":-121.4792,"as_of":"2026-08"},{"id":"68032/SKREB","plant_name":"Skylight Renewable Energy","generator_id":"SKREB","plant_id":68032,"state":"CA","county":"Sutter","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WALC","lat":38.947494,"lon":-121.4792,"as_of":"2026-08"},{"id":"68205/GRNWD","plant_name":"Greenwood Solar I","generator_id":"GRNWD","plant_id":68205,"state":"VA","county":"Culpeper","developer":"Greenwood Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-06","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":38.427261,"lon":-77.90787,"as_of":"2026-08"},{"id":"68604/DALBS","plant_name":"Dahlia Energy","generator_id":"DALBS","plant_id":68604,"state":"TX","county":"La Salle","developer":"Dahlia Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":28.369598,"lon":-98.96762,"as_of":"2026-08"},{"id":"69762/425LM","plant_name":"Southern Bighorn Solar 2","generator_id":"425LM","plant_id":69762,"state":"NV","county":"Clark","developer":"425LM 8ME LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NEVP","lat":36.56117,"lon":-114.7413,"as_of":"2026-08"},{"id":"69762/BESS2","plant_name":"Southern Bighorn Solar 2","generator_id":"BESS2","plant_id":69762,"state":"NV","county":"Clark","developer":"425LM 8ME LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NEVP","lat":36.56117,"lon":-114.7413,"as_of":"2026-08"},{"id":"64659/AMS","plant_name":"AEUG Madison Solar, LLC","generator_id":"AMS","plant_id":64659,"state":"KY","county":"Madison","developer":"Acciona Energy USA Global, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-09","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":37.822029,"lon":-84.30052,"as_of":"2026-08"},{"id":"64848/BEF1","plant_name":"Bedington Energy Facility, LLC","generator_id":"BEF1","plant_id":64848,"state":"WV","county":"Berkeley","developer":"Bedington Energy Facility, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.531839,"lon":-77.88709,"as_of":"2026-08"},{"id":"69021/RH1PV","plant_name":"Rustic Hills Solar I","generator_id":"RH1PV","plant_id":69021,"state":"IN","county":"Warrick","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":37.96707,"lon":-87.30739,"as_of":"2026-08"},{"id":"69022/RH2PV","plant_name":"Rustic Hills Solar II LLC","generator_id":"RH2PV","plant_id":69022,"state":"IN","county":"Warrick","developer":"Clenera DevCo LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":37.974259,"lon":-87.32197,"as_of":"2026-08"},{"id":"66114/INRD1","plant_name":"Merrillville Solar","generator_id":"INRD1","plant_id":66114,"state":"IN","county":"Lake","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":41.462794,"lon":-87.27285,"as_of":"2026-08"},{"id":"68352/GIPV1","plant_name":"Girasol Solar Farm","generator_id":"GIPV1","plant_id":68352,"state":"MS","county":"Sunflower","developer":"Girasol Solar Farm LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":33.676092,"lon":-90.64287,"as_of":"2026-08"},{"id":"69608/SNSPI","plant_name":"Sinnissippi Solar Energy LLC","generator_id":"SNSPI","plant_id":69608,"state":"WI","county":"Jefferson","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":43.12592,"lon":-88.67098,"as_of":"2026-08"},{"id":"69775/STBSP","plant_name":"Strasburg Solar Park","generator_id":"STBSP","plant_id":69775,"state":"MI","county":"Monroe","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.971933,"lon":-83.45975,"as_of":"2026-08"},{"id":"67896/229HD","plant_name":"Holstein 2 Battery Storage","generator_id":"229HD","plant_id":67896,"state":"TX","county":"Nolan","developer":"229HD 8me, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-05","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.081901,"lon":-100.159,"as_of":"2026-08"},{"id":"67325/NYRIV","plant_name":"Riverside Solar LLC","generator_id":"NYRIV","plant_id":67325,"state":"NY","county":"St Lawrence","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":44.06585,"lon":-76.1222,"as_of":"2026-08"},{"id":"67324/NYSOM","plant_name":"Somerset Solar LLC","generator_id":"NYSOM","plant_id":67324,"state":"NY","county":"Niagara","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":125,"planned_start":"2029-10","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":43.352072,"lon":-78.61036,"as_of":"2026-08"},{"id":"68343/GRVA1","plant_name":"Grand Valley Solar Generation and BESS","generator_id":"GRVA1","plant_id":68343,"state":"CO","county":"Mesa","developer":"GRVA bn, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-10","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":39.1987,"lon":-108.782,"as_of":"2026-08"},{"id":"68343/GRVA2","plant_name":"Grand Valley Solar Generation and BESS","generator_id":"GRVA2","plant_id":68343,"state":"CO","county":"Mesa","developer":"GRVA bn, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-10","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":39.1987,"lon":-108.782,"as_of":"2026-08"},{"id":"65808/BSVEC","plant_name":"Sacramento Valley Energy Center, LLC","generator_id":"BSVEC","plant_id":65808,"state":"CA","county":"Sacramento","developer":"Sacramento Valley Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-12","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BANC","lat":38.57147,"lon":-121.1845,"as_of":"2026-08"},{"id":"69636/69363","plant_name":"Main Horn Solar","generator_id":"69363","plant_id":69636,"state":"TX","county":"Navarro","developer":"Main Horn Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.984498,"lon":-96.36558,"as_of":"2026-08"},{"id":"69642/96513","plant_name":"Arkana Solar","generator_id":"96513","plant_id":69642,"state":"AR","county":"Columbia","developer":"Arkana Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":33.04521,"lon":-93.44841,"as_of":"2026-08"},{"id":"69639/16777","plant_name":"Triune Solar","generator_id":"16777","plant_id":69639,"state":"TX","county":"Trinity","developer":"Triune Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":100,"summer_mw":100,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.996927,"lon":-95.12384,"as_of":"2026-08"},{"id":"64531/KOV4A","plant_name":"Noosa Energy Storage LLC","generator_id":"KOV4A","plant_id":64531,"state":"CA","county":"San Joaquin","developer":"Engie North America","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":99,"summer_mw":99,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.756292,"lon":-121.1481,"as_of":"2026-08"},{"id":"4050/BESS1","plant_name":"Edgewater","generator_id":"BESS1","plant_id":4050,"state":"WI","county":"Sheboygan","developer":"Wisconsin Power & Light Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":99,"summer_mw":99,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.715142,"lon":-87.70586,"as_of":"2026-08"},{"id":"69981/GRNTS","plant_name":"Grant Solar, LLC","generator_id":"GRNTS","plant_id":69981,"state":"SD","county":"McCook","developer":"Geronimo Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":99,"summer_mw":99,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":43.550003,"lon":-97.26738,"as_of":"2026-08"},{"id":"68153/PV1","plant_name":"Fremont Solar","generator_id":"PV1","plant_id":68153,"state":"UT","county":"Iron","developer":"Fremont Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":99,"summer_mw":99,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":37.9789,"lon":-112.7761,"as_of":"2026-08"},{"id":"68228/Q1448","plant_name":"Agricola Wind","generator_id":"Q1448","plant_id":68228,"state":"NY","county":"Cayuga","developer":"Liberty Renewables Incorporated","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":99,"summer_mw":97,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.755287,"lon":-76.53902,"as_of":"2026-08"},{"id":"68738/CANBS","plant_name":"Cannibal Draw Solar and Storage","generator_id":"CANBS","plant_id":68738,"state":"TX","county":"Glasscock","developer":"Red River Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":98.6,"summer_mw":98.6,"planned_start":"2028-04","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":32.023861,"lon":-101.284,"as_of":"2026-08"},{"id":"69742/PV3","plant_name":"Cooperative Solar Three-Marion","generator_id":"PV3","plant_id":69742,"state":"KY","county":"Marion","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":96,"summer_mw":96,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.605113,"lon":-85.24824,"as_of":"2026-08"},{"id":"65293/OEMS4","plant_name":"Covington (MS)","generator_id":"OEMS4","plant_id":65293,"state":"MS","county":"Covington","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":96,"summer_mw":96,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":31.4395,"lon":-89.4846,"as_of":"2026-08"},{"id":"67568/WIGSP","plant_name":"Wittig Solar Park","generator_id":"WIGSP","plant_id":67568,"state":"TX","county":"Wharton","developer":"Greenalia Solar Power Wittig, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":96,"summer_mw":96,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":29.245055,"lon":-95.87477,"as_of":"2026-08"},{"id":"69629/BIGM1","plant_name":"Big Muddy Solar","generator_id":"BIGM1","plant_id":69629,"state":"IL","county":"Jackson","developer":"Big Muddy Solar Project, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":95,"summer_mw":95,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":37.86,"lon":-89.3,"as_of":"2026-08"},{"id":"68073/BLUER","plant_name":"Blue Ridge Solar","generator_id":"BLUER","plant_id":68073,"state":"VA","county":"Pittsylvania","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":95,"summer_mw":95,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.790101,"lon":-79.42875,"as_of":"2026-08"},{"id":"68085/RMS1","plant_name":"Red Maple LRE","generator_id":"RMS1","plant_id":68085,"state":"IL","county":"DeKalb","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":95,"summer_mw":95,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.886064,"lon":-88.72725,"as_of":"2026-08"},{"id":"66484/GCA","plant_name":"Glen Canyon Solar A, LLC","generator_id":"GCA","plant_id":66484,"state":"UT","county":"Kane","developer":"AES Distributed Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":95,"summer_mw":95,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":37.091539,"lon":-111.7255,"as_of":"2026-08"},{"id":"68271/SWLS1","plant_name":"Sweetleaf Solar LLC","generator_id":"SWLS1","plant_id":68271,"state":"NC","county":"Halifax","developer":"CleanChoice Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":93,"summer_mw":93,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":36.220711,"lon":-77.68863,"as_of":"2026-08"},{"id":"67650/BEARR","plant_name":"Bear Ridge","generator_id":"BEARR","plant_id":67650,"state":"NY","county":"Niagara","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":93,"summer_mw":93,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":43.14244,"lon":-78.79106,"as_of":"2026-08"},{"id":"69648/RSBA","plant_name":"Rosamond South II","generator_id":"RSBA","plant_id":69648,"state":"CA","county":"Kern","developer":"Golden Fields Solar VI, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":92,"summer_mw":92,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.852326,"lon":-118.4312,"as_of":"2026-08"},{"id":"67544/LEGSP","plant_name":"Leitrim Solar Park","generator_id":"LEGSP","plant_id":67544,"state":"TX","county":"Hill","developer":"Greenalia Solar Power Leitrim, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":91.2,"summer_mw":91.2,"planned_start":"2030-10","planned_year":2030,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":31.79623,"lon":-97.20278,"as_of":"2026-08"},{"id":"64253/S1","plant_name":"Mohawk Solar","generator_id":"S1","plant_id":64253,"state":"NY","county":"Montgomery","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90.5,"summer_mw":90.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.887133,"lon":-74.63781,"as_of":"2026-08"},{"id":"65050/MRC1","plant_name":"Mark Center Solar Project","generator_id":"MRC1","plant_id":65050,"state":"OH","county":"Defiance","developer":"Naturgy Solar Operation USA LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.288044,"lon":-84.61132,"as_of":"2026-08"},{"id":"68253/ROCH1","plant_name":"SR Rochelle I","generator_id":"ROCH1","plant_id":68253,"state":"GA","county":"Wilcox","developer":"SR Rochelle I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":31.923234,"lon":-83.45427,"as_of":"2026-08"},{"id":"69524/WLS","plant_name":"Windy Lane Energy Center","generator_id":"WLS","plant_id":69524,"state":"NM","county":"De Baca","developer":"Windy Lane Energy Center, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":34.587619,"lon":-104.0312,"as_of":"2026-08"},{"id":"64428/JVR1A","plant_name":"JVR Energy Park LLC","generator_id":"JVR1A","plant_id":64428,"state":"CA","county":"San Diego","developer":"JVR Energy Park LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":32.625903,"lon":-116.1749,"as_of":"2026-08"},{"id":"65052/HSEC","plant_name":"Homer Solar Energy Center","generator_id":"HSEC","plant_id":65052,"state":"NY","county":"Cortland","developer":"EDF Renewables Development, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.658652,"lon":-76.09993,"as_of":"2026-08"},{"id":"67561/RIC93","plant_name":"Callan Solar","generator_id":"RIC93","plant_id":67561,"state":"TX","county":"McCulloch","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.990928,"lon":-99.60118,"as_of":"2026-08"},{"id":"68585/YRS","plant_name":"York Run Solar","generator_id":"YRS","plant_id":68585,"state":"NY","county":"Chautauqua","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2028-09","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.011319,"lon":-79.2243,"as_of":"2026-08"},{"id":"64849/WILDC","plant_name":"Wildcat Solar Power Plant LLC","generator_id":"WILDC","plant_id":64849,"state":"NM","county":"McKinley","developer":"Solariant Capital, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":90,"summer_mw":90,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PNM","lat":35.580453,"lon":-108.9023,"as_of":"2026-08"},{"id":"68466/CFB3","plant_name":"Centennial Flats","generator_id":"CFB3","plant_id":68466,"state":"AZ","county":"La Paz","developer":"Copia Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":89,"summer_mw":89,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AZPS","lat":33.588334,"lon":-113.5283,"as_of":"2026-08"},{"id":"70405/BA-1","plant_name":"Winchester Solar I, LLC","generator_id":"BA-1","plant_id":70405,"state":"AZ","county":"Cochise","developer":"Torch Operating Company, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":87.8,"summer_mw":87.8,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TEPC","lat":32.186372,"lon":-109.9531,"as_of":"2026-08"},{"id":"70405/PV-1","plant_name":"Winchester Solar I, LLC","generator_id":"PV-1","plant_id":70405,"state":"AZ","county":"Cochise","developer":"Torch Operating Company, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":87.8,"summer_mw":87.8,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TEPC","lat":32.186372,"lon":-109.9531,"as_of":"2026-08"},{"id":"70406/BA-2","plant_name":"Winchester Solar II, LLC","generator_id":"BA-2","plant_id":70406,"state":"AZ","county":"Cochise","developer":"Torch Operating Company, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":87.8,"summer_mw":87.8,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WALC","lat":32.207126,"lon":-109.9435,"as_of":"2026-08"},{"id":"70406/PV-2","plant_name":"Winchester Solar II, LLC","generator_id":"PV-2","plant_id":70406,"state":"AZ","county":"Cochise","developer":"Torch Operating Company, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":87.8,"summer_mw":87.8,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WALC","lat":32.207126,"lon":-109.9435,"as_of":"2026-08"},{"id":"69795/KEABE","plant_name":"Keamuku","generator_id":"KEABE","plant_id":69795,"state":"HI","county":"Hawaii","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":86,"summer_mw":86,"planned_start":"2030-05","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"HECO","lat":19.8799,"lon":-155.7373,"as_of":"2026-08"},{"id":"69795/KEAMU","plant_name":"Keamuku","generator_id":"KEAMU","plant_id":69795,"state":"HI","county":"Hawaii","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":86,"summer_mw":86,"planned_start":"2030-05","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"HECO","lat":19.8799,"lon":-155.7373,"as_of":"2026-08"},{"id":"68226/BACON","plant_name":"SR Bacon","generator_id":"BACON","plant_id":68226,"state":"GA","county":"Bacon","developer":"SR Bacon, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":85,"summer_mw":85,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":31.511392,"lon":-82.33683,"as_of":"2026-08"},{"id":"70089/MURCH","plant_name":"Murch Solar, LLC","generator_id":"MURCH","plant_id":70089,"state":"MI","county":"Van Buren","developer":"Murch Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":85,"summer_mw":85,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.401,"lon":-86.03,"as_of":"2026-08"},{"id":"67788/GRS10","plant_name":"Payne Battlecreek Solar","generator_id":"GRS10","plant_id":67788,"state":"TX","county":"Hill","developer":"Gransolar Texas Ten LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":85,"summer_mw":85,"planned_start":"2027-08","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.852503,"lon":-96.75536,"as_of":"2026-08"},{"id":"69925/SWBA1","plant_name":"Stellar Wright BESS","generator_id":"SWBA1","plant_id":69925,"state":"CA","county":"Merced","developer":"Stellar Renewable Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":84.8,"summer_mw":80,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.007998,"lon":-120.9637,"as_of":"2026-08"},{"id":"67782/GS22B","plant_name":"RedSun PV and BESS","generator_id":"GS22B","plant_id":67782,"state":"TX","county":"Burnet","developer":"Gransolar Texas Twenty Two LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":84,"summer_mw":84,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.784886,"lon":-98.20217,"as_of":"2026-08"},{"id":"67782/GS22P","plant_name":"RedSun PV and BESS","generator_id":"GS22P","plant_id":67782,"state":"TX","county":"Burnet","developer":"Gransolar Texas Twenty Two LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":84,"summer_mw":84,"planned_start":"2028-07","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.784886,"lon":-98.20217,"as_of":"2026-08"},{"id":"69147/G1","plant_name":"New Caledonia","generator_id":"G1","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"69147/G2","plant_name":"New Caledonia","generator_id":"G2","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"69147/G3","plant_name":"New Caledonia","generator_id":"G3","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"69147/G4","plant_name":"New Caledonia","generator_id":"G4","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"69147/G5","plant_name":"New Caledonia","generator_id":"G5","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"69147/G6","plant_name":"New Caledonia","generator_id":"G6","plant_id":69147,"state":"MS","county":"Lowndes","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":84,"summer_mw":81,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.649272,"lon":-88.3146,"as_of":"2026-08"},{"id":"66895/LP1BA","plant_name":"Lupinus Solar 1, LLC","generator_id":"LP1BA","plant_id":66895,"state":"TX","county":"Franklin","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":83,"summer_mw":83,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.303385,"lon":-95.25692,"as_of":"2026-08"},{"id":"67566/ROGSP","plant_name":"Roscommon Solar Park","generator_id":"ROGSP","plant_id":67566,"state":"TX","county":"Lamar","developer":"Greenalia Solar Power Roscommon, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":82.8,"summer_mw":82.8,"planned_start":"2029-10","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":33.631719,"lon":-95.69587,"as_of":"2026-08"},{"id":"69197/HALIF","plant_name":"Halifax County Solar","generator_id":"HALIF","plant_id":69197,"state":"NC","county":"Halifax","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.2537,"lon":-77.6884,"as_of":"2026-08"},{"id":"70084/AC","plant_name":"Alligator Creek Solar","generator_id":"AC","plant_id":70084,"state":"GA","county":"Wheeler","developer":"Alligator Creek Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":32.104,"lon":-82.844,"as_of":"2026-08"},{"id":"64202/BGSTB","plant_name":"Big Star Solar, LLC (Hybrid)","generator_id":"BGSTB","plant_id":64202,"state":"TX","county":"Bastrop","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.894053,"lon":-97.27054,"as_of":"2026-08"},{"id":"68002/FOLEY","plant_name":"Foley Solar, LLC","generator_id":"FOLEY","plant_id":68002,"state":"AL","county":"Baldwin","developer":"Foley Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SOCO","lat":30.377488,"lon":-87.72751,"as_of":"2026-08"},{"id":"70235/68372","plant_name":"Mulqueeney Wind Energy","generator_id":"68372","plant_id":70235,"state":"CA","county":"Alameda","developer":"Mulqueeney Wind Energy LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.69742,"lon":-121.5891,"as_of":"2026-08"},{"id":"67998/KSEC","plant_name":"Karn Solar Energy Center","generator_id":"KSEC","plant_id":67998,"state":"MI","county":"Bay","developer":"Consumers Energy Co - (MI)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.644996,"lon":-83.84007,"as_of":"2026-08"},{"id":"70364/GEN1","plant_name":"Walker Solar","generator_id":"GEN1","plant_id":70364,"state":"PA","county":"Juniata","developer":"MN8 Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.585531,"lon":-77.34537,"as_of":"2026-08"},{"id":"70035/NSES","plant_name":"North Star Energy Storage, LLC","generator_id":"NSES","plant_id":70035,"state":"MN","county":"Chisago","developer":"North Star Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.480911,"lon":-92.90814,"as_of":"2026-08"},{"id":"68812/STVML","plant_name":"Stevens Mill Solar","generator_id":"STVML","plant_id":68812,"state":"NC","county":"Wayne","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLE","lat":35.35546,"lon":-78.1192,"as_of":"2026-08"},{"id":"69967/FTB","plant_name":"Foxtail Flats Solar, LLC","generator_id":"FTB","plant_id":69967,"state":"NM","county":"San Juan","developer":"Foxtail Flats Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":36.8685,"lon":-108.277,"as_of":"2026-08"},{"id":"70302/22","plant_name":"Gum Swamp Solar, LLC","generator_id":"22","plant_id":70302,"state":"NC","county":"Scotland","developer":"Headwater Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":34.867,"lon":-79.599,"as_of":"2026-08"},{"id":"69463/BCRSP","plant_name":"Beecher Solar Park","generator_id":"BCRSP","plant_id":69463,"state":"MI","county":"Lenawee","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-06","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.923,"lon":-83.917,"as_of":"2026-08"},{"id":"67663/SGROV","plant_name":"Scotch Grove Solar","generator_id":"SGROV","plant_id":67663,"state":"NC","county":"Scotland","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLE","lat":34.84957,"lon":-79.44656,"as_of":"2026-08"},{"id":"67665/SDAVI","plant_name":"South Davidson","generator_id":"SDAVI","plant_id":67665,"state":"NC","county":"Davidson","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":35.618203,"lon":-80.10797,"as_of":"2026-08"},{"id":"68057/BAMA1","plant_name":"Alabama Creek Solar","generator_id":"BAMA1","plant_id":68057,"state":"AL","county":"Dallas","developer":"Alabama Creek Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":32.315548,"lon":-87.22312,"as_of":"2026-08"},{"id":"70271/OKFL1","plant_name":"Fiddle Leaf Solar, LLC","generator_id":"OKFL1","plant_id":70271,"state":"OK","county":"Delaware","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":76,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":36.256047,"lon":-94.58653,"as_of":"2026-08"},{"id":"70304/24","plant_name":"Sleepy Creek Solar, LLC","generator_id":"24","plant_id":70304,"state":"NC","county":"Bladen","developer":"Headwater Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":34.592,"lon":-78.326,"as_of":"2026-08"},{"id":"66363/GEN1","plant_name":"Black Walnut Solar, LLC","generator_id":"GEN1","plant_id":66363,"state":"NC","county":"Jones","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":35.050032,"lon":-77.15218,"as_of":"2026-08"},{"id":"66383/GEN1","plant_name":"Hyco Solar LLC","generator_id":"GEN1","plant_id":66383,"state":"NC","county":"Person","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":36.484574,"lon":-79.13311,"as_of":"2026-08"},{"id":"67989/PGR28","plant_name":"Drawhorn Solar","generator_id":"PGR28","plant_id":67989,"state":"GA","county":"Hancock","developer":"Drawhorn Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-11","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":33.214449,"lon":-83.04206,"as_of":"2026-08"},{"id":"68028/DSP","plant_name":"Delta Solar Plant","generator_id":"DSP","plant_id":68028,"state":"LA","county":"Bolivar","developer":"Entergy Mississippi LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":33.794007,"lon":-90.71392,"as_of":"2026-08"},{"id":"63653/SNDHC","plant_name":"Sand Hill C","generator_id":"SNDHC","plant_id":63653,"state":"CA","county":"Alameda","developer":"Viracocha Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":37.769695,"lon":-121.5961,"as_of":"2026-08"},{"id":"67990/BM1","plant_name":"Bright Mountain Solar","generator_id":"BM1","plant_id":67990,"state":"KY","county":"Perry","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.29003,"lon":-83.28286,"as_of":"2026-08"},{"id":"68104/HPHUL","plant_name":"SR Hope Hull","generator_id":"HPHUL","plant_id":68104,"state":"AL","county":"Montgomery","developer":"SR Hope Hull, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":32.2555,"lon":-86.3194,"as_of":"2026-08"},{"id":"66385/GEN1","plant_name":"Panther Branch Solar, LLC","generator_id":"GEN1","plant_id":66385,"state":"NC","county":"Duplin","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2028-08","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":35.145344,"lon":-78.15963,"as_of":"2026-08"},{"id":"68043/ROBES","plant_name":"Robeson Solar I","generator_id":"ROBES","plant_id":68043,"state":"NC","county":"Robeson","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CPLE","lat":34.614574,"lon":-78.93468,"as_of":"2026-08"},{"id":"68871/TIMIL","plant_name":"Timber Mill Solar","generator_id":"TIMIL","plant_id":68871,"state":"NC","county":"Jones","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CPLE","lat":34.96634,"lon":-77.21299,"as_of":"2026-08"},{"id":"65325/98936","plant_name":"High Top Solar","generator_id":"98936","plant_id":65325,"state":"WA","county":"Yakima","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":80,"summer_mw":80,"planned_start":"2029-01","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PACW","lat":46.522974,"lon":-119.9586,"as_of":"2026-08"},{"id":"58175/JWPI","plant_name":"Jawbone Wind Project","generator_id":"JWPI","plant_id":58175,"state":"MT","county":"Wheatland","developer":"Triple Oak Power LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":80,"summer_mw":80,"planned_start":"2029-12","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NWMT","lat":46.508056,"lon":-109.7278,"as_of":"2026-08"},{"id":"61331/BA1","plant_name":"NISA Electric Generation Project","generator_id":"BA1","plant_id":61331,"state":"NY","county":"Kings","developer":"NYC Energy LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":79.9,"summer_mw":79.9,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":40.7065,"lon":-73.9702,"as_of":"2026-08"},{"id":"68249/METTR","plant_name":"SR Horus","generator_id":"METTR","plant_id":68249,"state":"KY","county":"Simpson","developer":"SR Horus, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":79.7,"summer_mw":79.7,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":36.661,"lon":-86.534,"as_of":"2026-08"},{"id":"68969/ENX39","plant_name":"Strinestown Solar","generator_id":"ENX39","plant_id":68969,"state":"PA","county":"York","developer":"Strinestown Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":79.6,"summer_mw":79.6,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.090105,"lon":-76.73955,"as_of":"2026-08"},{"id":"66862/NY29","plant_name":"KCE NY 29, LLC","generator_id":"NY29","plant_id":66862,"state":"NY","county":"Suffolk","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":79,"summer_mw":79,"planned_start":"2030-03","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":40.81278,"lon":-73.21729,"as_of":"2026-08"},{"id":"67563/RAGSP","plant_name":"Ratcliff Solar Park","generator_id":"RAGSP","plant_id":67563,"state":"TX","county":"Freestone","developer":"Greenalia Solar Power Ratcliff, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":78.8,"summer_mw":78.8,"planned_start":"2029-08","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":30.217058,"lon":-95.81602,"as_of":"2026-08"},{"id":"68197/ROCKY","plant_name":"Rocky Forge Wind","generator_id":"ROCKY","plant_id":68197,"state":"VA","county":"Botetourt","developer":"Rocky Forge Wind, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":78,"summer_mw":78,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":37.710827,"lon":-79.7196,"as_of":"2026-08"},{"id":"67581/CIRSB","plant_name":"Cairos Solar and Storage","generator_id":"CIRSB","plant_id":67581,"state":"TX","county":"Kinney","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":77.3,"summer_mw":77.3,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":29.269974,"lon":-100.1975,"as_of":"2026-08"},{"id":"66315/CCSO","plant_name":"Clover Creek Solar","generator_id":"CCSO","plant_id":66315,"state":"VA","county":"Halifax","developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":77.2,"summer_mw":77.2,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.816641,"lon":-78.69262,"as_of":"2026-08"},{"id":"69351/HNYBS","plant_name":"Honeycomb Solar and Storage","generator_id":"HNYBS","plant_id":69351,"state":"TX","county":"Bee","developer":"Honeycomb Solar Holdco, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":76.5,"summer_mw":76.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":28.184344,"lon":-97.77169,"as_of":"2026-08"},{"id":"66398/EYTCH","plant_name":"Eytcheson Solar","generator_id":"EYTCH","plant_id":66398,"state":"TX","county":"Navarro","developer":"Gransolar Texas Fourteen, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":76.4,"summer_mw":76.2,"planned_start":"2028-01","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.872617,"lon":-96.7,"as_of":"2026-08"},{"id":"69823/CABOK","plant_name":"Cabokenze Energy Storage","generator_id":"CABOK","plant_id":69823,"state":"GA","county":"Burke","developer":"Cabokenze Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":76,"summer_mw":76,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SOCO","lat":33.037636,"lon":-82.11924,"as_of":"2026-08"},{"id":"70220/RSP1","plant_name":"Robinson Solar Plant","generator_id":"RSP1","plant_id":70220,"state":"SC","county":"Chesterfield","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":76,"summer_mw":76,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLE","lat":34.4168,"lon":-80.1918,"as_of":"2026-08"},{"id":"68172/MYEBT","plant_name":"Myers Solar and Storage","generator_id":"MYEBT","plant_id":68172,"state":"TX","county":"Goliad","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75.7,"summer_mw":75.7,"planned_start":"2028-08","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":28.420043,"lon":-97.70934,"as_of":"2026-08"},{"id":"68461/KEYBA","plant_name":"Key Energy Storage","generator_id":"KEYBA","plant_id":68461,"state":"CA","county":"Fresno","developer":"Key Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75,"summer_mw":75,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":36.13681,"lon":-120.1312,"as_of":"2026-08"},{"id":"68578/AC1S","plant_name":"AC Ranch I","generator_id":"AC1S","plant_id":68578,"state":"NM","county":"Lea","developer":"Lydian Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":32.732263,"lon":-103.2748,"as_of":"2026-08"},{"id":"67676/GEN01","plant_name":"Zeta Solar & Storage","generator_id":"GEN01","plant_id":67676,"state":"CA","county":"Merced","developer":"Zeta Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":36.911894,"lon":-120.8101,"as_of":"2026-08"},{"id":"67676/GEN02","plant_name":"Zeta Solar & Storage","generator_id":"GEN02","plant_id":67676,"state":"CA","county":"Merced","developer":"Zeta Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":36.911894,"lon":-120.8101,"as_of":"2026-08"},{"id":"61511/BCNE","plant_name":"Burt County Wind","generator_id":"BCNE","plant_id":61511,"state":"NE","county":"Burt","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":41.886,"lon":-96.345,"as_of":"2026-08"},{"id":"70023/EDGCM","plant_name":"Edgecombe Solar LLC","generator_id":"EDGCM","plant_id":70023,"state":"NC","county":"Edgecombe","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":35.949381,"lon":-77.65926,"as_of":"2026-08"},{"id":"68337/LOTUS","plant_name":"Lotus Solar","generator_id":"LOTUS","plant_id":68337,"state":"SC","county":"Darlington","developer":"Lotus Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.447832,"lon":-80.10356,"as_of":"2026-08"},{"id":"68995/ENX38","plant_name":"Dover Solar (PA)","generator_id":"ENX38","plant_id":68995,"state":"PA","county":"York","developer":"Dover Solar, LLC (PA)","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.01169,"lon":-76.8234,"as_of":"2026-08"},{"id":"65344/66149","plant_name":"Noria Hondo Solar (Hybrid)","generator_id":"66149","plant_id":65344,"state":"TX","county":"Kleberg","developer":"Nexus Renewable Power, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":27.553355,"lon":-97.67528,"as_of":"2026-08"},{"id":"66851/FAIR1","plant_name":"Fairview Solar (AR)","generator_id":"FAIR1","plant_id":66851,"state":"AR","county":"Ashley","developer":"Urban Grid Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":33.342883,"lon":-91.89495,"as_of":"2026-08"},{"id":"70365/BODES","plant_name":"Bodkin BESS","generator_id":"BODES","plant_id":70365,"state":"TX","county":"Brazoria","developer":"Bodkin BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75,"summer_mw":75,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":29.292,"lon":-95.301,"as_of":"2026-08"},{"id":"70366/BHBES","plant_name":"Boot Hill Energy Storage","generator_id":"BHBES","plant_id":70366,"state":"KS","county":"Ford","developer":"Boot Hill Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":75,"summer_mw":75,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":37.704,"lon":-99.977,"as_of":"2026-08"},{"id":"68331/CVSO","plant_name":"Caverns Solar","generator_id":"CVSO","plant_id":68331,"state":"FL","county":"Jackson","developer":"CVSO, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":75,"summer_mw":75,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"FPL","lat":30.871983,"lon":-85.29425,"as_of":"2026-08"},{"id":"64346/9999","plant_name":"Highland Solar South","generator_id":"9999","plant_id":64346,"state":"FL","county":"Highlands","developer":"Placid Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"FPC","lat":27.2664,"lon":-81.4082,"as_of":"2026-08"},{"id":"67666/SUNDN","plant_name":"Sundance (CO)","generator_id":"SUNDN","plant_id":67666,"state":"CO","county":"Elbert","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":39.414779,"lon":-104.4481,"as_of":"2026-08"},{"id":"68052/PV1","plant_name":"Bailey Mill Solar","generator_id":"PV1","plant_id":68052,"state":"FL","county":"Jefferson","developer":"Duke Energy Florida, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"FPC","lat":30.409127,"lon":-83.93336,"as_of":"2026-08"},{"id":"67723/SOLAR","plant_name":"Kingstree West 115","generator_id":"SOLAR","plant_id":67723,"state":"SC","county":"Williamsburg","developer":"Kingstree West 115 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CPLE","lat":33.693976,"lon":-79.95404,"as_of":"2026-08"},{"id":"62181/23","plant_name":"B & K Solar","generator_id":"23","plant_id":62181,"state":"SC","county":"Darlington","developer":"B & K Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLE","lat":34.423425,"lon":-80.06213,"as_of":"2026-08"},{"id":"70223/TPSP1","plant_name":"Turnpike Solar Plant","generator_id":"TPSP1","plant_id":70223,"state":"FL","county":"Osceola","developer":"Duke Energy Florida, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"FPC","lat":28.063296,"lon":-81.22305,"as_of":"2026-08"},{"id":"62184/27","plant_name":"Big Fork Solar","generator_id":"27","plant_id":62184,"state":"SC","county":"Barnwell","developer":"Big Fork Solar","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":33.135275,"lon":-81.23911,"as_of":"2026-08"},{"id":"62234/48","plant_name":"Juniper Solar","generator_id":"48","plant_id":62234,"state":"SC","county":"Chesterfield","developer":"Juniper Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.638189,"lon":-79.86121,"as_of":"2026-08"},{"id":"70222/LCSP1","plant_name":"Lonesome Camp Solar Plant","generator_id":"LCSP1","plant_id":70222,"state":"FL","county":"Osceola","developer":"Duke Energy Florida, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"FPC","lat":28.079121,"lon":-81.24029,"as_of":"2026-08"},{"id":"64345/1112","plant_name":"Highland Solar North","generator_id":"1112","plant_id":64345,"state":"FL","county":"Highlands","developer":"Placid Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"FPC","lat":27.2821,"lon":-81.4256,"as_of":"2026-08"},{"id":"62221/33","plant_name":"Culpepper Solar","generator_id":"33","plant_id":62221,"state":"SC","county":"Darlington","developer":"Culpepper Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.465864,"lon":-79.96044,"as_of":"2026-08"},{"id":"62295/67","plant_name":"Rollins Solar","generator_id":"67","plant_id":62295,"state":"SC","county":"Darlington","developer":"Rollins Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.353572,"lon":-80.01618,"as_of":"2026-08"},{"id":"62296/68","plant_name":"Ross Solar","generator_id":"68","plant_id":62296,"state":"SC","county":"Darlington","developer":"Ross Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.444756,"lon":-79.85173,"as_of":"2026-08"},{"id":"62184/26","plant_name":"Big Fork Solar","generator_id":"26","plant_id":62184,"state":"SC","county":"Barnwell","developer":"Big Fork Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":33.135275,"lon":-81.23911,"as_of":"2026-08"},{"id":"62188/30","plant_name":"Colleton Solar","generator_id":"30","plant_id":62188,"state":"SC","county":"Colleton","developer":"Colleton Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":33.123794,"lon":-80.84248,"as_of":"2026-08"},{"id":"68075/PINES","plant_name":"Pineside Solar","generator_id":"PINES","plant_id":68075,"state":"VA","county":"Buckingham","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.9,"summer_mw":74.9,"planned_start":"2030-01","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.5,"lon":-78.5,"as_of":"2026-08"},{"id":"69351/HNYPV","plant_name":"Honeycomb Solar and Storage","generator_id":"HNYPV","plant_id":69351,"state":"TX","county":"Bee","developer":"Honeycomb Solar Holdco, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.8,"summer_mw":74.8,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":28.184344,"lon":-97.77169,"as_of":"2026-08"},{"id":"69474/SWTSU","plant_name":"Sweet Sue Solar","generator_id":"SWTSU","plant_id":69474,"state":"VA","county":"King William","developer":"Dominion Renewable Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.8,"summer_mw":74.8,"planned_start":"2027-09","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":37.762,"lon":-77.191,"as_of":"2026-08"},{"id":"69461/1","plant_name":"Keene Branch Solar","generator_id":"1","plant_id":69461,"state":"FL","county":"Hillsborough","developer":"Tampa Electric Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TEC","lat":27.658706,"lon":-82.2657,"as_of":"2026-08"},{"id":"69626/SMF","plant_name":"FRP Miller Solar","generator_id":"SMF","plant_id":69626,"state":"FL","county":"Duval","developer":"FRP Miller Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"JEA","lat":30.320634,"lon":-81.91274,"as_of":"2026-08"},{"id":"68828/1","plant_name":"Tangelo","generator_id":"1","plant_id":68828,"state":"FL","county":"Okeechobee","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.507993,"lon":-80.73651,"as_of":"2026-08"},{"id":"68834/1","plant_name":"Hendry","generator_id":"1","plant_id":68834,"state":"FL","county":"Hendry","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":26.410345,"lon":-81.03189,"as_of":"2026-08"},{"id":"68824/1","plant_name":"Middle Lake","generator_id":"1","plant_id":68824,"state":"FL","county":"Madison","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":30.380511,"lon":-83.34074,"as_of":"2026-08"},{"id":"68829/1","plant_name":"Ambersweet","generator_id":"1","plant_id":68829,"state":"FL","county":"Indian River","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.567468,"lon":-80.62782,"as_of":"2026-08"},{"id":"68832/1","plant_name":"County Line","generator_id":"1","plant_id":68832,"state":"FL","county":"DeSoto","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.110556,"lon":-81.80083,"as_of":"2026-08"},{"id":"68830/1","plant_name":"Catfish","generator_id":"1","plant_id":68830,"state":"FL","county":"Okeechobee","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.277731,"lon":-80.78854,"as_of":"2026-08"},{"id":"68831/1","plant_name":"Cocoplum","generator_id":"1","plant_id":68831,"state":"FL","county":"Hendry","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":26.762027,"lon":-81.1907,"as_of":"2026-08"},{"id":"68833/1","plant_name":"Hardwood Hammock","generator_id":"1","plant_id":68833,"state":"FL","county":"Walton","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.282662,"lon":-81.77522,"as_of":"2026-08"},{"id":"68836/1","plant_name":"Maple Trail","generator_id":"1","plant_id":68836,"state":"FL","county":"Baker","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":30.314392,"lon":-82.18501,"as_of":"2026-08"},{"id":"68825/1","plant_name":"Pinecone","generator_id":"1","plant_id":68825,"state":"FL","county":"Calhoun","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":30.439415,"lon":-85.25499,"as_of":"2026-08"},{"id":"68826/1","plant_name":"Saddle","generator_id":"1","plant_id":68826,"state":"FL","county":"Calhoun","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":30.439415,"lon":-85.25499,"as_of":"2026-08"},{"id":"68827/1","plant_name":"Spanish Moss","generator_id":"1","plant_id":68827,"state":"FL","county":"St Lucie","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.509782,"lon":-80.56447,"as_of":"2026-08"},{"id":"68835/1","plant_name":"Joshua Creek","generator_id":"1","plant_id":68835,"state":"FL","county":"DeSoto","developer":"Florida Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPL","lat":27.282662,"lon":-81.77522,"as_of":"2026-08"},{"id":"65708/WMSS","plant_name":"Warren Meadow Solar Station","generator_id":"WMSS","plant_id":65708,"state":"ME","county":"Knox","developer":"Warren Meadow Solar Station, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74.5,"summer_mw":74.5,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":44.16061,"lon":-69.22341,"as_of":"2026-08"},{"id":"62229/43","plant_name":"Holliday Solar I","generator_id":"43","plant_id":62229,"state":"SC","county":"Horry","developer":"Holliday Solar I","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74,"summer_mw":74,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SC","lat":34.054128,"lon":-79.20663,"as_of":"2026-08"},{"id":"62309/73","plant_name":"Shining Sun Solar","generator_id":"73","plant_id":62309,"state":"SC","county":"Orangeburg","developer":"Shining Sun Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":74,"summer_mw":74.4,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SC","lat":33.5425,"lon":-80.57219,"as_of":"2026-08"},{"id":"64634/90FIB","plant_name":"Kingsley Solar Farm","generator_id":"90FIB","plant_id":64634,"state":"CA","county":"Imperial","developer":"90FI 8me, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":74,"summer_mw":74,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":32.742036,"lon":-115.7354,"as_of":"2026-08"},{"id":"64167/GEN","plant_name":"Hornet Solar","generator_id":"GEN","plant_id":64167,"state":"NC","county":"Gaston","developer":"Hornet Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":73,"summer_mw":73,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"DUK","lat":35.387,"lon":-81.029,"as_of":"2026-08"},{"id":"67195/GEN","plant_name":"Maple Leaf Solar","generator_id":"GEN","plant_id":67195,"state":"NC","county":"Johnston","developer":"Capital Power Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":73,"summer_mw":73,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"DUK","lat":35.595,"lon":-78.317,"as_of":"2026-08"},{"id":"6085/19A","plant_name":"R M Schahfer","generator_id":"19A","plant_id":6085,"state":"IN","county":"Jasper","developer":"Northern Indiana Pub Serv Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":71.5,"summer_mw":49.6,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.2164,"lon":-87.0261,"as_of":"2026-08"},{"id":"6085/19B","plant_name":"R M Schahfer","generator_id":"19B","plant_id":6085,"state":"IN","county":"Jasper","developer":"Northern Indiana Pub Serv Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":71.5,"summer_mw":49.6,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.2164,"lon":-87.0261,"as_of":"2026-08"},{"id":"6085/19C","plant_name":"R M Schahfer","generator_id":"19C","plant_id":6085,"state":"IN","county":"Jasper","developer":"Northern Indiana Pub Serv Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":71.5,"summer_mw":49.6,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.2164,"lon":-87.0261,"as_of":"2026-08"},{"id":"62262/GEN1","plant_name":"Rolling Upland Wind Farm LLC","generator_id":"GEN1","plant_id":62262,"state":"NY","county":"Madison","developer":"Rolling Upland Wind Farm LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":71.4,"summer_mw":71.4,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.524607,"lon":-75.27744,"as_of":"2026-08"},{"id":"70221/HPSP1","plant_name":"Hudson Place Solar Plant","generator_id":"HPSP1","plant_id":70221,"state":"SC","county":"Newberry","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70.7,"summer_mw":70.7,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":34.2391,"lon":-81.6922,"as_of":"2026-08"},{"id":"66691/BRUGG","plant_name":"Briggs Solar, LLC","generator_id":"BRUGG","plant_id":66691,"state":"TX","county":"Haskell","developer":"Intersect USA, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":70.5,"summer_mw":70.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":33.144326,"lon":-99.55977,"as_of":"2026-08"},{"id":"68000/BLUMN","plant_name":"Blue Moon","generator_id":"BLUMN","plant_id":68000,"state":"KY","county":"Harrison","developer":"Blue Moon Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70,"summer_mw":70,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.37118,"lon":-84.2578,"as_of":"2026-08"},{"id":"66787/ELVPS","plant_name":"Elevate Pier S","generator_id":"ELVPS","plant_id":66787,"state":"CA","county":"Los Angeles","developer":"Lighthouse Pier S, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":70,"summer_mw":70,"planned_start":"2026-12","planned_year":2026,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":33.764993,"lon":-118.2237,"as_of":"2026-08"},{"id":"69947/GEN05","plant_name":"EDPR Scarlet III","generator_id":"GEN05","plant_id":69947,"state":"CA","county":"Fresno","developer":"EDPR Scarlet III LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":70,"summer_mw":70,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.608742,"lon":-120.3511,"as_of":"2026-08"},{"id":"64428/JVR1B","plant_name":"JVR Energy Park LLC","generator_id":"JVR1B","plant_id":64428,"state":"CA","county":"San Diego","developer":"JVR Energy Park LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":70,"summer_mw":70,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":32.625903,"lon":-116.1749,"as_of":"2026-08"},{"id":"50736/FSS17","plant_name":"Pure Hedge LLC","generator_id":"FSS17","plant_id":50736,"state":"CT","county":"Windham","developer":"Pure Hedge LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70,"summer_mw":70,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.712448,"lon":-71.82225,"as_of":"2026-08"},{"id":"70109/JASMI","plant_name":"Jasmine","generator_id":"JASMI","plant_id":70109,"state":"CA","county":"Kern","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70,"summer_mw":70,"planned_start":"2027-12","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.1006,"lon":-119.1187,"as_of":"2026-08"},{"id":"67560/RIC94","plant_name":"Edens Solar","generator_id":"RIC94","plant_id":67560,"state":"TX","county":"Hill","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70,"summer_mw":70,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":32.063132,"lon":-97.11104,"as_of":"2026-08"},{"id":"66124/SSPV","plant_name":"Switchgrass Solar, LLC","generator_id":"SSPV","plant_id":66124,"state":"VA","county":"Suffolk City","developer":"RWE Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":70,"summer_mw":70,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":36.676484,"lon":-76.58588,"as_of":"2026-08"},{"id":"201/4","plant_name":"Thomas Fitzhugh","generator_id":"4","plant_id":201,"state":"AR","county":"Franklin","developer":"Arkansas Electric Coop Corp","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":69.3,"summer_mw":46.5,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":35.462382,"lon":-93.80493,"as_of":"2026-08"},{"id":"69524/WLB","plant_name":"Windy Lane Energy Center","generator_id":"WLB","plant_id":69524,"state":"NM","county":"De Baca","developer":"Windy Lane Energy Center, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":68,"summer_mw":68,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":34.587619,"lon":-104.0312,"as_of":"2026-08"},{"id":"68416/CTS1","plant_name":"Crooked Trail Solar","generator_id":"CTS1","plant_id":68416,"state":"ME","county":"Penobscot","developer":"VCP Realty, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":68,"summer_mw":68,"planned_start":"2029-10","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":45.144194,"lon":-68.58603,"as_of":"2026-08"},{"id":"67379/1","plant_name":"Whitetail Wind Farm","generator_id":"1","plant_id":67379,"state":"WI","county":"Grant","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":67.2,"summer_mw":67.2,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":42.951448,"lon":-90.4407,"as_of":"2026-08"},{"id":"68175/SYMPV","plant_name":"Symank Solar","generator_id":"SYMPV","plant_id":68175,"state":"TX","county":"Bosque","developer":"Belltown Power Texas 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":66.6,"summer_mw":66.6,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.626039,"lon":-97.64211,"as_of":"2026-08"},{"id":"68926/BLUEJ","plant_name":"Blue Jay Road Solar, LLC","generator_id":"BLUEJ","plant_id":68926,"state":"MO","county":"Ralls","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":66,"summer_mw":66,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":39.380782,"lon":-91.53206,"as_of":"2026-08"},{"id":"68556/DURHM","plant_name":"SR Durhamville","generator_id":"DURHM","plant_id":68556,"state":"TN","county":"Haywood","developer":"SR Durhamville, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":66,"summer_mw":66,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":35.626611,"lon":-89.46162,"as_of":"2026-08"},{"id":"3407/G1","plant_name":"Kingston","generator_id":"G1","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G10","plant_name":"Kingston","generator_id":"G10","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G11","plant_name":"Kingston","generator_id":"G11","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G12","plant_name":"Kingston","generator_id":"G12","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G13","plant_name":"Kingston","generator_id":"G13","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G14","plant_name":"Kingston","generator_id":"G14","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G15","plant_name":"Kingston","generator_id":"G15","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G16","plant_name":"Kingston","generator_id":"G16","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G2","plant_name":"Kingston","generator_id":"G2","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G3","plant_name":"Kingston","generator_id":"G3","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G4","plant_name":"Kingston","generator_id":"G4","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G5","plant_name":"Kingston","generator_id":"G5","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G6","plant_name":"Kingston","generator_id":"G6","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G7","plant_name":"Kingston","generator_id":"G7","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G8","plant_name":"Kingston","generator_id":"G8","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"3407/G9","plant_name":"Kingston","generator_id":"G9","plant_id":3407,"state":"TN","county":"Roane","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":65.8,"summer_mw":45,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":35.8992,"lon":-84.5194,"as_of":"2026-08"},{"id":"69631/SFS01","plant_name":"Sunflower Sky Energy Center","generator_id":"SFS01","plant_id":69631,"state":"KS","county":"Wilson","developer":"Evergy Missouri West","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":65,"summer_mw":65,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":37.502223,"lon":-95.64868,"as_of":"2026-08"},{"id":"70420/BA1","plant_name":"Wheatridge Optimization I","generator_id":"BA1","plant_id":70420,"state":"OR","county":"Morrow","developer":"Wheatridge Optimization I, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":65,"summer_mw":65,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":45.560054,"lon":-119.6224,"as_of":"2026-08"},{"id":"62280/58","plant_name":"Melsam Solar","generator_id":"58","plant_id":62280,"state":"SC","county":"Dillon","developer":"Melsam Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":65,"summer_mw":65,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.344878,"lon":-79.37456,"as_of":"2026-08"},{"id":"68672/OECHA","plant_name":"Chalan","generator_id":"OECHA","plant_id":68672,"state":"CA","county":"Kern","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":64.9,"summer_mw":64.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.7803,"lon":-119.911,"as_of":"2026-08"},{"id":"70109/JASBE","plant_name":"Jasmine","generator_id":"JASBE","plant_id":70109,"state":"CA","county":"Kern","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":64.4,"summer_mw":64.4,"planned_start":"2027-12","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.1006,"lon":-119.1187,"as_of":"2026-08"},{"id":"68074/CERUL","plant_name":"Cerulean Solar","generator_id":"CERUL","plant_id":68074,"state":"VA","county":"Richmond","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":62,"summer_mw":62,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":37.867194,"lon":-76.58987,"as_of":"2026-08"},{"id":"68593/OERHC","plant_name":"Rockhound C","generator_id":"OERHC","plant_id":68593,"state":"TX","county":"Ector","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":61,"summer_mw":61,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.723088,"lon":-102.5196,"as_of":"2026-08"},{"id":"69773/GT1","plant_name":"Mohave Energy Park","generator_id":"GT1","plant_id":69773,"state":"AZ","county":"Mohave","developer":"Arizona Electric Pwr Coop Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":43,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":34.932499,"lon":-114.548,"as_of":"2026-08"},{"id":"69773/GT2","plant_name":"Mohave Energy Park","generator_id":"GT2","plant_id":69773,"state":"AZ","county":"Mohave","developer":"Arizona Electric Pwr Coop Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":43,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":34.932499,"lon":-114.548,"as_of":"2026-08"},{"id":"69773/GT3","plant_name":"Mohave Energy Park","generator_id":"GT3","plant_id":69773,"state":"AZ","county":"Mohave","developer":"Arizona Electric Pwr Coop Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":43,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":34.932499,"lon":-114.548,"as_of":"2026-08"},{"id":"69773/GT4","plant_name":"Mohave Energy Park","generator_id":"GT4","plant_id":69773,"state":"AZ","county":"Mohave","developer":"Arizona Electric Pwr Coop Inc","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":43,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WALC","lat":34.932499,"lon":-114.548,"as_of":"2026-08"},{"id":"66478/GEN1","plant_name":"NTEC Gas Plant","generator_id":"GEN1","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN10","plant_name":"NTEC Gas Plant","generator_id":"GEN10","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN11","plant_name":"NTEC Gas Plant","generator_id":"GEN11","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN12","plant_name":"NTEC Gas Plant","generator_id":"GEN12","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN13","plant_name":"NTEC Gas Plant","generator_id":"GEN13","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN14","plant_name":"NTEC Gas Plant","generator_id":"GEN14","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN15","plant_name":"NTEC Gas Plant","generator_id":"GEN15","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN16","plant_name":"NTEC Gas Plant","generator_id":"GEN16","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN17","plant_name":"NTEC Gas Plant","generator_id":"GEN17","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN18","plant_name":"NTEC Gas Plant","generator_id":"GEN18","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN2","plant_name":"NTEC Gas Plant","generator_id":"GEN2","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN3","plant_name":"NTEC Gas Plant","generator_id":"GEN3","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN4","plant_name":"NTEC Gas Plant","generator_id":"GEN4","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN5","plant_name":"NTEC Gas Plant","generator_id":"GEN5","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN6","plant_name":"NTEC Gas Plant","generator_id":"GEN6","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN7","plant_name":"NTEC Gas Plant","generator_id":"GEN7","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN8","plant_name":"NTEC Gas Plant","generator_id":"GEN8","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"66478/GEN9","plant_name":"NTEC Gas Plant","generator_id":"GEN9","plant_id":66478,"state":"NM","county":"San Juan","developer":"Navajo Transitional Energy Company","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":60.5,"summer_mw":37.6,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.682944,"lon":-108.4502,"as_of":"2026-08"},{"id":"67871/ENX29","plant_name":"Gladys Solar LLC","generator_id":"ENX29","plant_id":67871,"state":"VA","county":"Campbell","developer":"Gladys Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60.4,"summer_mw":60.4,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.143719,"lon":-79.14207,"as_of":"2026-08"},{"id":"67781/GRS7","plant_name":"Lampe Solar","generator_id":"GRS7","plant_id":67781,"state":"TX","county":"Washington","developer":"Gransolar Texas Seven LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60.2,"summer_mw":60.2,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":30.310524,"lon":-96.47887,"as_of":"2026-08"},{"id":"67562/RIC92","plant_name":"Stonewall Solar","generator_id":"RIC92","plant_id":67562,"state":"TX","county":"Stonewall","developer":"RIC Development, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60.2,"summer_mw":60.2,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":33.174177,"lon":-100.2308,"as_of":"2026-08"},{"id":"66313/MOCO","plant_name":"Moon Corner Solar","generator_id":"MOCO","plant_id":66313,"state":"VA","county":"Richmond","developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":37.89,"lon":-76.54,"as_of":"2026-08"},{"id":"68495/BDOG1","plant_name":"Bird Dog Energy Storage","generator_id":"BDOG1","plant_id":68495,"state":"TX","county":"San Patricio","developer":"VESI 37 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":60,"summer_mw":60,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":28.158672,"lon":-97.86231,"as_of":"2026-08"},{"id":"62310/74","plant_name":"Shorthorn Solar","generator_id":"74","plant_id":62310,"state":"SC","county":"Lee","developer":"Shorthorn Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.246975,"lon":-80.15782,"as_of":"2026-08"},{"id":"68810/MORA","plant_name":"Mora Solar","generator_id":"MORA","plant_id":68810,"state":"PA","county":"Carbon","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.062982,"lon":-75.63435,"as_of":"2026-08"},{"id":"70450/BA1","plant_name":"Wheatridge Optimization II","generator_id":"BA1","plant_id":70450,"state":"OR","county":"Morrow","developer":"Wheatridge Optimization II, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":60,"summer_mw":60,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":45.559975,"lon":-119.6292,"as_of":"2026-08"},{"id":"63567/WSMTR","plant_name":"Westminister NC","generator_id":"WSMTR","plant_id":63567,"state":"NC","county":"Rutherford","developer":"Ecoplexus, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"DUK","lat":35.452,"lon":-81.919,"as_of":"2026-08"},{"id":"64767/TC001","plant_name":"Pigeon Run Solar Project","generator_id":"TC001","plant_id":64767,"state":"VA","county":"Campbell","developer":"Pigeon Run Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2029-07","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.158473,"lon":-79.05564,"as_of":"2026-08"},{"id":"64768/TC001","plant_name":"Zenith Solar","generator_id":"TC001","plant_id":64768,"state":"VA","county":"Pittsylvania","developer":"Zenith Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":60,"summer_mw":60,"planned_start":"2030-07","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":36.817763,"lon":-79.23328,"as_of":"2026-08"},{"id":"68924/IROB","plant_name":"Iron BESS","generator_id":"IROB","plant_id":68924,"state":"CA","county":"Fresno","developer":"Panoche BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":59.5,"summer_mw":57,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":36.652653,"lon":-120.5783,"as_of":"2026-08"},{"id":"69541/VACB","plant_name":"Vaca BESS","generator_id":"VACB","plant_id":69541,"state":"CA","county":"Solano","developer":"Vaca Dixon BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":59.5,"summer_mw":57,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":38.398379,"lon":-121.924,"as_of":"2026-08"},{"id":"65823/PARB","plant_name":"Parowan Solar","generator_id":"PARB","plant_id":65823,"state":"UT","county":"Iron","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":58,"summer_mw":58,"planned_start":"2028-02","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PACE","lat":37.875795,"lon":-112.8885,"as_of":"2026-08"},{"id":"65823/PARS0","plant_name":"Parowan Solar","generator_id":"PARS0","plant_id":65823,"state":"UT","county":"Iron","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":58,"summer_mw":58,"planned_start":"2028-02","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PACE","lat":37.875795,"lon":-112.8885,"as_of":"2026-08"},{"id":"68981/GRWF3","plant_name":"Gonzaga Ridge Wind Farm","generator_id":"GRWF3","plant_id":68981,"state":"CA","county":"Merced","developer":"Gonzaga Ridge Wind Farm, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":57.9,"summer_mw":57.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.065806,"lon":-121.1294,"as_of":"2026-08"},{"id":"708/5","plant_name":"Hammond","generator_id":"5","plant_id":708,"state":"GA","county":"Floyd","developer":"Georgia Power Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":57.5,"summer_mw":57.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":34.2528,"lon":-85.3456,"as_of":"2026-08"},{"id":"6249/5","plant_name":"Winyah","generator_id":"5","plant_id":6249,"state":"SC","county":"Georgetown","developer":"South Carolina Public Service Authority","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"GT","nameplate_mw":57,"summer_mw":44,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SC","lat":33.33184,"lon":-79.35724,"as_of":"2026-08"},{"id":"6249/6","plant_name":"Winyah","generator_id":"6","plant_id":6249,"state":"SC","county":"Georgetown","developer":"South Carolina Public Service Authority","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"GT","nameplate_mw":57,"summer_mw":44,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SC","lat":33.33184,"lon":-79.35724,"as_of":"2026-08"},{"id":"69799/EG001","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG001","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG002","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG002","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG003","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG003","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG004","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG004","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG005","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG005","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG006","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG006","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG007","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG007","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG008","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG008","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG009","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG009","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG010","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG010","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG011","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG011","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG012","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG012","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG013","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG013","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG014","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG014","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG015","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG015","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG016","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG016","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG017","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG017","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG018","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG018","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG019","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG019","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG020","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG020","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG021","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG021","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG022","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG022","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG023","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG023","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG024","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG024","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG025","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG025","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG026","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG026","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG027","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG027","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG028","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG028","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG029","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG029","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG030","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG030","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG031","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG031","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG032","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG032","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG033","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG033","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG034","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG034","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG035","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG035","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG036","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG036","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG037","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG037","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG038","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG038","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG039","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG039","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG040","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG040","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG041","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG041","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG042","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG042","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG043","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG043","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG044","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG044","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG045","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG045","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG046","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG046","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG047","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG047","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/EG048","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"EG048","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG001","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG001","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG002","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG002","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG003","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG003","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG004","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG004","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG005","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG005","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG006","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG006","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG007","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG007","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG008","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG008","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG009","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG009","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG010","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG010","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG011","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG011","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG012","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG012","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG013","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG013","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG014","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG014","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG015","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG015","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG016","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG016","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG017","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG017","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG018","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG018","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG019","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG019","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG020","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG020","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG021","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG021","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG022","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG022","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG023","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG023","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG024","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG024","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG025","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG025","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG026","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG026","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG027","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG027","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG028","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG028","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG029","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG029","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG030","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG030","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG031","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG031","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG032","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG032","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG033","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG033","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG034","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG034","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG035","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG035","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG036","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG036","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG037","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG037","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG038","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG038","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG039","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG039","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG040","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG040","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG041","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG041","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG042","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG042","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG043","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG043","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG044","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG044","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG045","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG045","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG046","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG046","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG047","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG047","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/MG048","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"MG048","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":57,"summer_mw":57,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"67785/GRS19","plant_name":"Whistle Solar","generator_id":"GRS19","plant_id":67785,"state":"TX","county":"Navarro","developer":"Gransolar Texas Nineteen LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":56.3,"summer_mw":56.3,"planned_start":"2028-05","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.985,"lon":-96.43658,"as_of":"2026-08"},{"id":"69119/NHBA1","plant_name":"New Hill 1 Battery","generator_id":"NHBA1","plant_id":69119,"state":"NC","county":"Wake","developer":"Duke Energy Progress - (NC)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":56,"summer_mw":56,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":35.659692,"lon":-78.94412,"as_of":"2026-08"},{"id":"67157/PV1","plant_name":"Powell Solar","generator_id":"PV1","plant_id":67157,"state":"OR","county":"Crook","developer":"Invenergy Services LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":55.9,"summer_mw":55.9,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PACW","lat":44.258414,"lon":-120.8895,"as_of":"2026-08"},{"id":"66341/EGSB","plant_name":"Eagle Springs Hybrid","generator_id":"EGSB","plant_id":66341,"state":"TX","county":"Delta","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":55.1,"summer_mw":55.1,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.433264,"lon":-95.57444,"as_of":"2026-08"},{"id":"69956/S8","plant_name":"Sanborn Hybrid 3","generator_id":"S8","plant_id":69956,"state":"CA","county":"Kern","developer":"Terra-Gen Operating Co-Hybrid","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":55,"summer_mw":55,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.996,"lon":-118.114,"as_of":"2026-08"},{"id":"68561/MIDDN","plant_name":"SR Middleton","generator_id":"MIDDN","plant_id":68561,"state":"TN","county":"Hardeman","developer":"SR Middleton, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":55,"summer_mw":55,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TVA","lat":35.176939,"lon":-88.87867,"as_of":"2026-08"},{"id":"66382/GEN1","plant_name":"Healing Springs Solar, LLC","generator_id":"GEN1","plant_id":66382,"state":"NC","county":"Davidson","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":55,"summer_mw":55,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"DUK","lat":35.623627,"lon":-80.15972,"as_of":"2026-08"},{"id":"68486/44STA","plant_name":"Sienna 2 Solar and Storage Project","generator_id":"44STA","plant_id":68486,"state":"CA","county":"San Bernardino","developer":"44ST 8ME LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":55,"summer_mw":55,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.506711,"lon":-116.8901,"as_of":"2026-08"},{"id":"68486/44STB","plant_name":"Sienna 2 Solar and Storage Project","generator_id":"44STB","plant_id":68486,"state":"CA","county":"San Bernardino","developer":"44ST 8ME LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":55,"summer_mw":55,"planned_start":"2029-03","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.506711,"lon":-116.8901,"as_of":"2026-08"},{"id":"68923/ENTB","plant_name":"Enterprise BESS","generator_id":"ENTB","plant_id":68923,"state":"CA","county":"San Diego","developer":"Enterprise BESS LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":54.1,"summer_mw":52,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":33.12181,"lon":-117.1174,"as_of":"2026-08"},{"id":"69523/1","plant_name":"Mattaniah Solar","generator_id":"1","plant_id":69523,"state":"FL","county":"Polk","developer":"Tampa Electric Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":52,"summer_mw":52,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TEC","lat":27.893214,"lon":-82.04614,"as_of":"2026-08"},{"id":"7887/5","plant_name":"Terry Bundy Generating Station","generator_id":"5","plant_id":7887,"state":"NE","county":"Lancaster","developer":"Lincoln Electric System","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":52,"summer_mw":46.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":40.909653,"lon":-96.61309,"as_of":"2026-08"},{"id":"7887/6","plant_name":"Terry Bundy Generating Station","generator_id":"6","plant_id":7887,"state":"NE","county":"Lancaster","developer":"Lincoln Electric System","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":52,"summer_mw":46.9,"planned_start":"2029-06","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":40.909653,"lon":-96.61309,"as_of":"2026-08"},{"id":"68980/GRBF","plant_name":"Gonzaga Ridge Battery Facility","generator_id":"GRBF","plant_id":68980,"state":"CA","county":"Merced","developer":"Gonzaga Ridge Battery Facility, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":51.8,"summer_mw":51.8,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.065806,"lon":-121.1929,"as_of":"2026-08"},{"id":"68380/ISCPV","plant_name":"Isaac Solar","generator_id":"ISCPV","plant_id":68380,"state":"TX","county":"Matagorda","developer":"Industrial Bravo Project, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":51.4,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":28.797223,"lon":-95.93717,"as_of":"2026-08"},{"id":"69793/HEPV1","plant_name":"Henderson County Solar","generator_id":"HEPV1","plant_id":69793,"state":"KY","county":"Henderson","developer":"Stellar Renewable Power","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":51.1,"summer_mw":50,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":37.799412,"lon":-87.62325,"as_of":"2026-08"},{"id":"67674/LUPE3","plant_name":"Lupinus Storage 3","generator_id":"LUPE3","plant_id":67674,"state":"TX","county":"Franklin","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50.9,"summer_mw":50.9,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":33.3015,"lon":-95.2548,"as_of":"2026-08"},{"id":"66390/GDYES","plant_name":"MRG Goody Solar Project Hybrid","generator_id":"GDYES","plant_id":66390,"state":"TX","county":"Lamar","developer":"Nexus Renewable Power, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50.4,"summer_mw":50.4,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":33.639193,"lon":-95.62905,"as_of":"2026-08"},{"id":"66894/ALBBA","plant_name":"Albatross Solar, LLC","generator_id":"ALBBA","plant_id":66894,"state":"TX","county":"McLennan","developer":"Sunraycer Assets I LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50.4,"summer_mw":50.4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":31.484342,"lon":-97.42239,"as_of":"2026-08"},{"id":"67778/GR16B","plant_name":"Findley PV and BESS","generator_id":"GR16B","plant_id":67778,"state":"TX","county":"Limestone","developer":"Gransolar Texas Sixteen, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50.3,"summer_mw":50.3,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.643389,"lon":-96.77961,"as_of":"2026-08"},{"id":"67778/GR16P","plant_name":"Findley PV and BESS","generator_id":"GR16P","plant_id":67778,"state":"TX","county":"Limestone","developer":"Gransolar Texas Sixteen, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50.3,"summer_mw":50.3,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.643389,"lon":-96.77961,"as_of":"2026-08"},{"id":"68970/HOFEL","plant_name":"Ho-Fel Solar","generator_id":"HOFEL","plant_id":68970,"state":"VA","county":"Isle of Wight","developer":"Ho-Fel Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50.2,"summer_mw":50.2,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":36.673032,"lon":-76.88201,"as_of":"2026-08"},{"id":"65043/DUST","plant_name":"Dulles Solar and Storage","generator_id":"DUST","plant_id":65043,"state":"VA","county":"Loudoun","developer":"Dominion Energy Inc.","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.95,"lon":-77.5,"as_of":"2026-08"},{"id":"67552/ELMBA","plant_name":"Elm Flats Solar","generator_id":"ELMBA","plant_id":67552,"state":"TX","county":"Navarro","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":32.113579,"lon":-96.30476,"as_of":"2026-08"},{"id":"67666/SUNBA","plant_name":"Sundance (CO)","generator_id":"SUNBA","plant_id":67666,"state":"CO","county":"Elbert","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":39.414779,"lon":-104.4481,"as_of":"2026-08"},{"id":"68929/RUBY","plant_name":"Ruby Solar, LLC","generator_id":"RUBY","plant_id":68929,"state":"IL","county":"Clinton","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.595759,"lon":-89.16983,"as_of":"2026-08"},{"id":"69964/BALBE","plant_name":"Baldy Mesa Storage","generator_id":"BALBE","plant_id":69964,"state":"CA","county":"San Bernardino","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.6029,"lon":-117.449,"as_of":"2026-08"},{"id":"68850/GRTSP","plant_name":"Gratiot Solar Park","generator_id":"GRTSP","plant_id":68850,"state":"MI","county":"Gratiot","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":43.436999,"lon":-84.49845,"as_of":"2026-08"},{"id":"68938/OHJE1","plant_name":"Juliet Energy Project, LLC","generator_id":"OHJE1","plant_id":68938,"state":"OH","county":"Wood","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.343803,"lon":-83.81598,"as_of":"2026-08"},{"id":"67215/ENX25","plant_name":"Sun Ridge Solar","generator_id":"ENX25","plant_id":67215,"state":"VA","county":"Rockingham","developer":"Sun Ridge Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.314898,"lon":-78.74463,"as_of":"2026-08"},{"id":"68953/KB1","plant_name":"Kifer BESS 1","generator_id":"KB1","plant_id":68953,"state":"CA","county":"Santa Clara","developer":"Kifer Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.376214,"lon":-121.952,"as_of":"2026-08"},{"id":"68247/GRGTN","plant_name":"SR Georgetown","generator_id":"GRGTN","plant_id":68247,"state":"SC","county":"Georgetown","developer":"SR Georgetown. LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"DUK","lat":33.333354,"lon":-79.51325,"as_of":"2026-08"},{"id":"68340/1","plant_name":"Solway Solar","generator_id":"1","plant_id":68340,"state":"MN","county":"Beltrami","developer":"Otter Tail Power Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":47.546501,"lon":-95.13,"as_of":"2026-08"},{"id":"69548/SFE","plant_name":"FRP Forest Trail Solar","generator_id":"SFE","plant_id":69548,"state":"FL","county":"Duval","developer":"FRP Forest Trail Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"JEA","lat":30.440764,"lon":-81.83423,"as_of":"2026-08"},{"id":"69626/BMF","plant_name":"FRP Miller Solar","generator_id":"BMF","plant_id":69626,"state":"FL","county":"Duval","developer":"FRP Miller Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"JEA","lat":30.320634,"lon":-81.91274,"as_of":"2026-08"},{"id":"70107/MSP","plant_name":"Mills Solar Project","generator_id":"MSP","plant_id":70107,"state":"IA","county":"Mills","developer":"MidAmerican Energy Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.033333,"lon":-95.45192,"as_of":"2026-08"},{"id":"70345/SFES","plant_name":"Steele Flats Energy Storage","generator_id":"SFES","plant_id":70345,"state":"NE","county":"Jefferson","developer":"Steele Flats Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":40.051306,"lon":-96.95178,"as_of":"2026-08"},{"id":"68930/ENX36","plant_name":"MC Solar","generator_id":"ENX36","plant_id":68930,"state":"PA","county":"Mercer","developer":"MC Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.412805,"lon":-80.43245,"as_of":"2026-08"},{"id":"69770/BRS","plant_name":"Ryan Storage","generator_id":"BRS","plant_id":69770,"state":"TX","county":"Coryell","developer":"Ryan Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.53576,"lon":-97.79874,"as_of":"2026-08"},{"id":"63846/RACE","plant_name":"Raceway Solar","generator_id":"RACE","plant_id":63846,"state":"DE","county":"Kent","developer":"Freepoint Commodities LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.909956,"lon":-75.58819,"as_of":"2026-08"},{"id":"69194/MCBA","plant_name":"Maiden Creek Battery","generator_id":"MCBA","plant_id":69194,"state":"NC","county":"Catawba","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DUK","lat":35.613673,"lon":-81.18707,"as_of":"2026-08"},{"id":"68564/PURYR","plant_name":"SR Puryear","generator_id":"PURYR","plant_id":68564,"state":"TN","county":"Henry","developer":"SR Puryear, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":36.449856,"lon":-88.30107,"as_of":"2026-08"},{"id":"67988/PGR28","plant_name":"Sandersville Solar","generator_id":"PGR28","plant_id":67988,"state":"GA","county":"Washington","developer":"Sandersville Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-10","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SOCO","lat":32.987105,"lon":-82.75254,"as_of":"2026-08"},{"id":"67884/ENX28","plant_name":"Two Oaks Solar and Storage LLC","generator_id":"ENX28","plant_id":67884,"state":"VA","county":"Louisa","developer":"Two Oaks Solar and Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":38.013053,"lon":-77.93117,"as_of":"2026-08"},{"id":"70197/LORE1","plant_name":"Lorenzo Energy Storage","generator_id":"LORE1","plant_id":70197,"state":"TX","county":"Crosby","developer":"Lorenzo Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":33.749367,"lon":-101.4829,"as_of":"2026-08"},{"id":"56998/BA7","plant_name":"Pueblo Airport Generating Station","generator_id":"BA7","plant_id":56998,"state":"CO","county":"Pueblo","developer":"Black Hills Service Company LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":38.320833,"lon":-104.5264,"as_of":"2026-08"},{"id":"63202/701-S","plant_name":"TREX US Red Holly","generator_id":"701-S","plant_id":63202,"state":"TX","county":"Lynn","developer":"TREX US Red Holly LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.952,"lon":-101.737,"as_of":"2026-08"},{"id":"65407/BEAR1","plant_name":"Beartooth Energy Storage LLC","generator_id":"BEAR1","plant_id":65407,"state":"MT","county":"Yellowstone","developer":"Beartooth Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NWMT","lat":45.7843,"lon":-108.7178,"as_of":"2026-08"},{"id":"68562/MTPLT","plant_name":"SR Mount Pleasant","generator_id":"MTPLT","plant_id":68562,"state":"MS","county":"Marshall","developer":"SR Mount Pleasant, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":34.951675,"lon":-89.58282,"as_of":"2026-08"},{"id":"68565/ROCH2","plant_name":"SR Rochelle II","generator_id":"ROCH2","plant_id":68565,"state":"GA","county":"Wilcox","developer":"SR Rochelle II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":32.030665,"lon":-83.506,"as_of":"2026-08"},{"id":"69799/FBG01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBG02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBG03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBG04","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG04","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBG05","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG05","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/FBG06","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"FBG06","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":50,"summer_mw":49.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"67983/AURRB","plant_name":"Aurora Renewable Energy (Hybrid)","generator_id":"AURRB","plant_id":67983,"state":"CA","county":"Stanislaus","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"BANC","lat":37.628805,"lon":-121.0714,"as_of":"2026-08"},{"id":"67983/AURRE","plant_name":"Aurora Renewable Energy (Hybrid)","generator_id":"AURRE","plant_id":67983,"state":"CA","county":"Stanislaus","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"BANC","lat":37.628805,"lon":-121.0714,"as_of":"2026-08"},{"id":"62190/32","plant_name":"Crossroads Solar","generator_id":"32","plant_id":62190,"state":"SC","county":"Barnwell","developer":"Crossroads Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":33.368886,"lon":-81.36497,"as_of":"2026-08"},{"id":"62217/40","plant_name":"GEB Solar","generator_id":"40","plant_id":62217,"state":"SC","county":"Darlington","developer":"GEB Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.412367,"lon":-80.04192,"as_of":"2026-08"},{"id":"62299/66","plant_name":"Quest Solar","generator_id":"66","plant_id":62299,"state":"SC","county":"Allendale","developer":"Quest Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SCEG","lat":32.976531,"lon":-81.22681,"as_of":"2026-08"},{"id":"64849/ATMWS","plant_name":"Wildcat Solar Power Plant LLC","generator_id":"ATMWS","plant_id":64849,"state":"NM","county":"McKinley","developer":"Solariant Capital, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PNM","lat":35.580453,"lon":-108.9023,"as_of":"2026-08"},{"id":"65286/ENX18","plant_name":"Caden Energix Piney River LLC","generator_id":"ENX18","plant_id":65286,"state":"VA","county":"Amherst","developer":"Caden Energix Piney River LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.696818,"lon":-79.02306,"as_of":"2026-08"},{"id":"68019/RICBA","plant_name":"Richwood Solar and Storage","generator_id":"RICBA","plant_id":68019,"state":"OH","county":"Union","developer":"Samsung C&T Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.353175,"lon":-83.33117,"as_of":"2026-08"},{"id":"68213/1","plant_name":"Panton","generator_id":"1","plant_id":68213,"state":"VT","county":"Addison","developer":"Viridis Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":44.1328,"lon":-73.31151,"as_of":"2026-08"},{"id":"69099/HEWA1","plant_name":"Orion - Helion","generator_id":"HEWA1","plant_id":69099,"state":"WA","county":"Chelan","developer":"Helion Energy, Inc.","sector":"IPP Non-CHP","technology":"All Other","energy_source":"H2","prime_mover":"OT","nameplate_mw":50,"summer_mw":50,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CHPD","lat":47.3368,"lon":-120.1043,"as_of":"2026-08"},{"id":"60670/1","plant_name":"CE&P Imperial Valley 1","generator_id":"1","plant_id":60670,"state":"CA","county":"Imperial","developer":"California Ethanol Power, LLC","sector":"Industrial CHP","technology":"All Other","energy_source":"OTH","prime_mover":"CC","nameplate_mw":50,"summer_mw":50,"planned_start":"2029-06","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"IID","lat":32.912778,"lon":-115.5183,"as_of":"2026-08"},{"id":"65445/RBESS","plant_name":"Ridgely Energy Farm","generator_id":"RBESS","plant_id":65445,"state":"TN","county":"Lake","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":36.306319,"lon":-89.46202,"as_of":"2026-08"},{"id":"67838/NY30","plant_name":"KCE NY 30, LLC","generator_id":"NY30","plant_id":67838,"state":"NY","county":"Suffolk","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":40.69477,"lon":-73.35182,"as_of":"2026-08"},{"id":"67839/NY31","plant_name":"KCE NY 31, LLC","generator_id":"NY31","plant_id":67839,"state":"NY","county":"Suffolk","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":50,"summer_mw":50,"planned_start":"2031-05","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":40.9581,"lon":-72.86654,"as_of":"2026-08"},{"id":"69278/3","plant_name":"Fortress 1","generator_id":"3","plant_id":69278,"state":"CO","county":"Morgan","developer":"Fortress Solar 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":49.9,"summer_mw":49.9,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PSCO","lat":40.26,"lon":-103.57,"as_of":"2026-08"},{"id":"56948/COE19","plant_name":"Coolidge Generation Station","generator_id":"COE19","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"56948/COE20","plant_name":"Coolidge Generation Station","generator_id":"COE20","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"56948/COE21","plant_name":"Coolidge Generation Station","generator_id":"COE21","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"56948/COE22","plant_name":"Coolidge Generation Station","generator_id":"COE22","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"56948/COE23","plant_name":"Coolidge Generation Station","generator_id":"COE23","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"56948/COE24","plant_name":"Coolidge Generation Station","generator_id":"COE24","plant_id":56948,"state":"AZ","county":"Pinal","developer":"Salt River Project","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49.5,"summer_mw":42,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":32.917399,"lon":-111.5033,"as_of":"2026-08"},{"id":"55455/CT10","plant_name":"Red Hawk","generator_id":"CT10","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT3","plant_name":"Red Hawk","generator_id":"CT3","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT4","plant_name":"Red Hawk","generator_id":"CT4","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT5","plant_name":"Red Hawk","generator_id":"CT5","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT6","plant_name":"Red Hawk","generator_id":"CT6","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT7","plant_name":"Red Hawk","generator_id":"CT7","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT8","plant_name":"Red Hawk","generator_id":"CT8","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"55455/CT9","plant_name":"Red Hawk","generator_id":"CT9","plant_id":55455,"state":"AZ","county":"Maricopa","developer":"Arizona Public Service Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":49,"summer_mw":45,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SRP","lat":33.334562,"lon":-112.8406,"as_of":"2026-08"},{"id":"7903/MGS3","plant_name":"McCartney","generator_id":"MGS3","plant_id":7903,"state":"MO","county":"Greene","developer":"City Utilities of Springfield - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48.9,"summer_mw":47.4,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.248431,"lon":-93.17084,"as_of":"2026-08"},{"id":"7903/MGS4","plant_name":"McCartney","generator_id":"MGS4","plant_id":7903,"state":"MO","county":"Greene","developer":"City Utilities of Springfield - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48.9,"summer_mw":47.4,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.248431,"lon":-93.17084,"as_of":"2026-08"},{"id":"7903/MGS5","plant_name":"McCartney","generator_id":"MGS5","plant_id":7903,"state":"MO","county":"Greene","developer":"City Utilities of Springfield - (MO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48.9,"summer_mw":47.4,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.248431,"lon":-93.17084,"as_of":"2026-08"},{"id":"69648/BSBA2","plant_name":"Rosamond South II","generator_id":"BSBA2","plant_id":69648,"state":"CA","county":"Kern","developer":"Golden Fields Solar VI, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":48,"summer_mw":48,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.852326,"lon":-118.4312,"as_of":"2026-08"},{"id":"68705/H01","plant_name":"Horizon","generator_id":"H01","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H02","plant_name":"Horizon","generator_id":"H02","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H03","plant_name":"Horizon","generator_id":"H03","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H04","plant_name":"Horizon","generator_id":"H04","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H05","plant_name":"Horizon","generator_id":"H05","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H06","plant_name":"Horizon","generator_id":"H06","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H07","plant_name":"Horizon","generator_id":"H07","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H08","plant_name":"Horizon","generator_id":"H08","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H09","plant_name":"Horizon","generator_id":"H09","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"68705/H10","plant_name":"Horizon","generator_id":"H10","plant_id":68705,"state":"CO","county":"El Paso","developer":"City of Colorado Springs - (CO)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":48,"summer_mw":37,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":38.775,"lon":-104.6668,"as_of":"2026-08"},{"id":"64073/GBS","plant_name":"Great Bear Solar, LLC","generator_id":"GBS","plant_id":64073,"state":"OH","county":"Van Wert","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":46,"summer_mw":46,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.9397,"lon":-84.5828,"as_of":"2026-08"},{"id":"69772/BRSP1","plant_name":"Bush River Solar Plant","generator_id":"BRSP1","plant_id":69772,"state":"SC","county":"Laurens","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":45,"summer_mw":45,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLW","lat":34.3861,"lon":-81.7944,"as_of":"2026-08"},{"id":"66879/CT1","plant_name":"KCE CT 1, LLC","generator_id":"CT1","plant_id":66879,"state":"CT","county":"Windham","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":45,"summer_mw":45,"planned_start":"2031-04","planned_year":2031,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":41.882568,"lon":-71.89481,"as_of":"2026-08"},{"id":"6761/G","plant_name":"Rawhide","generator_id":"G","plant_id":6761,"state":"CO","county":"Larimer","developer":"Platte River Power Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":44.6,"summer_mw":44.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":40.860905,"lon":-105.0212,"as_of":"2026-08"},{"id":"6761/H","plant_name":"Rawhide","generator_id":"H","plant_id":6761,"state":"CO","county":"Larimer","developer":"Platte River Power Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":44.6,"summer_mw":44.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":40.860905,"lon":-105.0212,"as_of":"2026-08"},{"id":"6761/LM3","plant_name":"Rawhide","generator_id":"LM3","plant_id":6761,"state":"CO","county":"Larimer","developer":"Platte River Power Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":44.6,"summer_mw":44.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":40.860905,"lon":-105.0212,"as_of":"2026-08"},{"id":"6761/LM4","plant_name":"Rawhide","generator_id":"LM4","plant_id":6761,"state":"CO","county":"Larimer","developer":"Platte River Power Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":44.6,"summer_mw":44.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":40.860905,"lon":-105.0212,"as_of":"2026-08"},{"id":"6761/LM5","plant_name":"Rawhide","generator_id":"LM5","plant_id":6761,"state":"CO","county":"Larimer","developer":"Platte River Power Authority","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":44.6,"summer_mw":44.6,"planned_start":"2028-03","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PSCO","lat":40.860905,"lon":-105.0212,"as_of":"2026-08"},{"id":"67772/GRS9","plant_name":"Braswell Solar","generator_id":"GRS9","plant_id":67772,"state":"TX","county":"McLennan","developer":"Gransolar Texas Nine LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":44.2,"summer_mw":42.6,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":31.34904,"lon":-97.21786,"as_of":"2026-08"},{"id":"70343/WAGT1","plant_name":"GPI WACO Power","generator_id":"WAGT1","plant_id":70343,"state":"TX","county":"McLennan","developer":"Graphic Packaging International - WACO","sector":"Industrial Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":43.4,"summer_mw":43.4,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.47682,"lon":-97.18766,"as_of":"2026-08"},{"id":"6211/GEN4","plant_name":"Dynegy Oakland Power Plant","generator_id":"GEN4","plant_id":6211,"state":"CA","county":"Alameda","developer":"Dynegy Oakland, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":43.3,"summer_mw":43.3,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":37.79675,"lon":-122.2819,"as_of":"2026-08"},{"id":"68068/CP1G1","plant_name":"Cape Generating Station","generator_id":"CP1G1","plant_id":68068,"state":"UT","county":"Beaver","developer":"Cape HoldCo LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"BT","nameplate_mw":43,"summer_mw":30,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"LDWP","lat":38.506706,"lon":-112.9175,"as_of":"2026-08"},{"id":"68068/CP1G2","plant_name":"Cape Generating Station","generator_id":"CP1G2","plant_id":68068,"state":"UT","county":"Beaver","developer":"Cape HoldCo LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"BT","nameplate_mw":43,"summer_mw":30,"planned_start":"2027-01","planned_year":2027,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"LDWP","lat":38.506706,"lon":-112.9175,"as_of":"2026-08"},{"id":"68068/CP1G3","plant_name":"Cape Generating Station","generator_id":"CP1G3","plant_id":68068,"state":"UT","county":"Beaver","developer":"Cape HoldCo LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"BT","nameplate_mw":43,"summer_mw":30,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LDWP","lat":38.506706,"lon":-112.9175,"as_of":"2026-08"},{"id":"66657/STEUB","plant_name":"Steubenville Solar","generator_id":"STEUB","plant_id":66657,"state":"OH","county":"Jefferson","developer":"BQ Energy Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":43,"summer_mw":43,"planned_start":"2027-03","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.351722,"lon":-80.67036,"as_of":"2026-08"},{"id":"68229/DEMRK","plant_name":"SR Denmark","generator_id":"DEMRK","plant_id":68229,"state":"TN","county":"Madison","developer":"SR Denmark, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":42,"summer_mw":42,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"TVA","lat":35.563633,"lon":-88.93254,"as_of":"2026-08"},{"id":"64188/PV","plant_name":"Shepherd's Run Solar","generator_id":"PV","plant_id":64188,"state":"NY","county":"Columbia","developer":"Shepherd's Run Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":42,"summer_mw":42,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.16141,"lon":-73.57453,"as_of":"2026-08"},{"id":"69294/OTS","plant_name":"Oregon Trail Solar","generator_id":"OTS","plant_id":69294,"state":"OR","county":"Gilliam","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":41,"summer_mw":41,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":45.553436,"lon":-120.1861,"as_of":"2026-08"},{"id":"70225/SES","plant_name":"Shutler Energy Storage","generator_id":"SES","plant_id":70225,"state":"OR","county":"Gilliam","developer":"Avangrid Power LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":41,"summer_mw":41,"planned_start":"2028-03","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"AVRN","lat":45.54,"lon":-120.18,"as_of":"2026-08"},{"id":"68981/GRWF1","plant_name":"Gonzaga Ridge Wind Farm","generator_id":"GRWF1","plant_id":68981,"state":"CA","county":"Merced","developer":"Gonzaga Ridge Wind Farm, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":40.3,"summer_mw":40.3,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.065806,"lon":-121.1294,"as_of":"2026-08"},{"id":"62892/SONR2","plant_name":"EDPR CA Solar Park VI LLC (CA) Hybrid","generator_id":"SONR2","plant_id":62892,"state":"CA","county":"Fresno","developer":"EDPR CA Solar Park VI LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":40,"summer_mw":40,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.62543,"lon":-120.3789,"as_of":"2026-08"},{"id":"68054/SNSB","plant_name":"Sunnyside Solar Energy Center","generator_id":"SNSB","plant_id":68054,"state":"WI","county":"Dane","developer":"Madison Gas & Electric Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":40,"summer_mw":40,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.985244,"lon":-89.43607,"as_of":"2026-08"},{"id":"69522/1","plant_name":"Brewster Solar","generator_id":"1","plant_id":69522,"state":"FL","county":"Polk","developer":"Tampa Electric Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TEC","lat":27.74188,"lon":-81.96187,"as_of":"2026-08"},{"id":"70306/21","plant_name":"Westfield Solar, LLC","generator_id":"21","plant_id":70306,"state":"NC","county":"Hoke","developer":"Headwater Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":34.943,"lon":-79.242,"as_of":"2026-08"},{"id":"70092/2BLUE","plant_name":"Two Blues Solar, LLC","generator_id":"2BLUE","plant_id":70092,"state":"IL","county":"Perry","developer":"Two Blues Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.1633,"lon":-89.37,"as_of":"2026-08"},{"id":"69539/TRAB","plant_name":"Tracy BESS","generator_id":"TRAB","plant_id":69539,"state":"CA","county":"San Joaquin","developer":"Middle River Power","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.711459,"lon":-121.4895,"as_of":"2026-08"},{"id":"69799/G6B01","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"G6B01","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":38.7,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/G6B02","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"G6B02","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":38.7,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/G6B03","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"G6B03","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":38.7,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69978/STPV","plant_name":"Station Solar","generator_id":"STPV","plant_id":69978,"state":"IL","county":"Mercer","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.0777,"lon":-90.55,"as_of":"2026-08"},{"id":"63806/PGR28","plant_name":"West River Solar, LLC","generator_id":"PGR28","plant_id":63806,"state":"NC","county":"Guilford","developer":"West River Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DUK","lat":36.043671,"lon":-79.64174,"as_of":"2026-08"},{"id":"68035/SYTOB","plant_name":"Syracuse and Tours Renewable Energy","generator_id":"SYTOB","plant_id":68035,"state":"CA","county":"Kern","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":34.951078,"lon":-118.3083,"as_of":"2026-08"},{"id":"68035/SYTOR","plant_name":"Syracuse and Tours Renewable Energy","generator_id":"SYTOR","plant_id":68035,"state":"CA","county":"Kern","developer":"Vesper Energy Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":34.951078,"lon":-118.3083,"as_of":"2026-08"},{"id":"69741/PV2","plant_name":"Cooperative Solar Two-Fayette","generator_id":"PV2","plant_id":69741,"state":"KY","county":"Fayette","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.035403,"lon":-84.31579,"as_of":"2026-08"},{"id":"69771/CCSP1","plant_name":"Clark Creek Solar Plant","generator_id":"CCSP1","plant_id":69771,"state":"NC","county":"Lincoln","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLW","lat":35.532689,"lon":-81.24866,"as_of":"2026-08"},{"id":"69743/KUIHE","plant_name":"Kuihelani Phase 2","generator_id":"KUIHE","plant_id":69743,"state":"HI","county":"Maui","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2028-11","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"HECO","lat":20.8026,"lon":-156.4984,"as_of":"2026-08"},{"id":"57703/02B","plant_name":"Cheyenne Prairie Generating Station","generator_id":"02B","plant_id":57703,"state":"WY","county":"Laramie","developer":"Black Hills Service Company LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":40,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.123611,"lon":-104.72,"as_of":"2026-08"},{"id":"57703/03A","plant_name":"Cheyenne Prairie Generating Station","generator_id":"03A","plant_id":57703,"state":"WY","county":"Laramie","developer":"Black Hills Service Company LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":40,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.123611,"lon":-104.72,"as_of":"2026-08"},{"id":"57703/03B","plant_name":"Cheyenne Prairie Generating Station","generator_id":"03B","plant_id":57703,"state":"WY","county":"Laramie","developer":"Black Hills Service Company LLC","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":40,"summer_mw":40,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"WACM","lat":41.123611,"lon":-104.72,"as_of":"2026-08"},{"id":"67221/NY128","plant_name":"Foothills Solar (NY)","generator_id":"NY128","plant_id":67221,"state":"NY","county":"Fulton","developer":"Boralex US Operations LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":40,"summer_mw":40,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":43.113678,"lon":-74.24503,"as_of":"2026-08"},{"id":"67966/NEWJ1","plant_name":"New Jay PV & BESS","generator_id":"NEWJ1","plant_id":67966,"state":"IN","county":"Jay","developer":"Hodson Greendefine Jay Desoto LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":39,"summer_mw":39,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.369376,"lon":-85.18392,"as_of":"2026-08"},{"id":"69890/UNIT3","plant_name":"Marshall Energy Center","generator_id":"UNIT3","plant_id":69890,"state":"MO","county":"Saline","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":38,"summer_mw":33.7,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":39.12358,"lon":-93.20592,"as_of":"2026-08"},{"id":"69890/UNIT4","plant_name":"Marshall Energy Center","generator_id":"UNIT4","plant_id":69890,"state":"MO","county":"Saline","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":38,"summer_mw":33.7,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SWPP","lat":39.12358,"lon":-93.20592,"as_of":"2026-08"},{"id":"69869/UNIT1","plant_name":"Hannibal Energy Center","generator_id":"UNIT1","plant_id":69869,"state":"MO","county":"Marion","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":38,"summer_mw":32.2,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.70965,"lon":-91.44026,"as_of":"2026-08"},{"id":"69869/UNIT2","plant_name":"Hannibal Energy Center","generator_id":"UNIT2","plant_id":69869,"state":"MO","county":"Marion","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":38,"summer_mw":32.2,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":39.70965,"lon":-91.44026,"as_of":"2026-08"},{"id":"69102/U1","plant_name":"Toronto Power Plant","generator_id":"U1","plant_id":69102,"state":"SD","county":"Deuel","developer":"Western Minnesota Mun Pwr Agny","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":36.3,"summer_mw":35.6,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.594752,"lon":-96.62219,"as_of":"2026-08"},{"id":"69102/U2","plant_name":"Toronto Power Plant","generator_id":"U2","plant_id":69102,"state":"SD","county":"Deuel","developer":"Western Minnesota Mun Pwr Agny","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":36.3,"summer_mw":35.6,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.594752,"lon":-96.62219,"as_of":"2026-08"},{"id":"69102/U3","plant_name":"Toronto Power Plant","generator_id":"U3","plant_id":69102,"state":"SD","county":"Deuel","developer":"Western Minnesota Mun Pwr Agny","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":36.3,"summer_mw":35.6,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.594752,"lon":-96.62219,"as_of":"2026-08"},{"id":"69102/U4","plant_name":"Toronto Power Plant","generator_id":"U4","plant_id":69102,"state":"SD","county":"Deuel","developer":"Western Minnesota Mun Pwr Agny","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":36.3,"summer_mw":35.6,"planned_start":"2029-12","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":44.594752,"lon":-96.62219,"as_of":"2026-08"},{"id":"70093/WSPV1","plant_name":"Wallace Solar - (TX)","generator_id":"WSPV1","plant_id":70093,"state":"TX","county":"Culberson","developer":"Delaware Ranch Solar, LLC","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":36,"summer_mw":36,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.917641,"lon":-104.3148,"as_of":"2026-08"},{"id":"61364/HHB","plant_name":"Hu Honua Bioenergy Facility","generator_id":"HHB","plant_id":61364,"state":"HI","county":"Hawaii","developer":"Hu Honua Bioenergy, LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBS","prime_mover":"ST","nameplate_mw":36,"summer_mw":32,"planned_start":"2027-12","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":19.843504,"lon":-155.0871,"as_of":"2026-08"},{"id":"69977/BBPV","plant_name":"Blue Branch Solar","generator_id":"BBPV","plant_id":69977,"state":"IL","county":"Johnson","developer":"Birch Creek Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":35.9,"summer_mw":35.9,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":37.467778,"lon":-88.96889,"as_of":"2026-08"},{"id":"68461/KEYBC","plant_name":"Key Energy Storage","generator_id":"KEYBC","plant_id":68461,"state":"CA","county":"Fresno","developer":"Key Energy Storage LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":35,"summer_mw":35,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.13681,"lon":-120.1312,"as_of":"2026-08"},{"id":"1167/10","plant_name":"Muscatine Plant #1","generator_id":"10","plant_id":1167,"state":"IA","county":"Muscatine","developer":"Board of Water Electric & Communications","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":35,"summer_mw":32.6,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.3917,"lon":-91.0569,"as_of":"2026-08"},{"id":"67977/QUACR","plant_name":"Quaker Creek Farm Solar","generator_id":"QUACR","plant_id":67977,"state":"NC","county":"Alamance","developer":"Quaker Creek Farm Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":34.9,"summer_mw":34.9,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DUK","lat":36.156688,"lon":-79.32292,"as_of":"2026-08"},{"id":"68981/GRWF2","plant_name":"Gonzaga Ridge Wind Farm","generator_id":"GRWF2","plant_id":68981,"state":"CA","county":"Merced","developer":"Gonzaga Ridge Wind Farm, LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":34.6,"summer_mw":34.6,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.065806,"lon":-121.1294,"as_of":"2026-08"},{"id":"64168/GEN","plant_name":"Bear Branch Solar","generator_id":"GEN","plant_id":64168,"state":"NC","county":"Stokes","developer":"Bear Branch Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":34.5,"summer_mw":34.5,"planned_start":"2027-01","planned_year":2027,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"DUK","lat":36.340427,"lon":-80.12974,"as_of":"2026-08"},{"id":"66850/BEAC1","plant_name":"Beaver Creek Solar","generator_id":"BEAC1","plant_id":66850,"state":"PA","county":"Franklin","developer":"Urban Grid Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":34.2,"summer_mw":34.2,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.086625,"lon":-77.66283,"as_of":"2026-08"},{"id":"66363/GEN1B","plant_name":"Black Walnut Solar, LLC","generator_id":"GEN1B","plant_id":66363,"state":"NC","county":"Jones","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":32,"summer_mw":32,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"DUK","lat":35.050032,"lon":-77.15218,"as_of":"2026-08"},{"id":"68871/TIMIB","plant_name":"Timber Mill Solar","generator_id":"TIMIB","plant_id":68871,"state":"NC","county":"Jones","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":32,"summer_mw":32,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CPLE","lat":34.96634,"lon":-77.21299,"as_of":"2026-08"},{"id":"66385/GEN1B","plant_name":"Panther Branch Solar, LLC","generator_id":"GEN1B","plant_id":66385,"state":"NC","county":"Duplin","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":32,"summer_mw":32,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"DUK","lat":35.145344,"lon":-78.15963,"as_of":"2026-08"},{"id":"68673/SLW_S","plant_name":"Sand Luis West","generator_id":"SLW_S","plant_id":68673,"state":"CA","county":"Fresno","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":31.3,"summer_mw":31.3,"planned_start":"2028-11","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.1676,"lon":-120.054,"as_of":"2026-08"},{"id":"2161/BAT1","plant_name":"James River Power Station","generator_id":"BAT1","plant_id":2161,"state":"MO","county":"Greene","developer":"City Utilities of Springfield - (MO)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":31,"summer_mw":31,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.108611,"lon":-93.26194,"as_of":"2026-08"},{"id":"69404/CRAGB","plant_name":"Craggy Energy Storage","generator_id":"CRAGB","plant_id":69404,"state":"NC","county":"Buncombe","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":30.5,"summer_mw":30.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLW","lat":35.641793,"lon":-82.60868,"as_of":"2026-08"},{"id":"60434/PV1","plant_name":"Baxter Creek Solar","generator_id":"PV1","plant_id":60434,"state":"NC","county":"Davie","developer":"Duke Energy Carolinas, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":30,"summer_mw":30,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"DUK","lat":35.865502,"lon":-80.55309,"as_of":"2026-08"},{"id":"66066/WAIBA","plant_name":"AES Waiawa Phase 2 Solar","generator_id":"WAIBA","plant_id":66066,"state":"HI","county":"Honolulu","developer":"AES Distributed Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":30,"summer_mw":30,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":21.43026,"lon":-157.9779,"as_of":"2026-08"},{"id":"66066/WAIPV","plant_name":"AES Waiawa Phase 2 Solar","generator_id":"WAIPV","plant_id":66066,"state":"HI","county":"Honolulu","developer":"AES Distributed Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":30,"summer_mw":30,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":21.43026,"lon":-157.9779,"as_of":"2026-08"},{"id":"69144/PV1","plant_name":"Baxter Creek Solar","generator_id":"PV1","plant_id":69144,"state":"NC","county":"Davie","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":30,"summer_mw":30,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLE","lat":35.865502,"lon":-80.55309,"as_of":"2026-08"},{"id":"64216/309SJ","plant_name":"Rockmont Solar and Storage Project","generator_id":"309SJ","plant_id":64216,"state":"NM","county":"San Juan","developer":"201LC 8me LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":30,"summer_mw":30,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PNM","lat":36.776579,"lon":-108.3751,"as_of":"2026-08"},{"id":"65930/10","plant_name":"Redbud Run Solar","generator_id":"10","plant_id":65930,"state":"VA","county":"Frederick","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":30,"summer_mw":30,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.21157,"lon":-78.08417,"as_of":"2026-08"},{"id":"65981/TXSD2","plant_name":"Second Division Solar","generator_id":"TXSD2","plant_id":65981,"state":"TX","county":"Brazoria","developer":"Lightsource Renewable Energy Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":30,"summer_mw":30,"planned_start":"2031-12","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.170545,"lon":-95.74157,"as_of":"2026-08"},{"id":"68594/OERHD","plant_name":"Rockhound D","generator_id":"OERHD","plant_id":68594,"state":"TX","county":"Ector","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":28,"summer_mw":28,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.6859,"lon":-102.518,"as_of":"2026-08"},{"id":"70090/SNPDR","plant_name":"Snapdragon Solar, LLC","generator_id":"SNPDR","plant_id":70090,"state":"IL","county":"Perry","developer":"Snapdragon Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":28,"summer_mw":28,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":38.1703,"lon":-89.5532,"as_of":"2026-08"},{"id":"68043/ROBSS","plant_name":"Robeson Solar I","generator_id":"ROBSS","plant_id":68043,"state":"NC","county":"Robeson","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":28,"summer_mw":28,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CPLE","lat":34.614574,"lon":-78.93468,"as_of":"2026-08"},{"id":"59969/GEN01","plant_name":"Windhub Solar B, LLC","generator_id":"GEN01","plant_id":59969,"state":"CA","county":"Kern","developer":"Windhub Solar B, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":26.4,"summer_mw":20,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.0133,"lon":-118.2698,"as_of":"2026-08"},{"id":"67669/ABESS","plant_name":"Arlington Battery Energy Storage System","generator_id":"ABESS","plant_id":67669,"state":"WA","county":"Snohomish","developer":"PUD No 1 of Snohomish County - (WA)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":25,"summer_mw":25,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"BPAT","lat":48.15617,"lon":-122.1437,"as_of":"2026-08"},{"id":"68672/CHA_B","plant_name":"Chalan","generator_id":"CHA_B","plant_id":68672,"state":"CA","county":"Kern","developer":"Origis Energy USA, Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":25,"summer_mw":25,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.7803,"lon":-119.911,"as_of":"2026-08"},{"id":"70303/20","plant_name":"Midfield Solar, LLC","generator_id":"20","plant_id":70303,"state":"NC","county":"Columbus","developer":"Headwater Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":25,"summer_mw":25,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":34.394,"lon":-78.771,"as_of":"2026-08"},{"id":"69024/GLNB1","plant_name":"Glenarm BESS Plant","generator_id":"GLNB1","plant_id":69024,"state":"CA","county":"Los Angeles","developer":"Glenarm BESS LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":25,"summer_mw":25,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":34.12739,"lon":-118.1477,"as_of":"2026-08"},{"id":"70049/NUCPV","plant_name":"Sierra Solar","generator_id":"NUCPV","plant_id":70049,"state":"AZ","county":"Mohave","developer":"Sierra Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":25,"summer_mw":25,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"WALC","lat":35.129649,"lon":-114.0803,"as_of":"2026-08"},{"id":"66695/HRSPN","plant_name":"Horsepen Branch Solar","generator_id":"HRSPN","plant_id":66695,"state":"VA","county":"Louisa","developer":"Horsepen Branch Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":25,"summer_mw":25,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.961,"lon":-77.792,"as_of":"2026-08"},{"id":"68528/77","plant_name":"Dynamo Solar LLC","generator_id":"77","plant_id":68528,"state":"CA","county":"Napa","developer":"Laketricity USA Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":24.5,"summer_mw":24.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":38.229106,"lon":-122.2937,"as_of":"2026-08"},{"id":"68240/SS3PV","plant_name":"Solar Star 3","generator_id":"SS3PV","plant_id":68240,"state":"CA","county":"Kern","developer":"Solar Star 3, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":24,"summer_mw":24,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.84166,"lon":-118.4551,"as_of":"2026-08"},{"id":"68241/SS4PV","plant_name":"Solar Star 4","generator_id":"SS4PV","plant_id":68241,"state":"CA","county":"Kern","developer":"Solar Star 4, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":24,"summer_mw":24,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.84166,"lon":-118.4551,"as_of":"2026-08"},{"id":"66978/MS1","plant_name":"MPW Solar 1","generator_id":"MS1","plant_id":66978,"state":"IA","county":"Muscatine","developer":"MPW Solar 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":24,"summer_mw":24,"planned_start":"2028-01","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":41.3849,"lon":-91.0964,"as_of":"2026-08"},{"id":"70261/WS02","plant_name":"Westside - (NM)","generator_id":"WS02","plant_id":70261,"state":"NM","county":"San Juan","developer":"Saddle Butte Energy Farmington, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":24,"summer_mw":24,"planned_start":"2028-01","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":36.752288,"lon":-108.3148,"as_of":"2026-08"},{"id":"69890/UNIT1","plant_name":"Marshall Energy Center","generator_id":"UNIT1","plant_id":69890,"state":"MO","county":"Saline","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":23.1,"summer_mw":19.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":39.12358,"lon":-93.20592,"as_of":"2026-08"},{"id":"69890/UNIT2","plant_name":"Marshall Energy Center","generator_id":"UNIT2","plant_id":69890,"state":"MO","county":"Saline","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":23.1,"summer_mw":19.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":39.12358,"lon":-93.20592,"as_of":"2026-08"},{"id":"68240/SS3BT","plant_name":"Solar Star 3","generator_id":"SS3BT","plant_id":68240,"state":"CA","county":"Kern","developer":"Solar Star 3, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":23,"summer_mw":23,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.84166,"lon":-118.4551,"as_of":"2026-08"},{"id":"68241/SS4BT","plant_name":"Solar Star 4","generator_id":"SS4BT","plant_id":68241,"state":"CA","county":"Kern","developer":"Solar Star 4, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":23,"summer_mw":23,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.84166,"lon":-118.4551,"as_of":"2026-08"},{"id":"69628/GBPV1","plant_name":"GBG SOLAR","generator_id":"GBPV1","plant_id":69628,"state":"TX","county":"Midland","developer":"Greater Bryant G Solar, LLC","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":22.2,"summer_mw":17.7,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.92835,"lon":-102.1617,"as_of":"2026-08"},{"id":"69806/GWBS1","plant_name":"Gaskell West Storage 1, LLC","generator_id":"GWBS1","plant_id":69806,"state":"CA","county":"Kern","developer":"Matrix Renewables","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":21.6,"summer_mw":21.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":34.833541,"lon":-118.5469,"as_of":"2026-08"},{"id":"70240/PFNON","plant_name":"PF Onsite BESS","generator_id":"PFNON","plant_id":70240,"state":"PA","county":"Luzerne","developer":"PF Onsite Generation LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":21,"summer_mw":21,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.918616,"lon":-76.07934,"as_of":"2026-08"},{"id":"63088/ROONR","plant_name":"Rooney Ranch","generator_id":"ROONR","plant_id":63088,"state":"CA","county":"Alameda","developer":"Viracocha Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":21,"summer_mw":21,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":37.737366,"lon":-121.6521,"as_of":"2026-08"},{"id":"69760/RIG1","plant_name":"Rock Island Generation Project","generator_id":"RIG1","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69760/RIG2","plant_name":"Rock Island Generation Project","generator_id":"RIG2","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69760/RIG3","plant_name":"Rock Island Generation Project","generator_id":"RIG3","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69760/RIG4","plant_name":"Rock Island Generation Project","generator_id":"RIG4","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69760/RIG5","plant_name":"Rock Island Generation Project","generator_id":"RIG5","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69760/RIG6","plant_name":"Rock Island Generation Project","generator_id":"RIG6","plant_id":69760,"state":"TX","county":"Colorado","developer":"Kerrville Public Utility Board Public Facility Corp","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20.3,"summer_mw":19.9,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":29.55068,"lon":-96.53675,"as_of":"2026-08"},{"id":"69444/ECB1","plant_name":"Elm City BESS","generator_id":"ECB1","plant_id":69444,"state":"NC","county":"Wilson","developer":"Duke Energy Progress - (NC)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLE","lat":35.789717,"lon":-77.85501,"as_of":"2026-08"},{"id":"70232/EVERG","plant_name":"Evergreen Energy Center, LLC","generator_id":"EVERG","plant_id":70232,"state":"VA","county":"Loudoun","developer":"East Point Energy, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":39.044885,"lon":-77.58191,"as_of":"2026-08"},{"id":"69535/NS1","plant_name":"Nutes Solar","generator_id":"NS1","plant_id":69535,"state":"NH","county":"Strafford","developer":"Walden Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":43.375125,"lon":-71.023,"as_of":"2026-08"},{"id":"70231/BETHL","plant_name":"Bethlehem Energy Center, LLC - (VA)","generator_id":"BETHL","plant_id":70231,"state":"VA","county":"Prince William","developer":"East Point Energy, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.781889,"lon":-77.5426,"as_of":"2026-08"},{"id":"70233/RAILR","plant_name":"Railroad Energy Center, LLC","generator_id":"RAILR","plant_id":70233,"state":"VA","county":"Prince William","developer":"East Point Energy, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.781689,"lon":-77.54202,"as_of":"2026-08"},{"id":"68054/SNSS","plant_name":"Sunnyside Solar Energy Center","generator_id":"SNSS","plant_id":68054,"state":"WI","county":"Dane","developer":"Madison Gas & Electric Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.985244,"lon":-89.43607,"as_of":"2026-08"},{"id":"64255/VBESS","plant_name":"Vonore Battery Energy Storage System","generator_id":"VBESS","plant_id":64255,"state":"TN","county":"Monroe","developer":"Tennessee Valley Authority","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":35.61543,"lon":-84.27489,"as_of":"2026-08"},{"id":"70234/REID","plant_name":"Reid Energy Center, LLC","generator_id":"REID","plant_id":70234,"state":"VA","county":"Prince William","developer":"East Point Energy, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.729874,"lon":-77.59242,"as_of":"2026-08"},{"id":"62823/Q584","plant_name":"SunEast Dog Corners Solar Project","generator_id":"Q584","plant_id":62823,"state":"NY","county":"Cayuga","developer":"Altus Power America Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.744301,"lon":-76.66531,"as_of":"2026-08"},{"id":"63862/Q#828","plant_name":"SunEast Valley Solar Project","generator_id":"Q#828","plant_id":63862,"state":"NY","county":"Tioga","developer":"Altus Power America Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.083795,"lon":-76.2477,"as_of":"2026-08"},{"id":"62816/Q670","plant_name":"SunEast Skyline Solar Project","generator_id":"Q670","plant_id":62816,"state":"NY","county":"Oneida","developer":"SunEast Skyline Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":43.063069,"lon":-75.45195,"as_of":"2026-08"},{"id":"64037/Q#913","plant_name":"SunEast Manchester Solar Project","generator_id":"Q#913","plant_id":64037,"state":"NY","county":"Ontario","developer":"SunEast Manchester Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":42.958318,"lon":-77.19503,"as_of":"2026-08"},{"id":"63901/Q#865","plant_name":"SunEast Flat Hill Solar Project","generator_id":"Q#865","plant_id":63901,"state":"NY","county":"Herkimer","developer":"Altus Power America Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.044363,"lon":-74.79632,"as_of":"2026-08"},{"id":"50736/FSS13","plant_name":"Pure Hedge LLC","generator_id":"FSS13","plant_id":50736,"state":"CT","county":"Windham","developer":"Pure Hedge LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.712448,"lon":-71.82225,"as_of":"2026-08"},{"id":"62895/Q581","plant_name":"SunEast Hills Solar Project","generator_id":"Q581","plant_id":62895,"state":"NY","county":"Herkimer","developer":"Hills Solar NY LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":43.068296,"lon":-74.84923,"as_of":"2026-08"},{"id":"63863/Q#885","plant_name":"SunEast Grassy Knoll Solar Project","generator_id":"Q#885","plant_id":63863,"state":"NY","county":"Herkimer","developer":"Grassy Knoll Solar NY LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":43.065379,"lon":-74.84372,"as_of":"2026-08"},{"id":"70395/BESS1","plant_name":"Pace Road Battery Storage","generator_id":"BESS1","plant_id":70395,"state":"FL","county":"Polk","developer":"Tampa Electric Co","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TEC","lat":28.136235,"lon":-81.82978,"as_of":"2026-08"},{"id":"62896/Q586","plant_name":"SunEast Watkins Road Solar Project","generator_id":"Q586","plant_id":62896,"state":"NY","county":"Herkimer","developer":"Watkins Road Solar NY LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":43.06127,"lon":-75.05584,"as_of":"2026-08"},{"id":"65901/6","plant_name":"Hatchery Solar","generator_id":"6","plant_id":65901,"state":"NY","county":"Livingston","developer":"Hatchery Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"NYIS","lat":42.976583,"lon":-77.76974,"as_of":"2026-08"},{"id":"64911/CSRB1","plant_name":"South Ripley Solar","generator_id":"CSRB1","plant_id":64911,"state":"NY","county":"Chautauqua","developer":"Repsol Renewables NA","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.198116,"lon":-79.75789,"as_of":"2026-08"},{"id":"65821/HNYBA","plant_name":"Honey Creek Solar","generator_id":"HNYBA","plant_id":65821,"state":"IN","county":"White","developer":"Leeward Asset Management, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.7971,"lon":-86.8572,"as_of":"2026-08"},{"id":"65931/3","plant_name":"Clear View Solar","generator_id":"3","plant_id":65931,"state":"NY","county":"Steuben","developer":"Clear View Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.57062,"lon":-77.46378,"as_of":"2026-08"},{"id":"68278/21066","plant_name":"Greater Wise Solar Project","generator_id":"21066","plant_id":68278,"state":"VA","county":"Wise","developer":"BQ Energy Development","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LGEE","lat":36.932469,"lon":-82.6769,"as_of":"2026-08"},{"id":"69667/FHS1","plant_name":"Fair Haven Solar","generator_id":"FHS1","plant_id":69667,"state":"VT","county":"Rutland","developer":"Freepoint Commodities LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":43.636,"lon":-73.279,"as_of":"2026-08"},{"id":"70261/WS03","plant_name":"Westside - (NM)","generator_id":"WS03","plant_id":70261,"state":"NM","county":"San Juan","developer":"Saddle Butte Energy Farmington, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-05","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":36.752288,"lon":-108.3148,"as_of":"2026-08"},{"id":"64036/ENX08","plant_name":"Caden Energix New Kent, LLC","generator_id":"ENX08","plant_id":64036,"state":"VA","county":"New Kent","developer":"Caden Energix New Kent, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-08","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.49004,"lon":-77.0616,"as_of":"2026-08"},{"id":"66682/NY10","plant_name":"KCE NY 10, LLC","generator_id":"NY10","plant_id":66682,"state":"NY","county":"Erie","developer":"Key Capture Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.907908,"lon":-78.66011,"as_of":"2026-08"},{"id":"68072/BRIDL","plant_name":"Bridleton Solar","generator_id":"BRIDL","plant_id":68072,"state":"VA","county":"Henrico","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":37.46,"lon":-77.27,"as_of":"2026-08"},{"id":"64064/SHAFT","plant_name":"Shaftsbury Solar","generator_id":"SHAFT","plant_id":64064,"state":"VT","county":"Bennington","developer":"Freepoint Commodities LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":42.96463,"lon":-73.16841,"as_of":"2026-08"},{"id":"65934/7","plant_name":"Highbanks Solar","generator_id":"7","plant_id":65934,"state":"NY","county":"Livingston","developer":"Highbanks Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":20,"summer_mw":20,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.737227,"lon":-77.91431,"as_of":"2026-08"},{"id":"65709/TRNR","plant_name":"Turner Meadow Solar Station","generator_id":"TRNR","plant_id":65709,"state":"ME","county":"Androscoggin","developer":"Turner Meadow Solar Station, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":19.8,"summer_mw":19.8,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":44.229478,"lon":-70.28027,"as_of":"2026-08"},{"id":"69799/TM001","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM001","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM002","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM002","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM003","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM003","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM004","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM004","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM005","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM005","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM006","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM006","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"69799/TM007","plant_name":"Project Matador Gas Plant (PMG)","generator_id":"TM007","plant_id":69799,"state":"TX","county":"Carson","developer":"Fermi America","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":18.9,"summer_mw":18,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":35.283762,"lon":-101.569,"as_of":"2026-08"},{"id":"68453/1","plant_name":"KYMEA Energy Center I","generator_id":"1","plant_id":68453,"state":"KY","county":"Hopkins","developer":"Kentucky Municipal Energy Agency","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.8,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LGEE","lat":37.319733,"lon":-87.55111,"as_of":"2026-08"},{"id":"68453/2","plant_name":"KYMEA Energy Center I","generator_id":"2","plant_id":68453,"state":"KY","county":"Hopkins","developer":"Kentucky Municipal Energy Agency","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.8,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LGEE","lat":37.319733,"lon":-87.55111,"as_of":"2026-08"},{"id":"68453/3","plant_name":"KYMEA Energy Center I","generator_id":"3","plant_id":68453,"state":"KY","county":"Hopkins","developer":"Kentucky Municipal Energy Agency","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.8,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LGEE","lat":37.319733,"lon":-87.55111,"as_of":"2026-08"},{"id":"68453/4","plant_name":"KYMEA Energy Center I","generator_id":"4","plant_id":68453,"state":"KY","county":"Hopkins","developer":"Kentucky Municipal Energy Agency","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.8,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LGEE","lat":37.319733,"lon":-87.55111,"as_of":"2026-08"},{"id":"389/RICE1","plant_name":"El Centro Hybrid","generator_id":"RICE1","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"389/RICE2","plant_name":"El Centro Hybrid","generator_id":"RICE2","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"389/RICE3","plant_name":"El Centro Hybrid","generator_id":"RICE3","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"389/RICE4","plant_name":"El Centro Hybrid","generator_id":"RICE4","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"389/RICE5","plant_name":"El Centro Hybrid","generator_id":"RICE5","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"389/RICE6","plant_name":"El Centro Hybrid","generator_id":"RICE6","plant_id":389,"state":"CA","county":"Imperial","developer":"Imperial Irrigation District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.8,"summer_mw":18.6,"planned_start":"2029-09","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"IID","lat":32.802222,"lon":-115.54,"as_of":"2026-08"},{"id":"69726/L1","plant_name":"Liberty Station","generator_id":"L1","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L10","plant_name":"Liberty Station","generator_id":"L10","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L11","plant_name":"Liberty Station","generator_id":"L11","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L12","plant_name":"Liberty Station","generator_id":"L12","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L2","plant_name":"Liberty Station","generator_id":"L2","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L3","plant_name":"Liberty Station","generator_id":"L3","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L4","plant_name":"Liberty Station","generator_id":"L4","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L5","plant_name":"Liberty Station","generator_id":"L5","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L6","plant_name":"Liberty Station","generator_id":"L6","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L7","plant_name":"Liberty Station","generator_id":"L7","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L8","plant_name":"Liberty Station","generator_id":"L8","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69726/L9","plant_name":"Liberty Station","generator_id":"L9","plant_id":69726,"state":"KY","county":"Casey","developer":"East Kentucky Power Coop, Inc","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":17.8,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":37.369331,"lon":-84.95767,"as_of":"2026-08"},{"id":"69808/R01","plant_name":"Princeton Road Station","generator_id":"R01","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R02","plant_name":"Princeton Road Station","generator_id":"R02","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R03","plant_name":"Princeton Road Station","generator_id":"R03","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R04","plant_name":"Princeton Road Station","generator_id":"R04","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R05","plant_name":"Princeton Road Station","generator_id":"R05","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R06","plant_name":"Princeton Road Station","generator_id":"R06","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R07","plant_name":"Princeton Road Station","generator_id":"R07","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R08","plant_name":"Princeton Road Station","generator_id":"R08","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R09","plant_name":"Princeton Road Station","generator_id":"R09","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R10","plant_name":"Princeton Road Station","generator_id":"R10","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R11","plant_name":"Princeton Road Station","generator_id":"R11","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"69808/R12","plant_name":"Princeton Road Station","generator_id":"R12","plant_id":69808,"state":"NE","county":"Lancaster","developer":"Nebraska Public Power District","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":18.1,"summer_mw":18.1,"planned_start":"2029-06","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":40.570394,"lon":-96.78647,"as_of":"2026-08"},{"id":"70108/PIKE","plant_name":"PIKE Solar","generator_id":"PIKE","plant_id":70108,"state":"IL","county":"Fayette","developer":"Pike Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":18,"summer_mw":18,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.9577,"lon":-89.169,"as_of":"2026-08"},{"id":"70260/SCIPI","plant_name":"Scipio Solar","generator_id":"SCIPI","plant_id":70260,"state":"NY","county":"Cayuga","developer":"Altus Power America Management, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":18,"summer_mw":18,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.78732,"lon":-76.32378,"as_of":"2026-08"},{"id":"69782/CW216","plant_name":"Cartwright Solar II","generator_id":"CW216","plant_id":69782,"state":"OR","county":"Crook","developer":"Cartwright Solar II LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":17.6,"summer_mw":17.6,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"BPAT","lat":44.244,"lon":-120.938,"as_of":"2026-08"},{"id":"65305/BESS","plant_name":"Powells Creek Solar - Hybrid","generator_id":"BESS","plant_id":65305,"state":"VA","county":"Halifax","developer":"Powells Creek Farm Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":17.5,"summer_mw":17.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":36.55467,"lon":-79.0286,"as_of":"2026-08"},{"id":"69429/AVLB1","plant_name":"Asheville BESS","generator_id":"AVLB1","plant_id":69429,"state":"NC","county":"Buncombe","developer":"Duke Energy Progress - (NC)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":17.3,"summer_mw":17.3,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLW","lat":35.472139,"lon":-82.54163,"as_of":"2026-08"},{"id":"65369/TMSS","plant_name":"Topsham Meadow Solar Station","generator_id":"TMSS","plant_id":65369,"state":"ME","county":"Sagadahoc","developer":"Topsham Meadow Solar Station LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":17.2,"summer_mw":17.2,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":43.975183,"lon":-70.0113,"as_of":"2026-08"},{"id":"65371/WBSS","plant_name":"West Baldwin Solar Station","generator_id":"WBSS","plant_id":65371,"state":"ME","county":"Cumberland","developer":"West Baldwin Solar Station LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":17.1,"summer_mw":17.1,"planned_start":"2028-12","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":43.867403,"lon":-70.7866,"as_of":"2026-08"},{"id":"50666/GEN2","plant_name":"Pasco Cnty Solid Waste Resource Recovery","generator_id":"GEN2","plant_id":50666,"state":"FL","county":"Pasco","developer":"Pasco County - (FL)","sector":"IPP Non-CHP","technology":"Municipal Solid Waste","energy_source":"MSW","prime_mover":"ST","nameplate_mw":17,"summer_mw":15,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"FPC","lat":28.3681,"lon":-82.5583,"as_of":"2026-08"},{"id":"63652/SNDHB","plant_name":"Sand Hill B","generator_id":"SNDHB","plant_id":63652,"state":"CA","county":"Alameda","developer":"Viracocha Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":17,"summer_mw":17,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":37.755007,"lon":-121.5968,"as_of":"2026-08"},{"id":"55478/IC01","plant_name":"Lange Generating Station","generator_id":"IC01","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"55478/IC02","plant_name":"Lange Generating Station","generator_id":"IC02","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"55478/IC03","plant_name":"Lange Generating Station","generator_id":"IC03","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"55478/IC04","plant_name":"Lange Generating Station","generator_id":"IC04","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"55478/IC05","plant_name":"Lange Generating Station","generator_id":"IC05","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"55478/IC06","plant_name":"Lange Generating Station","generator_id":"IC06","plant_id":55478,"state":"SD","county":"Pennington","developer":"Black Hills Power, Inc.","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16.6,"summer_mw":16.3,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":44.1218,"lon":-103.2641,"as_of":"2026-08"},{"id":"69868/UNIT1","plant_name":"Fulton Energy Center","generator_id":"UNIT1","plant_id":69868,"state":"MO","county":"Callaway","developer":"Missouri Jnt Muni.Pwr Elec. Ut. Comm.","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":16.5,"summer_mw":15.1,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":38.8676,"lon":-91.94778,"as_of":"2026-08"},{"id":"65366/EMSS","plant_name":"Emery Meadow Solar Station","generator_id":"EMSS","plant_id":65366,"state":"ME","county":"York","developer":"Emery Meadow Solar Station, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":16.4,"summer_mw":16.4,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":43.643433,"lon":-70.55837,"as_of":"2026-08"},{"id":"1024/8","plant_name":"Crawfordsville Power Plant","generator_id":"8","plant_id":1024,"state":"IN","county":"Montgomery","developer":"Crawfordsville Energy LLC","sector":"IPP Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CS","nameplate_mw":16.3,"summer_mw":16.3,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":40.048889,"lon":-86.8992,"as_of":"2026-08"},{"id":"3338/3","plant_name":"Aberdeen CT","generator_id":"3","plant_id":3338,"state":"SD","county":"Brown","developer":"NorthWestern Energy - (SD)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":16,"summer_mw":15,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":45.429884,"lon":-98.49396,"as_of":"2026-08"},{"id":"3338/4","plant_name":"Aberdeen CT","generator_id":"4","plant_id":3338,"state":"SD","county":"Brown","developer":"NorthWestern Energy - (SD)","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":16,"summer_mw":15,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":45.429884,"lon":-98.49396,"as_of":"2026-08"},{"id":"69602/90918","plant_name":"Essex VT BESS 1","generator_id":"90918","plant_id":69602,"state":"VT","county":"Chittenden","developer":"Essex VT BESS 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":16,"summer_mw":16,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":44.483701,"lon":-73.10717,"as_of":"2026-08"},{"id":"70261/WS01","plant_name":"Westside - (NM)","generator_id":"WS01","plant_id":70261,"state":"NM","county":"San Juan","developer":"Saddle Butte Energy Farmington, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":16,"summer_mw":16,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":36.752288,"lon":-108.3148,"as_of":"2026-08"},{"id":"59572/PV1","plant_name":"Cotton Solar","generator_id":"PV1","plant_id":59572,"state":"SC","county":"Dillon","developer":"Cotton Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":16,"summer_mw":16,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CPLE","lat":34.455,"lon":-79.41028,"as_of":"2026-08"},{"id":"67954/BRPV1","plant_name":"BAI-Boyles Run-Phase I","generator_id":"BRPV1","plant_id":67954,"state":"PA","county":"Northumberland","developer":"Boyles Run Solar I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":15.9,"summer_mw":15.9,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.771847,"lon":-76.78119,"as_of":"2026-08"},{"id":"67955/BRPV2","plant_name":"BAI-Boyles Run-Phase 2","generator_id":"BRPV2","plant_id":67955,"state":"PA","county":"Northumberland","developer":"Boyles Run Solar II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":15.9,"summer_mw":15.9,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.771847,"lon":-76.78119,"as_of":"2026-08"},{"id":"66785/ELVAK","plant_name":"Elevate Arthur Kill","generator_id":"ELVAK","plant_id":66785,"state":"NY","county":"Richmond","developer":"Lighthouse Arthur Kill, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":15.1,"summer_mw":15.1,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":40.590066,"lon":-74.19836,"as_of":"2026-08"},{"id":"68560/MARJT","plant_name":"SR Marion Junction","generator_id":"MARJT","plant_id":68560,"state":"AL","county":"Dallas","developer":"SR Marion Junction, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":15,"summer_mw":15,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":32.418685,"lon":-87.36171,"as_of":"2026-08"},{"id":"10328/GEN11","plant_name":"T B Simon Power Plant","generator_id":"GEN11","plant_id":10328,"state":"MI","county":"Ingham","developer":"Michigan State University","sector":"Commercial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":15,"summer_mw":15,"planned_start":"2028-01","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.7178,"lon":-84.4836,"as_of":"2026-08"},{"id":"67879/ENX26","plant_name":"Stony Creek Solar","generator_id":"ENX26","plant_id":67879,"state":"PA","county":"Somerset","developer":"Stony Creek Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":15,"summer_mw":15,"planned_start":"2028-10","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.222386,"lon":-78.8812,"as_of":"2026-08"},{"id":"60642/1","plant_name":"M&G Resins USA","generator_id":"1","plant_id":60642,"state":"TX","county":"Nueces","developer":"CC Polymers LLC","sector":"Industrial Non-CHP","technology":"All Other","energy_source":"WH","prime_mover":"OT","nameplate_mw":14.3,"summer_mw":11.7,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":27.833756,"lon":-97.49652,"as_of":"2026-08"},{"id":"60642/2","plant_name":"M&G Resins USA","generator_id":"2","plant_id":60642,"state":"TX","county":"Nueces","developer":"CC Polymers LLC","sector":"Industrial Non-CHP","technology":"All Other","energy_source":"WH","prime_mover":"OT","nameplate_mw":14.3,"summer_mw":11.7,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":27.833756,"lon":-97.49652,"as_of":"2026-08"},{"id":"70203/GEN1","plant_name":"Bealeton Solar","generator_id":"GEN1","plant_id":70203,"state":"VA","county":"Fauquier","developer":"TerraForm Power Operating, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":14.2,"summer_mw":14,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.555832,"lon":-77.77828,"as_of":"2026-08"},{"id":"61912/MHSOL","plant_name":"McGinness Hills 3","generator_id":"MHSOL","plant_id":61912,"state":"NV","county":"Lander","developer":"Ormat Nevada Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":14,"summer_mw":14,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NEVP","lat":39.5963,"lon":-116.8942,"as_of":"2026-08"},{"id":"69771/CCBS1","plant_name":"Clark Creek Solar Plant","generator_id":"CCBS1","plant_id":69771,"state":"NC","county":"Lincoln","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":14,"summer_mw":14,"planned_start":"2028-02","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLW","lat":35.532689,"lon":-81.24866,"as_of":"2026-08"},{"id":"1239/13","plant_name":"Riverton","generator_id":"13","plant_id":1239,"state":"KS","county":"Cherokee","developer":"Empire District Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":13.5,"summer_mw":13.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":37.072616,"lon":-94.6987,"as_of":"2026-08"},{"id":"1239/14","plant_name":"Riverton","generator_id":"14","plant_id":1239,"state":"KS","county":"Cherokee","developer":"Empire District Electric Co","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":13.5,"summer_mw":13.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":37.072616,"lon":-94.6987,"as_of":"2026-08"},{"id":"63126/SNDHA","plant_name":"Sand Hill A","generator_id":"SNDHA","plant_id":63126,"state":"CA","county":"Alameda","developer":"Viracocha Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":13.5,"summer_mw":13.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":37.743809,"lon":-121.6078,"as_of":"2026-08"},{"id":"70409/ENX41","plant_name":"Hera Solar","generator_id":"ENX41","plant_id":70409,"state":"VA","county":"Tazewell","developer":"Hera Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":13.3,"summer_mw":13.3,"planned_start":"2028-06","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":36.167141,"lon":-81.50336,"as_of":"2026-08"},{"id":"70296/MTBAT","plant_name":"Milltown Onsite BESS","generator_id":"MTBAT","plant_id":70296,"state":"NJ","county":"Middlesex","developer":"Milltown Onsite Generation, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":13.2,"summer_mw":13.2,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.453346,"lon":-74.43502,"as_of":"2026-08"},{"id":"67836/GSP1","plant_name":"Gibson Solar Project - Hybrid","generator_id":"GSP1","plant_id":67836,"state":"CA","county":"Yolo","developer":"Emeren US, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":13,"summer_mw":13,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":38.678386,"lon":-121.9876,"as_of":"2026-08"},{"id":"67836/GSP2","plant_name":"Gibson Solar Project - Hybrid","generator_id":"GSP2","plant_id":67836,"state":"CA","county":"Yolo","developer":"Emeren US, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":13,"summer_mw":13,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":38.678386,"lon":-121.9876,"as_of":"2026-08"},{"id":"65302/BESS","plant_name":"Salt City Solar Project - Hybrid","generator_id":"BESS","plant_id":65302,"state":"OH","county":"Ross","developer":"Salt City Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":12.5,"summer_mw":12.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.41473,"lon":-82.96285,"as_of":"2026-08"},{"id":"65304/BESS","plant_name":"ENGIE Solidago Solar Project - Hybrid","generator_id":"BESS","plant_id":65304,"state":"DE","county":"New Castle","developer":"ENGIE Solidago Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":12.5,"summer_mw":12.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.395187,"lon":-75.7535,"as_of":"2026-08"},{"id":"65307/SUNB","plant_name":"Sunnybrook Solar Project - Hybrid","generator_id":"SUNB","plant_id":65307,"state":"VA","county":"Halifax","developer":"Sunnybrook Farm Solar, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":12.5,"summer_mw":12.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":36.798717,"lon":-78.83961,"as_of":"2026-08"},{"id":"67253/761","plant_name":"Cherry Valley","generator_id":"761","plant_id":67253,"state":"IL","county":"Boone","developer":"Greenbacker Renewable Energy Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":12.5,"summer_mw":12.5,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.240017,"lon":-88.93076,"as_of":"2026-08"},{"id":"70410/ENX42","plant_name":"Willow Solar","generator_id":"ENX42","plant_id":70410,"state":"VA","county":"Franklin","developer":"Willow Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":12,"summer_mw":12,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":36.968749,"lon":-79.93001,"as_of":"2026-08"},{"id":"58639/BESS8","plant_name":"KRS I Anahola Solar Hybrid","generator_id":"BESS8","plant_id":58639,"state":"HI","county":"Kauai","developer":"Kauai Island Utility Cooperative","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":12,"summer_mw":12,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":null,"lat":22.131667,"lon":-159.3031,"as_of":"2026-08"},{"id":"58640/BESS7","plant_name":"KRS II Koloa Solar","generator_id":"BESS7","plant_id":58640,"state":"HI","county":"Kauai","developer":"Kauai Island Utility Cooperative","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":12,"summer_mw":12,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":null,"lat":21.900833,"lon":-159.45,"as_of":"2026-08"},{"id":"57472/CTG","plant_name":"TBE-Montgomery LLC","generator_id":"CTG","plant_id":57472,"state":"NY","county":"Orange","developer":"TBE Montgomery LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBG","prime_mover":"CT","nameplate_mw":12,"summer_mw":11.6,"planned_start":"2039-12","planned_year":2039,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":41.4885,"lon":-74.2262,"as_of":"2026-08"},{"id":"69870/BAT1","plant_name":"Parkwood BESS","generator_id":"BAT1","plant_id":69870,"state":"NC","county":"Union","developer":"North Carolina El Member Corp","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":11.6,"summer_mw":11.6,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"DUK","lat":34.891701,"lon":-80.63255,"as_of":"2026-08"},{"id":"66870/DAVS","plant_name":"Davis Solar (WV)","generator_id":"DAVS","plant_id":66870,"state":"WV","county":"Tucker","developer":"Monongahela Power Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":11.5,"summer_mw":11.5,"planned_start":"2028-12","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.155005,"lon":-79.44334,"as_of":"2026-08"},{"id":"69988/WBA2","plant_name":"Warsaw 2 Energy Storage","generator_id":"WBA2","plant_id":69988,"state":"NC","county":"Duplin","developer":"Duke Energy Progress - (NC)","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":11,"summer_mw":10.1,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLE","lat":35.003702,"lon":-78.1165,"as_of":"2026-08"},{"id":"69552/90916","plant_name":"Danville VA BESS 2","generator_id":"90916","plant_id":69552,"state":"VA","county":"Pittsylvania","developer":"Danville VA BESS 2 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":11,"summer_mw":11,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.6052,"lon":-79.4358,"as_of":"2026-08"},{"id":"69457/MEBA1","plant_name":"Mesquite Clean Energy Center (BESS)","generator_id":"MEBA1","plant_id":69457,"state":"TX","county":"Cameron","developer":"On Energy Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10.1,"summer_mw":10.1,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":26.098447,"lon":-97.82261,"as_of":"2026-08"},{"id":"69865/CLBA1","plant_name":"Columbus Clean Energy Center (BESS)","generator_id":"CLBA1","plant_id":69865,"state":"TX","county":"Colorado","developer":"On Energy Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10.1,"summer_mw":10.1,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.6789,"lon":-96.53042,"as_of":"2026-08"},{"id":"69864/COBA1","plant_name":"Colorado Clean Energy Center (BESS)","generator_id":"COBA1","plant_id":69864,"state":"TX","county":"Colorado","developer":"On Energy Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10.1,"summer_mw":10.1,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.649,"lon":-96.51519,"as_of":"2026-08"},{"id":"69866/MGBA1","plant_name":"Matagorda Clean Energy Center (BESS)","generator_id":"MGBA1","plant_id":69866,"state":"TX","county":"Matagorda","developer":"On Energy Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10.1,"summer_mw":10.1,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":28.99489,"lon":-96.12536,"as_of":"2026-08"},{"id":"66410/596","plant_name":"Grizzly Ridge Solar","generator_id":"596","plant_id":66410,"state":"TX","county":"Hamilton","developer":"Grizzly Ridge Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.738177,"lon":-98.21374,"as_of":"2026-08"},{"id":"67283/6569","plant_name":"Six Flags Magic Mountain","generator_id":"6569","plant_id":67283,"state":"CA","county":"Los Angeles","developer":"Magic Mountain Parkway Solar Project 2023, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.428209,"lon":-118.5993,"as_of":"2026-08"},{"id":"68439/17184","plant_name":"NorCal FPV 1","generator_id":"17184","plant_id":68439,"state":"CA","county":"Alameda","developer":"Madison Energy Investments LLC","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":37.6778,"lon":-121.8275,"as_of":"2026-08"},{"id":"69226/KNBA1","plant_name":"Knapp BESS","generator_id":"KNBA1","plant_id":69226,"state":"TX","county":"Scurry","developer":"GoldenMax Energy Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.6913,"lon":-101.0515,"as_of":"2026-08"},{"id":"69465/CSTSP","plant_name":"City of Detroit Castle Solar","generator_id":"CSTSP","plant_id":69465,"state":"MI","county":"Wayne","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.411333,"lon":-83.01867,"as_of":"2026-08"},{"id":"69252/HABA1","plant_name":"Harlingen #1 BESS 1","generator_id":"HABA1","plant_id":69252,"state":"TX","county":"Cameron","developer":"Harlingen ESS Assets LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":26.206111,"lon":-97.70842,"as_of":"2026-08"},{"id":"69253/NEBA1","plant_name":"North Edinburg BESS 1","generator_id":"NEBA1","plant_id":69253,"state":"TX","county":"Hidalgo","developer":"Edinburg ESS Assets LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":26.347194,"lon":-98.18844,"as_of":"2026-08"},{"id":"69665/ORCH","plant_name":"Orchard BESS","generator_id":"ORCH","plant_id":69665,"state":"TX","county":"Fort Bend","developer":"IEP Tejas Verde, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.539579,"lon":-95.95732,"as_of":"2026-08"},{"id":"64171/1","plant_name":"Tygart Hydropower","generator_id":"1","plant_id":64171,"state":"WV","county":"Taylor","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.279354,"lon":-80.00891,"as_of":"2026-08"},{"id":"64171/2","plant_name":"Tygart Hydropower","generator_id":"2","plant_id":64171,"state":"WV","county":"Taylor","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.279354,"lon":-80.00891,"as_of":"2026-08"},{"id":"64171/3","plant_name":"Tygart Hydropower","generator_id":"3","plant_id":64171,"state":"WV","county":"Taylor","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.279354,"lon":-80.00891,"as_of":"2026-08"},{"id":"67858/DILL1","plant_name":"Dill Holdings LLC","generator_id":"DILL1","plant_id":67858,"state":"NC","county":"Iredell","developer":"Dill Holdings LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":10,"summer_mw":10,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DUK","lat":35.966645,"lon":-80.71882,"as_of":"2026-08"},{"id":"64616/1","plant_name":"South Portland ESS, LLC","generator_id":"1","plant_id":64616,"state":"ME","county":"Cumberland","developer":"South Portland ESS, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":43.622939,"lon":-70.33098,"as_of":"2026-08"},{"id":"68566/SIPSY","plant_name":"SR Sipsey","generator_id":"SIPSY","plant_id":68566,"state":"AL","county":"Fayette","developer":"SR Sipsey, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":10,"summer_mw":10,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":33.694556,"lon":-87.81805,"as_of":"2026-08"},{"id":"68988/SHB01","plant_name":"Sherco LDES","generator_id":"SHB01","plant_id":68988,"state":"MN","county":"Sherburne","developer":"Northern States Power Co - Minnesota","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2028-05","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":45.374997,"lon":-93.89719,"as_of":"2026-08"},{"id":"69702/PI-1","plant_name":"Pike Island Hydroelectric Project","generator_id":"PI-1","plant_id":69702,"state":"OH","county":"Jefferson","developer":"Pike Island Hydropower Corporation","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":10,"planned_start":"2029-01","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.151,"lon":-80.70569,"as_of":"2026-08"},{"id":"69702/PI-2","plant_name":"Pike Island Hydroelectric Project","generator_id":"PI-2","plant_id":69702,"state":"OH","county":"Jefferson","developer":"Pike Island Hydropower Corporation","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":10,"planned_start":"2029-01","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.151,"lon":-80.70569,"as_of":"2026-08"},{"id":"69701/NC-1","plant_name":"New Cumberland Hydroelectric Project","generator_id":"NC-1","plant_id":69701,"state":"WV","county":"Hancock","developer":"Current Hydro Project 19, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":10,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.52821,"lon":-80.62574,"as_of":"2026-08"},{"id":"69701/NC-2","plant_name":"New Cumberland Hydroelectric Project","generator_id":"NC-2","plant_id":69701,"state":"WV","county":"Hancock","developer":"Current Hydro Project 19, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":10,"summer_mw":10,"planned_start":"2029-04","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.52821,"lon":-80.62574,"as_of":"2026-08"},{"id":"67570/3004","plant_name":"Cedar Hill ESS","generator_id":"3004","plant_id":67570,"state":"TX","county":"Dallas","developer":"Cedar Hill ESS Assets, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":10,"summer_mw":10,"planned_start":"2030-06","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ERCO","lat":32.612139,"lon":-96.92511,"as_of":"2026-08"},{"id":"69318/APPLE","plant_name":"Apple BESS","generator_id":"APPLE","plant_id":69318,"state":"TX","county":"Ector","developer":"Apple Infra, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.675697,"lon":-102.3638,"as_of":"2026-08"},{"id":"65834/SDBTD","plant_name":"Saddleback BESS2","generator_id":"SDBTD","plant_id":65834,"state":"TX","county":"Reeves","developer":"HEN Infrastructure, L.L.C.","sector":"IPP Non-CHP","technology":"All Other","energy_source":"OTH","prime_mover":"IC","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.332883,"lon":-103.4984,"as_of":"2026-08"},{"id":"69246/BSOU1","plant_name":"BESS TX Camarine - BSHOU001","generator_id":"BSOU1","plant_id":69246,"state":"TX","county":"Harris","developer":"Prologis Logistics Services Incorporated BESS","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":29.86648,"lon":-95.43066,"as_of":"2026-08"},{"id":"69338/LEAKY","plant_name":"Regis Leakey","generator_id":"LEAKY","plant_id":69338,"state":"TX","county":"Real","developer":"Regis Leakey LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":29.681012,"lon":-99.76172,"as_of":"2026-08"},{"id":"69340/MEDIN","plant_name":"Regis Medina","generator_id":"MEDIN","plant_id":69340,"state":"TX","county":"Bandera","developer":"Regis Medina LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.807877,"lon":-99.25467,"as_of":"2026-08"},{"id":"69534/TOR_B","plant_name":"Torrecillas Energy Storage","generator_id":"TOR_B","plant_id":69534,"state":"TX","county":"Webb","developer":"Torrecillas Energy Storage, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":27.618936,"lon":-98.83924,"as_of":"2026-08"},{"id":"65811/CYSTD","plant_name":"Coyote Springs (TX)","generator_id":"CYSTD","plant_id":65811,"state":"TX","county":"Reeves","developer":"HEN Infrastructure, L.L.C.","sector":"IPP Non-CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2027-02","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ERCO","lat":31.39471,"lon":-103.6303,"as_of":"2026-08"},{"id":"69902/HOCKL","plant_name":"Hockley","generator_id":"HOCKL","plant_id":69902,"state":"TX","county":"Harris","developer":"Hockley LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.9,"summer_mw":9.9,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":30.021964,"lon":-95.84826,"as_of":"2026-08"},{"id":"65897/INPKY","plant_name":"Industrial Parkway Storage","generator_id":"INPKY","plant_id":65897,"state":"CA","county":"Santa Barbara","developer":"RPCA Storage 1, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.8,"summer_mw":9.8,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":34.907345,"lon":-120.4465,"as_of":"2026-08"},{"id":"68255/SHELB","plant_name":"SR Shelby","generator_id":"SHELB","plant_id":68255,"state":"TN","county":"Shelby","developer":"SR Shelby, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":9.8,"summer_mw":9.8,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":35.353292,"lon":-89.81498,"as_of":"2026-08"},{"id":"59596/PV1","plant_name":"Rhubarb One SC","generator_id":"PV1","plant_id":59596,"state":"SC","county":"Marion","developer":"SolRiver Capital LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":9.6,"summer_mw":9.6,"planned_start":"2027-06","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CPLE","lat":34.151111,"lon":-79.41,"as_of":"2026-08"},{"id":"59027/GEN 1","plant_name":"Mahoney Lake Hydroelectric","generator_id":"GEN 1","plant_id":59027,"state":"AK","county":"Ketchikan Gateway","developer":"Ketchikan Electric Company","sector":"Electric Utility","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":9.6,"summer_mw":9.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":null,"lat":55.419444,"lon":-131.5378,"as_of":"2026-08"},{"id":"69903/EBERN","plant_name":"East Bernard","generator_id":"EBERN","plant_id":69903,"state":"TX","county":"Wharton","developer":"East Bernard LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.5,"summer_mw":9.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.52854,"lon":-96.07052,"as_of":"2026-08"},{"id":"69904/PLEDG","plant_name":"Pledger","generator_id":"PLEDG","plant_id":69904,"state":"TX","county":"Wharton","developer":"Pledger LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":9.5,"summer_mw":9.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":29.187719,"lon":-95.91223,"as_of":"2026-08"},{"id":"69357/PV1","plant_name":"Asheville Solar","generator_id":"PV1","plant_id":69357,"state":"NC","county":"Buncombe","developer":"Duke Energy Progress - (NC)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":9.5,"summer_mw":9.5,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CPLW","lat":35.470591,"lon":-82.54223,"as_of":"2026-08"},{"id":"69819/TRNTN","plant_name":"Trenton Solar - (OH)","generator_id":"TRNTN","plant_id":69819,"state":"OH","county":"Butler","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":9.5,"summer_mw":9.5,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.455321,"lon":-84.46788,"as_of":"2026-08"},{"id":"68284/PE-1","plant_name":"Puuloa Energy","generator_id":"PE-1","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-10","plant_name":"Puuloa Energy","generator_id":"PE-10","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-11","plant_name":"Puuloa Energy","generator_id":"PE-11","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-2","plant_name":"Puuloa Energy","generator_id":"PE-2","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-3","plant_name":"Puuloa Energy","generator_id":"PE-3","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-4","plant_name":"Puuloa Energy","generator_id":"PE-4","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-5","plant_name":"Puuloa Energy","generator_id":"PE-5","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-6","plant_name":"Puuloa Energy","generator_id":"PE-6","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-7","plant_name":"Puuloa Energy","generator_id":"PE-7","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-8","plant_name":"Puuloa Energy","generator_id":"PE-8","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"68284/PE-9","plant_name":"Puuloa Energy","generator_id":"PE-9","plant_id":68284,"state":"HI","county":"Honolulu","developer":"Puuloa Energy LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBL","prime_mover":"IC","nameplate_mw":9.4,"summer_mw":9.4,"planned_start":"2029-04","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.347833,"lon":-157.9506,"as_of":"2026-08"},{"id":"50969/GEN10","plant_name":"MU Combined Heat and Power Plant","generator_id":"GEN10","plant_id":50969,"state":"MO","county":"Boone","developer":"Curators of the University of Missouri","sector":"Commercial CHP","technology":"Natural Gas Steam Turbine","energy_source":"NG","prime_mover":"ST","nameplate_mw":9,"summer_mw":8,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.9461,"lon":-92.3328,"as_of":"2026-08"},{"id":"66618/FL5","plant_name":"Fish Lake Geothermal","generator_id":"FL5","plant_id":66618,"state":"NV","county":"Esmeralda","developer":"Fish Lake Geothermal LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"ST","nameplate_mw":9,"summer_mw":6.8,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":37.860925,"lon":-118.0341,"as_of":"2026-08"},{"id":"57472/STG","plant_name":"TBE-Montgomery LLC","generator_id":"STG","plant_id":57472,"state":"NY","county":"Orange","developer":"TBE Montgomery LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"OBG","prime_mover":"CA","nameplate_mw":9,"summer_mw":7.4,"planned_start":"2039-12","planned_year":2039,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":41.4885,"lon":-74.2262,"as_of":"2026-08"},{"id":"69695/CCM-1","plant_name":"Colonel Charles D. Maynard Project","generator_id":"CCM-1","plant_id":69695,"state":"AR","county":"Jefferson","developer":"Maynard Hydroelectric LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.6,"summer_mw":8.6,"planned_start":"2031-11","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.411873,"lon":-92.10319,"as_of":"2026-08"},{"id":"69695/CCM-2","plant_name":"Colonel Charles D. Maynard Project","generator_id":"CCM-2","plant_id":69695,"state":"AR","county":"Jefferson","developer":"Maynard Hydroelectric LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.6,"summer_mw":8.6,"planned_start":"2031-11","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.411873,"lon":-92.10319,"as_of":"2026-08"},{"id":"69695/CCM-3","plant_name":"Colonel Charles D. Maynard Project","generator_id":"CCM-3","plant_id":69695,"state":"AR","county":"Jefferson","developer":"Maynard Hydroelectric LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.6,"summer_mw":8.6,"planned_start":"2031-11","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":34.411873,"lon":-92.10319,"as_of":"2026-08"},{"id":"70305/23","plant_name":"Tanglewood Solar, LLC","generator_id":"23","plant_id":70305,"state":"NC","county":"Pasquotank","developer":"Headwater Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":8.4,"summer_mw":8.4,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CPLE","lat":36.25,"lon":-76.3,"as_of":"2026-08"},{"id":"66901/WRS","plant_name":"Wylie Ridge Solar","generator_id":"WRS","plant_id":66901,"state":"WV","county":"Hancock","developer":"Monongahela Power Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":8.4,"summer_mw":8.4,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.452683,"lon":-80.57255,"as_of":"2026-08"},{"id":"68558/LOTT","plant_name":"SR Lott","generator_id":"LOTT","plant_id":68558,"state":"AL","county":"Mobile","developer":"SR Lott, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":8.3,"summer_mw":8.3,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":30.940181,"lon":-88.29926,"as_of":"2026-08"},{"id":"62391/NA1","plant_name":"Overton Hydroelectric Project","generator_id":"NA1","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"62391/NA2","plant_name":"Overton Hydroelectric Project","generator_id":"NA2","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"62391/NA3","plant_name":"Overton Hydroelectric Project","generator_id":"NA3","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"62391/NA4","plant_name":"Overton Hydroelectric Project","generator_id":"NA4","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"62391/NA5","plant_name":"Overton Hydroelectric Project","generator_id":"NA5","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"62391/NA6","plant_name":"Overton Hydroelectric Project","generator_id":"NA6","plant_id":62391,"state":"LA","county":"Rapides","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":8.1,"summer_mw":5.5,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":31.185978,"lon":-92.29309,"as_of":"2026-08"},{"id":"54918/TM02","plant_name":"Ergon Refining Vicksburg","generator_id":"TM02","plant_id":54918,"state":"MS","county":"Warren","developer":"Ergon Refining Inc","sector":"Industrial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":7.9,"summer_mw":7.9,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.388271,"lon":-90.90834,"as_of":"2026-08"},{"id":"54918/TM03","plant_name":"Ergon Refining Vicksburg","generator_id":"TM03","plant_id":54918,"state":"MS","county":"Warren","developer":"Ergon Refining Inc","sector":"Industrial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":7.9,"summer_mw":7.9,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.388271,"lon":-90.90834,"as_of":"2026-08"},{"id":"69992/BA1","plant_name":"Sherwood Forest BESS","generator_id":"BA1","plant_id":69992,"state":"LA","county":"Orleans","developer":"Entergy New Orleans, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":7.7,"summer_mw":7.7,"planned_start":"2027-07","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"MISO","lat":30.01266,"lon":-89.94403,"as_of":"2026-08"},{"id":"54224/CTG1","plant_name":"Franklin Heating Station","generator_id":"CTG1","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CT","nameplate_mw":7.5,"summer_mw":7.3,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"62425/NA1","plant_name":"Sardis Lake Hydroelectric Project","generator_id":"NA1","plant_id":62425,"state":"MS","county":"Panola","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":7.5,"summer_mw":5.5,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.399125,"lon":-89.77246,"as_of":"2026-08"},{"id":"62425/NA2","plant_name":"Sardis Lake Hydroelectric Project","generator_id":"NA2","plant_id":62425,"state":"MS","county":"Panola","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":7.5,"summer_mw":5.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.399125,"lon":-89.77246,"as_of":"2026-08"},{"id":"55369/BESS1","plant_name":"Hamakua Energy Plant","generator_id":"BESS1","plant_id":55369,"state":"HI","county":"Hawaii","developer":"Hamakua Energy LP","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":7.5,"summer_mw":7.5,"planned_start":"2030-11","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":null,"lat":20.0939,"lon":-155.4711,"as_of":"2026-08"},{"id":"70333/KBPV1","plant_name":"Keenesburg","generator_id":"KBPV1","plant_id":70333,"state":"CO","county":"Weld","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":7.2,"summer_mw":7.2,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":40.187364,"lon":-104.5061,"as_of":"2026-08"},{"id":"66002/MVSBA","plant_name":"AES Mountain View Solar","generator_id":"MVSBA","plant_id":66002,"state":"HI","county":"Honolulu","developer":"AES Distributed Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":7,"summer_mw":7,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":21.45799,"lon":-158.1767,"as_of":"2026-08"},{"id":"66002/MVSPV","plant_name":"AES Mountain View Solar","generator_id":"MVSPV","plant_id":66002,"state":"HI","county":"Honolulu","developer":"AES Distributed Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":7,"summer_mw":7,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":21.45799,"lon":-158.1767,"as_of":"2026-08"},{"id":"70119/GEN1","plant_name":"Raceway Solar - (CO)","generator_id":"GEN1","plant_id":70119,"state":"CO","county":"Morgan","developer":"Raceway Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":7,"summer_mw":7,"planned_start":"2027-04","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"SWPP","lat":40.262222,"lon":-103.8292,"as_of":"2026-08"},{"id":"69466/GRESP","plant_name":"City of Detroit Greenfield","generator_id":"GRESP","plant_id":69466,"state":"MI","county":"Wayne","developer":"DTE Electric Company","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":7,"summer_mw":7,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":42.420589,"lon":-83.09909,"as_of":"2026-08"},{"id":"62400/NA1","plant_name":"Montgomery L&D Hydroelectric Project","generator_id":"NA1","plant_id":62400,"state":"PA","county":"Beaver","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5.5,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.652478,"lon":-80.38687,"as_of":"2026-08"},{"id":"62400/NA2","plant_name":"Montgomery L&D Hydroelectric Project","generator_id":"NA2","plant_id":62400,"state":"PA","county":"Beaver","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.652478,"lon":-80.38687,"as_of":"2026-08"},{"id":"62400/NA3","plant_name":"Montgomery L&D Hydroelectric Project","generator_id":"NA3","plant_id":62400,"state":"PA","county":"Beaver","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5.5,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.652478,"lon":-80.38687,"as_of":"2026-08"},{"id":"62433/NA1","plant_name":"Emsworth L&D Hydroelectric Project","generator_id":"NA1","plant_id":62433,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5,"planned_start":"2030-10","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50305,"lon":-80.08944,"as_of":"2026-08"},{"id":"62433/NA2","plant_name":"Emsworth L&D Hydroelectric Project","generator_id":"NA2","plant_id":62433,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5,"planned_start":"2030-11","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50305,"lon":-80.08944,"as_of":"2026-08"},{"id":"62433/NA3","plant_name":"Emsworth L&D Hydroelectric Project","generator_id":"NA3","plant_id":62433,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50305,"lon":-80.08944,"as_of":"2026-08"},{"id":"62434/NA3","plant_name":"Emsworth BC Hydroelectric Project","generator_id":"NA3","plant_id":62434,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.8,"summer_mw":5,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50083,"lon":-80.10306,"as_of":"2026-08"},{"id":"60588/JHI01","plant_name":"Sweetheart Lake Hydroelectric Facility","generator_id":"JHI01","plant_id":60588,"state":"AK","county":"Juneau","developer":"Juneau Hydropower, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.6,"summer_mw":6.6,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":null,"lat":57.9449,"lon":-133.6867,"as_of":"2026-08"},{"id":"60588/JHI02","plant_name":"Sweetheart Lake Hydroelectric Facility","generator_id":"JHI02","plant_id":60588,"state":"AK","county":"Juneau","developer":"Juneau Hydropower, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.6,"summer_mw":6.6,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":null,"lat":57.9449,"lon":-133.6867,"as_of":"2026-08"},{"id":"60588/JHI03","plant_name":"Sweetheart Lake Hydroelectric Facility","generator_id":"JHI03","plant_id":60588,"state":"AK","county":"Juneau","developer":"Juneau Hydropower, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6.6,"summer_mw":6.6,"planned_start":"2028-01","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":null,"lat":57.9449,"lon":-133.6867,"as_of":"2026-08"},{"id":"68285/PS-1","plant_name":"Puuloa Solar","generator_id":"PS-1","plant_id":68285,"state":"HI","county":"Honolulu","developer":"Puuloa Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":6.4,"summer_mw":6.4,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.351522,"lon":-157.9269,"as_of":"2026-08"},{"id":"66618/FL4","plant_name":"Fish Lake Geothermal","generator_id":"FL4","plant_id":66618,"state":"NV","county":"Esmeralda","developer":"Fish Lake Geothermal LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"ST","nameplate_mw":6.2,"summer_mw":4.3,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":37.860925,"lon":-118.0341,"as_of":"2026-08"},{"id":"63972/TR1","plant_name":"Two Rivers Wind Facility","generator_id":"TR1","plant_id":63972,"state":"WY","county":"Carbon","developer":"Two Rivers Wind LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":6.1,"summer_mw":6.1,"planned_start":"2028-10","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PACE","lat":41.97508,"lon":-106.1805,"as_of":"2026-08"},{"id":"69516/HAMM","plant_name":"Hamms Landfill","generator_id":"HAMM","plant_id":69516,"state":"NJ","county":"Sussex","developer":"NJR Clean Energy Ventures Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":6,"summer_mw":6,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.1015,"lon":-74.6706,"as_of":"2026-08"},{"id":"68285/PS-2","plant_name":"Puuloa Solar","generator_id":"PS-2","plant_id":68285,"state":"HI","county":"Honolulu","developer":"Puuloa Solar LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":6,"summer_mw":6,"planned_start":"2027-11","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"HECO","lat":21.351522,"lon":-157.9269,"as_of":"2026-08"},{"id":"69867/SHEII","plant_name":"SR Shelby II, LLC","generator_id":"SHEII","plant_id":69867,"state":"TN","county":"Shelby","developer":"SR Shelby II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":6,"summer_mw":6,"planned_start":"2028-02","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":35.353646,"lon":-89.8109,"as_of":"2026-08"},{"id":"62388/NA1","plant_name":"Grays Landing L&D Hydroelectric Project","generator_id":"NA1","plant_id":62388,"state":"PA","county":"Greene","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.823738,"lon":-79.92302,"as_of":"2026-08"},{"id":"62388/NA2","plant_name":"Grays Landing L&D Hydroelectric Project","generator_id":"NA2","plant_id":62388,"state":"PA","county":"Greene","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.823738,"lon":-79.92302,"as_of":"2026-08"},{"id":"62404/NA1","plant_name":"Monongahela L&D4 Hydroelectric Project","generator_id":"NA1","plant_id":62404,"state":"PA","county":"Washington","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.145943,"lon":-79.90095,"as_of":"2026-08"},{"id":"62385/NA1","plant_name":"Maxwell L&D Hydroelectric Project","generator_id":"NA1","plant_id":62385,"state":"PA","county":"Fayette","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.002401,"lon":-79.95883,"as_of":"2026-08"},{"id":"62404/NA2","plant_name":"Monongahela L&D4 Hydroelectric Project","generator_id":"NA2","plant_id":62404,"state":"PA","county":"Washington","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.145943,"lon":-79.90095,"as_of":"2026-08"},{"id":"62385/NA2","plant_name":"Maxwell L&D Hydroelectric Project","generator_id":"NA2","plant_id":62385,"state":"PA","county":"Fayette","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4.5,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.002401,"lon":-79.95883,"as_of":"2026-08"},{"id":"62434/NA1","plant_name":"Emsworth BC Hydroelectric Project","generator_id":"NA1","plant_id":62434,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":3,"planned_start":"2030-11","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50083,"lon":-80.10306,"as_of":"2026-08"},{"id":"62434/NA2","plant_name":"Emsworth BC Hydroelectric Project","generator_id":"NA2","plant_id":62434,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":6,"summer_mw":4,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.50083,"lon":-80.10306,"as_of":"2026-08"},{"id":"67265/CTG-1","plant_name":"CHP Plant","generator_id":"CTG-1","plant_id":67265,"state":"DC","county":"District of Columbia","developer":"Howard University","sector":"IPP CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":5.7,"summer_mw":5.3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.92033,"lon":-77.021,"as_of":"2026-08"},{"id":"68543/3850B","plant_name":"Town of Sharon Portfolio -Mt St Landfill","generator_id":"3850B","plant_id":68543,"state":"MA","county":"Norfolk","developer":"Mountain Street Solar Project 2019, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5.7,"summer_mw":5.7,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":42.102685,"lon":-71.15906,"as_of":"2026-08"},{"id":"59091/GEN1","plant_name":"Braddock Lock and Dam","generator_id":"GEN1","plant_id":59091,"state":"PA","county":"Allegheny","developer":"Lock+ Hydro Friends Fund XLII, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":5.3,"summer_mw":5.3,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.388889,"lon":-79.85889,"as_of":"2026-08"},{"id":"69841/BLUST","plant_name":"Bluestar Solar Project, LLC","generator_id":"BLUST","plant_id":69841,"state":"IL","county":"Montgomery","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-08","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":39.150212,"lon":-89.45092,"as_of":"2026-08"},{"id":"69844/HORSE","plant_name":"Horseshoe Solar Project, LLC","generator_id":"HORSE","plant_id":69844,"state":"IL","county":"Montgomery","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-08","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":39.14706,"lon":-89.4426,"as_of":"2026-08"},{"id":"69848/SPIL1","plant_name":"Spillertown CSG 1 LLC","generator_id":"SPIL1","plant_id":69848,"state":"IL","county":"Williamson","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-08","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":37.761959,"lon":-88.9226,"as_of":"2026-08"},{"id":"66497/BHBA1","plant_name":"Bensonhurst Energy Storage 1 LLC","generator_id":"BHBA1","plant_id":66497,"state":"NY","county":"Kings","developer":"Convergent Energy and Power LP","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":40.636787,"lon":-73.93435,"as_of":"2026-08"},{"id":"68388/RT5SS","plant_name":"AES Rt 5 Solar CSG","generator_id":"RT5SS","plant_id":68388,"state":"NY","county":"Genesee","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.97347,"lon":-78.01527,"as_of":"2026-08"},{"id":"68389/GLENG","plant_name":"AES Glengarry Farms Solar CSG","generator_id":"GLENG","plant_id":68389,"state":"NY","county":"Franklin","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":44.9183,"lon":-74.1477,"as_of":"2026-08"},{"id":"69105/SLO-2","plant_name":"SLO-2","generator_id":"SLO-2","plant_id":69105,"state":"NM","county":"Sandoval","developer":"Affordable Solar Silver City, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PNM","lat":35.363052,"lon":-106.631,"as_of":"2026-08"},{"id":"69262/HILL1","plant_name":"Hillsboro Solar Project","generator_id":"HILL1","plant_id":69262,"state":"TX","county":"Hill","developer":"Ellomay USA Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.029636,"lon":-97.14555,"as_of":"2026-08"},{"id":"69262/HILL2","plant_name":"Hillsboro Solar Project","generator_id":"HILL2","plant_id":69262,"state":"TX","county":"Hill","developer":"Ellomay USA Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ERCO","lat":32.029636,"lon":-97.14555,"as_of":"2026-08"},{"id":"69551/90915","plant_name":"Holyoke MA BESS 1","generator_id":"90915","plant_id":69551,"state":"MA","county":"Hampden","developer":"Holyoke MA BESS 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":42.16774,"lon":-72.64898,"as_of":"2026-08"},{"id":"69847/SPIL2","plant_name":"Spillertown CSG 2 LLC","generator_id":"SPIL2","plant_id":69847,"state":"IL","county":"Williamson","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":37.771487,"lon":-88.91635,"as_of":"2026-08"},{"id":"69852/MCCR1","plant_name":"McCray Solar 1, LLC","generator_id":"MCCR1","plant_id":69852,"state":"IL","county":"Bond","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.892269,"lon":-89.41314,"as_of":"2026-08"},{"id":"70002/MACED","plant_name":"Macedon CSG LLC","generator_id":"MACED","plant_id":70002,"state":"NY","county":"Wayne","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.083573,"lon":-77.26768,"as_of":"2026-08"},{"id":"70446/33699","plant_name":"Dragon's Breath Solar LLC PV","generator_id":"33699","plant_id":70446,"state":"IL","county":"Tazewell","developer":"Dragon's Breath Solar LLC PV","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.428093,"lon":-89.37261,"as_of":"2026-08"},{"id":"63677/STURB","plant_name":"Sturbridge Road Solar","generator_id":"STURB","plant_id":63677,"state":"MA","county":"Worcester","developer":"Madison Energy Investments LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ISNE","lat":42.174611,"lon":-72.01786,"as_of":"2026-08"},{"id":"68975/17340","plant_name":"Washington Street Solar 1 LLC","generator_id":"17340","plant_id":68975,"state":"IL","county":"Mclean","developer":"Washington Street Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.477287,"lon":-89.04986,"as_of":"2026-08"},{"id":"69178/11237","plant_name":"Cherry Solar 1","generator_id":"11237","plant_id":69178,"state":"IL","county":"Bureau","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":41.450314,"lon":-89.22483,"as_of":"2026-08"},{"id":"69180/11254","plant_name":"Cold Springs","generator_id":"11254","plant_id":69180,"state":"NY","county":"Onondaga","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":43.137912,"lon":-76.27779,"as_of":"2026-08"},{"id":"69383/MALL1","plant_name":"Mallory South PV I","generator_id":"MALL1","plant_id":69383,"state":"NY","county":"Oswego","developer":"Mallory South PV I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.2669,"lon":-76.137,"as_of":"2026-08"},{"id":"69384/MALL2","plant_name":"Mallory South PV II","generator_id":"MALL2","plant_id":69384,"state":"NY","county":"Oswego","developer":"Mallory South PV II LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.2669,"lon":-76.137,"as_of":"2026-08"},{"id":"69603/90917","plant_name":"Ipswich MA BESS 1","generator_id":"90917","plant_id":69603,"state":"MA","county":"Essex","developer":"Ipswich MA BESS 1 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":42.716353,"lon":-70.84202,"as_of":"2026-08"},{"id":"69837/FALCH","plant_name":"Falconhead Solar, LLC","generator_id":"FALCH","plant_id":69837,"state":"IL","county":"Will","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.43149,"lon":-87.63821,"as_of":"2026-08"},{"id":"70025/CINC1","plant_name":"Cincinnati CSG 1 LLC","generator_id":"CINC1","plant_id":70025,"state":"IL","county":"Tazewell","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.526203,"lon":-89.63886,"as_of":"2026-08"},{"id":"70026/CINC2","plant_name":"Cincinnati CSG 2 LLC","generator_id":"CINC2","plant_id":70026,"state":"IL","county":"Tazewell","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.526203,"lon":-89.63886,"as_of":"2026-08"},{"id":"70027/CORT2","plant_name":"Cortland CSG 2 LLC","generator_id":"CORT2","plant_id":70027,"state":"NY","county":"Cortland","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.54409,"lon":-75.99276,"as_of":"2026-08"},{"id":"70176/KIESE","plant_name":"Kieser","generator_id":"KIESE","plant_id":70176,"state":"IL","county":"McLean","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.4396,"lon":-89.0078,"as_of":"2026-08"},{"id":"70376/IL52","plant_name":"Pivot Energy IL 52","generator_id":"IL52","plant_id":70376,"state":"IL","county":"McHenry","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.329332,"lon":-88.41144,"as_of":"2026-08"},{"id":"70386/BESS1","plant_name":"Chicopee BESS","generator_id":"BESS1","plant_id":70386,"state":"MA","county":"Hampden","developer":"Uriel Renovables S.A","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":42.173653,"lon":-72.6119,"as_of":"2026-08"},{"id":"70387/BESS1","plant_name":"Framingham BESS","generator_id":"BESS1","plant_id":70387,"state":"MA","county":"Middlesex","developer":"Uriel Renovables S.A","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":42.313107,"lon":-71.38953,"as_of":"2026-08"},{"id":"70440/BRACE","plant_name":"NL IL Braceville","generator_id":"BRACE","plant_id":70440,"state":"IL","county":"Grundy","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.230511,"lon":-88.25037,"as_of":"2026-08"},{"id":"67279/6572","plant_name":"Borrego - Highland Ave","generator_id":"6572","plant_id":67279,"state":"MA","county":"Bristol","developer":"Highland Ave Solar 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.661525,"lon":-71.05998,"as_of":"2026-08"},{"id":"67279/6572B","plant_name":"Borrego - Highland Ave","generator_id":"6572B","plant_id":67279,"state":"MA","county":"Bristol","developer":"Highland Ave Solar 1, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.661525,"lon":-71.05998,"as_of":"2026-08"},{"id":"67637/GILLD","plant_name":"Gillard","generator_id":"GILLD","plant_id":67637,"state":"IL","county":"Grundy","developer":"38DN Asset Management LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.19401,"lon":-88.29454,"as_of":"2026-08"},{"id":"67643/SOLIT","plant_name":"Solitude","generator_id":"SOLIT","plant_id":67643,"state":"IL","county":"LaSalle","developer":"38DN Asset Management LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.130185,"lon":-89.04407,"as_of":"2026-08"},{"id":"69182/11225","plant_name":"KA 340","generator_id":"11225","plant_id":69182,"state":"IL","county":"Kankakee","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.245,"lon":-87.753,"as_of":"2026-08"},{"id":"69205/11249","plant_name":"Lodi I","generator_id":"11249","plant_id":69205,"state":"NY","county":"Schuyler","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.588337,"lon":-76.84425,"as_of":"2026-08"},{"id":"69206/11250","plant_name":"Lodi II","generator_id":"11250","plant_id":69206,"state":"NY","county":"Schuyler","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.586527,"lon":-76.84413,"as_of":"2026-08"},{"id":"69218/11247","plant_name":"Vienna","generator_id":"11247","plant_id":69218,"state":"NY","county":"Oneida","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.23835,"lon":-75.69039,"as_of":"2026-08"},{"id":"69310/23220","plant_name":"SL Pembroke 2","generator_id":"23220","plant_id":69310,"state":"NY","county":"Genesee","developer":"SL Pembroke 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.028056,"lon":-78.45694,"as_of":"2026-08"},{"id":"69372/KNOXS","plant_name":"Knox II PV","generator_id":"KNOXS","plant_id":69372,"state":"NY","county":"Albany","developer":"Knox II PV LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.67591,"lon":-74.07563,"as_of":"2026-08"},{"id":"69756/23212","plant_name":"SL Dunkirk","generator_id":"23212","plant_id":69756,"state":"NY","county":"Chautauqua","developer":"SL Dunkirk, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.463685,"lon":-79.34316,"as_of":"2026-08"},{"id":"69931/BJORN","plant_name":"Bjorn","generator_id":"BJORN","plant_id":69931,"state":"WI","county":"Barron","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.395931,"lon":-91.881,"as_of":"2026-08"},{"id":"70030/FABIU","plant_name":"Fabius CSG LLC","generator_id":"FABIU","plant_id":70030,"state":"NY","county":"Onondaga","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.830007,"lon":-76.06217,"as_of":"2026-08"},{"id":"70294/EAST","plant_name":"NL IL 2700 East","generator_id":"EAST","plant_id":70294,"state":"IL","county":"Livingston","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.050261,"lon":-88.42827,"as_of":"2026-08"},{"id":"70378/GEN5","plant_name":"Crane Creek Garden","generator_id":"GEN5","plant_id":70378,"state":"MN","county":"Waseca","developer":"Bullrock-NxtGenREA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.09501,"lon":-93.65467,"as_of":"2026-08"},{"id":"70382/GEN3","plant_name":"Mazaska Garden","generator_id":"GEN3","plant_id":70382,"state":"MN","county":"Rice","developer":"Bullrock-NxtGenREA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.48723,"lon":-93.13416,"as_of":"2026-08"},{"id":"67609/21599","plant_name":"NY ELBA 7195 OAK ORCHARD RD - Genesee 1","generator_id":"21599","plant_id":67609,"state":"NY","county":"Genesee","developer":"NY CDG Genesee 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.064414,"lon":-78.18456,"as_of":"2026-08"},{"id":"68934/EAST1","plant_name":"SV CSG East St Louis","generator_id":"EAST1","plant_id":68934,"state":"IL","county":"St Clair","developer":"SV CSG East St Louis LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.6056,"lon":-90.0705,"as_of":"2026-08"},{"id":"69159/DIEL","plant_name":"SV CSG Diel 1","generator_id":"DIEL","plant_id":69159,"state":"IL","county":"Richland","developer":"SV CSG Diel 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.70762,"lon":-88.22238,"as_of":"2026-08"},{"id":"69181/11150","plant_name":"Hillview","generator_id":"11150","plant_id":69181,"state":"NY","county":"Warren","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.29864,"lon":-73.56023,"as_of":"2026-08"},{"id":"69815/KINGS","plant_name":"SV CSG Kingston Solar 1","generator_id":"KINGS","plant_id":69815,"state":"IL","county":"DeKalb","developer":"SV CSG Kingston Solar 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":42.0971,"lon":-88.7318,"as_of":"2026-08"},{"id":"69882/USMID","plant_name":"USS Middle Solar","generator_id":"USMID","plant_id":69882,"state":"IL","county":"Grundy","developer":"USS Middle Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.413923,"lon":-88.44451,"as_of":"2026-08"},{"id":"69883/USJOR","plant_name":"USS Jornada Solar","generator_id":"USJOR","plant_id":69883,"state":"NM","county":"Dona Ana","developer":"USS Jornada Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":32.431485,"lon":-106.6832,"as_of":"2026-08"},{"id":"69997/FASTA","plant_name":"Fast Ave Solar LLC","generator_id":"FASTA","plant_id":69997,"state":"IL","county":"Tazewell","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.534803,"lon":-89.28959,"as_of":"2026-08"},{"id":"70001/HARPC","plant_name":"Harper Creek Solar, LLC","generator_id":"HARPC","plant_id":70001,"state":"IL","county":"Jefferson","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.301552,"lon":-88.91451,"as_of":"2026-08"},{"id":"70295/LAKE","plant_name":"NL IL Lake","generator_id":"LAKE","plant_id":70295,"state":"IL","county":"Lake","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":42.464881,"lon":-87.88974,"as_of":"2026-08"},{"id":"68543/3850G","plant_name":"Town of Sharon Portfolio -Mt St Landfill","generator_id":"3850G","plant_id":68543,"state":"MA","county":"Norfolk","developer":"Mountain Street Solar Project 2019, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":42.102685,"lon":-71.15906,"as_of":"2026-08"},{"id":"69035/PI36","plant_name":"Pivot Solar 36","generator_id":"PI36","plant_id":69035,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"WACM","lat":40.346119,"lon":-104.7314,"as_of":"2026-08"},{"id":"70009/WILL1","plant_name":"Willis Solar 1, LLC - (IL)","generator_id":"WILL1","plant_id":70009,"state":"IL","county":"Macoupin","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":39.118354,"lon":-89.84199,"as_of":"2026-08"},{"id":"70102/PS33","plant_name":"Pivot Solar 33 LLC","generator_id":"PS33","plant_id":70102,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.32508,"lon":-104.731,"as_of":"2026-08"},{"id":"70177/ALLEN","plant_name":"Allen CSG","generator_id":"ALLEN","plant_id":70177,"state":"IL","county":"Peoria","developer":"AES Clean Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.9166,"lon":-89.5273,"as_of":"2026-08"},{"id":"67639/LLEAF","plant_name":"Leatherleaf","generator_id":"LLEAF","plant_id":67639,"state":"NY","county":"Genesee","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-02","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":43.048657,"lon":-78.03491,"as_of":"2026-08"},{"id":"68855/TRP01","plant_name":"Tracy Renewable Power Plant","generator_id":"TRP01","plant_id":68855,"state":"CA","county":"San Joaquin","developer":"Tracy Renewable Energy, LLC","sector":"IPP Non-CHP","technology":"Other Waste Biomass","energy_source":"AB","prime_mover":"ST","nameplate_mw":5,"summer_mw":3,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.77158,"lon":-121.4251,"as_of":"2026-08"},{"id":"69814/SUNSO","plant_name":"SV CSG Sun Trust Solar","generator_id":"SUNSO","plant_id":69814,"state":"IL","county":"Kane","developer":"SV CSG Sun Trust Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":42.0969,"lon":-88.3865,"as_of":"2026-08"},{"id":"70100/IL070","plant_name":"Pivot Energy IL 70 LLC","generator_id":"IL070","plant_id":70100,"state":"IL","county":"Boone","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.227709,"lon":-88.8679,"as_of":"2026-08"},{"id":"68215/BRAES","plant_name":"Braley Hill North Solar","generator_id":"BRAES","plant_id":68215,"state":"MA","county":"Plymouth","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.776,"lon":-70.904,"as_of":"2026-08"},{"id":"68215/BRAPV","plant_name":"Braley Hill North Solar","generator_id":"BRAPV","plant_id":68215,"state":"MA","county":"Plymouth","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.776,"lon":-70.904,"as_of":"2026-08"},{"id":"68218/RANES","plant_name":"Randall Lane Solar","generator_id":"RANES","plant_id":68218,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.663,"lon":-70.844,"as_of":"2026-08"},{"id":"68218/RANPV","plant_name":"Randall Lane Solar","generator_id":"RANPV","plant_id":68218,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.663,"lon":-70.844,"as_of":"2026-08"},{"id":"67257/BVEB1","plant_name":"Bear Valley Battery Plant","generator_id":"BVEB1","plant_id":67257,"state":"CA","county":"San Bernardino","developer":"Bear Valley Electric Service","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-04","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.25,"lon":-116.86,"as_of":"2026-08"},{"id":"68520/MNDA4","plant_name":"Madena 4","generator_id":"MNDA4","plant_id":68520,"state":"CA","county":"Placer","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-04","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":38.977582,"lon":-121.3765,"as_of":"2026-08"},{"id":"69816/WILSN","plant_name":"SV CSG Wilson School Solar","generator_id":"WILSN","plant_id":69816,"state":"IL","county":"Kane","developer":"SV CSG Wilson School Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":42.053991,"lon":-88.35269,"as_of":"2026-08"},{"id":"69825/MADCR","plant_name":"Madden Creek Solar","generator_id":"MADCR","plant_id":69825,"state":"IL","county":"Piatt","developer":"Madden Creek Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":40.201889,"lon":-88.46611,"as_of":"2026-08"},{"id":"68863/PV1","plant_name":"Bloomfield Solar","generator_id":"PV1","plant_id":68863,"state":"NY","county":"Saratoga","developer":"Bloomfield Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-05","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.989691,"lon":-73.88121,"as_of":"2026-08"},{"id":"69158/REEDR","plant_name":"SV CSG Reeder Solar","generator_id":"REEDR","plant_id":69158,"state":"IL","county":"Knox","developer":"SV CSG Reeder Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.92886,"lon":-90.49347,"as_of":"2026-08"},{"id":"70007/RICHR","plant_name":"Richmond Road Solar LLC","generator_id":"RICHR","plant_id":70007,"state":"VA","county":"James City","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.39976,"lon":-76.82053,"as_of":"2026-08"},{"id":"70210/PV1","plant_name":"Cypert - Fallsburg I","generator_id":"PV1","plant_id":70210,"state":"NY","county":"Sullivan","developer":"NY Fallsburg II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":41.783296,"lon":-74.60056,"as_of":"2026-08"},{"id":"67645/TWNDA","plant_name":"Varnsen","generator_id":"TWNDA","plant_id":67645,"state":"IL","county":"Winnebago","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":42.315822,"lon":-89.31315,"as_of":"2026-08"},{"id":"69817/SANNE","plant_name":"SV CSG St Anne 1","generator_id":"SANNE","plant_id":69817,"state":"IL","county":"Kankakee","developer":"SV CSG St Anne 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-07","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.041,"lon":-87.6999,"as_of":"2026-08"},{"id":"70401/CLEM","plant_name":"Clems Way Solar","generator_id":"CLEM","plant_id":70401,"state":"MA","county":"Bristol","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-07","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":41.732,"lon":-70.894,"as_of":"2026-08"},{"id":"70437/GROTN","plant_name":"Groton Flanders Road Landfill","generator_id":"GROTN","plant_id":70437,"state":"CT","county":"New London","developer":"NJR Clean Energy Ventures Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.35,"lon":-72.05,"as_of":"2026-08"},{"id":"69948/MANTB","plant_name":"SV CSG Manteno","generator_id":"MANTB","plant_id":69948,"state":"IL","county":"Kankakee","developer":"SV CSG Manteno, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.221257,"lon":-87.88186,"as_of":"2026-08"},{"id":"69948/MANTO","plant_name":"SV CSG Manteno","generator_id":"MANTO","plant_id":69948,"state":"IL","county":"Kankakee","developer":"SV CSG Manteno, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.221257,"lon":-87.88186,"as_of":"2026-08"},{"id":"69949/BLOMB","plant_name":"SV CSG Bloomington","generator_id":"BLOMB","plant_id":69949,"state":"IL","county":"McLean","developer":"SV CSG Bloomington, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":40.465889,"lon":-89.03208,"as_of":"2026-08"},{"id":"69949/BLOOM","plant_name":"SV CSG Bloomington","generator_id":"BLOOM","plant_id":69949,"state":"IL","county":"McLean","developer":"SV CSG Bloomington, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":40.465889,"lon":-89.03208,"as_of":"2026-08"},{"id":"70402/LOGN","plant_name":"Logging Swamp North","generator_id":"LOGN","plant_id":70402,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":41.775,"lon":-70.881,"as_of":"2026-08"},{"id":"70404/LOGS","plant_name":"Logging Swamp South","generator_id":"LOGS","plant_id":70404,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-08","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":41.774,"lon":-70.88,"as_of":"2026-08"},{"id":"69821/SROX","plant_name":"SV CSG South Roxana","generator_id":"SROX","plant_id":69821,"state":"IL","county":"Madison","developer":"SV CSG South Roxana, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":38.811582,"lon":-90.0515,"as_of":"2026-08"},{"id":"69894/13PV1","plant_name":"E 1300 Street Solar LLC","generator_id":"13PV1","plant_id":69894,"state":"IL","county":"Henry","developer":"HQCA Energy Solutions, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":41.310529,"lon":-90.18478,"as_of":"2026-08"},{"id":"70134/243","plant_name":"Westhampton - NY 0243 (Giaquinto 1)","generator_id":"243","plant_id":70134,"state":"NY","county":"Suffolk","developer":"CVE US NY Westhampton 243 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.83636,"lon":-72.69044,"as_of":"2026-08"},{"id":"69859/MURP1","plant_name":"Murphysboro 1","generator_id":"MURP1","plant_id":69859,"state":"IL","county":"Jackson","developer":"Navisun LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.794585,"lon":-89.35141,"as_of":"2026-08"},{"id":"70130/141","plant_name":"Suffolk - VA 0141 (Johnson South)","generator_id":"141","plant_id":70130,"state":"VA","county":"Suffolk City","developer":"CVE US VA Suffolk 141 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"TVA","lat":36.70257,"lon":-76.79211,"as_of":"2026-08"},{"id":"70132/426","plant_name":"Waynesboro - VA 0426 (Patterson B)","generator_id":"426","plant_id":70132,"state":"VA","county":"Augusta","developer":"CVE US VA Patterson 426 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.14701,"lon":-78.87457,"as_of":"2026-08"},{"id":"58151/STG03","plant_name":"Central Utility Plant - Texas A&M","generator_id":"STG03","plant_id":58151,"state":"TX","county":"Brazos","developer":"Texas A&M, Utilities & Energy Services","sector":"Commercial CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ERCO","lat":30.617778,"lon":-96.34333,"as_of":"2026-08"},{"id":"64615/1","plant_name":"Sanford ESS, LLC","generator_id":"1","plant_id":64615,"state":"ME","county":"York","developer":"Sanford ESS, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"ISNE","lat":43.407648,"lon":-70.71209,"as_of":"2026-08"},{"id":"67647/KINGL","plant_name":"Kinglet","generator_id":"KINGL","plant_id":67647,"state":"VA","county":"Stafford","developer":"Cypress Creek Renewables","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.350511,"lon":-77.47619,"as_of":"2026-08"},{"id":"68859/PV1","plant_name":"Endicott","generator_id":"PV1","plant_id":68859,"state":"NY","county":"Broome","developer":"Endicott NY Solar Farm, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.139575,"lon":-76.09664,"as_of":"2026-08"},{"id":"68861/PV1","plant_name":"Tully 4","generator_id":"PV1","plant_id":68861,"state":"NY","county":"Onondaga","developer":"CP Tully Four LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.810918,"lon":-76.12014,"as_of":"2026-08"},{"id":"68862/PV1","plant_name":"Emerson NY","generator_id":"PV1","plant_id":68862,"state":"NY","county":"Columbia","developer":"Emerson Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.275414,"lon":-73.73512,"as_of":"2026-08"},{"id":"64067/AUBPV","plant_name":"Auburn PV - BD Solar Auburn LLC","generator_id":"AUBPV","plant_id":64067,"state":"ME","county":"Androscoggin","developer":"BD Solar Auburn LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":44.05,"lon":-70.3,"as_of":"2026-08"},{"id":"64071/LJNPV","plant_name":"Lewiston Jn PV - BD Solar Lewiston Jn LL","generator_id":"LJNPV","plant_id":64071,"state":"ME","county":"Androscoggin","developer":"BD Solar Lewiston Junction LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2028-03","planned_year":2028,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":44.05,"lon":-70.3,"as_of":"2026-08"},{"id":"62430/NA1","plant_name":"Grenada Lake Hydroelectric Project","generator_id":"NA1","plant_id":62430,"state":"MS","county":"Grenada","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":5,"summer_mw":4,"planned_start":"2028-04","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.808842,"lon":-89.77246,"as_of":"2026-08"},{"id":"62430/NA2","plant_name":"Grenada Lake Hydroelectric Project","generator_id":"NA2","plant_id":62430,"state":"MS","county":"Grenada","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":5,"summer_mw":4,"planned_start":"2028-05","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":33.808842,"lon":-89.77246,"as_of":"2026-08"},{"id":"68864/PV1","plant_name":"Bridgewater 2","generator_id":"PV1","plant_id":68864,"state":"NY","county":"Saratoga","developer":"Bridgewater Solar 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.831613,"lon":-73.67479,"as_of":"2026-08"},{"id":"68865/PV1","plant_name":"Bridgewater 1","generator_id":"PV1","plant_id":68865,"state":"NY","county":"Saratoga","developer":"Bridgewater Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":5,"summer_mw":5,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.831613,"lon":-73.67479,"as_of":"2026-08"},{"id":"70444/11131","plant_name":"Cottonwood - IL","generator_id":"11131","plant_id":70444,"state":"IL","county":"Woodford","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-08","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.684739,"lon":-89.00338,"as_of":"2026-08"},{"id":"68392/IL2PV","plant_name":"IL2 - W109","generator_id":"IL2PV","plant_id":68392,"state":"IL","county":"Will","developer":"Madison Energy Investments LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.470454,"lon":-88.02366,"as_of":"2026-08"},{"id":"70010/167","plant_name":"Pescara 1","generator_id":"167","plant_id":70010,"state":"NY","county":"Orleans","developer":"Pescara 1 Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.304517,"lon":-78.2196,"as_of":"2026-08"},{"id":"70011/168","plant_name":"Pescara 2","generator_id":"168","plant_id":70011,"state":"NY","county":"Orleans","developer":"Pescara 2 Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":43.30713,"lon":-78.22121,"as_of":"2026-08"},{"id":"70242/215","plant_name":"Riverhead - CVE","generator_id":"215","plant_id":70242,"state":"NY","county":"Suffolk","developer":"CVE US NY Riverhead 215 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.94233,"lon":-72.71824,"as_of":"2026-08"},{"id":"68277/1","plant_name":"Brookings Solar","generator_id":"1","plant_id":68277,"state":"SD","county":"Brookings","developer":"Western Minnesota Mun Pwr Agny","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":44.340596,"lon":-96.72945,"as_of":"2026-08"},{"id":"68208/LRZBR","plant_name":"City of Little Rock Solar Array","generator_id":"LRZBR","plant_id":68208,"state":"AR","county":"Pulaski","developer":"City of Little Rock - (AR)","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":34.69761,"lon":-92.21437,"as_of":"2026-08"},{"id":"70442/11224","plant_name":"KN216","generator_id":"11224","plant_id":70442,"state":"IL","county":"Kane","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.852991,"lon":-88.43975,"as_of":"2026-08"},{"id":"70327/ND012","plant_name":"Heron Clean Energy, LLC","generator_id":"ND012","plant_id":70327,"state":"NY","county":"Kings","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.618159,"lon":-73.93242,"as_of":"2026-08"},{"id":"70328/ND013","plant_name":"Jamaica Community Energy, LLC","generator_id":"ND013","plant_id":70328,"state":"NY","county":"Kings","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.637975,"lon":-73.92817,"as_of":"2026-08"},{"id":"68870/PV1","plant_name":"Watson 2","generator_id":"PV1","plant_id":68870,"state":"NY","county":"Broome","developer":"NY Union II, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.124945,"lon":-75.99177,"as_of":"2026-08"},{"id":"64541/1","plant_name":"Potic Solar","generator_id":"1","plant_id":64541,"state":"NY","county":"Greene","developer":"FPS Potic Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":42.29559,"lon":-73.9012,"as_of":"2026-08"},{"id":"70312/ND022","plant_name":"Lobelia Clean Energy LLC","generator_id":"ND022","plant_id":70312,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.853531,"lon":-73.89531,"as_of":"2026-08"},{"id":"70313/ND024","plant_name":"Lobelia 4452 Clean Energy LLC","generator_id":"ND024","plant_id":70313,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.853722,"lon":-73.89525,"as_of":"2026-08"},{"id":"70322/ND025","plant_name":"Wintergreen Clean Energy, LLC","generator_id":"ND025","plant_id":70322,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.812557,"lon":-73.89,"as_of":"2026-08"},{"id":"70323/ND027","plant_name":"Wintergreen B Clean Energy LLC","generator_id":"ND027","plant_id":70323,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.812516,"lon":-73.89011,"as_of":"2026-08"},{"id":"70324/ND023","plant_name":"Wintergreen C Clean Energy LLC","generator_id":"ND023","plant_id":70324,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.812516,"lon":-73.89011,"as_of":"2026-08"},{"id":"70325/ND026","plant_name":"Wintergreen D Clean Energy LLC","generator_id":"ND026","plant_id":70325,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.812516,"lon":-73.89011,"as_of":"2026-08"},{"id":"70308/ND030","plant_name":"Blue Aster Clean Energy LLC","generator_id":"ND030","plant_id":70308,"state":"NY","county":"Kings","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.674137,"lon":-73.90102,"as_of":"2026-08"},{"id":"70309/ND031","plant_name":"Blue Aster B Clean Energy LLC","generator_id":"ND031","plant_id":70309,"state":"NY","county":"Kings","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.674137,"lon":-73.90102,"as_of":"2026-08"},{"id":"70310/ND028","plant_name":"Blue Aster C Clean Energy LLC","generator_id":"ND028","plant_id":70310,"state":"NY","county":"Kings","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.9,"summer_mw":4.9,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.674137,"lon":-73.90102,"as_of":"2026-08"},{"id":"67749/TWISS","plant_name":"Pistachio Road 1726-WD","generator_id":"TWISS","plant_id":67749,"state":"CA","county":"Kern","developer":"Russell Pacific LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.70789,"lon":-119.8917,"as_of":"2026-08"},{"id":"68097/CHERR","plant_name":"SR Cherry Valley","generator_id":"CHERR","plant_id":68097,"state":"AR","county":"Cross","developer":"SR Cherry Valley, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":35.372893,"lon":-90.7708,"as_of":"2026-08"},{"id":"69558/GRANT","plant_name":"Pluma - SLT Grant","generator_id":"GRANT","plant_id":69558,"state":"NM","county":"Grant","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PNM","lat":32.762349,"lon":-108.1793,"as_of":"2026-08"},{"id":"67134/MARSH","plant_name":"SR Marshall, LLC","generator_id":"MARSH","plant_id":67134,"state":"MS","county":"Marshall","developer":"SR Marshall, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"TVA","lat":34.959526,"lon":-89.58856,"as_of":"2026-08"},{"id":"68230/DESAR","plant_name":"SR Des Arc","generator_id":"DESAR","plant_id":68230,"state":"AR","county":"Prairie","developer":"SR Des Arc, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":34.977439,"lon":-91.52516,"as_of":"2026-08"},{"id":"68256/SBAST","plant_name":"SR South Bastrop","generator_id":"SBAST","plant_id":68256,"state":"LA","county":"Morehouse","developer":"SR South Bastrop, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.747456,"lon":-91.91091,"as_of":"2026-08"},{"id":"68257/WINN","plant_name":"SR Winnsboro","generator_id":"WINN","plant_id":68257,"state":"LA","county":"Franklin","developer":"SR Winnsboro, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":32.159745,"lon":-91.67586,"as_of":"2026-08"},{"id":"70116/GEN1","plant_name":"La Junta Solar","generator_id":"GEN1","plant_id":70116,"state":"CO","county":"Otero","developer":"Clay Creek Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":38.038,"lon":-103.5237,"as_of":"2026-08"},{"id":"70117/GEN1","plant_name":"Lamar Solar","generator_id":"GEN1","plant_id":70117,"state":"CO","county":"Prowers","developer":"Clay Creek Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":38.043192,"lon":-102.5922,"as_of":"2026-08"},{"id":"68869/PV1","plant_name":"Watson 1","generator_id":"PV1","plant_id":68869,"state":"NY","county":"Broome","developer":"NY Union I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.124945,"lon":-75.99177,"as_of":"2026-08"},{"id":"68557/FORRC","plant_name":"SR Forrest City","generator_id":"FORRC","plant_id":68557,"state":"AR","county":"St Francis","developer":"SR Forrest City, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":34.984256,"lon":-90.78602,"as_of":"2026-08"},{"id":"68569/ULM","plant_name":"SR Ulm","generator_id":"ULM","plant_id":68569,"state":"AR","county":"Prairie","developer":"SR Ulm, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":34.577902,"lon":-91.45184,"as_of":"2026-08"},{"id":"68570/WHELN","plant_name":"SR West Helena","generator_id":"WHELN","plant_id":68570,"state":"AR","county":"Phillips","developer":"SR West Helena, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":34.552639,"lon":-90.68421,"as_of":"2026-08"},{"id":"69704/RC-1","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-1","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"69704/RC-2","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-2","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"69704/RC-3","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-3","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"69704/RC-4","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-4","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"69704/RC-5","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-5","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"69704/RC-6","plant_name":"R.C. Byrd L&D Hydroelectric Project","generator_id":"RC-6","plant_id":69704,"state":"WV","county":"Mason","developer":"Ohio Power and Light LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.8,"summer_mw":4.8,"planned_start":"2029-02","planned_year":2029,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":38.68,"lon":-82.179,"as_of":"2026-08"},{"id":"66618/FL3","plant_name":"Fish Lake Geothermal","generator_id":"FL3","plant_id":66618,"state":"NV","county":"Esmeralda","developer":"Fish Lake Geothermal LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"ST","nameplate_mw":4.7,"summer_mw":3.4,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":37.860925,"lon":-118.0341,"as_of":"2026-08"},{"id":"69896/7999G","plant_name":"7999 Gateway Solar","generator_id":"7999G","plant_id":69896,"state":"CA","county":"Alameda","developer":"Coast Energy Holdings, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.6,"summer_mw":4.6,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.5215,"lon":-122.0397,"as_of":"2026-08"},{"id":"70048/AIREX","plant_name":"City of Milwaukee- Airport Expansion","generator_id":"AIREX","plant_id":70048,"state":"WI","county":"Milwaukee","developer":"WEC: City of Milwaukee - Airport Expansion","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.6,"summer_mw":4.6,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.930271,"lon":-87.88801,"as_of":"2026-08"},{"id":"69195/LONTB","plant_name":"Longtown Energy Storage","generator_id":"LONTB","plant_id":69195,"state":"SC","county":"Fairfield","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"DUK","lat":34.416433,"lon":-80.86814,"as_of":"2026-08"},{"id":"69828/MEXIC","plant_name":"Mexico PV, LLC","generator_id":"MEXIC","plant_id":69828,"state":"NY","county":"Oswego","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.429675,"lon":-76.16547,"as_of":"2026-08"},{"id":"69174/11238","plant_name":"Arlington 1","generator_id":"11238","plant_id":69174,"state":"IL","county":"Bureau","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.454037,"lon":-89.29509,"as_of":"2026-08"},{"id":"69175/11239","plant_name":"Arlington 2","generator_id":"11239","plant_id":69175,"state":"IL","county":"Bureau","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.454503,"lon":-89.29475,"as_of":"2026-08"},{"id":"69207/11215","plant_name":"Osman Trust","generator_id":"11215","plant_id":69207,"state":"IL","county":"McHenry","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.267124,"lon":-88.45245,"as_of":"2026-08"},{"id":"69932/CSTLO","plant_name":"Castle Rock Lake Solar","generator_id":"CSTLO","plant_id":69932,"state":"WI","county":"Juneau","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":43.972048,"lon":-90.06761,"as_of":"2026-08"},{"id":"70357/PS58","plant_name":"Pivot Solar 58 LLC","generator_id":"PS58","plant_id":70357,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.474398,"lon":-104.623,"as_of":"2026-08"},{"id":"68972/11253","plant_name":"Gilman Solar LLC","generator_id":"11253","plant_id":68972,"state":"IL","county":"Iroquois","developer":"Gilman Solar LLC PV","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.764392,"lon":-87.99916,"as_of":"2026-08"},{"id":"68243/BEAR","plant_name":"SR Bear Creek","generator_id":"BEAR","plant_id":68243,"state":"AL","county":"Marion","developer":"SR Bear Creek, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.5,"summer_mw":4.5,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"SOCO","lat":34.275559,"lon":-87.70564,"as_of":"2026-08"},{"id":"62401/NA1","plant_name":"Allegheny L&D2 Hydroelectric Project","generator_id":"NA1","plant_id":62401,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.5,"summer_mw":2.5,"planned_start":"2030-11","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.89444,"lon":-79.91361,"as_of":"2026-08"},{"id":"62401/NA2","plant_name":"Allegheny L&D2 Hydroelectric Project","generator_id":"NA2","plant_id":62401,"state":"PA","county":"Allegheny","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.5,"summer_mw":2.5,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":40.89444,"lon":-79.91361,"as_of":"2026-08"},{"id":"70311/ND020","plant_name":"Eastern BlueBird Clean Energy LLC","generator_id":"ND020","plant_id":70311,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.4,"summer_mw":4.4,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.884948,"lon":-73.82901,"as_of":"2026-08"},{"id":"70315/ND021","plant_name":"Northern Cardinal Clean Energy, LLC","generator_id":"ND021","plant_id":70315,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4.4,"summer_mw":4.4,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.884948,"lon":-73.82901,"as_of":"2026-08"},{"id":"56615/G200","plant_name":"Rancho Penasquitos","generator_id":"G200","plant_id":56615,"state":"CA","county":"San Diego","developer":"San Diego County Water Auth","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":4.3,"summer_mw":4.1,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":32.93695,"lon":-117.1137,"as_of":"2026-08"},{"id":"69276/23219","plant_name":"SL Ashville 2","generator_id":"23219","plant_id":69276,"state":"NY","county":"Chautauqua","developer":"SL Ashville 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.3,"summer_mw":4.3,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.071667,"lon":-79.41167,"as_of":"2026-08"},{"id":"69473/23211","plant_name":"SL Brockport","generator_id":"23211","plant_id":69473,"state":"NY","county":"Monroe","developer":"SL Brockport, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.3,"summer_mw":4.3,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.201111,"lon":-77.89806,"as_of":"2026-08"},{"id":"69889/USGOL","plant_name":"USS Gold Solar","generator_id":"USGOL","plant_id":69889,"state":"NM","county":"Luna","developer":"USS Gold Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.3,"summer_mw":4.3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":32.26144,"lon":-107.7778,"as_of":"2026-08"},{"id":"68567/SUNST","plant_name":"SR Sunset","generator_id":"SUNST","plant_id":68567,"state":"LA","county":"St Landry","developer":"SR Sunset, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.3,"summer_mw":4.3,"planned_start":"2027-12","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":30.421588,"lon":-92.07507,"as_of":"2026-08"},{"id":"69834/AVON2","plant_name":"Avon CSG 2 LLC","generator_id":"AVON2","plant_id":69834,"state":"NY","county":"Livingston","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4.1,"summer_mw":4.1,"planned_start":"2026-08","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":42.885817,"lon":-77.71431,"as_of":"2026-08"},{"id":"52021/GEN3","plant_name":"ITT Cogen Facility","generator_id":"GEN3","plant_id":52021,"state":"IL","county":"Cook","developer":"ITT Energy Tech Partners, LLC","sector":"Commercial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":4.1,"summer_mw":4.1,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.83442,"lon":-87.62847,"as_of":"2026-08"},{"id":"52021/GEN4","plant_name":"ITT Cogen Facility","generator_id":"GEN4","plant_id":52021,"state":"IL","county":"Cook","developer":"ITT Energy Tech Partners, LLC","sector":"Commercial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":4.1,"summer_mw":4.1,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.83442,"lon":-87.62847,"as_of":"2026-08"},{"id":"69293/WTS1","plant_name":"Waterton Solar I","generator_id":"WTS1","plant_id":69293,"state":"CO","county":"Douglas","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":39.5,"lon":-105.07,"as_of":"2026-08"},{"id":"69620/WTS2","plant_name":"Waterton Solar II","generator_id":"WTS2","plant_id":69620,"state":"CO","county":"Douglas","developer":"Public Service Co of Colorado","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":39.5,"lon":-105.07,"as_of":"2026-08"},{"id":"70051/GRISS","plant_name":"Kearsarge Grissom","generator_id":"GRISS","plant_id":70051,"state":"NH","county":"Sullivan","developer":"Kearsarge Grissom LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ISNE","lat":43.344697,"lon":-72.37781,"as_of":"2026-08"},{"id":"70201/PS50","plant_name":"Pivot Solar 50 LLC","generator_id":"PS50","plant_id":70201,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.3657,"lon":-104.6336,"as_of":"2026-08"},{"id":"70242/216","plant_name":"Riverhead - CVE","generator_id":"216","plant_id":70242,"state":"NY","county":"Suffolk","developer":"CVE US NY Riverhead 215 LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.94233,"lon":-72.71824,"as_of":"2026-08"},{"id":"68195/DEAVE","plant_name":"Delaware Ave Solar","generator_id":"DEAVE","plant_id":68195,"state":"DE","county":"Kent","developer":"Delaware Ave Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.930578,"lon":-75.57075,"as_of":"2026-08"},{"id":"69204/11241","plant_name":"Little Creek","generator_id":"11241","plant_id":69204,"state":"IL","county":"McDonough","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.564286,"lon":-90.88035,"as_of":"2026-08"},{"id":"70380/GEN4","plant_name":"Kraemer Garden","generator_id":"GEN4","plant_id":70380,"state":"MN","county":"Stearns","developer":"Baxter Healthcare of Puerto Rico/Jayuya","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.53123,"lon":-94.24932,"as_of":"2026-08"},{"id":"69309/23215","plant_name":"SL Pembroke","generator_id":"23215","plant_id":69309,"state":"NY","county":"Genesee","developer":"SL Pembroke, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.028056,"lon":-78.45694,"as_of":"2026-08"},{"id":"70104/PS53","plant_name":"Pivot Solar 53 LLC","generator_id":"PS53","plant_id":70104,"state":"CO","county":"Adams","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":39.748549,"lon":-104.6673,"as_of":"2026-08"},{"id":"68196/RIFPV","plant_name":"Rifle Range Road Solar","generator_id":"RIFPV","plant_id":68196,"state":"DE","county":"Sussex","developer":"Rifle Range Road Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.725699,"lon":-75.57144,"as_of":"2026-08"},{"id":"70374/CSC52","plant_name":"Chaberton Solar Crestone","generator_id":"CSC52","plant_id":70374,"state":"DE","county":"Kent","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.946876,"lon":-75.57677,"as_of":"2026-08"},{"id":"65710/PTNM","plant_name":"Putnam Meadow Solar Station","generator_id":"PTNM","plant_id":65710,"state":"CT","county":"Windham","developer":"Putnam Meadow Solar Station, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.902261,"lon":-71.91154,"as_of":"2026-08"},{"id":"66513/18229","plant_name":"MA Acushnet 540R Main St","generator_id":"18229","plant_id":66513,"state":"MA","county":"Bristol","developer":"TJA 540R Main St. Acushnet, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.702987,"lon":-70.8888,"as_of":"2026-08"},{"id":"68211/GRER","plant_name":"Grears Corner Solar","generator_id":"GRER","plant_id":68211,"state":"DE","county":"New Castle","developer":"Grears Corner Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.380083,"lon":-75.70611,"as_of":"2026-08"},{"id":"68219/SNIES","plant_name":"Snipatuit Road Solar","generator_id":"SNIES","plant_id":68219,"state":"MA","county":"Plymouth","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.768,"lon":-70.882,"as_of":"2026-08"},{"id":"68219/SNIPV","plant_name":"Snipatuit Road Solar","generator_id":"SNIPV","plant_id":68219,"state":"MA","county":"Plymouth","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.768,"lon":-70.882,"as_of":"2026-08"},{"id":"65146/VCP16","plant_name":"CT Airport Authority Solar One","generator_id":"VCP16","plant_id":65146,"state":"CT","county":"Hartford","developer":"CAA CT Solar One, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":4,"summer_mw":4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":41.933776,"lon":-72.6714,"as_of":"2026-08"},{"id":"69593/1","plant_name":"MCCo BESS Generating Facility","generator_id":"1","plant_id":69593,"state":"OH","county":"Cuyahoga","developer":"The Medical Center Company","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.3026,"lon":-81.3604,"as_of":"2026-08"},{"id":"69593/2","plant_name":"MCCo BESS Generating Facility","generator_id":"2","plant_id":69593,"state":"OH","county":"Cuyahoga","developer":"The Medical Center Company","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.3026,"lon":-81.3604,"as_of":"2026-08"},{"id":"69593/3","plant_name":"MCCo BESS Generating Facility","generator_id":"3","plant_id":69593,"state":"OH","county":"Cuyahoga","developer":"The Medical Center Company","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.3026,"lon":-81.3604,"as_of":"2026-08"},{"id":"69593/4","plant_name":"MCCo BESS Generating Facility","generator_id":"4","plant_id":69593,"state":"OH","county":"Cuyahoga","developer":"The Medical Center Company","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.3026,"lon":-81.3604,"as_of":"2026-08"},{"id":"68936/NAP1","plant_name":"SV CSG Naplate","generator_id":"NAP1","plant_id":68936,"state":"IL","county":"LaSalle","developer":"SV CSG Naplate, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.332158,"lon":-88.88482,"as_of":"2026-08"},{"id":"69137/ALP2","plant_name":"Althea Avenue Solar","generator_id":"ALP2","plant_id":69137,"state":"CA","county":"Fresno","developer":"RPCA Solar 8, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.893121,"lon":-120.6569,"as_of":"2026-08"},{"id":"69871/BAT1","plant_name":"Tanglewood BESS","generator_id":"BAT1","plant_id":69871,"state":"NC","county":"Pasquotank","developer":"North Carolina El Member Corp","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":36.272111,"lon":-76.30127,"as_of":"2026-08"},{"id":"69872/BAT1","plant_name":"Windsor BESS","generator_id":"BAT1","plant_id":69872,"state":"NC","county":"Bertie","developer":"North Carolina El Member Corp","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":36.025838,"lon":-76.98179,"as_of":"2026-08"},{"id":"68519/MDNA3","plant_name":"Madena 3","generator_id":"MDNA3","plant_id":68519,"state":"CA","county":"Yuba","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":39.026009,"lon":-121.5441,"as_of":"2026-08"},{"id":"70320/ND018","plant_name":"Water Willow A Clean Energy LLC","generator_id":"ND018","plant_id":70320,"state":"NY","county":"Queens","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.708897,"lon":-73.77939,"as_of":"2026-08"},{"id":"70321/ND019","plant_name":"Water Willow B Clean Energy LLC","generator_id":"ND019","plant_id":70321,"state":"NY","county":"Queens","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.9,"summer_mw":3.9,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.708897,"lon":-73.77939,"as_of":"2026-08"},{"id":"69275/23210","plant_name":"SL Ashville","generator_id":"23210","plant_id":69275,"state":"NY","county":"Chautauqua","developer":"SL Ashville, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.8,"summer_mw":3.8,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.071667,"lon":-79.41167,"as_of":"2026-08"},{"id":"69935/GILMN","plant_name":"Gilman","generator_id":"GILMN","plant_id":69935,"state":"WI","county":"Chippewa","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.8,"summer_mw":3.8,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.119204,"lon":-90.87405,"as_of":"2026-08"},{"id":"70019/23221","plant_name":"SL Portland Community 2, LLC","generator_id":"23221","plant_id":70019,"state":"NY","county":"Chautauqua","developer":"SL Portland Community 2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.8,"summer_mw":3.8,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.37773,"lon":-79.45972,"as_of":"2026-08"},{"id":"7907/4","plant_name":"Pine Flat","generator_id":"4","plant_id":7907,"state":"CA","county":"Fresno","developer":"Kings River Conservation Dist","sector":"Electric Utility","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":3.8,"summer_mw":3.8,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":36.8326,"lon":-119.327,"as_of":"2026-08"},{"id":"70326/ND014","plant_name":"Coral Honeysuckle Clean Energy LLC","generator_id":"ND014","plant_id":70326,"state":"NY","county":"Queens","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.7,"summer_mw":3.7,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":40.679023,"lon":-73.82032,"as_of":"2026-08"},{"id":"70329/ND015","plant_name":"Linden Clean Energy, LLC","generator_id":"ND015","plant_id":70329,"state":"NY","county":"Queens","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.7,"summer_mw":3.7,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":40.679074,"lon":-73.82041,"as_of":"2026-08"},{"id":"69811/ANGEL","plant_name":"SV CSG Angelly 1","generator_id":"ANGEL","plant_id":69811,"state":"IL","county":"Saline","developer":"SV CSG Angelly 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.6,"summer_mw":3.6,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":37.7164,"lon":-88.5303,"as_of":"2026-08"},{"id":"70202/PS56","plant_name":"Pivot Solar 56 LLC","generator_id":"PS56","plant_id":70202,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.6,"summer_mw":3.6,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.350547,"lon":-104.7226,"as_of":"2026-08"},{"id":"70103/PS43","plant_name":"Pivot Solar 43 LLC","generator_id":"PS43","plant_id":70103,"state":"CO","county":"Adams","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":39.748549,"lon":-104.6673,"as_of":"2026-08"},{"id":"70185/PV1","plant_name":"Copenhagen Ct","generator_id":"PV1","plant_id":70185,"state":"IL","county":"Cook","developer":"11601 Copenhagen Ct, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.939381,"lon":-87.91775,"as_of":"2026-08"},{"id":"69472/18198","plant_name":"NYSolar06","generator_id":"18198","plant_id":69472,"state":"NY","county":"Erie","developer":"NYSolar06, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.021667,"lon":-78.98806,"as_of":"2026-08"},{"id":"70018/23216","plant_name":"SL Portland Community, LLC","generator_id":"23216","plant_id":70018,"state":"NY","county":"Chautauqua","developer":"SL Portland Community, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.383832,"lon":-79.4718,"as_of":"2026-08"},{"id":"69810/MAHOM","plant_name":"SV CSG Mahomet","generator_id":"MAHOM","plant_id":69810,"state":"IL","county":"Champaign","developer":"SV CSG Mahomet, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":40.193189,"lon":-88.37984,"as_of":"2026-08"},{"id":"2185/HAU9","plant_name":"Hauser","generator_id":"HAU9","plant_id":2185,"state":"MT","county":"Lewis and Clark","developer":"NorthWestern Energy (MT Hydro)","sector":"Electric Utility","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NWMT","lat":46.765941,"lon":-111.8873,"as_of":"2026-08"},{"id":"65060/VCP02","plant_name":"Hope Solar One","generator_id":"VCP02","plant_id":65060,"state":"RI","county":"Providence","developer":"Hope Solar One, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"ISNE","lat":41.729285,"lon":-71.63759,"as_of":"2026-08"},{"id":"2185/HAU12","plant_name":"Hauser","generator_id":"HAU12","plant_id":2185,"state":"MT","county":"Lewis and Clark","developer":"NorthWestern Energy (MT Hydro)","sector":"Electric Utility","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":3.5,"summer_mw":3.5,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NWMT","lat":46.765941,"lon":-111.8873,"as_of":"2026-08"},{"id":"70228/LOCKW","plant_name":"AC IL - Lockport West","generator_id":"LOCKW","plant_id":70228,"state":"IL","county":"Will","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.5944,"lon":-88.0624,"as_of":"2026-08"},{"id":"54224/EG11","plant_name":"Franklin Heating Station","generator_id":"EG11","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"54224/EG12","plant_name":"Franklin Heating Station","generator_id":"EG12","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"54224/EG13","plant_name":"Franklin Heating Station","generator_id":"EG13","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"54224/EG14","plant_name":"Franklin Heating Station","generator_id":"EG14","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"54224/EG15","plant_name":"Franklin Heating Station","generator_id":"EG15","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"68884/PV1","plant_name":"Glen Mary","generator_id":"PV1","plant_id":68884,"state":"NY","county":"Tioga","developer":"NY Tioga IV, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.4,"summer_mw":3.4,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.128604,"lon":-76.27895,"as_of":"2026-08"},{"id":"69854/GLWAY","plant_name":"TJA-NY-1806 Perth Rd Galway, LLC","generator_id":"GLWAY","plant_id":69854,"state":"NY","county":"Saratoga","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":43.017403,"lon":-74.05131,"as_of":"2026-08"},{"id":"69271/STAG1","plant_name":"Staghorn Gas","generator_id":"STAG1","plant_id":69271,"state":"TX","county":"Ward","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.457838,"lon":-103.0847,"as_of":"2026-08"},{"id":"69271/STAG2","plant_name":"Staghorn Gas","generator_id":"STAG2","plant_id":69271,"state":"TX","county":"Ward","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.457838,"lon":-103.0847,"as_of":"2026-08"},{"id":"69271/STAG3","plant_name":"Staghorn Gas","generator_id":"STAG3","plant_id":69271,"state":"TX","county":"Ward","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":31.457838,"lon":-103.0847,"as_of":"2026-08"},{"id":"69881/USHER","plant_name":"USS Hermanas Solar","generator_id":"USHER","plant_id":69881,"state":"NM","county":"Luna","developer":"USS Hermanas Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":32.210444,"lon":-107.8114,"as_of":"2026-08"},{"id":"70439/PV1","plant_name":"SR 415 - NY Avoca I","generator_id":"PV1","plant_id":70439,"state":"NY","county":"Steuben","developer":"NY Avoca I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.401191,"lon":-77.41787,"as_of":"2026-08"},{"id":"70317/ND029","plant_name":"Roseate Tern Clean Energy LLC","generator_id":"ND029","plant_id":70317,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3.3,"summer_mw":3.3,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.715572,"lon":-73.88673,"as_of":"2026-08"},{"id":"66618/FL1","plant_name":"Fish Lake Geothermal","generator_id":"FL1","plant_id":66618,"state":"NV","county":"Esmeralda","developer":"Fish Lake Geothermal LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"ST","nameplate_mw":3.3,"summer_mw":2.1,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":37.860925,"lon":-118.0341,"as_of":"2026-08"},{"id":"66618/FL2","plant_name":"Fish Lake Geothermal","generator_id":"FL2","plant_id":66618,"state":"NV","county":"Esmeralda","developer":"Fish Lake Geothermal LLC","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"ST","nameplate_mw":3.3,"summer_mw":2.9,"planned_start":"2027-09","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NEVP","lat":37.860925,"lon":-118.0341,"as_of":"2026-08"},{"id":"70181/CN001","plant_name":"Prologis - SLCNJ001 - Community Solar","generator_id":"CN001","plant_id":70181,"state":"NJ","county":"Middlesex","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.2,"summer_mw":3.2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":40.56877,"lon":-74.49457,"as_of":"2026-08"},{"id":"69861/NORR2","plant_name":"Norris City 2","generator_id":"NORR2","plant_id":69861,"state":"IL","county":"White","developer":"Navisun LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.2,"summer_mw":3.2,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":38.020585,"lon":-88.27321,"as_of":"2026-08"},{"id":"70227/LOCKE","plant_name":"AC IL - Lockport East","generator_id":"LOCKE","plant_id":70227,"state":"IL","county":"Will","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.1,"summer_mw":3.1,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.6044,"lon":-88.0603,"as_of":"2026-08"},{"id":"70339/IL55B","plant_name":"Pivot Energy IL 55 LLC","generator_id":"IL55B","plant_id":70339,"state":"IL","county":"McHenry","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3.1,"summer_mw":3.1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.339848,"lon":-88.50452,"as_of":"2026-08"},{"id":"54224/DG9","plant_name":"Franklin Heating Station","generator_id":"DG9","plant_id":54224,"state":"MN","county":"Olmsted","developer":"Franklin Heating Station","sector":"Commercial CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3.1,"summer_mw":3.1,"planned_start":"2028-01","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":44.020576,"lon":-92.4656,"as_of":"2026-08"},{"id":"68018/MRCDB","plant_name":"Merced BESS","generator_id":"MRCDB","plant_id":68018,"state":"CA","county":"Merced","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":36.989396,"lon":-120.8775,"as_of":"2026-08"},{"id":"68070/ALBER","plant_name":"Alberta Solar","generator_id":"ALBER","plant_id":68070,"state":"VA","county":"Brunswick","developer":"Dominion Renewable Energy","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":36.841728,"lon":-77.91051,"as_of":"2026-08"},{"id":"69842/CARN1","plant_name":"Carneys Point Solar 1 LLC","generator_id":"CARN1","plant_id":69842,"state":"NJ","county":"Salem","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.685579,"lon":-75.41956,"as_of":"2026-08"},{"id":"70447/45629","plant_name":"Ember Sun LLC PV","generator_id":"45629","plant_id":70447,"state":"IL","county":"McDonough","developer":"Ember Sun LLC PV","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.489341,"lon":-90.69128,"as_of":"2026-08"},{"id":"69369/BARTE","plant_name":"Bartell South PV I","generator_id":"BARTE","plant_id":69369,"state":"NY","county":"Onondaga","developer":"Bartell South PV I LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.208874,"lon":-76.12219,"as_of":"2026-08"},{"id":"69855/POMFR","plant_name":"Pomfret PV, LLC","generator_id":"POMFR","plant_id":69855,"state":"NY","county":"Chautauqua","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":42.447083,"lon":-79.35516,"as_of":"2026-08"},{"id":"69937/MNDVI","plant_name":"Mondovi","generator_id":"MNDVI","plant_id":69937,"state":"WI","county":"Buffalo","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":44.569282,"lon":-91.70856,"as_of":"2026-08"},{"id":"69562/MINNE","plant_name":"Minneola Solar","generator_id":"MINNE","plant_id":69562,"state":"CA","county":"San Bernardino","developer":"Minneola Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.846914,"lon":-116.7698,"as_of":"2026-08"},{"id":"2678/ENG13","plant_name":"Plant No 1 Freeport","generator_id":"ENG13","plant_id":2678,"state":"NY","county":"Nassau","developer":"Village of Freeport - (NY)","sector":"Electric Utility","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.6561,"lon":-73.5922,"as_of":"2026-08"},{"id":"66552/MH162","plant_name":"EnerSmart Mesa Heights Sub Station","generator_id":"MH162","plant_id":66552,"state":"CA","county":"San Diego","developer":"EnerSmart Storage","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":32.82412,"lon":-117.1513,"as_of":"2026-08"},{"id":"69884/USMED","plant_name":"USS Meadow Lake Solar","generator_id":"USMED","plant_id":69884,"state":"NM","county":"Valencia","developer":"USS Meadow Lake Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":34.79756,"lon":-106.6542,"as_of":"2026-08"},{"id":"69996/HEMLK","plant_name":"Penn Hemlock Solar LLC","generator_id":"HEMLK","plant_id":69996,"state":"PA","county":"Snyder","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.693001,"lon":-77.10099,"as_of":"2026-08"},{"id":"70004/MONRO","plant_name":"Monroe Route 35 Solar LLC","generator_id":"MONRO","plant_id":70004,"state":"PA","county":"Juniata","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.685584,"lon":-77.13704,"as_of":"2026-08"},{"id":"70006/PERRR","plant_name":"Perry Route 104 Solar LLC","generator_id":"PERRR","plant_id":70006,"state":"PA","county":"Snyder","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.740172,"lon":-77.01011,"as_of":"2026-08"},{"id":"68140/CH547","plant_name":"Melrose Park 2-SLCHI547","generator_id":"CH547","plant_id":68140,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.9809,"lon":-87.8633,"as_of":"2026-08"},{"id":"69427/WAXWI","plant_name":"Waxwing Solar CSG","generator_id":"WAXWI","plant_id":69427,"state":"CO","county":"Pueblo","developer":"Waxwing Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PSCO","lat":38.2963,"lon":-104.5525,"as_of":"2026-08"},{"id":"69749/U1","plant_name":"Scholl Canyon","generator_id":"U1","plant_id":69749,"state":"CA","county":"Los Angeles","developer":"City of Glendale - (CA)","sector":"Electric Utility","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":2.8,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LDWP","lat":34.15638,"lon":-118.1927,"as_of":"2026-08"},{"id":"69749/U2","plant_name":"Scholl Canyon","generator_id":"U2","plant_id":69749,"state":"CA","county":"Los Angeles","developer":"City of Glendale - (CA)","sector":"Electric Utility","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":2.8,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LDWP","lat":34.15638,"lon":-118.1927,"as_of":"2026-08"},{"id":"69749/U3","plant_name":"Scholl Canyon","generator_id":"U3","plant_id":69749,"state":"CA","county":"Los Angeles","developer":"City of Glendale - (CA)","sector":"Electric Utility","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":2.8,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LDWP","lat":34.15638,"lon":-118.1927,"as_of":"2026-08"},{"id":"69749/U4","plant_name":"Scholl Canyon","generator_id":"U4","plant_id":69749,"state":"CA","county":"Los Angeles","developer":"City of Glendale - (CA)","sector":"Electric Utility","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":2.8,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"LDWP","lat":34.15638,"lon":-118.1927,"as_of":"2026-08"},{"id":"70008/WPERR","plant_name":"West Perry Planing Mill Road Solar LLC","generator_id":"WPERR","plant_id":70008,"state":"PA","county":"Snyder","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.689203,"lon":-77.14223,"as_of":"2026-08"},{"id":"1263/9","plant_name":"Belleville","generator_id":"9","plant_id":1263,"state":"KS","county":"Republic","developer":"City of Belleville - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":39.832769,"lon":-97.63204,"as_of":"2026-08"},{"id":"69560/MAGNO","plant_name":"Sunrise Magnolia DE","generator_id":"MAGNO","plant_id":69560,"state":"DE","county":"Kent","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":39.071366,"lon":-75.49303,"as_of":"2026-08"},{"id":"69998/WHTCH","plant_name":"Franklin White Church Road Solar LLC","generator_id":"WHTCH","plant_id":69998,"state":"PA","county":"Snyder","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.780457,"lon":-77.08402,"as_of":"2026-08"},{"id":"69999/GREEB","plant_name":"Greenwood Bottom Road Solar LLC","generator_id":"GREEB","plant_id":69999,"state":"PA","county":"Columbia","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.117527,"lon":-76.48308,"as_of":"2026-08"},{"id":"70000/GREER","plant_name":"Greenwood Route 254 Solar LLC","generator_id":"GREER","plant_id":70000,"state":"PA","county":"Columbia","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.130477,"lon":-76.51152,"as_of":"2026-08"},{"id":"70003/TAYLR","plant_name":"Madison Taylor Road Solar LLC","generator_id":"TAYLR","plant_id":70003,"state":"PA","county":"Columbia","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.112516,"lon":-76.538,"as_of":"2026-08"},{"id":"65828/1666","plant_name":"Chidsey Hill Road Solar","generator_id":"1666","plant_id":65828,"state":"NY","county":"Steuben","developer":"NY Pulteney I, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.573062,"lon":-77.16598,"as_of":"2026-08"},{"id":"68216/CUSES","plant_name":"Cushman Road Solar","generator_id":"CUSES","plant_id":68216,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.732,"lon":-70.875,"as_of":"2026-08"},{"id":"68216/CUSPV","plant_name":"Cushman Road Solar","generator_id":"CUSPV","plant_id":68216,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-05","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.732,"lon":-70.875,"as_of":"2026-08"},{"id":"70005/SHOOF","plant_name":"Penn Shoofly Solar LLC","generator_id":"SHOOF","plant_id":70005,"state":"PA","county":"Columbia","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-05","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.115059,"lon":-76.4738,"as_of":"2026-08"},{"id":"70105/GDNAB","plant_name":"Gardenia 1","generator_id":"GDNAB","plant_id":70105,"state":"CA","county":"Kings","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.790785,"lon":-119.8777,"as_of":"2026-08"},{"id":"70105/GDNAS","plant_name":"Gardenia 1","generator_id":"GDNAS","plant_id":70105,"state":"CA","county":"Kings","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":35.790785,"lon":-119.8777,"as_of":"2026-08"},{"id":"56895/7","plant_name":"Ameresco Ox Mountain","generator_id":"7","plant_id":56895,"state":"CA","county":"San Mateo","developer":"AMERESCO Ox Mountain Energy LLC","sector":"IPP Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":3,"summer_mw":2.8,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"CISO","lat":37.5,"lon":-122.4,"as_of":"2026-08"},{"id":"69160/OTTA1","plant_name":"SV CSG Ottawa 1","generator_id":"OTTA1","plant_id":69160,"state":"IL","county":"LaSalle","developer":"SV CSG Ottawa 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-09","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"MISO","lat":41.340799,"lon":-88.77689,"as_of":"2026-08"},{"id":"69994/MONTR","plant_name":"Montour Tower Drive Solar LLC","generator_id":"MONTR","plant_id":69994,"state":"PA","county":"Columbia","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-09","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.981975,"lon":-76.52315,"as_of":"2026-08"},{"id":"70170/429","plant_name":"Jones - PA 0429 (Rhodes South)","generator_id":"429","plant_id":70170,"state":"PA","county":"Elk","developer":"CVE US PA Jones 429 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-10","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.56421,"lon":-78.69733,"as_of":"2026-08"},{"id":"69995/MUNCL","plant_name":"Muncy Creek Lime Bluff Road Solar","generator_id":"MUNCL","plant_id":69995,"state":"PA","county":"Lycoming","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.22184,"lon":-76.75467,"as_of":"2026-08"},{"id":"70075/409","plant_name":"Bigler - PA 0409 (Flango 1)","generator_id":"409","plant_id":70075,"state":"PA","county":"Clearfield","developer":"CVE US PA Bigler 409 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.803436,"lon":-78.42275,"as_of":"2026-08"},{"id":"70079/151","plant_name":"Buckingham - PA 0151 (Crea)","generator_id":"151","plant_id":70079,"state":"PA","county":"Wayne","developer":"CVE US PA BUCKINGHAM 151 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.86605,"lon":-78.42275,"as_of":"2026-08"},{"id":"70080/396","plant_name":"Burrell - PA 0396 (Copeland)","generator_id":"396","plant_id":70080,"state":"PA","county":"Armstrong","developer":"CVE US PA Burrell 396 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.65921,"lon":-79.43822,"as_of":"2026-08"},{"id":"70081/379","plant_name":"CVE US PA Dayton 379","generator_id":"379","plant_id":70081,"state":"PA","county":"Armstrong","developer":"CVE US PA Dayton 379 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.89056,"lon":-79.27027,"as_of":"2026-08"},{"id":"70083/399","plant_name":"Jones - PA 0399 (Rhodes)","generator_id":"399","plant_id":70083,"state":"PA","county":"Elk","developer":"CVE US PA Jones 399 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.564214,"lon":-78.69733,"as_of":"2026-08"},{"id":"70166/385","plant_name":"Unity - PA 0385 (Soccerhound)","generator_id":"385","plant_id":70166,"state":"PA","county":"Clearfield","developer":"CVE US PA Latrobe 385 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.25174,"lon":-79.35354,"as_of":"2026-08"},{"id":"70171/187","plant_name":"Wetmore - PA 0187 (Chittester)","generator_id":"187","plant_id":70171,"state":"PA","county":"McKean","developer":"CVE US PA Kane 187 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.66753,"lon":-78.73295,"as_of":"2026-08"},{"id":"70172/383","plant_name":"Kittanning - PA 0383 (Hoeter)","generator_id":"383","plant_id":70172,"state":"PA","county":"Armstrong","developer":"CVE US PA Kittanning 383 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-11","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.82161,"lon":-79.33393,"as_of":"2026-08"},{"id":"70077/437","plant_name":"Bigler - PA 0437 (Flango 3)","generator_id":"437","plant_id":70077,"state":"PA","county":"Clearfield","developer":"CVE US PA Bigler 437 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.80344,"lon":-78.42275,"as_of":"2026-08"},{"id":"70120/185","plant_name":"New Alexandria - PA 0185 (Weimer)","generator_id":"185","plant_id":70120,"state":"PA","county":"Westmoreland","developer":"CVE US PA New Alexandria 185 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.40255,"lon":-79.42805,"as_of":"2026-08"},{"id":"70169/486","plant_name":"Monroe - PA 0486 (Acey)","generator_id":"486","plant_id":70169,"state":"PA","county":"Clarion","developer":"CVE US PA Monroe 486 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.13178,"lon":-79.4476,"as_of":"2026-08"},{"id":"1263/7A","plant_name":"Belleville","generator_id":"7A","plant_id":1263,"state":"KS","county":"Republic","developer":"City of Belleville - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-01","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"SWPP","lat":39.832769,"lon":-97.63204,"as_of":"2026-08"},{"id":"70076/436","plant_name":"Bigler - PA 0436 (Flango 2)","generator_id":"436","plant_id":70076,"state":"PA","county":"Clearfield","developer":"CVE US PA Bigler 436 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-02","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.80344,"lon":-78.42252,"as_of":"2026-08"},{"id":"70024/BEAVE","plant_name":"Beaver Gross Road Solar LLC","generator_id":"BEAVE","plant_id":70024,"state":"PA","county":"Snyder","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.747397,"lon":-77.18922,"as_of":"2026-08"},{"id":"70028/CONRR","plant_name":"Delaware Conrath Road Solar LLC","generator_id":"CONRR","plant_id":70028,"state":"PA","county":"Northumberland","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-03","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.113012,"lon":-76.85038,"as_of":"2026-08"},{"id":"69970/MPLRA","plant_name":"Maple Ridge A","generator_id":"MPLRA","plant_id":69970,"state":"PA","county":"Franklin","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-04","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.901992,"lon":-77.578,"as_of":"2026-08"},{"id":"69971/MPLRB","plant_name":"Maple Ridge B","generator_id":"MPLRB","plant_id":69971,"state":"PA","county":"Franklin","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-04","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.901992,"lon":-77.578,"as_of":"2026-08"},{"id":"70032/KEEFE","plant_name":"Liberty Keefer Mill Road Solar LLC","generator_id":"KEEFE","plant_id":70032,"state":"PA","county":"Montour","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-06","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":41.030468,"lon":-76.68827,"as_of":"2026-08"},{"id":"62386/NA1","plant_name":"Opekiska L&D Hydroelectric Project","generator_id":"NA1","plant_id":62386,"state":"WV","county":"Monongalia","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":3,"summer_mw":2,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.564917,"lon":-80.05114,"as_of":"2026-08"},{"id":"62386/NA2","plant_name":"Opekiska L&D Hydroelectric Project","generator_id":"NA2","plant_id":62386,"state":"WV","county":"Monongalia","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":3,"summer_mw":2,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.564917,"lon":-80.05114,"as_of":"2026-08"},{"id":"65313/ES","plant_name":"Elm Spring Solar 1","generator_id":"ES","plant_id":65313,"state":"VA","county":"Augusta","developer":"Antares Group Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":38.0945,"lon":-78.9595,"as_of":"2026-08"},{"id":"70164/406","plant_name":"Kittanning - PA 0406 (Hoeter B)","generator_id":"406","plant_id":70164,"state":"PA","county":"Armstrong","developer":"CVE US PA Kittanning 406 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.82161,"lon":-79.33393,"as_of":"2026-08"},{"id":"70165/407","plant_name":"Kittanning - PA 0407 (Hoeter C)","generator_id":"407","plant_id":70165,"state":"PA","county":"Armstrong","developer":"CVE US PA Kittanning 407 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2028-12","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.82161,"lon":-79.33393,"as_of":"2026-08"},{"id":"65312/SV","plant_name":"Shenvalee Solar","generator_id":"SV","plant_id":65312,"state":"VA","county":"Augusta","developer":"Antares Group Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":3,"summer_mw":3,"planned_start":"2029-12","planned_year":2029,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":38.0249,"lon":-79.0335,"as_of":"2026-08"},{"id":"69220/11253","plant_name":"West Genesee","generator_id":"11253","plant_id":69220,"state":"NY","county":"Onondaga","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.9,"summer_mw":2.9,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.165134,"lon":-76.41876,"as_of":"2026-08"},{"id":"54808/STG1","plant_name":"New York University Central Plant","generator_id":"STG1","plant_id":54808,"state":"NY","county":"New York","developer":"New York University","sector":"Commercial Non-CHP","technology":"Natural Gas Fired Combined Cycle","energy_source":"NG","prime_mover":"CA","nameplate_mw":2.9,"summer_mw":1.8,"planned_start":"2027-05","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":40.7899,"lon":-73.9233,"as_of":"2026-08"},{"id":"67770/30200","plant_name":"Pittsburg RV Solar","generator_id":"30200","plant_id":67770,"state":"CA","county":"Contra Costa","developer":"Pittsburg RV & Boat Storage, LLC","sector":"Commercial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.8,"summer_mw":2.9,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":38.01155,"lon":-121.8453,"as_of":"2026-08"},{"id":"70334/IL55B","plant_name":"Pivot Energy IL 55b LLC","generator_id":"IL55B","plant_id":70334,"state":"IL","county":"McHenry","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.8,"summer_mw":2.8,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.3455,"lon":-88.50561,"as_of":"2026-08"},{"id":"69804/MEPV1","plant_name":"Menard 1","generator_id":"MEPV1","plant_id":69804,"state":"IL","county":"Menard","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.8,"summer_mw":2.8,"planned_start":"2027-09","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.089,"lon":-89.723,"as_of":"2026-08"},{"id":"68110/MILAN","plant_name":"SR Milan","generator_id":"MILAN","plant_id":68110,"state":"TN","county":"Gibson","developer":"SR Milan, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.8,"summer_mw":2.8,"planned_start":"2028-07","planned_year":2028,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"TVA","lat":35.945285,"lon":-88.75989,"as_of":"2026-08"},{"id":"69196/NEBOB","plant_name":"Nebo Energy Storage","generator_id":"NEBOB","plant_id":69196,"state":"NC","county":"Burke","developer":"Duke Energy Carolinas, LLC","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2.7,"summer_mw":2.7,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"DUK","lat":35.791718,"lon":-81.85104,"as_of":"2026-08"},{"id":"54808/GR1","plant_name":"New York University Central Plant","generator_id":"GR1","plant_id":54808,"state":"NY","county":"New York","developer":"New York University","sector":"Commercial Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":40.7899,"lon":-73.9233,"as_of":"2026-08"},{"id":"70012/IN609","plant_name":"Redlands DC 9 - sline609","generator_id":"IN609","plant_id":70012,"state":"CA","county":"San Bernardino","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.083141,"lon":-117.2035,"as_of":"2026-08"},{"id":"70375/CLIN5","plant_name":"Clinton Solar 5","generator_id":"CLIN5","plant_id":70375,"state":"IL","county":"Clinton","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.595381,"lon":-89.18656,"as_of":"2026-08"},{"id":"58903/UNIT1","plant_name":"Marseilles Lock and Dam Hydro","generator_id":"UNIT1","plant_id":58903,"state":"IL","county":"LaSalle","developer":"Marseilles Land and Water Company","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.327778,"lon":-88.70111,"as_of":"2026-08"},{"id":"58903/UNIT2","plant_name":"Marseilles Lock and Dam Hydro","generator_id":"UNIT2","plant_id":58903,"state":"IL","county":"LaSalle","developer":"Marseilles Land and Water Company","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.327778,"lon":-88.70111,"as_of":"2026-08"},{"id":"58903/UNIT3","plant_name":"Marseilles Lock and Dam Hydro","generator_id":"UNIT3","plant_id":58903,"state":"IL","county":"LaSalle","developer":"Marseilles Land and Water Company","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.327778,"lon":-88.70111,"as_of":"2026-08"},{"id":"58903/UNIT4","plant_name":"Marseilles Lock and Dam Hydro","generator_id":"UNIT4","plant_id":58903,"state":"IL","county":"LaSalle","developer":"Marseilles Land and Water Company","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.327778,"lon":-88.70111,"as_of":"2026-08"},{"id":"70123/224","plant_name":"Petersburg - VA 0224 (Murphy)","generator_id":"224","plant_id":70123,"state":"VA","county":"Chesterfield","developer":"CVE US VA Petersburg 224 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":37.24348,"lon":-77.43647,"as_of":"2026-08"},{"id":"70126/467","plant_name":"Roulette - PA 0467","generator_id":"467","plant_id":70126,"state":"PA","county":"Potter","developer":"CVE US PA Roulette 467 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.6,"summer_mw":2.6,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.777,"lon":-78.1995,"as_of":"2026-08"},{"id":"69371/HALIF","plant_name":"Middle Road Solar Partners","generator_id":"HALIF","plant_id":69371,"state":"PA","county":"Dauphin","developer":"Middle Road Solar Partners LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.516,"lon":-76.937,"as_of":"2026-08"},{"id":"69592/PSKBS","plant_name":"NL NY- Pulaski","generator_id":"PSKBS","plant_id":69592,"state":"NY","county":"Orange","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":41.334309,"lon":-74.40401,"as_of":"2026-08"},{"id":"69592/PSKPV","plant_name":"NL NY- Pulaski","generator_id":"PSKPV","plant_id":69592,"state":"NY","county":"Orange","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":41.334309,"lon":-74.40401,"as_of":"2026-08"},{"id":"70205/BURS2","plant_name":"Bureau Solar 2 LLC","generator_id":"BURS2","plant_id":70205,"state":"IL","county":"Bureau","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":41.463853,"lon":-89.46756,"as_of":"2026-08"},{"id":"52149/GEN21","plant_name":"West Point (PA)","generator_id":"GEN21","plant_id":52149,"state":"PA","county":"Montgomery","developer":"Merck & Co Inc-West Point","sector":"Industrial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.217963,"lon":-75.29882,"as_of":"2026-08"},{"id":"69373/LITTL","plant_name":"Little Falls PV","generator_id":"LITTL","plant_id":69373,"state":"NY","county":"Herkimer","developer":"Little Falls PV LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":42.98791,"lon":-74.86305,"as_of":"2026-08"},{"id":"69377/NEWFR","plant_name":"New Freedom Solar Partners","generator_id":"NEWFR","plant_id":69377,"state":"PA","county":"York","developer":"New Freedom Solar Partners LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":39.745,"lon":-76.696,"as_of":"2026-08"},{"id":"69933/CLARK","plant_name":"Clark Solar-Longwood","generator_id":"CLARK","plant_id":69933,"state":"WI","county":"Clark","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":44.928616,"lon":-90.65894,"as_of":"2026-08"},{"id":"69938/RINGE","plant_name":"Ringe","generator_id":"RINGE","plant_id":69938,"state":"MN","county":"Olmsted","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":44.107842,"lon":-92.40043,"as_of":"2026-08"},{"id":"70031/ZEBRA","plant_name":"Zebrawood Solar, LLC","generator_id":"ZEBRA","plant_id":70031,"state":"IL","county":"Hancock","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.613821,"lon":-91.28497,"as_of":"2026-08"},{"id":"70336/NCBP1","plant_name":"NCBP ONE, LLC","generator_id":"NCBP1","plant_id":70336,"state":"MD","county":"Prince Georges","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.8698,"lon":-76.7394,"as_of":"2026-08"},{"id":"55027/1600B","plant_name":"Papillion Creek Wastewater","generator_id":"1600B","plant_id":55027,"state":"NE","county":"Sarpy","developer":"City of Omaha - (NE)","sector":"Commercial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":41.0772,"lon":-95.87,"as_of":"2026-08"},{"id":"55027/1600C","plant_name":"Papillion Creek Wastewater","generator_id":"1600C","plant_id":55027,"state":"NE","county":"Sarpy","developer":"City of Omaha - (NE)","sector":"Commercial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":41.0772,"lon":-95.87,"as_of":"2026-08"},{"id":"55027/1600D","plant_name":"Papillion Creek Wastewater","generator_id":"1600D","plant_id":55027,"state":"NE","county":"Sarpy","developer":"City of Omaha - (NE)","sector":"Commercial CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":41.0772,"lon":-95.87,"as_of":"2026-08"},{"id":"68935/ROX1","plant_name":"SV CSG Roxana 1","generator_id":"ROX1","plant_id":68935,"state":"IL","county":"Madison","developer":"SV CSG Roxana 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.836055,"lon":-90.03685,"as_of":"2026-08"},{"id":"69936/KALMR","plant_name":"Kalmar","generator_id":"KALMR","plant_id":69936,"state":"MN","county":"Olmsted","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":44.024642,"lon":-92.578,"as_of":"2026-08"},{"id":"69268/COYA1","plant_name":"Coyanosa Gas","generator_id":"COYA1","plant_id":69268,"state":"TX","county":"Pecos","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.275177,"lon":-103.1126,"as_of":"2026-08"},{"id":"69268/COYA2","plant_name":"Coyanosa Gas","generator_id":"COYA2","plant_id":69268,"state":"TX","county":"Pecos","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.275177,"lon":-103.1126,"as_of":"2026-08"},{"id":"69268/COYA3","plant_name":"Coyanosa Gas","generator_id":"COYA3","plant_id":69268,"state":"TX","county":"Pecos","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.275177,"lon":-103.1126,"as_of":"2026-08"},{"id":"69268/COYA4","plant_name":"Coyanosa Gas","generator_id":"COYA4","plant_id":69268,"state":"TX","county":"Pecos","developer":"RPC Merchant, LLC","sector":"IPP Non-CHP","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ERCO","lat":31.275177,"lon":-103.1126,"as_of":"2026-08"},{"id":"69934/FALUN","plant_name":"Falun","generator_id":"FALUN","plant_id":69934,"state":"WI","county":"Burnett","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.779061,"lon":-92.5306,"as_of":"2026-08"},{"id":"69940/TEEPL","plant_name":"Teeple Creek","generator_id":"TEEPL","plant_id":69940,"state":"IA","county":"Allamakee","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":43.234672,"lon":-91.50468,"as_of":"2026-08"},{"id":"69176/11218","plant_name":"Bonacci 1","generator_id":"11218","plant_id":69176,"state":"IL","county":"Champaign","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.083997,"lon":-88.16215,"as_of":"2026-08"},{"id":"69177/11218","plant_name":"Bonacci 2","generator_id":"11218","plant_id":69177,"state":"IL","county":"Champaign","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-02","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.083997,"lon":-88.16215,"as_of":"2026-08"},{"id":"68212/MDLN","plant_name":"Maryland Line Road Solar","generator_id":"MDLN","plant_id":68212,"state":"DE","county":"New Castle","developer":"Maryland Line Road Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":39.372,"lon":-75.763,"as_of":"2026-08"},{"id":"68144/CH305","plant_name":"Northlake 5-SLCHI305","generator_id":"CH305","plant_id":68144,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.929004,"lon":-87.91716,"as_of":"2026-08"},{"id":"935/8","plant_name":"Bushnell","generator_id":"8","plant_id":935,"state":"IL","county":"McDonough","developer":"City of Bushnell - (IL)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":40.548586,"lon":-90.51381,"as_of":"2026-08"},{"id":"66340/PV1","plant_name":"Canyonville Solar LLC (CSG)","generator_id":"PV1","plant_id":66340,"state":"OR","county":"Douglas","developer":"SolRiver Capital LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PACW","lat":42.956886,"lon":-123.2618,"as_of":"2026-08"},{"id":"70082/404","plant_name":"Dayton - PA 0404 (Good East)","generator_id":"404","plant_id":70082,"state":"PA","county":"Armstrong","developer":"CVE US PA Dayton 404 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.89056,"lon":-79.27027,"as_of":"2026-08"},{"id":"62402/NA1","plant_name":"Arkabutla Lake Hydroelectric Project","generator_id":"NA1","plant_id":62402,"state":"MS","county":"DeSoto","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-06","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.757926,"lon":-90.12569,"as_of":"2026-08"},{"id":"62402/NA2","plant_name":"Arkabutla Lake Hydroelectric Project","generator_id":"NA2","plant_id":62402,"state":"MS","county":"DeSoto","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-07","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.757926,"lon":-90.12569,"as_of":"2026-08"},{"id":"62387/NA1","plant_name":"Morgantown L&D Hydroelectric Project","generator_id":"NA1","plant_id":62387,"state":"WV","county":"Monongalia","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-08","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.619589,"lon":-79.96811,"as_of":"2026-08"},{"id":"69668/BCIC1","plant_name":"Brigham City Gas","generator_id":"BCIC1","plant_id":69668,"state":"UT","county":"Box Elder","developer":"Brigham City Corporation","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":41.507163,"lon":-112.0027,"as_of":"2026-08"},{"id":"69668/BCIC2","plant_name":"Brigham City Gas","generator_id":"BCIC2","plant_id":69668,"state":"UT","county":"Box Elder","developer":"Brigham City Corporation","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":41.507163,"lon":-112.0027,"as_of":"2026-08"},{"id":"69668/BCIC3","plant_name":"Brigham City Gas","generator_id":"BCIC3","plant_id":69668,"state":"UT","county":"Box Elder","developer":"Brigham City Corporation","sector":"Electric Utility","technology":"Natural Gas Internal Combustion Engine","energy_source":"NG","prime_mover":"IC","nameplate_mw":2.5,"summer_mw":2.5,"planned_start":"2028-08","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":41.507163,"lon":-112.0027,"as_of":"2026-08"},{"id":"62387/NA2","plant_name":"Morgantown L&D Hydroelectric Project","generator_id":"NA2","plant_id":62387,"state":"WV","county":"Monongalia","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-09","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.619589,"lon":-79.96811,"as_of":"2026-08"},{"id":"62432/NA1","plant_name":"Enid Lake Hydroelectric Project","generator_id":"NA1","plant_id":62432,"state":"MS","county":"Panola","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-10","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.158065,"lon":-89.90553,"as_of":"2026-08"},{"id":"62384/NA1","plant_name":"Point Marion L&D Hydroelectric Project","generator_id":"NA1","plant_id":62384,"state":"PA","county":"Fayette","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.726855,"lon":-79.91013,"as_of":"2026-08"},{"id":"62432/NA2","plant_name":"Enid Lake Hydroelectric Project","generator_id":"NA2","plant_id":62432,"state":"MS","county":"Panola","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-11","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"TVA","lat":34.158065,"lon":-89.90553,"as_of":"2026-08"},{"id":"62384/NA2","plant_name":"Point Marion L&D Hydroelectric Project","generator_id":"NA2","plant_id":62384,"state":"PA","county":"Fayette","developer":"Rye Development","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":2.5,"summer_mw":1.5,"planned_start":"2028-12","planned_year":2028,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":39.726855,"lon":-79.91013,"as_of":"2026-08"},{"id":"70372/LERMI","plant_name":"Lerdo Middle","generator_id":"LERMI","plant_id":70372,"state":"CA","county":"Kern","developer":"Wonderful Renewable Energy, LLC.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2026-08","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.50622,"lon":-119.162,"as_of":"2026-08"},{"id":"69052/MD11","plant_name":"MDD109-NCBP BLDG 11-Manekin","generator_id":"MD11","plant_id":69052,"state":"MD","county":"Prince Georges","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.8739,"lon":-76.7342,"as_of":"2026-08"},{"id":"69375/LYSAN","plant_name":"Lysander III PV","generator_id":"LYSAN","plant_id":69375,"state":"NY","county":"Onondaga","developer":"Lysander III PV LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"NYIS","lat":43.219759,"lon":-76.38847,"as_of":"2026-08"},{"id":"69767/NCBP7","plant_name":"NCBP Seven","generator_id":"NCBP7","plant_id":69767,"state":"MD","county":"Prince Georges","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.8692,"lon":-76.7368,"as_of":"2026-08"},{"id":"70012/BA609","plant_name":"Redlands DC 9 - sline609","generator_id":"BA609","plant_id":70012,"state":"CA","county":"San Bernardino","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":34.083141,"lon":-117.2035,"as_of":"2026-08"},{"id":"70452/OCS62","plant_name":"Buckaroo Solar 1","generator_id":"OCS62","plant_id":70452,"state":"OR","county":"Umatilla","developer":"Buckaroo Solar 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PACW","lat":45.660992,"lon":-118.7721,"as_of":"2026-08"},{"id":"70168/485","plant_name":"Monroe - PA 0485 (Lawrence)","generator_id":"485","plant_id":70168,"state":"PA","county":"Clarion","developer":"CVE US PA Monroe 485 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.11339,"lon":-79.4146,"as_of":"2026-08"},{"id":"61592/WT1","plant_name":"Cody Road Wind Farm","generator_id":"WT1","plant_id":61592,"state":"NY","county":"Madison","developer":"Green Power Energy LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2029-07","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.967145,"lon":-75.75592,"as_of":"2026-08"},{"id":"61592/WT2","plant_name":"Cody Road Wind Farm","generator_id":"WT2","plant_id":61592,"state":"NY","county":"Madison","developer":"Green Power Energy LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2029-07","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.967145,"lon":-75.75592,"as_of":"2026-08"},{"id":"61592/WT3","plant_name":"Cody Road Wind Farm","generator_id":"WT3","plant_id":61592,"state":"NY","county":"Madison","developer":"Green Power Energy LLC","sector":"IPP Non-CHP","technology":"Onshore Wind Turbine","energy_source":"WND","prime_mover":"WT","nameplate_mw":2.4,"summer_mw":2.4,"planned_start":"2029-07","planned_year":2029,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":42.967145,"lon":-75.75592,"as_of":"2026-08"},{"id":"66516/19500","plant_name":"TX Dallas 7750 Dynasty Drive","generator_id":"19500","plant_id":66516,"state":"TX","county":"Dallas","developer":"Catalyze Dallas 7750 Dynasty Drive Microgrid, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":32.652269,"lon":-96.75577,"as_of":"2026-08"},{"id":"68571/7481","plant_name":"Lowe's - 1440 - Rockford, IL RDC (POI 1)","generator_id":"7481","plant_id":68571,"state":"IL","county":"Winnebago","developer":"South Springfield Avenue Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.239075,"lon":-89.13187,"as_of":"2026-08"},{"id":"68572/7824","plant_name":"Lowe's - 1440 - Rockford, IL RDC (POI 2)","generator_id":"7824","plant_id":68572,"state":"IL","county":"Winnebago","developer":"South Springfield Avenue II Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":42.239075,"lon":-89.13187,"as_of":"2026-08"},{"id":"69939/SPOON","plant_name":"Spooner","generator_id":"SPOON","plant_id":69939,"state":"WI","county":"Washburn","developer":"OneEnergy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.84628,"lon":-91.8634,"as_of":"2026-08"},{"id":"70370/R4701","plant_name":"Ranch 4701","generator_id":"R4701","plant_id":70370,"state":"CA","county":"Kern","developer":"Wonderful Renewable Energy, LLC.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.742656,"lon":-119.0809,"as_of":"2026-08"},{"id":"65070/A04","plant_name":"Austin TX GigaFactory","generator_id":"A04","plant_id":65070,"state":"TX","county":"Travis","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"ERCO","lat":30.22021,"lon":-97.61968,"as_of":"2026-08"},{"id":"66830/P5376","plant_name":"Harrah's Atlantic City - POI 1 (Meeting","generator_id":"P5376","plant_id":66830,"state":"NJ","county":"Atlantic","developer":"Distributed Solar Development, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":39.384389,"lon":-74.42627,"as_of":"2026-08"},{"id":"70316/ND017","plant_name":"Piping Plover Clean Energy, LLC","generator_id":"ND017","plant_id":70316,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.815382,"lon":-73.86015,"as_of":"2026-08"},{"id":"70319/ND016","plant_name":"Warbler Clean Energy LLC","generator_id":"ND016","plant_id":70319,"state":"NY","county":"Bronx","developer":"NineDot Holdings, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2.3,"summer_mw":2.3,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.815404,"lon":-73.86023,"as_of":"2026-08"},{"id":"1267/15","plant_name":"Chanute 1","generator_id":"15","plant_id":1267,"state":"KS","county":"Neosho","developer":"City of Chanute (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":37.683333,"lon":-95.45472,"as_of":"2026-08"},{"id":"1267/16","plant_name":"Chanute 1","generator_id":"16","plant_id":1267,"state":"KS","county":"Neosho","developer":"City of Chanute (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":37.683333,"lon":-95.45472,"as_of":"2026-08"},{"id":"1267/17","plant_name":"Chanute 1","generator_id":"17","plant_id":1267,"state":"KS","county":"Neosho","developer":"City of Chanute (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SWPP","lat":37.683333,"lon":-95.45472,"as_of":"2026-08"},{"id":"70101/PPA29","plant_name":"Pivot Energy PPA 29 LLC","generator_id":"PPA29","plant_id":70101,"state":"CA","county":"Placer","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.2,"summer_mw":2.2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":38.828466,"lon":-121.3049,"as_of":"2026-08"},{"id":"69818/NCREK","plant_name":"SV CSG North Creek 1","generator_id":"NCREK","plant_id":69818,"state":"IL","county":"Livingston","developer":"SV CSG North Creek 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2.1,"summer_mw":2.1,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.916213,"lon":-88.60821,"as_of":"2026-08"},{"id":"2308/6","plant_name":"Tecumseh","generator_id":"6","plant_id":2308,"state":"NE","county":"Johnson","developer":"City of Tecumseh - (NE)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.1,"summer_mw":2.1,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":40.3664,"lon":-96.19,"as_of":"2026-08"},{"id":"2308/7","plant_name":"Tecumseh","generator_id":"7","plant_id":2308,"state":"NE","county":"Johnson","developer":"City of Tecumseh - (NE)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2.1,"summer_mw":2.1,"planned_start":"2027-08","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":40.3664,"lon":-96.19,"as_of":"2026-08"},{"id":"67283/6569B","plant_name":"Six Flags Magic Mountain","generator_id":"6569B","plant_id":67283,"state":"CA","county":"Los Angeles","developer":"Magic Mountain Parkway Solar Project 2023, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.428209,"lon":-118.5993,"as_of":"2026-08"},{"id":"68518/MRC2B","plant_name":"Merced 2 BESS","generator_id":"MRC2B","plant_id":68518,"state":"CA","county":"Merced","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":37.000929,"lon":-120.6648,"as_of":"2026-08"},{"id":"69053/IL60","plant_name":"ILL060-Sangamon-Atchison","generator_id":"IL60","plant_id":69053,"state":"IL","county":"Sangamon","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":39.849909,"lon":-89.29994,"as_of":"2026-08"},{"id":"70046/GNDHG","plant_name":"OER IL - Groundhog","generator_id":"GNDHG","plant_id":70046,"state":"IL","county":"McHenry","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":42.282505,"lon":-88.38802,"as_of":"2026-08"},{"id":"70182/PV1","plant_name":"Steger","generator_id":"PV1","plant_id":70182,"state":"IL","county":"Cook","developer":"Steger Road Solar 1 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.4701,"lon":-87.5793,"as_of":"2026-08"},{"id":"70206/PS57","plant_name":"Pivot Solar 57 LLC","generator_id":"PS57","plant_id":70206,"state":"CO","county":"Mesa","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":39.051557,"lon":-108.4522,"as_of":"2026-08"},{"id":"70393/S1","plant_name":"Stephenson County IL S1","generator_id":"S1","plant_id":70393,"state":"IL","county":"Stephenson","developer":"SolAmerica Energy / Stephenson County IL S1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.304234,"lon":-89.58015,"as_of":"2026-08"},{"id":"70448/22258","plant_name":"Keithsburg North Solar LLC PV","generator_id":"22258","plant_id":70448,"state":"IL","county":"Mercer","developer":"Keithsburg North Solar, LLC PV","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":41.120819,"lon":-90.94078,"as_of":"2026-08"},{"id":"1291/17","plant_name":"Iola","generator_id":"17","plant_id":1291,"state":"KS","county":"Allen","developer":"City of Iola - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.923076,"lon":-95.42557,"as_of":"2026-08"},{"id":"1291/18","plant_name":"Iola","generator_id":"18","plant_id":1291,"state":"KS","county":"Allen","developer":"City of Iola - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.923076,"lon":-95.42557,"as_of":"2026-08"},{"id":"1291/19","plant_name":"Iola","generator_id":"19","plant_id":1291,"state":"KS","county":"Allen","developer":"City of Iola - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.923076,"lon":-95.42557,"as_of":"2026-08"},{"id":"1291/20","plant_name":"Iola","generator_id":"20","plant_id":1291,"state":"KS","county":"Allen","developer":"City of Iola - (KS)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"SWPP","lat":37.923076,"lon":-95.42557,"as_of":"2026-08"},{"id":"63541/BCRV1","plant_name":"Solar Carver 1 Hybrid","generator_id":"BCRV1","plant_id":63541,"state":"MA","county":"Plymouth","developer":"Solar Carver 1, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":41.824474,"lon":-70.75292,"as_of":"2026-08"},{"id":"63541/SCRV1","plant_name":"Solar Carver 1 Hybrid","generator_id":"SCRV1","plant_id":63541,"state":"MA","county":"Plymouth","developer":"Solar Carver 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":41.824474,"lon":-70.75292,"as_of":"2026-08"},{"id":"67857/MCDOW","plant_name":"McDowell Creek Solar LLC","generator_id":"MCDOW","plant_id":67857,"state":"NC","county":"Mecklenburg","developer":"McDowell Creek Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"DUK","lat":35.394168,"lon":-80.94389,"as_of":"2026-08"},{"id":"68139/CH102","plant_name":"McCook 2-SLCHI102","generator_id":"CH102","plant_id":68139,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.803083,"lon":-87.81935,"as_of":"2026-08"},{"id":"68465/22324","plant_name":"Imperator Solar","generator_id":"22324","plant_id":68465,"state":"CA","county":"Kern","developer":"Imperator Solar, LLC","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":35.4932,"lon":-119.1659,"as_of":"2026-08"},{"id":"66511/18262","plant_name":"CA Riverside 2356 Fleetwood Dr.","generator_id":"18262","plant_id":66511,"state":"CA","county":"Riverside","developer":"Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.012142,"lon":-117.3811,"as_of":"2026-08"},{"id":"66511/B8262","plant_name":"CA Riverside 2356 Fleetwood Dr.","generator_id":"B8262","plant_id":66511,"state":"CA","county":"Riverside","developer":"Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.012142,"lon":-117.3811,"as_of":"2026-08"},{"id":"66768/694","plant_name":"Hogs Bay","generator_id":"694","plant_id":66768,"state":"ME","county":"Hancock","developer":"Greenbacker Renewable Energy Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":44.57579,"lon":-68.19965,"as_of":"2026-08"},{"id":"68933/CORB","plant_name":"SV CSG Corbell","generator_id":"CORB","plant_id":68933,"state":"IL","county":"Williamson","developer":"SV CSG Corbell, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"MISO","lat":37.758343,"lon":-89.05748,"as_of":"2026-08"},{"id":"70198/FLOR2","plant_name":"CF IL Solar Marigold Lane, Flora2 LLC","generator_id":"FLOR2","plant_id":70198,"state":"IL","county":"Clay","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":38.632489,"lon":-88.43829,"as_of":"2026-08"},{"id":"70373/SDF1A","plant_name":"100a Swiss Dale Farm","generator_id":"SDF1A","plant_id":70373,"state":"MD","county":"Cecil","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":39.661976,"lon":-76.05111,"as_of":"2026-08"},{"id":"61037/APPL","plant_name":"Apple Hill Solar","generator_id":"APPL","plant_id":61037,"state":"VT","county":"Bennington","developer":"Ecos Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":42.9077,"lon":-73.2041,"as_of":"2026-08"},{"id":"65130/PV2","plant_name":"City of Bowie","generator_id":"PV2","plant_id":65130,"state":"MD","county":"Prince Georges","developer":"Tesla Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":38.904641,"lon":-76.68877,"as_of":"2026-08"},{"id":"69885/USMOU","plant_name":"USS Mourning","generator_id":"USMOU","plant_id":69885,"state":"IL","county":"Schuyler","developer":"USS Mourning Lane","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.160741,"lon":-90.59832,"as_of":"2026-08"},{"id":"70350/RT40","plant_name":"IL - Forefront Ameren- Route 40","generator_id":"RT40","plant_id":70350,"state":"IL","county":"Peoria","developer":"IL Solar Route 40 Project2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.923873,"lon":-89.63042,"as_of":"2026-08"},{"id":"70353/TRU1","plant_name":"IL-Forefront Ameren-Truitt 1","generator_id":"TRU1","plant_id":70353,"state":"IL","county":"Peoria","developer":"IL Solar Truitt Project1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.929207,"lon":-89.64177,"as_of":"2026-08"},{"id":"70354/TRU2","plant_name":"IL-Forefront Ameren-Truitt 2","generator_id":"TRU2","plant_id":70354,"state":"IL","county":"Peoria","developer":"IL Solar Truitt Project2, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.929207,"lon":-89.64177,"as_of":"2026-08"},{"id":"70196/DEL22","plant_name":"DEL022-30423B Thorogoods Rd, LLC","generator_id":"DEL22","plant_id":70196,"state":"DE","county":"Sussex","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.569503,"lon":-75.26468,"as_of":"2026-08"},{"id":"69215/11216","plant_name":"Sommer","generator_id":"11216","plant_id":69215,"state":"IL","county":"Massac","developer":"Generate Capital","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":37.205915,"lon":-88.8179,"as_of":"2026-08"},{"id":"66513/B8229","plant_name":"MA Acushnet 540R Main St","generator_id":"B8229","plant_id":66513,"state":"MA","county":"Bristol","developer":"TJA 540R Main St. Acushnet, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.702987,"lon":-70.8888,"as_of":"2026-08"},{"id":"63535/GEN02","plant_name":"Solar BESS Hybrid","generator_id":"GEN02","plant_id":63535,"state":"GA","county":"Cobb","developer":"Cobb Electric Membership Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":33.979348,"lon":-84.55613,"as_of":"2026-08"},{"id":"63535/GEN03","plant_name":"Solar BESS Hybrid","generator_id":"GEN03","plant_id":63535,"state":"GA","county":"Cobb","developer":"Cobb Electric Membership Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":33.979348,"lon":-84.55613,"as_of":"2026-08"},{"id":"63535/GEN04","plant_name":"Solar BESS Hybrid","generator_id":"GEN04","plant_id":63535,"state":"GA","county":"Cobb","developer":"Cobb Electric Membership Corporation","sector":"Electric Utility","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-05","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"SOCO","lat":33.979348,"lon":-84.55613,"as_of":"2026-08"},{"id":"67741/I","plant_name":"OIT BESS","generator_id":"I","plant_id":67741,"state":"OR","county":"Klamath","developer":"PacifiCorp","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACW","lat":42.259366,"lon":-121.7864,"as_of":"2026-08"},{"id":"68858/PV1","plant_name":"Cavern","generator_id":"PV1","plant_id":68858,"state":"NY","county":"Clinton","developer":"Cavern Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":44.711557,"lon":-73.54126,"as_of":"2026-08"},{"id":"68860/PV1","plant_name":"Tully 5","generator_id":"PV1","plant_id":68860,"state":"NY","county":"Onondaga","developer":"CP Tully Five LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"NYIS","lat":42.810918,"lon":-76.12014,"as_of":"2026-08"},{"id":"70078/438","plant_name":"Bigler - PA 0438 (Flango 4)","generator_id":"438","plant_id":70078,"state":"PA","county":"Clearfield","developer":"CVE US PA Bigler 438 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":2,"summer_mw":2,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.80344,"lon":-78.42275,"as_of":"2026-08"},{"id":"68122/CH526","plant_name":"Bensenville 2-SLCHI526","generator_id":"CH526","plant_id":68122,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.971289,"lon":-87.95462,"as_of":"2026-08"},{"id":"70335/PS42","plant_name":"Pivot Solar 42 LLC","generator_id":"PS42","plant_id":70335,"state":"CO","county":"Larimer","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.692398,"lon":-104.9833,"as_of":"2026-08"},{"id":"69222/5381","plant_name":"American Canyon RV Boat Storage","generator_id":"5381","plant_id":69222,"state":"CA","county":"Napa","developer":"Napa Junction RV Storage LLC","sector":"Commercial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":38.198033,"lon":-122.257,"as_of":"2026-08"},{"id":"69591/20525","plant_name":"20525 Nordhoff PV (North)","generator_id":"20525","plant_id":69591,"state":"CA","county":"Los Angeles","developer":"Amiscope Nordhoff, LP","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"LDWP","lat":34.235572,"lon":-118.5811,"as_of":"2026-08"},{"id":"68119/CH307","plant_name":"Aurora 7-SLCHI307","generator_id":"CH307","plant_id":68119,"state":"IL","county":"Kane","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.79698,"lon":-88.26809,"as_of":"2026-08"},{"id":"68129/CH603","plant_name":"Cicero 3-SLCHI603","generator_id":"CH603","plant_id":68129,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.9,"summer_mw":1.9,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.86464,"lon":-87.75757,"as_of":"2026-08"},{"id":"69554/BELMO","plant_name":"BPL NJ - Belmont","generator_id":"BELMO","plant_id":69554,"state":"NJ","county":"Somerset","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":40.530503,"lon":-74.54493,"as_of":"2026-08"},{"id":"70337/PS71","plant_name":"Pivot Solar 71 LLC","generator_id":"PS71","plant_id":70337,"state":"CO","county":"Morgan","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.267178,"lon":-103.6512,"as_of":"2026-08"},{"id":"69807/WNSRL","plant_name":"Windsor Locks","generator_id":"WNSRL","plant_id":69807,"state":"CT","county":"Hartford","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"ISNE","lat":41.928086,"lon":-72.68693,"as_of":"2026-08"},{"id":"68787/23889","plant_name":"NorCal FPV 1 (Pond 2)","generator_id":"23889","plant_id":68787,"state":"CA","county":"Alameda","developer":"NorCal FPV 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.6779,"lon":-121.8276,"as_of":"2026-08"},{"id":"70115/GEN1","plant_name":"Fort Lyon Solar","generator_id":"GEN1","plant_id":70115,"state":"CO","county":"Bent","developer":"Clay Creek Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":38.081,"lon":-103.133,"as_of":"2026-08"},{"id":"70118/GEN1","plant_name":"Trinidad Solar","generator_id":"GEN1","plant_id":70118,"state":"CO","county":"Las Animas","developer":"Clay Creek Energy, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"WACM","lat":37.185879,"lon":-104.4924,"as_of":"2026-08"},{"id":"68138/CH321","plant_name":"Internationale Ctr 11-SLCHI321","generator_id":"CH321","plant_id":68138,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.8,"summer_mw":1.8,"planned_start":"2027-04","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.70053,"lon":-88.02744,"as_of":"2026-08"},{"id":"68044/RODA1","plant_name":"Rodatherm Milford 1","generator_id":"RODA1","plant_id":68044,"state":"UT","county":"Beaver","developer":"Rodatherm Energy Corporation","sector":"IPP Non-CHP","technology":"Geothermal","energy_source":"GEO","prime_mover":"BT","nameplate_mw":1.8,"summer_mw":1.2,"planned_start":"2028-01","planned_year":2028,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PACE","lat":38.572873,"lon":-112.9786,"as_of":"2026-08"},{"id":"70428/DRIVS","plant_name":"Bakersfield Driver","generator_id":"DRIVS","plant_id":70428,"state":"CA","county":"Kern","developer":"Pacifico Bakersfield Driver LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.562181,"lon":-119.202,"as_of":"2026-08"},{"id":"68132/CH701","plant_name":"Elk Grove 1-SLCHI701","generator_id":"CH701","plant_id":68132,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":42.010416,"lon":-87.958,"as_of":"2026-08"},{"id":"68541/7169","plant_name":"Palmdale Water District HQ","generator_id":"7169","plant_id":68541,"state":"CA","county":"Los Angeles","developer":"East Avenue Q Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.587916,"lon":-118.0931,"as_of":"2026-08"},{"id":"69888/USFLE","plant_name":"USS Fletcher Solar","generator_id":"USFLE","plant_id":69888,"state":"NM","county":"Hidalgo","developer":"USS Fletcher Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PNM","lat":32.366814,"lon":-108.6934,"as_of":"2026-08"},{"id":"69766/KHLS","plant_name":"Kalaeloa Home Lands Solar","generator_id":"KHLS","plant_id":69766,"state":"HI","county":"Honolulu","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"HECO","lat":21.310594,"lon":-158.0863,"as_of":"2026-08"},{"id":"68127/CH424","plant_name":"Bensenville Ind Park 4-SLCHI424","generator_id":"CH424","plant_id":68127,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.7,"summer_mw":1.7,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.983893,"lon":-87.95172,"as_of":"2026-08"},{"id":"68118/CH404","plant_name":"Addison 11-SLCHI404","generator_id":"CH404","plant_id":68118,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":41.930327,"lon":-88.04848,"as_of":"2026-08"},{"id":"68142/CH303","plant_name":"Northlake 3-SLCHI303","generator_id":"CH303","plant_id":68142,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.918532,"lon":-87.9093,"as_of":"2026-08"},{"id":"70095/IN015","plant_name":"Perris DC 5 - sline015","generator_id":"IN015","plant_id":70095,"state":"CA","county":"Riverside","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":33.850185,"lon":-117.2322,"as_of":"2026-08"},{"id":"68130/CH211","plant_name":"Des Plaines 11-SLCHI211","generator_id":"CH211","plant_id":68130,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-10","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":42.015,"lon":-87.915,"as_of":"2026-08"},{"id":"69711/6672","plant_name":"L3 Harris San Diego","generator_id":"6672","plant_id":69711,"state":"CA","county":"San Diego","developer":"Balboa Avenue I Solar Project 2023, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":32.822588,"lon":-117.1352,"as_of":"2026-08"},{"id":"68141/CH302","plant_name":"Northlake 2-SLCHI302","generator_id":"CH302","plant_id":68141,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.9118,"lon":-87.9081,"as_of":"2026-08"},{"id":"70451/OCS24","plant_name":"Tutuilla Solar","generator_id":"OCS24","plant_id":70451,"state":"OR","county":"Umatilla","developer":"Tutuilla Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PACW","lat":45.63153,"lon":-119.685,"as_of":"2026-08"},{"id":"69385/GEN1","plant_name":"Hastings Generating Facility","generator_id":"GEN1","plant_id":69385,"state":"MI","county":"Barry","developer":"NAPS - Hastings LLC","sector":"IPP Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-04","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":42.67856,"lon":-85.29629,"as_of":"2026-08"},{"id":"10748/FUTR1","plant_name":"Marina Landfill Gas","generator_id":"FUTR1","plant_id":10748,"state":"CA","county":"Monterey","developer":"Monterey Regional Waste Mgmt","sector":"Commercial Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.7131,"lon":-121.7686,"as_of":"2026-08"},{"id":"10748/FUTR2","plant_name":"Marina Landfill Gas","generator_id":"FUTR2","plant_id":10748,"state":"CA","county":"Monterey","developer":"Monterey Regional Waste Mgmt","sector":"Commercial Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.7131,"lon":-121.7686,"as_of":"2026-08"},{"id":"10748/FUTR3","plant_name":"Marina Landfill Gas","generator_id":"FUTR3","plant_id":10748,"state":"CA","county":"Monterey","developer":"Monterey Regional Waste Mgmt","sector":"Commercial Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.7131,"lon":-121.7686,"as_of":"2026-08"},{"id":"10748/FUTR4","plant_name":"Marina Landfill Gas","generator_id":"FUTR4","plant_id":10748,"state":"CA","county":"Monterey","developer":"Monterey Regional Waste Mgmt","sector":"Commercial Non-CHP","technology":"Landfill Gas","energy_source":"LFG","prime_mover":"IC","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":36.7131,"lon":-121.7686,"as_of":"2026-08"},{"id":"69242/PV1","plant_name":"AB Van Nuys","generator_id":"PV1","plant_id":69242,"state":"CA","county":"Los Angeles","developer":"Roscoe Boulevard Operating, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.6,"summer_mw":1.6,"planned_start":"2027-12","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"LDWP","lat":34.220959,"lon":-118.4768,"as_of":"2026-08"},{"id":"69791/NJUDC","plant_name":"BPL NJ - Union Distribution Center","generator_id":"NJUDC","plant_id":69791,"state":"NJ","county":"Union","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":40.6834,"lon":-74.2422,"as_of":"2026-08"},{"id":"70445/PV1","plant_name":"W 167th St","generator_id":"PV1","plant_id":70445,"state":"IL","county":"Cook","developer":"555 W 167th St Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.59009,"lon":-87.63044,"as_of":"2026-08"},{"id":"69753/13790","plant_name":"50 Meister Ave","generator_id":"13790","plant_id":69753,"state":"NJ","county":"Somerset","developer":"Meister Avenue Branchburg Solar Project 2024, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":40.600337,"lon":-74.69818,"as_of":"2026-08"},{"id":"66475/18263","plant_name":"CA Bloomington 2551 S Lilac Avenue Micro","generator_id":"18263","plant_id":66475,"state":"CA","county":"San Bernardino","developer":"Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.05523,"lon":-117.3778,"as_of":"2026-08"},{"id":"66475/B8263","plant_name":"CA Bloomington 2551 S Lilac Avenue Micro","generator_id":"B8263","plant_id":66475,"state":"CA","county":"San Bernardino","developer":"Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.05523,"lon":-117.3778,"as_of":"2026-08"},{"id":"69813/ARGEN","plant_name":"Argenta Solar","generator_id":"ARGEN","plant_id":69813,"state":"IL","county":"Macon","developer":"Argenta Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":39.989915,"lon":-88.81196,"as_of":"2026-08"},{"id":"2316/6","plant_name":"Wisner","generator_id":"6","plant_id":2316,"state":"NE","county":"Cuming","developer":"City of Wisner (NE)","sector":"Electric Utility","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"SWPP","lat":41.988069,"lon":-96.91599,"as_of":"2026-08"},{"id":"65072/GA3","plant_name":"Fremont CA AutoFactory","generator_id":"GA3","plant_id":65072,"state":"CA","county":"Alameda","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.49254,"lon":-121.9446,"as_of":"2026-08"},{"id":"69805/RFRD7","plant_name":"Rockford Plant 7","generator_id":"RFRD7","plant_id":69805,"state":"IL","county":"Winnebago","developer":"ENGIE Distributed Renewables Development LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":42.232527,"lon":-89.02408,"as_of":"2026-08"},{"id":"70106/JADEB","plant_name":"Jade Solar 3","generator_id":"JADEB","plant_id":70106,"state":"CA","county":"Madera","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":37.056528,"lon":-119.9805,"as_of":"2026-08"},{"id":"70106/JADES","plant_name":"Jade Solar 3","generator_id":"JADES","plant_id":70106,"state":"CA","county":"Madera","developer":"ZGlobal Inc","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2027-06","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":37.056528,"lon":-119.9805,"as_of":"2026-08"},{"id":"69862/GALF","plant_name":"Galva School","generator_id":"GALF","plant_id":69862,"state":"IL","county":"Henry","developer":"Navisun LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2027-10","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"PJM","lat":41.179241,"lon":-90.04677,"as_of":"2026-08"},{"id":"70114/363","plant_name":"New Alexandria - PA 0363 (Weimer North)","generator_id":"363","plant_id":70114,"state":"PA","county":"Westmoreland","developer":"CVE US PA New Alexandria 363 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.5,"summer_mw":1.5,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.40255,"lon":-79.42806,"as_of":"2026-08"},{"id":"69891/LA100","plant_name":"Torrance Dis Ctr 2 - SLLAX100","generator_id":"LA100","plant_id":69891,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":33.84516,"lon":-118.3164,"as_of":"2026-08"},{"id":"70099/IL007","plant_name":"Pivot Energy IL 7 LLC","generator_id":"IL007","plant_id":70099,"state":"IL","county":"Logan","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":40.268856,"lon":-89.23746,"as_of":"2026-08"},{"id":"68120/CH513","plant_name":"Bensenville 13-SLCHI513","generator_id":"CH513","plant_id":68120,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.987884,"lon":-87.95258,"as_of":"2026-08"},{"id":"70338/NCB10","plant_name":"NCBP TEN, LLC","generator_id":"NCB10","plant_id":70338,"state":"MD","county":"Prince Georges","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.867,"lon":-76.7386,"as_of":"2026-08"},{"id":"68502/PV1","plant_name":"Vienna Walbec Customer Hosted","generator_id":"PV1","plant_id":68502,"state":"WI","county":"Dane","developer":"Wisconsin Power & Light Co","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":43.208435,"lon":-89.41019,"as_of":"2026-08"},{"id":"65072/STAMP","plant_name":"Fremont CA AutoFactory","generator_id":"STAMP","plant_id":65072,"state":"CA","county":"Alameda","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":37.49254,"lon":-121.9446,"as_of":"2026-08"},{"id":"68143/CH304","plant_name":"Northlake 4-SLCHI304","generator_id":"CH304","plant_id":68143,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.92302,"lon":-87.91646,"as_of":"2026-08"},{"id":"68133/CH151","plant_name":"Elk Grove 51-SLCHI151","generator_id":"CH151","plant_id":68133,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2027-03","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":42.00096,"lon":-87.95782,"as_of":"2026-08"},{"id":"70029/EWIN1","plant_name":"East Windsor Solar 1 LLC","generator_id":"EWIN1","plant_id":70029,"state":"NJ","county":"Mercer","developer":"Dimension Energy LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.4,"summer_mw":1.4,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":40.274397,"lon":-74.50169,"as_of":"2026-08"},{"id":"68790/LA512","plant_name":"Dominguez - SLLAX512","generator_id":"LA512","plant_id":68790,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":33.84038,"lon":-118.2287,"as_of":"2026-08"},{"id":"68793/LA710","plant_name":"Bandini - SLLAX710","generator_id":"LA710","plant_id":68793,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":33.983566,"lon":-118.1348,"as_of":"2026-08"},{"id":"63622/OES01","plant_name":"OES Biogas Power","generator_id":"OES01","plant_id":63622,"state":"CA","county":"San Bernardino","developer":"Organic Energy Solutions, Inc.","sector":"IPP CHP","technology":"Other Waste Biomass","energy_source":"OBG","prime_mover":"IC","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":34.17325,"lon":-117.3464,"as_of":"2026-08"},{"id":"63622/OES02","plant_name":"OES Biogas Power","generator_id":"OES02","plant_id":63622,"state":"CA","county":"San Bernardino","developer":"Organic Energy Solutions, Inc.","sector":"IPP CHP","technology":"Other Waste Biomass","energy_source":"OBG","prime_mover":"IC","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2026-11","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":34.17325,"lon":-117.3464,"as_of":"2026-08"},{"id":"68137/CH910","plant_name":"Glendale Heights 10-SLCHI910","generator_id":"CH910","plant_id":68137,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.929422,"lon":-88.07008,"as_of":"2026-08"},{"id":"68121/CH414","plant_name":"Bensenville 14-SLCHI414","generator_id":"CH414","plant_id":68121,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.982829,"lon":-87.94589,"as_of":"2026-08"},{"id":"68236/LA680","plant_name":"South Bay Dis Ctr 6-SLLAX680","generator_id":"LA680","plant_id":68236,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.8439,"lon":-118.2242,"as_of":"2026-08"},{"id":"68792/LA680","plant_name":"Fordyce - SLLAX680","generator_id":"LA680","plant_id":68792,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.8439,"lon":-118.2242,"as_of":"2026-08"},{"id":"69860/MURP2","plant_name":"Murphysboro 2","generator_id":"MURP2","plant_id":69860,"state":"IL","county":"Jackson","developer":"Navisun LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.3,"summer_mw":1.3,"planned_start":"2027-10","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.794585,"lon":-89.35141,"as_of":"2026-08"},{"id":"68789/LA104","plant_name":"South Bay Dis Ctr 12 - SLLAX104","generator_id":"LA104","plant_id":68789,"state":"CA","county":"Los Angeles","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2026-09","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":33.842873,"lon":-118.2245,"as_of":"2026-08"},{"id":"69064/NC12","plant_name":"NCBP TWELVE, LLC","generator_id":"NC12","plant_id":69064,"state":"MD","county":"Prince Georges","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":38.8713,"lon":-76.7339,"as_of":"2026-08"},{"id":"69790/EZMLC","plant_name":"Elizabeth Metropolitan Logistics Center","generator_id":"EZMLC","plant_id":69790,"state":"NJ","county":"Union","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":40.68403,"lon":-74.20623,"as_of":"2026-08"},{"id":"68124/CH411","plant_name":"Bensenville Ind Park 11","generator_id":"CH411","plant_id":68124,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.986194,"lon":-87.94525,"as_of":"2026-08"},{"id":"68135/CH802","plant_name":"Franklin Park 2-SLCHI802","generator_id":"CH802","plant_id":68135,"state":"IL","county":"Cook","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.946509,"lon":-87.85944,"as_of":"2026-08"},{"id":"68123/CH410","plant_name":"Bensenville Ind Park 10-SLCHI410","generator_id":"CH410","plant_id":68123,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2027-01","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.984507,"lon":-87.94587,"as_of":"2026-08"},{"id":"69211/PV1","plant_name":"San Pedro Public Market (SPPM)","generator_id":"PV1","plant_id":69211,"state":"CA","county":"Los Angeles","developer":"SPPM Operating, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2027-06","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"LDWP","lat":33.731297,"lon":-118.2795,"as_of":"2026-08"},{"id":"69697/CW-1","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-1","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-2","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-2","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-3","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-3","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-4","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-4","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-5","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-5","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-6","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-6","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"69697/CW-7","plant_name":"CW Bill Young Hydropower Project","generator_id":"CW-7","plant_id":69697,"state":"PA","county":"Allegheny","developer":"C.W. Bill Young Hydropower Group, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.2,"summer_mw":1.2,"planned_start":"2031-10","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.54028,"lon":-79.81556,"as_of":"2026-08"},{"id":"70368/R4220","plant_name":"Ranch 4220","generator_id":"R4220","plant_id":70368,"state":"CA","county":"Kern","developer":"Wonderful Renewable Energy, LLC.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.60601,"lon":-119.1369,"as_of":"2026-08"},{"id":"70207/PS60","plant_name":"Pivot Solar 60 LLC","generator_id":"PS60","plant_id":70207,"state":"CO","county":"Weld","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PSCO","lat":40.474398,"lon":-104.623,"as_of":"2026-08"},{"id":"69533/21938","plant_name":"CA National City Terminal Ave","generator_id":"21938","plant_id":69533,"state":"CA","county":"San Diego","developer":"Catalyze National City Terminal Avenue Microgrid, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":32.654,"lon":-117.119,"as_of":"2026-08"},{"id":"68126/CH402","plant_name":"Bensenville Ind Park 2-SLCHI402","generator_id":"CH402","plant_id":68126,"state":"IL","county":"DuPage","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.983957,"lon":-87.95383,"as_of":"2026-08"},{"id":"69895/Gy1a2","plant_name":"Gateway#1&2 (Newark CA)","generator_id":"Gy1a2","plant_id":69895,"state":"CA","county":"Alameda","developer":"Coast Energy Holdings, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2027-04","planned_year":2027,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":37.540903,"lon":-122.0617,"as_of":"2026-08"},{"id":"69706/4149C","plant_name":"Bishop Ranch - BR 3-GG","generator_id":"4149C","plant_id":69706,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-GG Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.767242,"lon":-121.9582,"as_of":"2026-08"},{"id":"70128/479","plant_name":"Roulette - PA 0479","generator_id":"479","plant_id":70128,"state":"PA","county":"Potter","developer":"CVE US PA Roulette 479 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.777,"lon":-78.1995,"as_of":"2026-08"},{"id":"69698/DAS-1","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-1","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-2","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-2","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-3","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-3","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-4","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-4","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-5","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-5","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-6","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-6","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-7","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-7","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"69698/DAS-8","plant_name":"Dashields Hydroelectric Project","generator_id":"DAS-8","plant_id":69698,"state":"PA","county":"Allegheny","developer":"Dashields Hydropower Corporations","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1.1,"summer_mw":1.1,"planned_start":"2030-08","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.549546,"lon":-80.20544,"as_of":"2026-08"},{"id":"65045/VCP14","plant_name":"Emery Shute Solar One","generator_id":"VCP14","plant_id":65045,"state":"ME","county":"Waldo","developer":"VCP Realty, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":44.535591,"lon":-68.86433,"as_of":"2026-08"},{"id":"68783/NY009","plant_name":"NY CDG 009","generator_id":"NY009","plant_id":68783,"state":"NY","county":"Suffolk","developer":"NY CDG 009 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NYIS","lat":40.808538,"lon":-72.95773,"as_of":"2026-08"},{"id":"69616/USLYN","plant_name":"USS Lyndon Solar LLC","generator_id":"USLYN","plant_id":69616,"state":"IL","county":"Whiteside","developer":"United States Solar Corporation","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.659472,"lon":-89.92079,"as_of":"2026-08"},{"id":"69983/GRTKN","plant_name":"Novel Gertken Solar LLC","generator_id":"GRTKN","plant_id":69983,"state":"MN","county":"Stearns","developer":"Novel Gertken Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.618191,"lon":-94.4891,"as_of":"2026-08"},{"id":"63506/BCRV3","plant_name":"Solar Carver 3 Hybrid","generator_id":"BCRV3","plant_id":63506,"state":"MA","county":"Plymouth","developer":"Solar Carver 3, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":41.84206,"lon":-70.7699,"as_of":"2026-08"},{"id":"63506/SCRV3","plant_name":"Solar Carver 3 Hybrid","generator_id":"SCRV3","plant_id":63506,"state":"MA","county":"Plymouth","developer":"Solar Carver 3, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"ISNE","lat":41.84206,"lon":-70.7699,"as_of":"2026-08"},{"id":"69305/FITZH","plant_name":"Enterprise MN - Fitzthum","generator_id":"FITZH","plant_id":69305,"state":"MN","county":"Stearns","developer":"Standard Solar","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":45.644581,"lon":-94.22744,"as_of":"2026-08"},{"id":"69886/USSWA","plant_name":"USS Swank Solar","generator_id":"USSWA","plant_id":69886,"state":"IL","county":"Henry","developer":"USS Swank Solar LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"PJM","lat":41.1615,"lon":-90.0285,"as_of":"2026-08"},{"id":"70381/GEN1","plant_name":"Carver Garden","generator_id":"GEN1","plant_id":70381,"state":"MN","county":"Rice","developer":"Bullrock-NxtGenREA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-10","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":44.29848,"lon":-93.2408,"as_of":"2026-08"},{"id":"68542/7170G","plant_name":"Palmdale Water District 6MG Tank","generator_id":"7170G","plant_id":68542,"state":"CA","county":"Los Angeles","developer":"East Avenue South Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.558047,"lon":-118.1187,"as_of":"2026-08"},{"id":"70379/GEN2","plant_name":"Fuller Garden","generator_id":"GEN2","plant_id":70379,"state":"MN","county":"Sherburne","developer":"Bullrock-NxtGenREA","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-11","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.45357,"lon":-94.00707,"as_of":"2026-08"},{"id":"64098/3","plant_name":"Tesla Reno GigaFactory","generator_id":"3","plant_id":64098,"state":"NV","county":"Storey","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"NEVP","lat":39.539511,"lon":-119.4392,"as_of":"2026-08"},{"id":"64291/B4","plant_name":"Lincoln Medical and Mental Health Center","generator_id":"B4","plant_id":64291,"state":"NY","county":"Bronx","developer":"Lincoln Medical and Mental Health Center","sector":"Commercial Non-CHP","technology":"Petroleum Liquids","energy_source":"DFO","prime_mover":"IC","nameplate_mw":1,"summer_mw":1,"planned_start":"2026-12","planned_year":2026,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"NYIS","lat":40.816971,"lon":-73.92411,"as_of":"2026-08"},{"id":"69786/CV209","plant_name":"Stockton 9 - slcva209","generator_id":"CV209","plant_id":69786,"state":"CA","county":"San Joaquin","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-01","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.89233,"lon":-121.2667,"as_of":"2026-08"},{"id":"64865/BLILE","plant_name":"Novel Blilie Solar LLC","generator_id":"BLILE","plant_id":64865,"state":"MN","county":"Wilkin","developer":"Novel Blilie Solar, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":46.630077,"lon":-96.75811,"as_of":"2026-08"},{"id":"69812/BROWN","plant_name":"SV CSG Brownstown 1","generator_id":"BROWN","plant_id":69812,"state":"IL","county":"Fayette","developer":"SV CSG Brownstown 1, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-02","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":38.971573,"lon":-89.01849,"as_of":"2026-08"},{"id":"68217/FEAES","plant_name":"Featherbed Lane South Solar","generator_id":"FEAES","plant_id":68217,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.761,"lon":-70.896,"as_of":"2026-08"},{"id":"68217/FEAPV","plant_name":"Featherbed Lane South Solar","generator_id":"FEAPV","plant_id":68217,"state":"MA","county":"Plymouth","developer":"ReWild Renewables, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-03","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"ISNE","lat":41.761,"lon":-70.896,"as_of":"2026-08"},{"id":"69724/PIKE","plant_name":"Pike County Solar","generator_id":"PIKE","plant_id":69724,"state":"IL","county":"Pike","developer":"Illinois Rural Electric Coop","sector":"Electric Utility","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":39.6189,"lon":-90.8461,"as_of":"2026-08"},{"id":"70301/BOHRE","plant_name":"MN CSG 2019-57","generator_id":"BOHRE","plant_id":70301,"state":"MN","county":"Blue Earth","developer":"MN CSG 2019-57 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-03","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"MISO","lat":44.224001,"lon":-93.9787,"as_of":"2026-08"},{"id":"69034/PMI2","plant_name":"Pivot Energy Minnesota Solar 2","generator_id":"PMI2","plant_id":69034,"state":"MN","county":"Kandiyohi","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-04","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"MISO","lat":44.935059,"lon":-95.19906,"as_of":"2026-08"},{"id":"69609/EB702","plant_name":"San Leandro 10 - sleba702","generator_id":"EB702","plant_id":69609,"state":"CA","county":"Alameda","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.71422,"lon":-122.182,"as_of":"2026-08"},{"id":"67565/CEC01","plant_name":"East Road Storage Project","generator_id":"CEC01","plant_id":67565,"state":"CA","county":"Mendocino","developer":"Form Energy Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-06","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"CISO","lat":39.25,"lon":-123.196,"as_of":"2026-08"},{"id":"69785/CV801","plant_name":"Stockton 1 - slcva801","generator_id":"CV801","plant_id":69785,"state":"CA","county":"San Joaquin","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-07","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"CISO","lat":37.93997,"lon":-121.2265,"as_of":"2026-08"},{"id":"2038/BA1","plant_name":"Cambridge CT Hybrid","generator_id":"BA1","plant_id":2038,"state":"MN","county":"Isanti","developer":"Great River Energy","sector":"Electric Utility","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":1,"summer_mw":0.8,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"MISO","lat":45.601,"lon":-93.2081,"as_of":"2026-08"},{"id":"70167/408","plant_name":"Latrobe - PA 0408 (Soccerhound B)","generator_id":"408","plant_id":70167,"state":"PA","county":"Clearfield","developer":"CVE US PA Latrobe 408 LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":1,"summer_mw":1,"planned_start":"2027-12","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":40.25174,"lon":-79.35354,"as_of":"2026-08"},{"id":"69699/DI-1","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-1","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-10","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-10","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-2","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-2","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-3","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-3","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-4","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-4","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-5","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-5","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-6","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-6","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-7","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-7","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-8","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-8","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"69699/DI-9","plant_name":"Dresden Island Hydroelectric Project","generator_id":"DI-9","plant_id":69699,"state":"IL","county":"Grundy","developer":"Northern Illinois Hydropower, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":1,"summer_mw":1,"planned_start":"2030-12","planned_year":2030,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":41.401926,"lon":-88.28172,"as_of":"2026-08"},{"id":"68600/7236G","plant_name":"Las Virgenes MWD - Composting Plant","generator_id":"7236G","plant_id":68600,"state":"CA","county":"Los Angeles","developer":"Las Virgenes Road Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.9,"summer_mw":0.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.126481,"lon":-118.6981,"as_of":"2026-08"},{"id":"69713/9985C","plant_name":"Sanger USD - Sanger West HS","generator_id":"9985C","plant_id":69713,"state":"CA","county":"Fresno","developer":"South Fowler Avenue Solar Project 2023, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.9,"summer_mw":0.9,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":36.709291,"lon":-119.6814,"as_of":"2026-08"},{"id":"64758/MANB","plant_name":"Manorville II","generator_id":"MANB","plant_id":64758,"state":"NY","county":"Suffolk","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":40.834,"lon":-72.7819,"as_of":"2026-08"},{"id":"69694/AL4-1","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-1","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-2","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-2","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-3","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-3","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-4","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-4","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-5","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-5","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-6","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-6","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-7","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-7","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"69694/AL4-8","plant_name":"Allegheny Lock and Dam 4","generator_id":"AL4-8","plant_id":69694,"state":"PA","county":"Allegheny","developer":"Allegheny Hydro Group Lock and Dam 4, Inc","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.8,"summer_mw":0.8,"planned_start":"2031-02","planned_year":2031,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"PJM","lat":40.613718,"lon":-79.71829,"as_of":"2026-08"},{"id":"62749/1","plant_name":"Heidelberg Hydroelectric Project","generator_id":"1","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"62749/2","plant_name":"Heidelberg Hydroelectric Project","generator_id":"2","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"62749/5","plant_name":"Heidelberg Hydroelectric Project","generator_id":"5","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"62749/6","plant_name":"Heidelberg Hydroelectric Project","generator_id":"6","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"69706/4149B","plant_name":"Bishop Ranch - BR 3-GG","generator_id":"4149B","plant_id":69706,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-GG Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.767242,"lon":-121.9582,"as_of":"2026-08"},{"id":"69708/4150B","plant_name":"Bishop Ranch - BR 3-HH","generator_id":"4150B","plant_id":69708,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-HH Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.766297,"lon":-121.9582,"as_of":"2026-08"},{"id":"69708/4150C","plant_name":"Bishop Ranch - BR 3-HH","generator_id":"4150C","plant_id":69708,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-HH Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.766297,"lon":-121.9582,"as_of":"2026-08"},{"id":"69710/4148B","plant_name":"Bishop Ranch - BR 3-FF","generator_id":"4148B","plant_id":69710,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-FF Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.768388,"lon":-121.959,"as_of":"2026-08"},{"id":"69710/4148C","plant_name":"Bishop Ranch - BR 3-FF","generator_id":"4148C","plant_id":69710,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-FF Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.768388,"lon":-121.959,"as_of":"2026-08"},{"id":"62390/6","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"6","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"62390/NA1","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"NA1","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"62390/NA2","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"NA2","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"62390/NA5","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"NA5","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"64758/MAN","plant_name":"Manorville II","generator_id":"MAN","plant_id":64758,"state":"NY","county":"Suffolk","developer":"Agilitas Energy, Inc.","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2027-12","planned_year":2027,"status":"(L) Regulatory approvals pending. Not under construction","balancing_authority":"NYIS","lat":40.834,"lon":-72.7819,"as_of":"2026-08"},{"id":"62748/1","plant_name":"Evelyn Hydroelectric Project","generator_id":"1","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"62748/2","plant_name":"Evelyn Hydroelectric Project","generator_id":"2","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"62748/5","plant_name":"Evelyn Hydroelectric Project","generator_id":"5","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"62748/6","plant_name":"Evelyn Hydroelectric Project","generator_id":"6","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.6,"summer_mw":0.6,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"68600/7236B","plant_name":"Las Virgenes MWD - Composting Plant","generator_id":"7236B","plant_id":68600,"state":"CA","county":"Los Angeles","developer":"Las Virgenes Road Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.5,"summer_mw":0.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.126481,"lon":-118.6981,"as_of":"2026-08"},{"id":"69713/9985B","plant_name":"Sanger USD - Sanger West HS","generator_id":"9985B","plant_id":69713,"state":"CA","county":"Fresno","developer":"South Fowler Avenue Solar Project 2023, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.5,"summer_mw":0.5,"planned_start":"2026-10","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":36.709291,"lon":-119.6814,"as_of":"2026-08"},{"id":"65072/GVSRS","plant_name":"Fremont CA AutoFactory","generator_id":"GVSRS","plant_id":65072,"state":"CA","county":"Alameda","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.5,"summer_mw":0.5,"planned_start":"2026-12","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.49254,"lon":-121.9446,"as_of":"2026-08"},{"id":"68235/C34BB","plant_name":"Romeoville 34 - SLCHI234 - BSCHI234","generator_id":"C34BB","plant_id":68235,"state":"IL","county":"Will","developer":"Prologis Logistics Services Incorporated","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.5,"summer_mw":0.5,"planned_start":"2027-05","planned_year":2027,"status":"(U) Under construction, less than or equal to 50 percent complete","balancing_authority":"PJM","lat":41.597,"lon":-88.11,"as_of":"2026-08"},{"id":"65072/VSRS","plant_name":"Fremont CA AutoFactory","generator_id":"VSRS","plant_id":65072,"state":"CA","county":"Alameda","developer":"Tesla Inc.","sector":"Industrial Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.4,"summer_mw":0.4,"planned_start":"2026-12","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"CISO","lat":37.49254,"lon":-121.9446,"as_of":"2026-08"},{"id":"70428/DRIVB","plant_name":"Bakersfield Driver","generator_id":"DRIVB","plant_id":70428,"state":"CA","county":"Kern","developer":"Pacifico Bakersfield Driver LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.3,"summer_mw":0.3,"planned_start":"2026-09","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":35.562181,"lon":-119.202,"as_of":"2026-08"},{"id":"68542/7170B","plant_name":"Palmdale Water District 6MG Tank","generator_id":"7170B","plant_id":68542,"state":"CA","county":"Los Angeles","developer":"East Avenue South Solar Project 2022, LLC","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.3,"summer_mw":0.3,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":34.558047,"lon":-118.1187,"as_of":"2026-08"},{"id":"58168/TURB4","plant_name":"Energy Center","generator_id":"TURB4","plant_id":58168,"state":"CA","county":"San Bernardino","developer":"University of Redlands","sector":"Commercial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":0.3,"summer_mw":0.3,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.063056,"lon":-117.1639,"as_of":"2026-08"},{"id":"58168/TURB5","plant_name":"Energy Center","generator_id":"TURB5","plant_id":58168,"state":"CA","county":"San Bernardino","developer":"University of Redlands","sector":"Commercial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":0.3,"summer_mw":0.3,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.063056,"lon":-117.1639,"as_of":"2026-08"},{"id":"58168/TURB6","plant_name":"Energy Center","generator_id":"TURB6","plant_id":58168,"state":"CA","county":"San Bernardino","developer":"University of Redlands","sector":"Commercial CHP","technology":"Natural Gas Fired Combustion Turbine","energy_source":"NG","prime_mover":"GT","nameplate_mw":0.3,"summer_mw":0.3,"planned_start":"2030-12","planned_year":2030,"status":"(P) Planned for installation, but regulatory approvals not initiated","balancing_authority":"CISO","lat":34.063056,"lon":-117.1639,"as_of":"2026-08"},{"id":"62749/3","plant_name":"Heidelberg Hydroelectric Project","generator_id":"3","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"62749/4","plant_name":"Heidelberg Hydroelectric Project","generator_id":"4","plant_id":62749,"state":"KY","county":"Lee","developer":"Lock 14 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2026-09","planned_year":2026,"status":"(TS) Construction complete, but not yet in commercial operation","balancing_authority":"PJM","lat":37.552399,"lon":-83.77001,"as_of":"2026-08"},{"id":"69706/4149R","plant_name":"Bishop Ranch - BR 3-GG","generator_id":"4149R","plant_id":69706,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-GG Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.767242,"lon":-121.9582,"as_of":"2026-08"},{"id":"69708/4150R","plant_name":"Bishop Ranch - BR 3-HH","generator_id":"4150R","plant_id":69708,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-HH Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.766297,"lon":-121.9582,"as_of":"2026-08"},{"id":"69710/4148R","plant_name":"Bishop Ranch - BR 3-FF","generator_id":"4148R","plant_id":69710,"state":"CA","county":"Contra Costa","developer":"Camino Ramon BR 3-FF Solar Project 2020, LLC","sector":"IPP Non-CHP","technology":"Solar Photovoltaic","energy_source":"SUN","prime_mover":"PV","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2027-07","planned_year":2027,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":37.768388,"lon":-121.959,"as_of":"2026-08"},{"id":"62390/NA3","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"NA3","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"62390/NA4","plant_name":"KY No. 11 L&D Hydroelectric Project","generator_id":"NA4","plant_id":62390,"state":"KY","county":"Estill","developer":"Lock 11 Hydro Partners, LLC","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2027-11","planned_year":2027,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.78401,"lon":-84.10329,"as_of":"2026-08"},{"id":"62748/3","plant_name":"Evelyn Hydroelectric Project","generator_id":"3","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"62748/4","plant_name":"Evelyn Hydroelectric Project","generator_id":"4","plant_id":62748,"state":"KY","county":"Lee","developer":"Lock 13 Hydro Partners","sector":"IPP Non-CHP","technology":"Conventional Hydroelectric","energy_source":"WAT","prime_mover":"HY","nameplate_mw":0.2,"summer_mw":0.2,"planned_start":"2029-12","planned_year":2029,"status":"(T) Regulatory approvals received. Not under construction","balancing_authority":"PJM","lat":37.601982,"lon":-83.83297,"as_of":"2026-08"},{"id":"70101/PA29B","plant_name":"Pivot Energy PPA 29 LLC","generator_id":"PA29B","plant_id":70101,"state":"CA","county":"Placer","developer":"Pivot Energy","sector":"IPP Non-CHP","technology":"Batteries","energy_source":"MWH","prime_mover":"BA","nameplate_mw":0.1,"summer_mw":0.1,"planned_start":"2026-11","planned_year":2026,"status":"(V) Under construction, more than 50 percent complete","balancing_authority":"CISO","lat":38.828466,"lon":-121.3049,"as_of":"2026-08"}]